1
4721 E. 146th Street . Carmel, IN 46033 . (317) 815-8733 [email protected] JudScottConsultingArborist.com Consultants to the Professionals! The Consulting Arborist quiz brought to you by Jud Scott Consulting Arborist LLC. A resource for you when you have conflicts involving trees and landscapes. Consulting Arborist Quiz Name _________________________ Email _________________________ Company______________________ Underground Utilities and Safety Leave Jud a Note: Jud Scott Registered Consulting Arborist [email protected] JudScottConsultingArborist.com Your client has received notice from the Indiana Utility Regulatory Commission’s, Department of Pipeline Safety that he has violated Indiana State Law IC8-1-26 and he is going to be fined. What did he do and what could he have done to prevent it? 1. He didn’t heed the “Dial Before You Dig!” directive. True False 2. He should have called before he began the project. The number is: 811 911 311 4. When he calls, all the underground facilities will be marked? True False 3. How long before he started the digging project was he required to call the number? Two full working days Three full working days One full week 7. Can your client use mechanized equipment within the Safety Zone? Yes No 5. Once the Utilities are marked, the Safety Zone on either side of the markings is? One foot Two feet Six feet 9. Are there penalties if he hit a Gas line or Pipeline? Yes No 8. How long is a locate request valid in Indiana? 2 days 10 days 20 days Identify the colors that each utility uses to mark their lines Electric _________________ Communications________________ Gas or Pipeline ___________ Water________________________ Sewer___________________ Proposed Construction___________ Temporary Survey Markings_________ Special Thanks to Chuck Muller with Indiana Underground Plant Protection. If you have questions contact him at (317) 893-1404 or [email protected] 6. The Safety Zone is measured from the painted line or from the outside edge of the buried facility? Painted line From the outside edge of the buried facility

Underground Utilities and Safety Companyjudscottconsultingarborist.com/wp-content/uploads/2010/08/august... · underground facilities will be marked? True False 3. How long before

  • Upload
    vandiep

  • View
    226

  • Download
    1

Embed Size (px)

Citation preview

Page 1: Underground Utilities and Safety Companyjudscottconsultingarborist.com/wp-content/uploads/2010/08/august... · underground facilities will be marked? True False 3. How long before

4721 E. 146th Street . Carmel, IN 46033 . (317) [email protected]

JudScottConsultingArborist.com

Consultants to the Professionals!

The Consulting Arborist quiz brought to you by Jud Scott Consulting Arborist LLC. A resource for you when you have conflicts involving trees and landscapes.

Consulting Arborist Quiz Name _________________________ Email _________________________ Company______________________ Underground Utilities and Safety

Leave Jud a Note:Jud ScottRegistered Consulting [email protected]

Your client has received notice from the Indiana Utility Regulatory Commission’s, Department of Pipeline Safety that he has violated Indiana State Law IC8-1-26 and he is going to be fined. What did he do and what could he have done to prevent it?

1. He didn’t heed the “Dial Before You Dig!” directive.

True False

2. He should have called before he began the project. The number is:

811 911 311

4. When he calls, all the underground facilities will be marked?

True False

3. How long before he started the digging project was he required to call the number?

Two full working days Three full working days One full week

7. Can your client use mechanized equipment within the Safety Zone?

Yes No

5. Once the Utilities are marked, the Safety Zone on either side of the markings is?

One foot Two feet Six feet

9. Are there penalties if he hit a Gas line or Pipeline?

Yes No

8. How long is a locate request valid in Indiana?

2 days 10 days 20 days

Identify the colors that each utility uses to mark their lines

Electric _________________ Communications________________Gas or Pipeline ___________ Water________________________ Sewer___________________ Proposed Construction___________ Temporary Survey Markings_________

Special Thanks to Chuck Muller with Indiana Underground Plant Protection. If you have questions contact him at (317) 893-1404 [email protected]

6. The Safety Zone is measured from the painted line or from the outside edge of the buried facility? Painted line From the outside edge of the buried facility