HV SWITCHGEAR Go to SECTION INDEX Back to MAIN INDEX
DESCRIPTION DWG
INDEX31/5/11
62 5254 11
5229/1
5229/3
CONSTRUCTION CONSTRUCTION DESCRIPTION DWG
5234/1
5229/2
HV SWITCHGEAR
C. Noel
A. Bletchly
L. Burton
Construction code guide - Foundation & site finish
Construction code guide - 22kV Ring main unit
Construction code guide - 11kV Ring main unit
Location in council parklands
Location in council parklands 5234/2
Location in residential allotments 5233
5230
Site finish concrete suround
Outdoor RMU with precast concrete fdn - 5217
RING MAIN UNIT
5232/1
5232/2
Culvert Foundation details - Material
Culvert Foundation details - Construction
11RMU/ASL
5236/1
5236/2
ABB 11kV ring main unit Safelink - Material11RMU/O/ASL2S1F
11RMU/O/ASL2S2F
11RMU/O/ASL3S1F
11RMU/O/ASL3S
11RMU/O/ASL4S
Construction
ABB 11kV ring main unit Safelink -
Maximum cut & fill
Site preperation sloping site -
5237/1
5237/2
5238/1
5238/2
5253/1
HV switchgear schematic
ABB 11kV Safeplus / Safering -
ABB 11kV Safeplus / Safering - Material
5243/1
5243/2
22RMU/O/FGA2S1F F & G 22kV ring main unit - Material
F & G 22kV ring main unit - Construction22RMU/O/FGA2S2F
22RMU/O/FGA3S1F
22RMU/O/FGA2S1CB
22RMU/O/FGA3S
22RMU/O/FGA4S
22RMU/O/FGA1S1CB1F
22RMU/O/FGA1S1CB2F
5252/1
5252/2
F & G 22kV ring main unit - Schematic
F & G 22kV ring main unit - Schematic
schematic
ABB 11kV Safelink - HV switchgear
schematic
ABB 11kV Safelink - HV switchgear
Construction
ABB 11kV Safeplus / Safering5255/1Ring main unit installation
5255/2Ring main unit installation
5255/3Ring main unit installation
5255/4Ring main unit installation
B 14.01.14
D
5290Site requirement - separate earthing
schematic
ABB 11kV Safelink - HV switchgear 5237/3
5308/1ABB 11kV RMU Safelink2 - Material
ABB 11kV RMU Safelink2 - Material 5308/2
5308/3
schematic
ABB 11kV Safelink2 - HV switchgear
schematic
ABB 11kV Safelink2 - HV switchgear 5308/4
schematic
ABB 11kV Safelink2 - HV switchgear 5308/5
11RMU/O/ASL22S1F
11RMU/O/ASL22S2F
11RMU/O/ASL23S1F
11RMU/O/ASL23S
11RMU/O/ASL24S
C 13.04.15
D 19.01.17
5253/2
HV switchgear schematic
ABB 11kV Safeplus / Safering -
HARD COPYUNCONTROLLED
A ORIGINAL ISSUE
DRAWN
DATE
PASSED
APPROVED
Ergon Energy Corporation Ltd
ABN 50 087 646 062Dwg Sh
FILE: 5
UNDERGROUND DISTRIBUTION
DESCRIPTION DWG
INDEX19/01/17
62 5254 22
CONSTRUCTION CONSTRUCTION DESCRIPTION DWG
HV SWITCHGEAR
C. Noel
A. Bletchly
22kV Outdoor RMU - site finish paved surround
T. Borg
5364
5359/1F & G RMU - raised foundationgeneral arrangement
5359/2
5359/3
5359/4general arrangement
5359/5
5359/6
5359/7general arrangement
F & G 3 switch switching stationraised blockwork foundation
F & G 3 switch switching stationraised blockwork foundation
F & G 3 switch switching station
raised blockwork foundation
raised blockwork foundation
F & G 4 switch switching station
F & G 4 switch switching station
F & G 4 switch switching station
HARD COPYUNCONTROLLED
A ORIGINAL ISSUE
DRAWN
DATE
PASSED
APPROVED
Ergon Energy Corporation Ltd
ABN 50 087 646 062Dwg Sh
FILE: 5
UNDERGROUND DISTRIBUTION
EXAMPLE:-
CONSTRUCTIONSVOLTAGE
CONSTRUCTION CODE GUIDE
detail drawings in this manual.
appears on relevant construction
Code shown within dashed box
A
522962 5229 1
T.Borg
11kV RING MAIN UNIT CONSTRUCTION CODE
11 RMU/O/ASL 2S1F
11 = 11kV RMU = Ring Main Unit
LOCATION
O = Outdoor
HV SWITCHGEAR
ASL = ABB SafeLink
ASP = ABB SafePlus
ASR = ABB SafeRing
CONFIGURATION
2S1F = 2 switch + 1 fuse
2S2F = 2 switch + 2 fuse
3S = 3 switch
4S = 4 switch
3S1F = 3 switch + 1 fuse
1S1CB1F = 1 switch + 1 circuit breaker + 1 fuse
2S1CB = 2 switch + 1 circuit breaker
11RMU/O/ASL2S1F = 11kV, Ring Main Unit, outdoor, ABB SafeLink, 2 switches + 1 fuse.
C. Noel
A. Bletchly
1
11kV RING MAIN UNIT
9/9/10HV SWITCHGEARB 03.01.14
C
ASL2 = ABB SafeLink 2
C 11.01.17
2S2CB = 2 switch + 2 circuit breaker
3S1CB = 3 switch + 1 circuit breaker
HARD COPYUNCONTROLLED
A ORIGINAL ISSUE
DRAWN
DATE
PASSED
APPROVED
Ergon Energy Corporation Ltd
ABN 50 087 646 062Dwg Sh
FILE: 5
UNDERGROUND DISTRIBUTION
CONSTRUCTION CODE GUIDE
5229 262 5229 2
C. Noel
A. Bletchly
EXAMPLE:-
is not provided by others.
Required only where foundation
detail drawings in this manual.
appears on relevant construction
Code shown within dashed box
A
FOUNDATION AND SITE FINISH
3/5/11
RING MAIN UNIT FOUNDATION & SITE FINISH CONSTRUCTION CODE
11 RMUF / ASL
11 = 11kV
VOLTAGE RMU FOUNDATION
RMUF = Ring Main Unit Foundation
HV SWITCHGEAR
ASL = ABB Safelink
11RMUF/ASL = 11kV, Ring main unit foundation, ABB Safelink
L. Burton
HV SWITCHGEARHARD COPYUNCONTROLLED
B 01.10.14
B
22 = 22kV FGA = Felton & Guillaume (F & G)
A ORIGINAL ISSUE
DRAWN
DATE
PASSED
APPROVED
Ergon Energy Corporation Ltd
ABN 50 087 646 062Dwg Sh
FILE: 5
UNDERGROUND DISTRIBUTION
1 SITE
INSTALLATION
General1.1
Stable (soil conditions)
Free from steep batters
Flood free
Level (topography) where possible
1.4
1.2
1
1/6/11
Site Size
1.3
URD
Along coastal areas the site must be located as far as possible
from the shoreline and sheltered from salt spray.
Common earthing sites
Level sites - 3000mm width x 2800mm depth.
Retaining wall sites - 3400mm width x 3000mm depth.
The site shall be to the satisfaction of Ergon Energy, including
A site should not be located where impact by traffic is likely and,
if at a truncated section of the street alignment or other non-regular
shaped site the following shall apply:
The specified rectangular size of the site shall not be reduced.
a) In the Road Reserve:-
The Developer shall obtain all necessary approvals from the
Department of Transport or the Local Authority.
b) On Freehold property (including residential or parkland):-
The Developer shall provide Ergon Energy with a registered
easement at no cost to Ergon Energy.
HARD COPYUNCONTROLLED
L. Burton
A. Bletchly
C. Noel
62 5255 15255
HV SWITCHGEAR
RING MAIN UNIT
The minimum area required to accommodate a ring main unit
shall be:
Ring Main Unit Orientation
The developer shall provide a ring main unit site(s) as
required by Ergon Energy at no cost to Ergon Energy. The site shall
be included in the road reserve, or located on freehold property.
No ring main units are to be located in Trustee Reserves.
Where the developer required the ring main unit to be included:
Acceptable separation of ring main unit to adjacent dwellings is
provided if the front of dwellings are set back 6.0m from the R.P.
Street Alignment and the padmount is located as shown in
drawings No. 5233, 5234 Sheets 1 or 2.
Developments including streets where the allowable dwelling set
back is less than 6.0m will require ring main unit siting on either an
alternative street, where the dwelling set back is 6.0m, or in Parklands.
RING MAIN UNIT INSTALLATION
Free from other services
The front edge of the ring main unit shall be as near to
parallel as possible to the R.P. Street Alignment.
Ring main units shall be oriented such that the HV panels
are easily accessible from the dedicated footpath.
�
�
�
���
�
�
�
�
�
�
�
�
�
�
�
�
�
A ORIGINAL ISSUE
�
�
�
���
�
�
�
�
�
�
��
�
�
�
�
�
��
�
����� �
��
�
�
�
�
��
�
�
�
�
���
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
������
�
��
�
�
�DRAWN
DATE
PASSED
APPROVED
Ergon Energy Corporation Ltd
ABN 50 087 646 062Dwg Sh
FILE: 5
UNDERGROUND DISTRIBUTION
�
2
1 SITE
1.5
(CONT’D)
Commercial and Industrial or Landscaped Areas
1.6 Parklands - for other than URD
1.7
Cabling Only
Cabling and Access
2 SITE PREPARATION
Sites shall be prepared in accordance with the included
construction drawings.
3 CONSTRUCTION OF RETAINING WALLS
4
4.1 Uniculvert
Cabling and Access Requirement
A 3.0m wide easement, or road reserve, from the front of
the site is required for cabling and access.
��
62 5255 25255
HV SWITCHGEAR
INSTALLATION
RING MAIN UNIT
1/6/11
C. Noel
A. Bletchly
L. Burton
Whether the ring main unit is for the sole use of that
complex, or is required as part of the distribution network, the
owner is required to grant Ergon Energy an easement for the
ring main unit site, access and cabling.
Obtain the necessary approval for an easement to accommodate
the ring main unit, cabling and access to site.
Acceptable separation of ring main unit to adjacent dwellings is
shown in drawings No. 5234 Sheets 1 & 2.
Should the cabling route not be available in conjunction with
access, a 1.0m wide cable easement is required to the front
of the ring main unit. Additionally 2.0m x 3.0m (ring main unit
site width) is required immediately in front to allow spreading of
cables for entry to the ring main unit and also include the buried
earth cable.
Retaining walls shall be constructed around the perimeter of a
ring main unit site where:
A change in ground level of 300mm or more occurs within 2.0m
of the boundary of the ring main unit site.
RING MAIN UNIT FOUNDATION
Separation of 5.0m between ring main unit and the
nearest room or habitable area should be provided
where possible.
Uniculvert foundations shall not be constructed where site and
ground conditions do not provide an even or equal bearing
capacity for the ring main unit.
Uniculvert foundations for stable soil conditions shall
be constructed in accordance with Drawing No. 5232.
HARD COPYUNCONTROLLED
�
�
�
�
�
�
�
�
�
�
�
�
A ORIGINAL ISSUE
�
�
�
�
�
�
��
�
�
�
�
�
��
�
����� �
��
�
�
�
�
��
�
�
�
�
���
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
������
�
��
�
�
�DRAWN
DATE
PASSED
APPROVED
Ergon Energy Corporation Ltd
ABN 50 087 646 062Dwg Sh
FILE: 5
UNDERGROUND DISTRIBUTION
INSTALLATION
3
BACKFILLING AND FINAL SITE FINISH
ADDITIONAL REQUIREMENTS
C. Noel
A. Bletchly
1/6/11
L. Burton 62 5255 35255
RING MAIN UNIT FOUNDATION
Ring Main Units in Landscaped Areas
HV SWITCHGEAR
RING MAIN UNIT
4.2
HARD COPYUNCONTROLLED
B 01.10.14
B
installation or replacement.
Easy access for a mobile crane must be available for the purpose of
sectioned with construction joints for ease of future removal.
front of the substation cabinet shall be finished with a concrete slab
with a concrete slab (refer to drawing No. 5004). The 2.0m apron in
finished surface level. The substation site surface is to be finished
foundation. Conduits shall be 750mm minimum depth below the
foundation. No conduits shall pass through or under the uniculvert
the substation site and shall pass down the sides of the uniculvert
Ergon Energy cable conduits for the development may be placed in
emergency operations.
working platform and access around latched open doors for
full width of the site (ie 4.8m depth). This will provide a safe
An additional 2.0m apron shall be provided in front of, and for the
accordance with the applicable drawing.
All backfill of the site must be compacted before final site finish in
5.2 Separate Earthing Sites
5.3 Raised Blockwork Foundation - Common Earthing Sites
No. 5290.
extremeties shall be finished in accordance with drawing
ground surface between the concrete surround slab and site
In addition to the requirements of Clause 5.1 the remaining
ground surface shall be in accordance with drawing No. 5217.
and construction of the concrete surround slab over the
Sealing of the cable apertures in the precast concrete plinth
Ergon Energy.
foundation construction shall be used without the approval of
consideration. No special designs for ring main unit
design from a Civil Engineer (RPEQ) for Ergon Energy’s
In such circumstances, the developer shall obtain a certified
and heavy equipment at all times.
areas where clear, all weather access is provided for personnel
Ring main units shall be located on the development in
area (gardens) the following shall apply:
Where the ring main unit is located in a landscaped
(refer to drawing No. 5217).
The ring main unit site surface is to be finished with a concrete slab
removal.
a concrete slab sectioned with construction joints for ease of future
The 2.0m apron in front of the ring main unit site shall be finished with
6
6.1
5.1
5
4
6.2
Commercial and Industrial Installation
Common Earthing Sites
Unstable Sites
(CONT’D)
be applied, a special design shall be required.
construction techniques as described in this document cannot
Where sites are very unstable, and conventional foundation
not be provided.
manufacturer’s installation specifications. A concrete slab shall
approved by Ergon Energy) installed in accordance with the
interlocking masonary paving (besser "interlock" or equivalent
The ring main unit 3.0m x 5.2m site surface is to be finished with
doors shall face the adjoining footpath.
developments is at the real property street alignment. Switchgear cabinet
The preferred location of ring main unit sites at commercial and industrial
open doors for emergency operations.
This will provide a safe working platform and access around latched
be provided in front of, and for the full width of the site (ie 4.8m depth).
between buildings, an additional minimum 2.0m of clear access shall
Should the site be located in restricted areas such as carparks and
5.4 Raised Blockwork Foundation - Separate Earthing Sites
No. 5317 Sh. 3.
extremities shall be finished in accordance with drawing
surface between the barrier kerb (around the paving) and site
In addition to the requirements of clause 5.3 the remaining ground
A ORIGINAL ISSUE
DRAWN
DATE
PASSED
APPROVED
Ergon Energy Corporation Ltd
ABN 50 087 646 062Dwg Sh
FILE: 5
UNDERGROUND DISTRIBUTION
�INSTALLATION
4
6.2 (CONT’D)
6.3
7
Ring Main Unit in Landscaped Areas
When planting vegetation in landscaped areas and gardens,
ensure vegetation does not encroach on the ring main unit
site. Take into consideration the fully matured size
of vegetation to allow continuing access to the site.
Ergon Energy cable conduits for the development may be
placed in the ring main unit site and shall pass down the sides
of the uniculvert foundation. No conduits shall pass through
or under the uniculvert foundation. Conduits shall be 750mm
minimum depth below the finished surface level.
Ring Main Units Installation in Parklands
Where the ring main unit is located in Council
Parklands, the installation shall be in accordance with the
requirements of drawing No. 5234 Sheets 1 or 2.
A 2.0m apron as specified in Clause 6.2 shall be provided.
No buildings/residences, fences, including their foundations, LV
switchboard earths, or metalic objects are permitted within the
clearance zone around the RING MAIN UNIT.
Clearance to Telstra assets shall be as noted on EARTHING
drawing No. 5221 Sheet 1.
62 5255 45255
HV SWITCHGEAR
RING MAIN UNIT
1/6/11
C. Noel
A. Bletchly
L. Burton
SPACING BETWEEN RING MAIN UNIT AND OTHER
METAL OBJECTS
HARD COPYUNCONTROLLED
�
�
�
�
�
�
�
�
�
�
�
�
A ORIGINAL ISSUE
�
�
�
�
�
�
��
�
�
�
�
�
��
�
����� �
��
�
�
�
�
��
�
�
�
�
���
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
������
�
��
�
�
�DRAWN
DATE
PASSED
APPROVED
Ergon Energy Corporation Ltd
ABN 50 087 646 062Dwg Sh
FILE: 5
UNDERGROUND DISTRIBUTION
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
������
�� L. Burton 523462 5234 1
C. Noel
A. Bletchly
10.3.11
NOTES:
Parklands
1.
2.
3.
2.5m Min.
2.5
m M
in.
4.
Apron
PLAN
Dwelling
Real Property
Boundary
1.5m
Min.
R.P. Street
Alignment
FOOTPATH
Kerb
ROAD2.0
m
F
F
F
F
F
F
F
F
F
F
F
F
F
F
Dwelling
1.5
m
Min
.
F
F
Site
Boundary
As Req’d
3.0m
Away from residential dwellings and surrounding
properties to minimise visual and sound impact;
As close as possible to the road kerb to allow 24 hour
all weather access for personnel, a coventional crane
and heavy equipment.
Refer
Note 4
Refer
Note 4
F
F
F
F
RMU SET BACK FROM R.P. STREET ALIGNMENT
When planting vegetation in parklands, ensure vegetation
does not encroach on the ring main unit site.
Take into consideration the fully matured size of vegetation
to allow continuing access to the site.
A ring main unit in parkland shall be located:
The location of ring main unit sites is based on acceptable
separation to adjacent dwellings located as shown.
Any reduction in the 1.5m minimum dimension shown on
the drawings requires a corresponding relocation of the
ring main unit site to maintain the acceptable separation.
LOCATION IN COUNCIL PARKLANDS
A 3.0m wide cable and access easement or road reserve
shall be provided between the ring main unit site and the
R.P. Street Alignment.
1
HV SWITCHGEARHARD COPYUNCONTROLLED�
�
�
���
�
�
�
�
�
�
�
�
�
�
�
�
�
A ORIGINAL ISSUE
�
�
�
���
�
�
�
�
�
�
��
�
�
�
�
�
��
�
����� �
��
�
�
�
�
��
�
�
�
�
���
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
������
�
��
�
�
�DRAWN
DATE
PASSED
APPROVED
Ergon Energy Corporation Ltd
ABN 50 087 646 062Dwg Sh
FILE: 5
UNDERGROUND DISTRIBUTION
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
������
�� L. Burton 523462 5234 2
C. Noel
A. Bletchly
10.3.11
FOOTPATH
ROAD
Parklands
Kerb
PLAN
Dwelling
R.P. Street
Alignment
6.0m Min.
F
Site
Boundary
F
F
F
F
F
As Req’d
Real Property Boundary
FOOTPATH
ROAD
Parklands
Kerb
PLAN
Dwelling
F
Site
BoundaryF
F
F
F
F
Real Property Boundary
Less than
6.0m2.5m Min.
F
F
1.5m
Min.
F
F
Refer Note 4
Sheet 1.
R.P. Street
Alignment
RMU ADJOINING R.P. STREET ALIGNMENT
LOCATION IN COUNCIL PARKLANDS
2
HV SWITCHGEARHARD COPYUNCONTROLLED
�
�
�
�
�
�
�
�
�
�
�
�
A ORIGINAL ISSUE
�
�
�
�
�
�
��
�
�
�
�
�
��
�
����� �
��
�
�
�
�
��
�
�
�
�
���
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
������
�
��
�
�
�DRAWN
DATE
PASSED
APPROVED
Ergon Energy Corporation Ltd
ABN 50 087 646 062Dwg Sh
FILE: 5
UNDERGROUND DISTRIBUTION
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
������
�� L. Burton 523362 5233 1
8/3/11
C. Noel
A. Bletchly
F
F
FO
OT
PA
TH
R.P. Street
Alignment
F
6000
F
F
3000
NOTE:
Real Property Boundary
F
F2800
Dwelling
Dwelling
As
Req’d
As
Req’d
FF
FF
Ring main units
may be in 1 or 2
allotments
F
A reduction in dwelling setback
of 6000mm from the R.P. Street
Alignment will require relocation
of the ring main unit to an
alternative site to achieve
the acceptable separation.
LOCATION IN RESIDENTIAL ALLOTMENTS
HV SWITCHGEARHARD COPYUNCONTROLLED
�
�
�
�
�
�
�
�
�
�
�
�
A ORIGINAL ISSUE
�
�
�
�
�
�
��
�
�
�
�
�
��
�
����� �
��
�
�
�
�
��
�
�
�
�
���
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
������
�
��
�
�
�DRAWN
DATE
PASSED
APPROVED
Ergon Energy Corporation Ltd
ABN 50 087 646 062Dwg Sh
FILE: 5
UNDERGROUND DISTRIBUTION
FO
OT
PA
TH
NOTES:
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
������
��
PLAN
L. Burton
MAXIMUM CUT & FILL
(shown dashed)
3000
800
A_
FIL
L
100 M
AX
R.P. Street
Alignment
_
150 M
AX
CU
T
2800
SECTION A
2. Ergon Energy’s 3000mm x 2800mm (minimum) site
shall be levelled and surrounding area graded to ensure
NO PONDING of water occurs.
523062 5230 1
8.3.11SITE PREPARATION SLOPING SITE
Outline of RMU foundation over
1. Refer drawing 5226 for installation requirements.
3. No services other than the Ergon Energy’s electric cables
shall pass through this RMU site.
4. Clear access to the RMU shall be maintained for
Ergon Energy’s personnel & heavy equipment.
6. Mature landscaping (including trees, sprinklers etc) shall
not encroach onto the RMU site.
7. The finished surface of the adjacent footpath, in front
of the RMU cabinet, shall be level to ensure that
the cabinet doors will swing into the fully open position.
FF
F
F
F
F
F
F
F
F
F
FF
R.P. Street
Alignment
= =
==
Site
Boundary
F
5. After installation is complete the site surface is to be
finished with a concrete slab. (Refer drawing 5217).
HV SWITCHGEAR
A.Bletchly
C.Noel
HARD COPYUNCONTROLLED
�
�
�
�
�
�
�
�
�
�
�
�
A ORIGINAL ISSUE
�
�
�
�
�
�
��
�
�
�
�
�
��
�
����� �
��
�
�
�
�
��
�
�
�
�
���
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
������
�
��
�
�
�DRAWN
DATE
PASSED
APPROVED
Ergon Energy Corporation Ltd
ABN 50 087 646 062Dwg Sh
FILE: 5
UNDERGROUND DISTRIBUTION
5217
�
�
�
�
�
�
�
� �
�
�
�
�
�
��
�
�
� C.Lindsay
23/11/01
62 5217 1
SITE FINISH CONCRETE SURROUND
OUTDOOR RMU WITH PRECAST CONCRETE FDN
F
30
00
F
F 2800F
Concrete Edge
Beam
F
Fall
F
F
F
Fall
Fall
F
F
surround slab cast
F
Site
Boundary
(Level Site)
A_
PLAN
FO
OT
PA
TH
Alignment
R.P. Street
F
Reinforced concrete
around plinth
between plinth and
Abelflex sealant joint
concrete slab
NOTES:
2. Reinforced concrete surround slab:
a) 100/125mm thick slab:
b) 11 TM trench mesh reinforcement in centre of slab:
c) 25 MPa grade concrete:
d) Finish by wood float or by nylon broom.
4. The concrete slab is to slope away from plinth falling
at a slope of 1 in 25.
5. Cable apertures through the precast concrete plinth
shall be backfilled to 50mm from the top of plinth.
A 30mm deep layer of 1:16 ratio weak mix concrete
shall be placed to seal aperture.
6. The surface of the surround slab may be finished with
a stencil pattern surface to match the surrounding
pavements of the development. (Use Textcrete or
equivalent product. Construct to supplier’s specifications).
3. The top face of the concrete surround slab shall be
100mm Min. above the final surface level (when turf is laid).
Line
Ground
Finished
_SECTION A
Backfill
Cable Pit
Refer note 1.
F
Earth grid under
concrete edge beam
Fall
F
F
Fall
50 F
F
F
F10
0 M
in.
F
F
HV SWITCHGEAR
_SECTION B
Concrete edge
beam to perimeter
150 wide x 150
deep below
finished surface.Foundation
Finish
ground line
_B
F
C. Noel
A. Bletchly
F
Construction Type
11RMUF/ASL
Pre-cast foundation
1. Backfill Cable Pit with bedding sand and compact in place.
Refer TRENCHING Drawing No. 5227.
B 02.11.11
B
Refer Note 7
FF
F
7. Concrete slab to be cast in separate sections on side/s
where cables enter/exit to allow future access.
Provide ’Abelflex’ between sections and around plinth.
HARD COPYUNCONTROLLED
�
�
�
�
�
�
�
�
�
�
�
�
A ORIGINAL ISSUE
�
�
�
�
�
�
��
�
�
�
�
�
��
�
����� �
��
�
�
�
�
��
�
�
�
�
���
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
������
�
��
�
�
�DRAWN
DATE
PASSED
APPROVED
Ergon Energy Corporation Ltd
ABN 50 087 646 062Dwg Sh
FILE: 5
UNDERGROUND DISTRIBUTION
NOTES:
���������� �
��B� 1/2 �DISC
���� �
�
�
�
�
�
�
�
�
�
�
�
�
�
�
� L. Burton
1. Foundation design details are as follows:1
ASSY QTYDESCRIPTION
MATERIAL
1523262 5232 1
583-2 CulvertUnstable soils are soft clay to sandy gravel with a soil strength
50-150 kPa.
Stable soils are very stiff clay to shale/rock with soil strength of
150kPa or higher.
2. Lift the culvert separately with 4 x 1.3 tonnes
Reid Swiftlift lifting eyes.
3. Position the top face of the culvert at the finished ground level
of the site, as detailed on the Project’s Civil Construction drawings.
4. Do NOT remove the culvert end wall knockouts.
5. The culvert shall be constructed level. Under no circumstances
shall it be allowed to tilt forward towards the footpath.
7. Refer drawing No. 5217 for site finish concrete surround.
CULVERT FOUNDATION DETAILS
A. Bletchly
C. Noel
4/5/11
MATERIAL
HV SWITCHGEARHARD COPYUNCONTROLLED�
�
�
���
�
�
�
�
�
�
�
�
�
�
�
�
�
A ORIGINAL ISSUE
�
�
�
���
�
�
�
�
�
�
��
�
�
�
�
�
��
�
����� �
��
�
�
�
�
��
�
�
�
�
���
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
������
�
��
�
�
�DRAWN
DATE
PASSED
APPROVED
Ergon Energy Corporation Ltd
ABN 50 087 646 062Dwg Sh
FILE: 5
UNDERGROUND DISTRIBUTION
L. Burton62 5238 1
5238
C. Noel
A. Bletchly
ASSY DESCRIPTIONQTY
NOTES:
578-1
578-5
1
1.
MATERIAL - FREESTANDING RING MAIN UNIT
For circuit breaker setting refer to protection.
1S1CB1F 2S1CB
1
MATERIAL
9/5/11
1
11kV ABB safeplus RMU 1 switch 1 circuit breaker 1 fuse c/w cubical and plinth
11kV ABB safering 2 switch 1 circuit breaker c/w cubical and plinth
ABB 11kV SAFEPLUS / SAFERING
HV SWITCHGEARB 24.11.11
C
2.
in consultation with system operations staff.* Ring feeders - determine the circuit arrangement with CFI unit(s)* Radial feeders - switch disconnector(s) provided as follows:cable circuits (Refer dwg 5253 for schematic) Designer to nominate the position(s) of the outgoing
C 11.01.17
ASSY QTY
MATERIAL - DISTRIBUTION PADLOCK
REGION
Central
595-4
595-5
4
595-3
595-2
595-6
595-7
MENT
ARRANGE
SWITCH
North
Mackay
Wide Bay
South West
3
1
595-8
595-9
Central
595-4
595-5
5
595-3
595-2
595-6
595-7
North
Mackay
Wide Bay
South West
4
1
595-8
595-9
3S
2S1F
4S
3S1F
2S2F
555-4
555-5
555-7
555-8
555-9
555-10
ASSY DESCRIPTION QTY
3
MATERIAL - HV FUSE - EACH CIRCUIT
Refer note 3
555-2 Cartridge fuse link 10A HRC
Cartridge fuse link 20A HRC
Cartridge fuse link 25A HRC
Cartridge fuse link 40A HRC
Cartridge fuse link 50A HRC
Cartridge fuse link 63A HRC
Cartridge fuse link 80A HRC
578-7 11kV ABB safering 2 switch 2 circuit breaker c/w cubical and plinth
578-9 11kV ABB safering 3 switch 1 circuit breaker c/w cubical and plinth
2S2CB
1
3S1CB
1
3.Designer to nominate HV fuse link current rating.
4.Designer to nominate distribution padlock.
HARD COPYUNCONTROLLED
A ORIGINAL ISSUE
DRAWN
DATE
PASSED
APPROVED
Ergon Energy Corporation Ltd
ABN 50 087 646 062Dwg Sh
FILE: 5
UNDERGROUND DISTRIBUTION
L. Burton62 5238 2
5238
C. Noel
A. Bletchly
9/5/11
2
CONSTRUCTION
F
Lifting point
F
Lifting pointF
Lifting point
F
F
ABB 11kV SAFEPLUS / SAFERING
HV SWITCHGEARB 11.01.17
B
578-1, 5, 7 or 9
Assy Selection
F
595-2 to 9
Assy Selection
F
555-2 to 10
Assy Selection
F
cable connections.
drawing No. 5270 for
Refer HV CONSTRUCTION
HARD COPYUNCONTROLLED
A ORIGINAL ISSUE
DRAWN
DATE
PASSED
APPROVED
Ergon Energy Corporation Ltd
ABN 50 087 646 062Dwg Sh
FILE: 5
UNDERGROUND DISTRIBUTION
L. Burton62 5253 1
5253
C. Noel
A. Bletchly
HV SWITCHGEAR
1
9/5/11
HV SWITCHGEAR - SCHEMATIC
ABB 11kV SAFEPLUS / SAFERINGB 11.01.17
B
V FC
1 switch, 1 circuit breaker, 1 fuse
ABB Safeplus
11kV Ring Main Unit
(maintenance only)
1 switch, 1 circuit breaker, 2 fuse
ABB Safeplus
11kV Ring Main Unit
C V F F
HARD COPYUNCONTROLLED
A ORIGINAL ISSUE
DRAWN
DATE
PASSED
APPROVED
Ergon Energy Corporation Ltd
ABN 50 087 646 062Dwg Sh
FILE: 5
UNDERGROUND DISTRIBUTION
62 5253 25253
C. Noel
A. Bletchly
HV SWITCHGEAR
2
HV SWITCHGEAR - SCHEMATIC
ABB 11kV SAFEPLUS / SAFERING
CC
11/01/17
T. Borg
2 switch, 1 vacuum circuit breaker
ABB Safeplus
11kV Ring Main Unit
V
F
F
Fault Indicator
Shortcircuit & Earth
CC V
F
F
Fault Indicator
Shortcircuit & Earth
2 switch, 2 vacuum circuit breaker
ABB Safeplus
11kV Ring Main Unit
V CC V
F
Fault Indicator
Shortcircuit & Earth
3 switch, 1 vacuum circuit breaker
ABB Safeplus
11kV Ring Main Unit
C
F
FF
HARD COPYUNCONTROLLED
A ORIGINAL ISSUE
DRAWN
DATE
PASSED
APPROVED
Ergon Energy Corporation Ltd
ABN 50 087 646 062Dwg Sh
FILE: 5
UNDERGROUND DISTRIBUTION
ASSY DESCRIPTIONQTY
NOTES:
22/12/14
599-9
62 5308 15308
C. Noel
A. Bletchly
599-1
599-5
599-3
599-7
555-4
555-5
555-7
555-8
555-9
555-10
11kV ABB safelink2 3 switch c/w cubical and plinth
11kV ABB safelink2 4 switch c/w cubical and plinth
1
2S1F 2S2F 3S1F3S 4S
1.
2.
3.
MATERIAL - FREESTANDING RING MAIN UNIT
ASSY DESCRIPTION QTY
3
1
1
1
1
1
MATERIAL
MATERIAL - HV FUSE - EACH CIRCUIT
Refer note 1
555-2 Cartridge fuse link 10A HRC
Cartridge fuse link 20A HRC
Cartridge fuse link 25A HRC
Cartridge fuse link 40A HRC
Cartridge fuse link 50A HRC
Cartridge fuse link 63A HRC
Cartridge fuse link 80A HRC
Designer to nominate HV fuse link current rating
HV SWITCHGEAR
4.Designer to nominate distribution padlock.
ASSY QTY
MATERIAL - DISTRIBUTION PADLOCK
REGION
Central
595-4
595-5
4
595-3
595-2
595-6
595-7
MENT
ARRANGE
SWITCH
North
Mackay
Wide Bay
South West
3
1
595-8
595-9
Central
595-4
595-5
5
595-3
595-2
595-6
595-7
North
Mackay
Wide Bay
South West
4
1
595-8
595-9
3S
2S1F
4S
3S1F
2S2F
HARD COPYUNCONTROLLED
ABB 11kV RING MAIN UNIT SAFELINK2
T. Borg
11kV ABB safelink2 2 switch 1 fuse c/w cubical and plinth
11kV ABB safelink2 2 switch 2 fuse c/w cubical and plinth
11kV ABB safelink2 3 switch 1 fuse c/w cubical and plinth
CONTRACT No. 10179B
* Ring feeders - determine the circuit arrangement in consultation with system operations staff.
* Radial feeders - switch disconnector(s) provided with CFI unit(s)
(Refer sheets 3 to 5 for schematic) as follows:
Designer to nominate the position(s) of the outgoing cable circuits
and gland plates with RMU fitted.
The HV cables must be fitted with cable glands as per construction standards
A ORIGINAL ISSUE
DRAWN
DATE
PASSED
APPROVED
Ergon Energy Corporation Ltd
ABN 50 087 646 062Dwg Sh
FILE: 5
UNDERGROUND DISTRIBUTION
C. Noel
A. Bletchly
2
Construction Type
F
F
F
Concrete plinth
F
for feeder cable connections
drawing no. 5244 or 5245
Refer HV CONSTRUCTION
Side View Plan
F
4 x M12 ferrules
Lifting points
4 x M12 ferrules
Lifting points
CONSTRUCTION
HV SWITCHGEAR
F
595-2 to 9
Assy Selection
HARD COPYUNCONTROLLED
530862 5308 2
ABB 11kV RING MAIN UNIT SAFELINK222/12/14
T. Borg
CONTRACT No. 10179B
11RMU/O/ASL22S1F
11RMU/O/ASL22S2F
11RMU/O/ASL23S
11RMU/O/ASL23S1F
11RMU/O/ASL24S
555-2 to 10
599-1 to 9 and
Assy Selection
2
SAFELINK SAFELINK SAFELINK SAFELINK
A ORIGINAL ISSUE
DRAWN
DATE
PASSED
APPROVED
Ergon Energy Corporation Ltd
ABN 50 087 646 062Dwg Sh
FILE: 5
UNDERGROUND DISTRIBUTION
29/12/14
62 5308 35308
C. Noel
A. Bletchly
F
Note:
(CFI) on this switch disconnector unit
Represents circuit fault indicator
3
ABB 11kV SAFELINK2 - HV SWITCHGEAR
SCHEMATIC
HV SWITCHGEAR
F F F
FC C
Slide cable boot down to expose
Ø 8.5 Cable test point
& Earth Fault
Short Circuit
F F F
FC C
Slide cable boot down to expose
Ø 8.5 Cable test point
& Earth Fault
Short Circuit
F
F
F
Note:
(CFI) on this switch disconnector unit
Represents circuit fault indicator
F F
HARD COPYUNCONTROLLED
T. Borg
2S1F 11kV ABB safelink2 RMU 2 switch 1 fuse 2S2F 11kV ABB safelink2 RMU 2 switch 2 fuse
A ORIGINAL ISSUE
DRAWN
DATE
PASSED
APPROVED
Ergon Energy Corporation Ltd
ABN 50 087 646 062Dwg Sh
FILE: 5
UNDERGROUND DISTRIBUTION
29/12/14
62 5308 45308
C. Noel
A. Bletchly
F
Note:
(CFI) on this switch disconnector unit
Represents circuit fault indicator
4
ABB 11kV SAFELINK2 - HV SWITCHGEAR
SCHEMATIC
HV SWITCHGEAR
F F
C C
Slide cable boot down to expose
Ø 8.5 Cable test point
& Earth Fault
Short Circuit
F
& Earth Fault
Short Circuit
C
F F F
FC C
F
C
Slide cable boot down to expose
Ø 8.5 Cable test point
& Earth Fault
Short Circuit
& Earth Fault
Short Circuit
F
Note:
(CFI) on this switch disconnector unit
Represents circuit fault indicator
F F F F
HARD COPYUNCONTROLLED
T. Borg
3S 11kV ABB safelink2 RMU 3 switch 3S1F 11kV ABB safelink2 RMU 3 switch 1 fuse
A ORIGINAL ISSUE
DRAWN
DATE
PASSED
APPROVED
Ergon Energy Corporation Ltd
ABN 50 087 646 062Dwg Sh
FILE: 5
UNDERGROUND DISTRIBUTION
29/12/14
62 5308 55308
C. Noel
A. Bletchly
5
F
Note:
(CFI) on this switch disconnector unit
Represents circuit fault indicator
ABB 11kV SAFELINK2 - HV SWITCHGEAR
SCHEMATIC
HV SWITCHGEAR
F F
C C
& Earth Fault
Short Circuit
F
& Earth Fault
Short Circuit
C
F
C
Slide cable boot down to expose
Ø 8.5 Cable test point
& Earth Fault
Short Circuit
T. Borg
F F F
HARD COPYUNCONTROLLED
4S 11kV ABB safelink2 RMU 4 switch
A ORIGINAL ISSUE
DRAWN
DATE
PASSED
APPROVED
Ergon Energy Corporation Ltd
ABN 50 087 646 062Dwg Sh
FILE: 5
UNDERGROUND DISTRIBUTION
���������� �����
�
�
�
L. Burton
HARD COPYUNCONTROLLED
62 5252 15252
C. Noel
A. Bletchly
HV SWITCHGEAR
FEEDER
CABLE
FEEDER
CABLE
FEEDER
CABLE
F
F
Note:
(CFI) on this switch disconnector unit
Represents circuit fault indicator
FEEDER
CABLE
FEEDER
CABLE
FEEDER
CABLE
F
Note:
(CFI) on this switch disconnector unit
Represents circuit fault indicator
FEEDER
CABLE
FEEDER
CABLE
FEEDER
CABLE
FEEDER
CABLE
FEEDER
CABLE
F
Note:
(CFI) on this switch disconnector unit
Represents circuit fault indicator
1
SCHEMATIC
9/5/11F & G 22kV RING MAIN UNIT
2S1F 22kV F & G
ring main unit
2 switch, 1 fuse
2S2F 22kV F & G
ring main unit
2 switch, 2 fuse
3S1F 22kV F & G
ring main unit
3 switch, 1 fuse
F F F
�
�
�
���
�
�
�
�
�
�
�
�
�
�
�
�
�
A ORIGINAL ISSUE
�
�
�
���
�
�
�
�
�
�
��
�
�
�
�
�
��
�
����� �
��
�
�
�
�
��
�
�
�
�
���
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
������
�
��
�
�
�DRAWN
DATE
PASSED
APPROVED
Ergon Energy Corporation Ltd
ABN 50 087 646 062Dwg Sh
FILE: 5
UNDERGROUND DISTRIBUTION
���������� �����
�
�
�
L. Burton
10/3/11HARD COPYUNCONTROLLED
62 5252 25252
C. Noel
A. Bletchly
HV SWITCHGEAR
FEEDER
CABLE
FEEDER
CABLE
FEEDER
CABLE
F
Note:
(CFI) on this switch disconnector unit
Represents circuit fault indicator
2
FEEDER
CABLE
FEEDER
CABLE
FEEDER
CABLE
FEEDER
CABLE
F
Note:
(CFI) on this switch disconnector unit
Represents circuit fault indicator
SCHEMATIC
F & G 22kV RING MAIN UNIT
4S 22kV F & G
ring main unit
4 switch
3S 22kV F & G
ring main unit
3 switch
F F F F
�
�
�
�
�
�
�
�
�
�
�
�
A ORIGINAL ISSUE
�
�
�
�
�
�
��
�
�
�
�
�
��
�
����� �
��
�
�
�
�
��
�
�
�
�
���
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
������
�
��
�
�
�DRAWN
DATE
PASSED
APPROVED
Ergon Energy Corporation Ltd
ABN 50 087 646 062Dwg Sh
FILE: 5
UNDERGROUND DISTRIBUTION
5359 162 5359 1
C. Noel
A. Bletchly
27/07/16
T. Borg
GENERAL ARRANGEMENT
HV SWITCHGEAR
1.
2.
CONSTRUCTION NOTES
1.
2.
CONDUITS
3.
4.
5.
6.
All conduits to be sealed/fitted with caps before concrete pour.
All conduits to have 50mm min. projection above fsl of concrete.
All radius bends centreline radius to be 500mm min.
Conduit to be located as determined on masonry plan.
CONCRETE
1.
2.
3.
4.
5.
6.
Supply and lay concrete in accordance with AS3600.
Footings to be cast without construction joints unless otherwise indicated.
Concrete strength to N32 min.
Exposed concrete surfaces to be cured in accordance with AS3600.
7.
8.
9.
10.
Supply & lay reinforcement in accordance with AS3600.
Provide light broom finish to footings.
specification for excavation.
specification, standard specification for concrete and standard
This drawing should be read in conjunction with specific civil works
footing. Minimum 100kpa bearing capacity.
Footings to be found in sound material with 98% srdd subgrade under
with AS2053.
All conduits to be (class H.D.) orange PVC electrical in accordance
synthetic draw rope.
Unless otherwise specified all conduits to be fitted with one 8mm diameter
underlay the footing.
Supply & lay vapour barrier in accordance with AS2870 to continuously
to be class 3, true & free of blemishes & imperfections.
Concrete formwork in accordance with AS3610, exposed concrete surfaces
to ground.
Maintain 40mm concrete cover to top reinforcement and 50mm cover
1.
MASONRY BLOCKWORK
1.
2.
2.
3.
4.
5.
6.
7.
Mortar shall be class M3 in accordance with AS3700.
Grout shalll be 20mpa at 28 days - 10mm max. aggregate size.
Fill all cores with min 25mpa concrete.
Vertical reinforcement to block walls shall be 1-N12 as shown.
strength of 15mpa.
Concrete blocks shall have a min. unconfined compressive
with AS/NZS4455.
Concrete masonry material and workmanship shall comply
bars horizontally.
Reinforce single course bond beam at top of wall with 2-N12
BOLTS
with AS1111.
All bolts shall be of approved manufacture in accordance
under all nuts.
the thread from the shear plane. a suitable washer shall be used
All bolts shall be galvanised and of sufficient length to exclude
1.
2.
3.
4.
5.
6.
ALUMINIUM MATERIALS
Aluminium sheet shall comply with AS/NZS1734.
the drawing and shall be cleaned of all burrs and rough edges.
All holes shall finish accurately to size and in the position shown in
All holes shall be drilled.
noted otherwise in the drawing.
Bolts, nuts and washers shall be stainless steel grade 316 unless
AS1664 and AS/NZS1665.
All aluminium components shall be fabricated in accordance with
flat surfaces.
to produce clean straight bends with no distortion in the adjacent
Bending of aluminium plate or sheet shall be carried out in a press
Reinforcement supported by chairs for spacers appropriate to achieve cover.
F & G RING MAIN UNIT - RAISED FOUNDATIONHARD COPYUNCONTROLLED
A ORIGINAL ISSUE
DRAWN
DATE
PASSED
APPROVED
Ergon Energy Corporation Ltd
ABN 50 087 646 062Dwg Sh
FILE: 5
UNDERGROUND DISTRIBUTION
5359 262 5359 2
C. Noel
A. Bletchly
27/07/16
T. Borg
HV SWITCHGEAR
RAISED BLOCKWORK FOUNDATION
540
F
560
F
1:30
345
F
290
F
F
360
F
F
1350
F
F
F
50200
PLAN VIEW 1:20
SIDE ELEVATION
555
F
F
290
F
F
345
F
F
610
F
F
200
F
200
F
F
F
bars @ min 400mm cts.
M12 reinforcing
1800
F
F
1400
F
F
50
F
F
900
FF
F
See Detail ’A’ Sh 4
Aluminium cover platerF
200 series blockwork
F
200mm thick
Concrete base
A
FGL FGL
F(760 radius)
150mm conduit (3 off)
F
200 series blockwork
B3
3
F & G 3 SWITCH SWITCHING STATIONHARD COPYUNCONTROLLED
A ORIGINAL ISSUE
DRAWN
DATE
PASSED
APPROVED
Ergon Energy Corporation Ltd
ABN 50 087 646 062Dwg Sh
FILE: 5
UNDERGROUND DISTRIBUTION
5359 362 5359 3
C. Noel
A. Bletchly
27/07/16
T. Borg
HV SWITCHGEAR
RAISED BLOCKWORK FOUNDATION
FSL
1:20
1:20
50
F
F900
F
F200F
F
25
F
F
200F
F
200
F
F
200
F
F
F
ste two component epoxy pain system
blockwork surface with "dulux" durebild
Paint the stirrup to extend 100mm below
Fishtail stirrups - HDG
embedment 75mm
Chemset "REO 502" minimum
Pryda FS400/12 - 400 x 6mm M12 - 4.6/S
1400
F
F
200
F
F
F
50mm cover
SL82 mesh top and bottom
F
bedding sand 95% SRDD
Compacted, well graded course
400
90
60
200 1000 200FF
F F
1298 F
FF
F
centrally placed at end & cts.
N12 vertical starter bar
continuous 500 lap
2-N12 bond beam
F
and orientation
refer plan for location
F
refer detail ’A’ sh 4
& support angles
Aluminium cover plate
protection conduit
F
F
50mm cover
top and bottom
SL82 mesh
Fblockwork
200 series
SECTION B
SECTION A
F & G 3 SWITCH SWITCHING STATIONHARD COPYUNCONTROLLED
A ORIGINAL ISSUE
DRAWN
DATE
PASSED
APPROVED
Ergon Energy Corporation Ltd
ABN 50 087 646 062Dwg Sh
FILE: 5
UNDERGROUND DISTRIBUTION
5359 462 5359 4
C. Noel
A. Bletchly
27/07/16
T. Borg
HV SWITCHGEAR
GENERAL ARRANGEMENT
1:20
ELEVATION
1:5
DETAIL ’A’
F
blockwork
200 series
F
F
F
Refer detail ’A’
Aluminium cover plate
approx 300kg
F & G RMU
45F
F
25F
F
5
F
F
390
F
F
5
F
F
100F
F40
F
F
20
F
F
35
F
F
285
F
F
35
F
F
20
F
F
5
F
F 990
F
F 5F
F
F
blockwork
200 series
F
F
F
masonry anchors
M10 316 s/s dynabolt
alum. angle 355 long
75 x 50 x 6 marine grade
CFW all round
Weld cover plate to angle
& supplied by Ergon
in blockwork by contractor
alum support angles at opening
alum cover plate weld to the
415 x 990 x 3 marine grade
each corner
200mm from
concrete plinth
to secure RMU
Fishtail stirrup (4 total)
F
CFW to alum. angle for earthing
F
F & G 3 SWITCH SWITCHING STATIONHARD COPYUNCONTROLLED
DRAWN
DATE
PASSED
APPROVED
Ergon Energy Corporation Ltd
A ORIGINAL ISSUE
ABN 50 087 646 062
OVERHEAD DISTRIBUTION
Dwg ShFILE: 5
5359 562 5359 5
C. Noel
A. Bletchly
27/07/16
T. Borg
HV SWITCHGEAR
RAISED BLOCKWORK FOUNDATION
1:30
PLAN VIEW 1:20
SIDE ELEVATION
540F
560
F
1350
F
F
F
50200
1800
F
F
50
F
F
2200
F
F
345
F
290
F
F
380
F
F
345
F
F
440
F
F
200
F
555
F
290
F
F
345
F
F
610
F
F
F
900
FF
200F
F
F
200 series blockwork
F
200mm thick
Concrete base
F
See Detail ’B’ Sh 7
Aluminium cover plater
D
F
bars @ min 400mm cts.
M12 reinforcing
F
200 series blockwork
(760 radius)
150mm conduit (3 off)F
FGL FGL
C 6
6
F & G 4 SWITCH SWITCHING STATIONHARD COPYUNCONTROLLED
A ORIGINAL ISSUE
DRAWN
DATE
PASSED
APPROVED
Ergon Energy Corporation Ltd
ABN 50 087 646 062Dwg Sh
FILE: 5
UNDERGROUND DISTRIBUTION
5359 662 5359 6
C. Noel
A. Bletchly
27/07/16
T. Borg
HV SWITCHGEAR
RAISED BLOCKWORK FOUNDATION
1:20
200
F
F
F
and orientation
refer plan for location
F
refer detail ’B’ sh 7
& support angles
Aluminium cover plate
protection conduit
F
F
50mm cover
top and bottom
SL82 mesh
Fblockwork
200 series
200
F
F 900 F
F
50F
F
25
F
F
FSL
1:20
200F
F
200
F
F
F
1400
F
F
200
F
F
F
50mm cover
SL82 mesh top and bottom
F
bedding sand 95% SRDD
Compacted, well graded course
400
90
60
200 1000 200FF
F F
1298 F
F
F
F
centrally placed at end & cts.
N12 vertical starter bar
continuous 500 lap
2-N12 bond beam
F & G 4 SWITCH SWITCHING STATION
SECTION C
SECTION Dtwo component epoxy pain system
blockwork surface with "DULUX" Durebild STE
Paint the stirrup to extend 100mm below
Fishtail stirrups - HDG
embedment 75mm
Chemset "REO 502" minimum
Pryda FS400/12 - 400 x 6mm M12 - 4.6/S
HARD COPYUNCONTROLLED
A ORIGINAL ISSUE
DRAWN
DATE
PASSED
APPROVED
Ergon Energy Corporation Ltd
ABN 50 087 646 062Dwg Sh
FILE: 5
UNDERGROUND DISTRIBUTION
5359 762 5359 7
C. Noel
A. Bletchly
27/07/16
T. Borg
HV SWITCHGEAR
GENERAL ARRANGEMENT
1:20
ELEVATION
1:5
DETAIL ’B’
F
blockwork
200 series
F
F
F
Refer detail ’B’
Aluminium cover plate
approx 300kg
F & G RMU
45F
F
25F
F
5
F
F
390
F
F
5
F
F
100F
F40
F
F
20
F
F
35
F
F285
F
F
35
F
F
20
F
F
5
F
F 990
F
F 5F
F
F
blockwork
200 series
F
F
F
masonry anchors
M10 316 s/s dynabolt
alum. angle 355 long
75 x 50 x 6 marine grade
CFW all round
Weld cover plate to angle
& supplied by Ergon
in blockwork by contractor
alum support angles at opening
alum cover plate weld to the
415 x 990 x 3 marine grade
each corner
200mm from
concrete plinth
to secure RMU
Fishtail stirrup (4 total)
F
CFW to alum. angle for earthingF
F & G 4 SWITCH SWITCHING STATIONHARD COPYUNCONTROLLED
A ORIGINAL ISSUE
DRAWN
DATE
PASSED
APPROVED
Ergon Energy Corporation Ltd
ABN 50 087 646 062
OVERHEAD DISTRIBUTION
Dwg ShFILE: 5
5364
05.10.16
62 5364 1
F
3000
F
F 2800F
A_
PLAN
FO
OTP
AT
HNOTES:
_SECTION A
F
F
F
F
F
F
HV SWITCHGEAR
C. Noel
A. Bletchly
Construction Type
F
T. Borg
22kV OUTDOOR RMU
SITE FINISH PAVED SURROUND
BARRIER KERB
BARRIER KERB
BA
RRIE
R K
ER
B
BA
RRIE
R K
ER
B
Refer note 1
Drainage slot
22RMUF/FGA
and on sloping sites at 2m max. spacing on ’down hill’ sides.
On flat sites provide slots at 2m max. spacing on all sides
level to drain sand bedding under paving.
Provide approx. 5mm wide slots down to finished ground
1. Drainage Slots:-
2. For foundation and cover plate details refer Drawing 5359.
storm tide or flooding (1:100 year risk) level for that location.
3. The base of the RMU is to be above tidal inundation,
surface level (when turf is laid).
4. The top face of barrier kerb shall be 50mm above the final
at a slope of 1 in 50.
5. The paving is to be sloped away from plinth / foundation
200
F
F150
Min. Fall 1 in 50
F
specification.
in accordance with manufacturers
Besser "Interlock" pavers laid
course bedding sand.
of compacted, well graded,
40mm min. levelling layer
2 N12 bars min. 600 lap, 40 cover
HARD COPYUNCONTROLLED
A ORIGINAL ISSUE
DRAWN
DATE
PASSED
APPROVED
Ergon Energy Corporation Ltd
ABN 50 087 646 062Dwg Sh
FILE: 5
UNDERGROUND DISTRIBUTION
MAIN_INDEXISSUE_14_CHANGESINTRODUCTIONConstruction Manual IntroductionProcedure for reporting a problem NA000303R100Construction Standards Feedback Form NA000303F100 - Sh 1Construction Standards Feedback Form NA000303F100 - Sh 25369/1 EO Terminology Changes5369/2 EO Terminology Changes
ASSEMBLIESAssemblies Index Sheet 1Assemblies Index Sheet 2Assemblies Index Sheet 3Assemblies Index Sheet 4Assemblies Index Sheet 5Assemblies Index Sheet 6Assemblies Index Sheet 7 Assemblies Index Sheet 8500 Electricity supply pillars500-1 Pillar (tall) electricity supply500-2 Pillar (short) electricity cross road500-3 Pillar (large) electricity
501 LV supply pillar 1 way connection501-1 Connection cable 1 way501-2 Connection cable 1 way insect protected
502 LV supply pillar 2 way connection502-1 Connection cable 2 way502-2 Connection cable 2 way insect protected
503 LV supply pillar 3 way cable connection503-1 Connection cable 3 way503-2 Connection cable 3 way insect protected
504 Lug set504-1 Lug set Al 240mm² sector cable504-5 Lug set bi-metal 240mm² sector cable504-9 Lug set 16mm² cross road cable504-11 Lug set 50mm² cross road cable
505 Earthing MEN to LV pillar and LV distribution cabinet505-1 Earth MEN to LV pillar505-2 Earth MEN to LV distribution cabinet
506 LV pillar fuse panel506-4 Additional fuse, street light506-5 Panel, 6 fuse cross - road pillar506-6 Panel, 6 fuse supply pillar
507 Low voltage fuse links507-3 Cartridge fuse link 32A HRC507-6 Cartridge fuse link 63A HRC507-7 Cartridge fuse link 80A HRC507-8 Cartridge fuse link 100A HRC507-11 Link solid din size 1 (250A)507-12 Link solid din size 2 (400A)
508 Cable termination and connection to transformer508-1 Term. & conn. to transformer 22kV 35mm² cable insect protected508-4 Term. & conn. to transformer 22kV 185mm² cable
509 Uniculvert and base slab509-1 Uniculvert509-2 Base slab
510 Earth connection elbow connector to station earth510-1 Earth connection elbow connector to station earth510-6 Earth extension elbow connector to station earth
511 Trefoil clamping arrangements to pole termination bracket511-1 Clamp trefoil to pole term. bracket suit 11kV 35mm² cable511-1 Clamp trefoil to pole term. bracket suit 11kV 35mm² cable insect protected511-2 Clamp trefoil to pole term. bracket suit 22kV 35mm² cable insect protected511-3 Clamp trefoil to pole term. bracket suit 11kV 185mm² cable511-3 Clamp trefoil to pole term. bracket suit 11kV 185mm² cable insect protected511-6 Clamp trefoil to pole term. bracket suit 22kV 185mm² cable511-8 Clamp trefoil to pole term. bracket suit 11kV 400mm² cable insect protected511-10 Clamp trefoil to pole term. bracket suit 11kV 400mm² Al cable 511-10 Clamp trefoil to pole term. bracket suit 11kV 400mm² Al cable insect protected511-11 Clamp trefoil to pole term. bracket suit 33kV 300mm² 3 cable 511-12 Clamp trefoil to pole term. bracket suit 22kV 630mm² cable
512 Cable termination & connection to RMU512-1 Term. & conn. to RMU 22kV 35mm² cable insect protected512-4 Term. & conn. to RMU 22kV 185mm² cable512-7 Term. & conn. to RMU 22kV 630mm² cable
513 Connection earth bar to cover plate and service platform513-1 Connection earth bar to cover plate513-5 Connection earth bar to service platform
514 11kV ABB SD series RMU cable termination & connection 514-1 Term. & conn.(ABB SD) 11kV 35mm² cable514-2 Term. & conn.(ABB SD) 11kV 185mm² cable514-3 Term. & conn.(ABB SD) 11kV 35mm² cable insect protected 514-4 Term. & conn.(ABB SD) 11kV 185mm² cable insect protected
515 Cable clamping arrangements515-1 Clamp cable to P1000 channel515-2 Clamp cable to P3300 channel515-3 Clamp cable to wood pole bracket515-4 Clamp cable to wood pole
516 11kV magnefix MD series RMU & transformer. Cable termination & connection516-1 Term. & conn.(Magnefix MD & Transf.) 11kV 35mm² cable516-2 Term. & conn.(Magnefix MD & Transf.) 11kV 185mm² cable516-3 Term. & conn.(Magnefix & Transf.) 11kV 35mm² cable insect protected516-4 Term. & conn.(Magnefix & Transf.) 11kV 185mm² cable insect protected
517 LV pillar (large) support frame, neutral bar & fuse panel518 LV pillar (large) CFS unit phase connection518-1 Connection phase terminal CFS unit & fuse panel518-2 Connection phase terminal CFS unit & fuse panel insect protected518-3 Connection phase terminal CFS unit
519 LV pillar (large) neutral bar connection519-1 Connection neutral bar (large pillar)519-2 Connection neutral bar (large pillar) insect protected
520 Switch/fuse mounting pole & switch/fuse cable connection520-1 Switch/fuse mounting to wood pole520-2 Connection switch/fuse to open wire - 150mm² cable520-3 Connection switch/fuse to LVABC520-4 Connection switch/fuse to open wire - 95mm² cable
521 LV pole termination dropper connection521-1 Connection 240mm² sector cable to 150mm² Cu insulated521-2 Connection 240mm² sector cable to 95mm² Cu insulated521-6 Connection 240mm² sector cable to 95mm² LVABC
522 LV outdoor termination 240mm² Al & 16mm² Cu 4 core cable522-1 Termination outdoor 240mm² LV522-11 Termination outdoor 16mm² LV
523 Underground cable warning signs523-1 Warning sign 1 and post U/G cable523-2 Warning sign 2 and post U/G cable
524 Earth rod - additional524-1 Earth rod additional524-2 Earth rod additional depth524-3 Earth rod additional depth - suit 70mm² cable524-4 Additional earthing cable joint, 35mm²524-5 Additional earthing cable joint, 70mm²524-6 Additional earth connector 'C' type
525 Padmounted substation earth rod and connection525-1 Earth padmounted substation525-2 Earth connector additional525-3 Earth padmounted auto transformer
526 Grid to earth bar connection & earth - deep drilled526-1 Connection grid to earth bar - 35mm²526-2 Earth - deep drilled - 35mm²526-3 Connection grid to earth bar - 70mm²526-4 Earth - deep drilled - 70mm²
527 LV pillar (large) fuse mounting527-1 3 fuse527-2 6 fuse527-3 6 fuse insect prot.527-4 Additional fuse, S/L
528 LV pillar (large) CFS unit & link holder528-1 CFS unit528-2 Insulating Shroud (large)528-3 Insulating Shroud (small)
529 Low voltage fuse links529-2 Fuse link 80A din size 1529-3 Fuse link 100A din size 1529-4 Fuse link 125A din size 1529-5 Fuse link 160A din size 1529-6 Fuse link 200A din size 1529-7 Fuse link 250A din size 1529-10 Fuse link 100A din size 2529-11 Fuse link 125A din size 2529-13 Fuse link 200A din size 2529-14 Fuse link 250A din size 2529-15 Fuse link 315A din size 2529-16 Fuse link 355A din size 2529-17 Fuse link 400A din size 2529-23 Fuse link 500A din size 3529-24 Fuse link 630A din size 3529-26 Fuse link 35A din size 00
530 Insulation piercing connectors530-1 Connector I.P.C. 25/95mm² main to 6/35mm² tap530-6 Connector tap-off bare Al main 16.8/210mm² to 6/35mm² tap530-7 Connector tap-off bare Cu main 5.5/135mm² to 6/35mm² tap
531 Cable guard to pole531-1 Guard polymeric to wood pole531-2 Guard polymeric (small) to wood pole531-6 Guard metal (100) to wood pole531-7 Guard metal (130) to wood pole531-8 Guard metal (180) to wood pole
532 Saddle to pole, bracket cable support to x-arm532-1 Saddle (20mm) to wood pole532-2 Saddle (25mm) to wood pole532-6 Bracket cable support to x-arm
533 LV pole termination overhead mains connection\533-1 Connector Al./I.P.C. 95/240mm² Al. main to 35/95mm² ABC tap533-2 Connector Al./I.P.C. 50/150mm² Al. main to 35/95mm² ABC tap533-3 Connector Cu./I.P.C. 7/95mm² Cu. main to 35/95mm² ABC tap533-6 Connector I.P.C. 35/95mm² main to 35/95mm² tap533-11 Connector P.G. 95/240mm² Al. main 70/185mm² Cu. tap533-16 Connector P.G. 16/150mm² Cu. main to 16/150mm² Cu. tap
534 Distribution cabinet 6 module cast in situ foundation535 Distribution cabinet 6 module precast concrete foundation 536 Clamps to suit 3 x 1c 35mm² & 630mm cable fixings536-1 Clamps to suit 3x1 core 35mm² cable536-5 Clamps to suit 3x1 core 630mm² cable536-6 Fixings
537 11kV padmounted substation with LV switchgear537-1 Padmounted substation 100kVA with LV switchgear537-2 Padmounted substation 200kVA with LV switchgear537-3 Padmounted substation 315kVA with LV switchgear537-4 Padmounted substation 500kVA with LV switchgear537-5 Padmounted substation 750kVA with LV switchgear537-6 Padmounted substation 1000kVA with LV switchgear (Transformer disconnector only)
538 11kV padmounted substation HV switchgear538-1 RMU Magnefix 3 switch 1 fuse538-2 RMU ABB 2 switch 1 fuse538-3 RMU Magnefix 2 switch 1 fuse538-4 SFU Magnefix 1 switch 1 fuse
539 Bracket termination (11kV, 22kV & 33kV) mounting to wood pole540 11kV & 22kV pole termination arrester mounting to bracket540-1 Arrester 11kV mounting to bracket540-2 Arrester 22kV mounting to bracket (M12)540-3 Arrester 22kV mounting to bracket (M16) - 630mm² cable only540-4 Arrester 11kV mounting to bracket (M16) - 400mm² cable540-2 Arrester 33kV mounting to bracket (M12)
541 Trefoil clamp to channel541-4 Clamp trifoil to channel suit 11kV 35mm² cable541-4 Clamp trifoil to channel suit 11kV 35mm² cable insect protected541-5 Clamp trifoil to channel suit 22kV 35mm² cable insect protected541-7 Clamp trifoil to channel suit 11kV 185mm² cable541-7 Clamp trifoil to channel suit 11kV 185mm² cable insect protected541-9 Clamp trifoil to channel suit 22kV 185mm² cable541-12 Clamp trifoil to channel suit 11kV 400mm² cable541-12 Clamp trifoil to channel suit 11kV 400mm² cable insect protected
542 22kV padmounted substation with LV switchgear542-1 Padmounted substation 3.7m long. 500kVA with LV switchgear542-2 Padmounted substation 3.7m long. 1000kVA with LV switchgear542-3 Padmounted substation 4.1m long. 500kVA with LV switchgear542-4 Padmounted substation 4.1m long. 1000kVA with LV switchgear542-5 Padmounted substation 4.1m long. 315kVA with LV switchgear
543 22kV padmounted substation HV switchgear543-2 Ring Main Unit - 2 switch, 1 fuse543-3 Ring Main Unit - 2 switch, 2 fuse543-4 Ring Main Unit - 3 switch, 1 fuse534-5 Ring Main Unit - 3 switch534-6 Ring Main Unit - 4 switch
544 22kV padmounted substation transformer to RMU cable connection545 Earth connections545-1 Connection LV earth to earth bar545-2 Connection 35mm² earth bridge
546 11kV & 22kV outdoor termination triplex & 1 core XLPE cable546-1 Termination outdoor 11kV 35mm² cable546-2 Termination outdoor 11kV 185mm² cable546-3 Termination outdoor 11kV 35mm² cable insect protected546-4 Termination outdoor 11kV 185mm² cable insect protected546-6 Termination outdoor 11kV 400mm² cable546-7 Termination outdoor 11kV 400mm² cable insect protected546-10 Termination outdoor 22kV 185mm² cable546-11 Termination outdoor 22kV 630mm² cable546-12 Termination outdoor 22kV 35mm² cable insect protected
547 11kV & 22kV pole termination wildlife protection548 LV distribution cabinet 548-1 Distribution cabinet 6 module 1 isolator 2 fuse switch548-2 Distribution cabinet 2 module 2 fuse switch548-3 Distribution cabinet flood zone 9 fuse
549 LV distribution cabinet 6 module wall mounting support550 LV isolator and fuse switch550-1 Isolator550-6 Fuse switch550-7 Fuse switch - 630A Merlin Gerin
551 Insulating glove, heatshring tubing and heatshrink lug seal set551-1 Glove insulating 16mm² 4C cable551-2 Glove insulating 240mm² 4C cable551-3 Glove insulating 50mm² 4C cable551-6 Heatshrink lug seal set 240mm² cable551-11 Heatshrink tubing
552 Separate HV & LV earth modifications insulator busbar & labels552-1 Insulator busbar standoff552-2 Warning label552-3 Caution label
553 35mm² insect protected cable bonding brass tape to cable screens554 11kV fuse links - oil immeresed554-3 Cartridge fuse link 16A HRC - oil immersed554-5 Cartridge fuse link 25A HRC - oil immersed554-6 Cartridge fuse link 31.5A HRC - oil immersed554-8 Cartridge fuse link 50A HRC - oil immersed554-9 Cartridge fuse link 63A HRC - oil immersed554-11 Cartridge fuse link 80A HRC - oil immersed
555 11kV fuse links555-2 Cartridge fuse link 10A HRC555-4 Cartridge fuse link 20A HRC555-5 Cartridge fuse link 25A HRC555-7 Cartridge fuse link 40A HRC555-8 Cartridge fuse link 50A HRC555-9 Cartridge fuse link 63A HRC555-10 Cartridge fuse link 80A HRC
556 22kV fuse links556-3 Cartridge fuse link 16A HRC556-4 Cartridge fuse link 20A HRC556-7 Cartridge fuse link 40A HRC
557 Trefoil clamping arrangements557-8 Clamp trefoil to wood pole to suit 400mm² cable 11kV 1 core557-12 Clamp trefoil to wood pole to suit 630mm² cable 22kV 1 core557-20 Spring nut suit P1000 channel557-21 Spring nut suit P3300 channel
558 Conduit bends558-10 Conduit bend H.D. 40 dia.300R 90°558-20 Conduit bend L.D. 80 dia. 450R 90°558-30 Terminator conduit PVC flexible 16mm558-31 Terminator conduit PVC flexible 20mm558-32 Terminator conduit PVC flexible 25mm558-40 Conduit PVC flexible 16mm558-41 Conduit PVC flexible 20mm558-42 Conduit PVC flexible 25mm558-43 Conduit PVC flexible 50mm
559 Communications conduits & bends559-10 Conduit communication 50 dia.(white)559-55 Conduit bend communication 304 Rad. 50 Dia. 90 Deg.559-75 Conduit bend communication 304 Rad. 50 Dia. 45 Deg.
560 Communications splicing enclosure for fibre optic cable560-5 Splicing enclosure for 48/48 fibre optic cable communications560-10 Splicing enclosure for 36/36 fibre optic cable communications560-15 Splicing enclosure for 96/96, 48/48, and 36/36 fibre optic cable communications
561 Pits562 Communications HFT cable guard to pole562-1 HFT cable guard (25mm) single FOC to concrete pole562-6 HFT cable guard (25mm) double FOC to concrete pole562-11 HFT cable guard (25mm) FOC to wood pole
563 11kV padmounted substation with LV switchgear & RMU ABB SDAF3 2S1F563-3 Padmounted substation 315kVA with LV switchgear & RMU ABB SDAF3 2S1F563-4 Padmounted substation 500kVA with LV switchgear & RMU ABB SDAF3 2S1F563-5 Padmounted substation 750 kVA with LV switchgear & RMU ABB SDAF3 2S1F563-6 Padmounted substation 1000kVA with LV switchgear & RMU ABB SDAF3 2S1F
564 Conduits564-20 Conduit UPVC 80 dia. L.D. orange564-50 Conduit UPVC 40 dia. H.D. orange
565 11kV padmounted substation with LV switchgear 565-3 Padmounted substation 315kVA with LV switchgear565-4 Padmounted substation 500kVA with LV switchgear565-5 Padmounted substation 750kVA with LV switchgear565-6 Padmounted substation 1000kVA with LV switchgear
566 11kV padmounted substation with LV switchgear & ABB safelink RMU 2S1F566-3 Padmounted substation 315kVA with LV switchgear & RMU ABB SafeLink 2S1F566-4 Padmounted substation 500kVA with LV switchgear & RMU ABB SafeLink 2S1F566-5 Padmounted substation 750kVA with LV switchgear & RMU ABB SafeLink 2S1F566-6 Padmounted substation 1000kVA with LV switchgear & RMU ABB SafeLink 2S1F
567 11kV safelink ring main unit outdoor enclosure567-1 11kV ABB safelink 2 switch 1 fuse c/w cubical & plinth567-3 11kV ABB safelink 2 switch 2 fuse c/w cubical & plinth567-5 11kV ABB safelink 3 switch c/w cubical & plinth567-7 11kV ABB safelink 3 switch 1 fuse c/w cubical & plinth567-9 11kV ABB safelink 4 switch c/w cubical & plinth567-12 11kV ABB safelink 2 switch 1 fuse (RMU only)
569 Communications cable guard with bandit strap569-1 Guard metal (100) to concrete pole569-2 Guard metal (130) to concrete pole
570 11kV ABB safelink RMU in padmounted substation 1 core 400mm² Cu. cable term. & connection571 11kV ABB safelink RMU in padmounted substation cable termination & connection571-1 Term. & conn. (ABB SafeLink) 11kV 35mm² cable571-2 Term. & conn. (ABB SafeLink) 11kV 185mm² cable571-3 Term. & conn. (ABB SafeLink) 11kV 35mm² cable insect protected571-4 Term. & conn. (ABB SafeLink) 11kV 185mm² cable insect protected571-8 Term. & conn. (ABB SafeLink) 11kV 400mm² Cu cable 571-9 Term. & conn. (ABB SafeLink) 11kV 400mm² Cu cable insect protected
572 11kV outdoor termination 1 core 400mm² Cu. cable573 Cast aluminium single cable clamp to channel573-2 Clamp to channel suit 11kV 35mm² cable573-2 Clamp to channel suit 11kV 35mm² cable insect protected573-4 Clamp to channel suit 11kV 185mm² cable573-4 Clamp to channel suit 11/22kV 185mm² cable insect protected573-6 Clamp to channel suit 11kV 400mm² cable insect protected573-9 Clamp to channel suit 11kV 400mm² cable 573-9 Clamp to channel suit 11kV 400mm² cable insect protected573-11 Clamp to channel suit 22kV 35mm² cable
576 22kV padmounted substation with LV switchgear and F & G RMU576-2 Padmounted substation 315kVA 4.1m long with LV switchgear and RMU F & G 2 switch 1 fuse576-3 Padmounted substation 315kVA 4.1m long with LV switchgear and RMU F & G 3 switch 1 fuse576-4 Padmounted substation 315kVA 4.1m long with LV switchgear and RMU F & G 2 switch 2 fuse576-5 Padmounted substation 500kVA 4.1m long with LV switchgear and RMU F & G 2 switch 1 fuse576-8 Padmounted substation 1000kVA 4.1m long with LV switchgear and RMU F & G 2 switch 1 fuse576-9 Padmounted substation 1000kVA 4.1m long with LV switchgear and RMU F & G 3 switch 1 fuse
577 ABB bushing boots 16-300mm² cable - ABB safelink only. Raychem bushing boots 35-400mm² cable577-1 ABB bushing boots 16-300mm² cable (ABB safelink only)577-5 Raychem bushing boots 35-400mm² cable
578 11kV ABB safeplus & safering ring main unit - outdoor enclosure578-1 11kV ABB safeplus RMU 1 switch 1 circuit breaker 1 fuse c/w cubical & plinth578-5 11kV ABB safeplus RMU 2 switch 1 circuit breaker c/w cubical & plinth578-7 11kV ABB safering RMU 2 switch 2 circuit breaker c/w cubical & plinth578-9 11kV ABB safering RMU 3 switch 1 circuit breaker c/w cubical & plinth
579 22kV F & G ring main unit - outdoor enclosure579-1 22kV F & G RMU 2 switch 1 fuse c/w cubical & plinth579-3 22kV F & G RMU 2 switch 2 fuse c/w cubical & plinth579-5 22kV F & G RMU 3 switch c/w cubical & plinth579-7 22kV F & G RMU 3 switch 1 fuse c/w cubical & plinth579-9 22kV F & G RMU 4 switch c/w cubical & plinth579-11 22kV F & G RMU 1 switch 1 circuit breaker 1 fuse c/w cubical & plinth579-13 22kV F & G RMU 1 switch 1 circuit breaker 2 fuse c/w cubical & plinth579-11 22kV F & G RMU 2 switch 1 circuit breaker c/w cubical & plinth
580-1 Cable separation mounting bracket for termination leads581 Sign, asset identification numerals and letters581-0 Asset identification number '0'581-1 Asset identification number '1'581-2 Asset identification number '2'581-3 Asset identification number '3'581-4 Asset identification number '4'581-5 Asset identification number '5'581-6 Asset identification number '6'581-7 Asset identification number '7'581-8 Asset identification number '8'581-9 Asset identification number '9'581-A Asset identification letter 'A'581-B Asset identification letter 'B'581-C Asset identification letter 'C'581-D Asset identification letter 'D'581-E Asset identification letter 'E'
582 Sign, asset identification label tray582-2 Asset identification backing plate to polymeric / powder coated assets582-4 Asset identification backing plate to steel / aluminium assets
583-2 Concrete culvert - ABB safelink ring main unit584 33kV outdoor termination triplex & 1 core XLPE cable584-1 termination outdoor 33kV 50mm² cable584-3 termination outdoor 33kV 300mm² cable
586 LV Circuit Breaker586-1 Circuit Breaker, 1200A including busbar sub assembly to suit Webber 750kVa586-2 Circuit breaker, 1600A including busbar sub assembly to suit Webber 1000kVA586-3 Circuit breaker, 1600A, to suit Opus LV board in Schneider 22kV 1000kVA Padmount586-4 Circuit breaker, 1250A including busbar sub assembly - suit Jean Muller 750kVA Padmount LV Board586-5 Circuit breaker, 1600A including busbar sub assembly - suit Jean Muller 1000kVA Padmount LV Board
587 11kV Padmounted Substation with LV switchgear & Schneider Electric FBX RMU 2S1F587-3 Padmounted Substation 315kVA with LV switchgear & Schneider Electric FBX RMU 2S1F587-4 Padmounted Substation 500kVA with LV switchgear & Schneider Electric FBX RMU 2S1F587-5 Padmounted Substation 750kVA with LV switchgear & Schneider Electric FBX RMU 2S1F587-6 Padmounted Substation 1000kVA with LV switchgear & Schneider Electric FBX RMU 2S1F587-7 Padmounted Substation 1500kVA with LV switchgear & HV switchgear 2S1CB
588 Termination & Connection to 11kV HV Switchgear588-1 Term. & Conn. to HV switchgear 11kV 35mm² cable588-4 Term. & Conn. to HV switchgear 11kV 185mm² cable588-7 Term. & Conn. to HV switchgear 11kV 400mm² cable
589 Cover cable entry - retro fit kit590 22kV Padmount Substation with LV switchgear and Schneider Electric RM6590-1 200kVA 4.1m long with LV switchgear & RM6 1 switch 1 fuse590-2 315kVA 4.1m long with LV switchgear & RM6 2 switch 1 fuse590-3 315kVA 4.1m long with LV switchgear & RM6 3 switch 1 fuse590-4 315kVA 4.1m long with LV switchgear & RM6 2 switch 2 fuse590-5 500kVA 4.1m long with LV switchgear & RM6 2 switch 1 fuse590-6 500kVA 4.1m long with LV switchgear & RM6 3 switch 1 fuse590-7 500kVA 4.1m long with LV switchgear & RM6 2 switch 2 fuse590-8 1000kVA 4.1m long with LV switchgear, circuit breaker & RM6 2 switch 1 fuse590-9 1000kVA 4.1m long with LV switchgear, circuit breaker & RM6 3 switch 1 fuse590-10 1000kVA 4.1m long with LV switchgear, circuit breaker & RM6 2 switch 2 fuse
591 Gland Plate Kit591-1 Gland plate kit & glands to suit 35mm² cable - 3 unit config. 591-2 Gland plate kit & glands - 35mm² cable - additional for LHS of 4 unit config.591-3 Gland plate kit & glands to suit 630mm² cable - 3 unit config591-4 Gland plate kit & glands - 630mm² cable - additional for LHS of 4 unit config591-5 Gland kit with glands to suit 185mm² cable
592 Asset Identification Number592-0 Asset Identification Number '0'592-1 Asset Identification Number '1'592-2 Asset Identification Number '2'592-3 Asset Identification Number '3'592-4 Asset Identification Number '4'592-5 Asset Identification Number '5'592-6 Asset Identification Number '6'592-7 Asset Identification Number '7'592-8 Asset Identification Number '8'592-9 Asset Identification Number '9'
593 Adapter Fuse Link HV594 Paralleling Kits for fuse strips594-1 Paralleling kit to suit Jean Muller - (suits 630A Jean Muller strips only)594-2 Paralleling kit to suit Opus Schnieder - (suits 630A Opus & Fuseway 1260A only)594-3 Phase segregation device retrofit to Jean Muller ganged switch adapter
595 Distribution Padlock596 Anti-Galling Paste597 Service Fuse bracket to pole597-1 Bracket 32mm x 8mm to wood pole597-2 Fuse holder 100A to bracket
598 Distribution cabinet floodzone precast concrete foundation599 11kV Safelink2 RMU outdoor enclosure599-1 11kV ABB Safelink2 - 2 switch 1 fuse c/w cubical & plinth599-3 11kV ABB Safelink2 - 2 switch 2 fuse c/w cubical & plinth599-5 11kV ABB Safelink2 - 3 switch c/w cubical & plinth599-7 11kV ABB Safelink2 - 3 switch 1 fuse c/w cubical & plinth599-9 11kV ABB Safelink2 - 4 switch c/w cubical & plinth
600 Cable gland for ABB Safelink2 freestanding RMU600-1 Cable gland to suit 185mm² IP & Non IP Al cable 600-3 Cable gland with heatshrink to suit 400mm² Al non IP & 240mm² Cu IP cable 600-5 Cable gland to suit 400mm² Cu IP & 400mm² Al IP cable
601 LV Distribution cabinet base and floodzone extension601-1 Distribution cabinet base601-2 Distribution cabinet flood zone extension
602 Neutral Voltage Displacement - ABB REF 615 IED602-1 Neutral voltage displacement ABB ref 615 IED
603 Parallel cable adapter to suit Weber fuse switch603-1 Parallel cable adapter - to suit Weber fuse switch
604 Cable insulated604-5 Cable insulated 6mm² 2C Cu
605 Neutral Voltage Displacement Voltage Sensor605-1 Neutral voltage displacement voltage sensor - suits Prysmian & Elastamold type c connectors605-3 Neutral voltage displacement voltage sensor - suit Tyco (TE) Raychem type c connectors
606 11kV Padmounted substation with LV switchgear & RMU 2S1F606-1 Padmounted Substation 315kVA with LV switchgear & RMU 2S1F606-2 Padmounted Substation 500kVA with LV switchgear & RMU 2S1F606-3 Padmounted Substation 750kVA with LV switchgear &