8
BUILDING 3 - 2065 SANYO AVENUE, SAN DIEGO 137,000 SF for lease Divisible to 50,000 SF COMPLETION DECEMBER 2019 UNDER CONSTRUCTION Andy Irwin 858.410.6376 [email protected] RE lic #01302674 Jones Lang LaSalle Brokerage, Inc. RE License #01856260 Joe Anderson 858.410.6360 [email protected] RE lic #01509782

UNDER CONSTRUCTION · 805 IN TERSTATE 5 INTERS TATE 905 905 125 11 SAN DIEGO AIRPORT TJ INTL AIRPORT BROWN FIELD AIRPORT OTAY MESA PORT OF ENTRY CROSS BORDER TERMINAL INTERNATIONAL

  • Upload
    others

  • View
    5

  • Download
    0

Embed Size (px)

Citation preview

Page 1: UNDER CONSTRUCTION · 805 IN TERSTATE 5 INTERS TATE 905 905 125 11 SAN DIEGO AIRPORT TJ INTL AIRPORT BROWN FIELD AIRPORT OTAY MESA PORT OF ENTRY CROSS BORDER TERMINAL INTERNATIONAL

BUILDING 3 - 2065 SANYO AVENUE, SAN DIEGO

137,000 SF for leaseDivisible to 50,000 SF COMPLETION DECEMBER 2019

UNDER CONSTRUCTION

Andy Irwin 858.410.6376 [email protected] RE lic #01302674

Jones Lang LaSalle Brokerage, Inc.RE License #01856260

Joe Anderson 858.410.6360 [email protected] RE lic #01509782

Page 2: UNDER CONSTRUCTION · 805 IN TERSTATE 5 INTERS TATE 905 905 125 11 SAN DIEGO AIRPORT TJ INTL AIRPORT BROWN FIELD AIRPORT OTAY MESA PORT OF ENTRY CROSS BORDER TERMINAL INTERNATIONAL

San Diego Bay

Mission Bay

Pac i f i c Ocean

San Elijo Lagoon

Batiquitos Lagoon

Lake Hodges

I-805

I-8

I-15I-5

I-5

I-5

UNITED STATES

MEXICO

North CountyWest

I-15 Corridor

Central Suburban

East County

North Cities

Downtown

South Bay

San Ysidro POEOtay Mesa POE

SR 905Otay Mesa

Kearny Mesa22 miles

El Cajon24 miles

Miramar/UTC27 miles

Downtown19 miles

5INTERST AT E

125

805INTERST AT E

905

INTERST AT E

8

94

54

5INTERST AT E

INTERST AT E

15

BUILDING 3 FEATURES Total Size 137,000 SF

Mezzanine Area 5,000 SF

First Floor Area 132,000 SF Divisible 50,000 SF

Clear Height 32'

Power 4,000 amps, 227/480 3-phase*

Sprinklers ESFR

Loading 33 standard dock high doors 10 additional short yard docks available 4 grade level doors

Concrete Truck Yard 190’

Skylights 3%

Typical Column Spacing 50’ x 54’; 60’ deep dock bay

Completion

Rent

Operating Expenses

Additional Details

Parking

Visibility

Location

Security

Total Project Size

December 2019

$.785 NNN

$0.21/SF estimated in year 1

Walking distance to Otay Mesa Border Crossing

1/1,000

Highly visible from the SR-905 and SR-11 freeways

Excellent location 1/4 mile to Otay Mesa Port of Entry

with direct access to SR-905 and SR-11

Fullyfenced,securedsitewthonsitesecurity,C-TPATcertified

670,448 SF

2

* additional power available

Page 3: UNDER CONSTRUCTION · 805 IN TERSTATE 5 INTERS TATE 905 905 125 11 SAN DIEGO AIRPORT TJ INTL AIRPORT BROWN FIELD AIRPORT OTAY MESA PORT OF ENTRY CROSS BORDER TERMINAL INTERNATIONAL

THE CAMPUS SITE PLAN

3

Building 32065 Sanyo Ave

137,000 SF

Building 3

First Floor 132,000 SFMezz (expandable) 5,000 SFTotal 137,000 SF

Dock DoorsShort Yard DocksTotal Docks

331043

Grade DoorsDock Ratio

41 / 3,100 SF

Andy Irwin 858.410.6376 [email protected] RE License # 01302674

BUILDING 3 - 2065 SANYO AVENUE, SAN DIEGO

137,000 SF for leaseDivisible to 50,000 SF COMPLETION DECEMBER 2019

3

Building 12001 Sanyo Ave

324,756 SF

Building 22055 Sanyo Ave

208,692 SF

Sanyo AveTruck Entry

137’

Airway DriveTruck Entry

Joe Anderson 858.410.6360 [email protected] RE lic #01509782

Page 4: UNDER CONSTRUCTION · 805 IN TERSTATE 5 INTERS TATE 905 905 125 11 SAN DIEGO AIRPORT TJ INTL AIRPORT BROWN FIELD AIRPORT OTAY MESA PORT OF ENTRY CROSS BORDER TERMINAL INTERNATIONAL

4

N

4

DOCK HIGH DOOR (STANDARD)

33 DOCK HIGH DOORS

54’

210’ 162’

528’

156’

50’

250’

60’

DOCK HIGH DOOR (SHORT YARD)

GRADE LEVEL DOOR

10 S

HO

RT

YAR

D

DO

CK

HIG

H D

OO

RS

POTENTIAL DEMISING WALL

POTENTIAL DEMISING WALL

SUITE 11040,500 SF

SUITE 12039,000 SF

FUTUREOFFICE

FUTUREOFFICE

OFFICE

MEZZANINE OFFICE

SUITE 10057,500 SF

Page 5: UNDER CONSTRUCTION · 805 IN TERSTATE 5 INTERS TATE 905 905 125 11 SAN DIEGO AIRPORT TJ INTL AIRPORT BROWN FIELD AIRPORT OTAY MESA PORT OF ENTRY CROSS BORDER TERMINAL INTERNATIONAL

Andy Irwin 858.410.6376 [email protected] RE License # 01302674

BUILDING 3 - 9600 AIRWAY RD, SAN DIEGO

137,000 SF for leaseDivisible to 39,000 SF AVAILABLE Q1 2019

BUILDING 3 - 2065 SANYO AVENUE, SAN DIEGO

137,000 SF for leaseDivisible to 50,000 SF COMPLETION DECEMBER 2019

5

Andy Irwin 858.410.6376 [email protected] RE License # 01302674

Joe Anderson 858.410.6360 [email protected] RE lic #01509782

Page 6: UNDER CONSTRUCTION · 805 IN TERSTATE 5 INTERS TATE 905 905 125 11 SAN DIEGO AIRPORT TJ INTL AIRPORT BROWN FIELD AIRPORT OTAY MESA PORT OF ENTRY CROSS BORDER TERMINAL INTERNATIONAL

DOWNTOWNSAN DIEGO

805INTERSTATE

5INTERSTATE

905

905

125

11

SAN DIEGOAIRPORT

TJ INTLAIRPORT

BROWNFIELDAIRPORT

OTAY MESAPORT OF ENTRY

CROSS BORDERTERMINAL

INTE

RNA

TIO

NA

L BO

RDER

ENRICO FERMI ON/OFF RAMP

SIEMPRE VIVA ON/OFF RAMP

LA MEDIA ON/OFF RAMP

6

DETENTION BASIN

BUILDING 1779,050 SF

PROPOSEDOFFICEAREA

PROPOSEDOFFICE

TRUCK COURT

26 DOCK HIGH LOADING DOORS

54'

557'

470'

155'

52'

210'

RAMP

19 DOCK HIGH LOADING DOORS

TRUCK COURT

PROPOSEDOFFICEAREA

55' 50'

BUILDING 18121,970 SFPROPOSED

OFFICEAREA

132' RAMP

192'

132'

SUITE C

SUITE B

SUITE A

SUITE B

SUITE A

KERNS STREET

MELKSEE STREET

SIEMPRE VIVA ROAD

55

Page 7: UNDER CONSTRUCTION · 805 IN TERSTATE 5 INTERS TATE 905 905 125 11 SAN DIEGO AIRPORT TJ INTL AIRPORT BROWN FIELD AIRPORT OTAY MESA PORT OF ENTRY CROSS BORDER TERMINAL INTERNATIONAL

DOWNTOWNSAN DIEGO

805INTERSTATE

5INTERSTATE

905

905

125

11

SAN DIEGOAIRPORT

TJ INTLAIRPORT

BROWNFIELDAIRPORT

OTAY MESAPORT OF ENTRY

CROSS BORDERTERMINAL

INTE

RNA

TIO

NA

L BO

RDER

55

2055 SANYO AVE

2001 SANYO AVE

Andy Irwin 858.410.6376 [email protected] RE License # 01302674

66

BUILDING 3 - 2065 SANYO AVENUE, SAN DIEGO

137,000 SF for leaseDivisible to 50,000 SF COMPLETION DECEMBER 2019

7

Andy Irwin 858.410.6376 [email protected] RE License # 01302674

Joe Anderson 858.410.6360 [email protected] RE lic #01509782

BUILDING 3

Page 8: UNDER CONSTRUCTION · 805 IN TERSTATE 5 INTERS TATE 905 905 125 11 SAN DIEGO AIRPORT TJ INTL AIRPORT BROWN FIELD AIRPORT OTAY MESA PORT OF ENTRY CROSS BORDER TERMINAL INTERNATIONAL

57

Andy Irwin 858.410.6376 [email protected] RE License # 01302674

7

Although information has been obtained from sources deemed reliable, neither Owner nor JLL makes any guarantees, warranties or representations, express or implied, as to the completeness or accura-cy as to the information contained herein. Any projections, opinions, assumptions or estimates used are for example only. There may be differences between projected and actual results, and those differences may be material. The Property may be withdrawn without notice. Neither Owner nor JLL accepts any li-ability for any loss or damage suffered by any party resulting from reliance on this information. If the re-cipient of this information has signed a confidentiality agreement regarding this matter, this informa-tion is subject to the terms of that agreement. ©2019. Jones Lang LaSalle IP, Inc. All rights reserved.

8

UNDER CONSTRUCTION

Joe Anderson 858.410.6360 [email protected] RE lic #01509782