26
30 March 2005, G:/JETCD/JIC WAY AHEAD/JIC WA Y AHEAD.ppt 1 UNCLASSIFIED UNCLASSIFIED Joint Capability Areas Status Update to WJTSC 10-1 29 March 2010 Joint Staff J-7, JFDID

UNCLASSIFIED 1 Joint Capability Areas Status Update to WJTSC 10-1 29 March 2010 Joint Staff J-7, JFDID

Embed Size (px)

Citation preview

Page 1: UNCLASSIFIED 1 Joint Capability Areas Status Update to WJTSC 10-1 29 March 2010 Joint Staff J-7, JFDID

30 March 2005, G:/JETCD/JIC WAY AHEAD/JIC WAY AHEAD.ppt 1

UNCLASSIFIED

UNCLASSIFIED

Joint Capability AreasStatus Update

to WJTSC 10-1

29 March 2010

Joint Staff J-7, JFDID

Page 2: UNCLASSIFIED 1 Joint Capability Areas Status Update to WJTSC 10-1 29 March 2010 Joint Staff J-7, JFDID

UNCLASSIFIED

2

UNCLASSIFIED

Agenda

Time Topic/Subject Briefer

0800 - 0815 Welcome CDR Fleming

0815 - 0830 JCA Status Update Brief Mr. Brown

0830 - 0915 UJTL / JCA Mapping Initial Staffing Results Mr. Brown

0915 - 0945 Break All

0945 - 1015 UJTL / JCA Mapping GOFO Staffing Mr. Brown

1015 - 1115 Future JCA Initiatives Mr. Brown

1115 - 1200 Wrap up / Closing Remarks CDR Fleming

1200 - 1300 Lunch

Page 3: UNCLASSIFIED 1 Joint Capability Areas Status Update to WJTSC 10-1 29 March 2010 Joint Staff J-7, JFDID

3UNCLASSIFIED

UNCLASSIFIED

A Common Language

• DOD processes previously talked in five different languages (some still do)…

– Policy talked in terms of strategic priorities

– Programming talked in terms of appropriations and PEs

– Planning talked in terms of force packages

– Acquisition talked in terms of cost, schedule and performance parameters

– Requirements talked in terms of capabilities and gaps

• Common language enables an enterprise-wide capabilities-based strategy-to-task discussion

DOD’s Capabilities Based Planning “Rosetta Stone”

Page 4: UNCLASSIFIED 1 Joint Capability Areas Status Update to WJTSC 10-1 29 March 2010 Joint Staff J-7, JFDID

UNCLASSIFIED

4

UNCLASSIFIED

JCA Usage Examples

DoD Guidance & Reports• Quadrennial Roles and Missions (QRM) Report to Congress• Guidance for Developing the Force (GDF)• Capability Portfolio Management (CPM)

Business Processes / Policies• Joint Capabilities Integration Development System (JCIDS)• Functional Capability Boards (FCBs)• Joint Combat Capability Assessment (JCCA)• Defense Readiness Reporting System (DRRS)• Linking Plans to Resources (LPTR)• Joint Capability Requirements Manager (JCRM)

Enterprise Architectures• DoD Architectural Framework (DoDAF) 2.0• DoD Architecture Registry System• DON Architectures• Army Enterprise Architecture Framework • Defense Intelligence Enterprise Architecture BA and ISR Segments• Joint C2 Architectures and Capability Assessment Enterprise (JACAE)

Other• Visual C2 Capability Analysis and Tradeoff Suite• Joint Concept Development & Experimentation Campaign Plan (JCD&E C-Plan)• Defense Threat Reduction Agency Science & Technology Plan• USAF Electronic Warfare Roadmap• Naval Investment Management System• Dependence on Contractor Support in Contingency Operations Task Force

Page 5: UNCLASSIFIED 1 Joint Capability Areas Status Update to WJTSC 10-1 29 March 2010 Joint Staff J-7, JFDID

UNCLASSIFIED

5

UNCLASSIFIED

Acquisition and Requirements Reform – 9 Apr 09

Secretary Gate’s response to a President’s Tank Session question regarding Acquisition Reform

Page 6: UNCLASSIFIED 1 Joint Capability Areas Status Update to WJTSC 10-1 29 March 2010 Joint Staff J-7, JFDID

6UNCLASSIFIED UNCLASSIFIED

IDA Study

December 8

Capability Area Assessments (CAAs) (Cont.)

6. Capability Area Assessment Teams

• Co-Chairs: CAPE (Chair), JS or CoCom, DDR&E or NII

– CAPE provides analytic and programming lead

– JS provides warfighting concepts and user perspectives

– CoComs provide user perspectives and expertise

– OSD proponent offices provide technology perspective

• Other participants:

– Service force providers

– Other OSD offices and other organizations participate and contribute as needed

• Each CAA Team has a tailored supporting structure to conduct detailed analytical and technical work

• CAAs replace Capability Portfolio Management (CPM) structure, with support capabilities retained or developed as appropriate

8. Other Analyses to Support the Planning and Resources Process

• Annual regional Operational Assessments of current and future capability needs

• Analyses of Human Capital/Manpower issues

• Analyses of infrastructure, logistics, and O&M issues

CAPE (Chair)

JS/ CoCom

DDR&E/NII

Services

CoCom(s)

Comptroller

Other

JS

Other OSD

7. Illustrative CAA Taxonomy1. Joint C2 and Networking2. Battlespace Awareness3. Cyber4. Mobility

5. Maritime Combat and Presence6. Air Superiority, SEAD, Deep Strike 7. Close Combat and Forcible Entry8. Stability Ops & Building Partnerships

9. Strategic Deterrence10. Special Operations11. Homeland Defense, BMD

Technical Support- Technical Experts- FFRDC Studies

- Other

Policy

BU-8

Page 7: UNCLASSIFIED 1 Joint Capability Areas Status Update to WJTSC 10-1 29 March 2010 Joint Staff J-7, JFDID

7UNCLASSIFIED

UNCLASSIFIED

IDA Study Part 2 - Requirements

December 8

Acquisition and Requirements Themes for Part 2

BU-2

Page 8: UNCLASSIFIED 1 Joint Capability Areas Status Update to WJTSC 10-1 29 March 2010 Joint Staff J-7, JFDID

8UNCLASSIFIED

UNCLASSIFIED

C2 / NC / BA CPM Input

DCDR, JFCOM

JS J-3

PDASD(NII)/DOD CIO

JS J-6

DCDR, USSTRATCOM

USD(I)

“The CPM process continues to provide a proactive, collaborative engagement venue to develop and discuss recommendations to adjudicate cross-Service/Agency issues regarding joint requirements and compelling Defense-wide needs. This process is

essential to our way ahead …”

Page 9: UNCLASSIFIED 1 Joint Capability Areas Status Update to WJTSC 10-1 29 March 2010 Joint Staff J-7, JFDID

9UNCLASSIFIED

UNCLASSIFIED

JCA Management Plan

Contents

– Background

– Definitions

– Roles and Responsibilities• Substantive tiers 1-3 changes – DAWG

• All other changes – DJS / PDUSD(P)

• J-7 designated lead agent

– Management

– Refinement Process

Describes processes and establish roles and responsibilities for the management, refinement, and continued development of the

JCA framework and definitions.

Page 10: UNCLASSIFIED 1 Joint Capability Areas Status Update to WJTSC 10-1 29 March 2010 Joint Staff J-7, JFDID

10

UNCLASSIFIED

UNCLASSIFIED

JCA Refinement Way Forward

• Complete UJTL to JCA mapping flag-level staffing before beginning JCA refinement process because:

• Mapping effort will inform JCA refinement

• Coordinate mapping analysis with JETD

• Supports next way-point – WJTSC 10-1 (29 March 2010)

• JCAMP provides the refinement process authority• Reestablishing JCA POCs for collaboration

• Provide feedback back to Community of Interest on mappings

• Add refinement functionality to JCAMS

• Host JCA core team meeting to promulgate responsibilities, level playing field, ensure participation, and seek process input

• Kick off JCA refinement process with data call

Page 11: UNCLASSIFIED 1 Joint Capability Areas Status Update to WJTSC 10-1 29 March 2010 Joint Staff J-7, JFDID

UNCLASSIFIED

11

UNCLASSIFIED

JCA Refinement Plan

Change Request from

JCA COIFeasible

Initial Feasibility Analysis

N

Tier 1 JCA POC

Analysis

JCA Core Team

Review?

JCA COI Coord

Pass?

N

Approval Authority

Coordination/ Adjudication

Approve?

UpdateJCAMS

N N

NotifyCOI

Engineering / Installation SupportCorporate Management & Support (BTA)Human Terrain / Linguists / ChaplainSpace EnablersLogistics – Class of Supply vs. Supply Chain function

DataCall

Mar Apr May Jun Jul Aug Sep Oct Nov Dec

Re-constituteCore Team

Known Issue Working Groups Core Tm

ReviewJCA COI

Coord

Co-chairIPR

YPass

?

N

Y

Co-chairIPR CRC

YY

Page 12: UNCLASSIFIED 1 Joint Capability Areas Status Update to WJTSC 10-1 29 March 2010 Joint Staff J-7, JFDID

12UNCLASSIFIED

UNCLASSIFIED

DoDAF V2.0

Page 13: UNCLASSIFIED 1 Joint Capability Areas Status Update to WJTSC 10-1 29 March 2010 Joint Staff J-7, JFDID

UNCLASSIFIED

13

UNCLASSIFIED

Origins of Enterprise Architecture

Page 14: UNCLASSIFIED 1 Joint Capability Areas Status Update to WJTSC 10-1 29 March 2010 Joint Staff J-7, JFDID

14

Data &

Information

View

OV-7

Net-Centric

View

SV-11

All “Service”

Versions of

SV Products

Systems

View

All “Systems” Versions of SV Products

DoDAF V1.5

Capability

View

Project

View

System

Engineering

View

Standards

View

Operational

View

Rest of OVs

All TVs

All

ViewAll AVs

DoDAF V2.0

NewUpdated Moved

DoDAF Metamodel (DM2)

Fit ForPurpose

PresentationDashboards Graphical

DepictionsReference

ModelsFusion

ProductsCompositeProducts

Page 15: UNCLASSIFIED 1 Joint Capability Areas Status Update to WJTSC 10-1 29 March 2010 Joint Staff J-7, JFDID

15

Select the Viewpoints That Fit-the-Purpose

15

Page 16: UNCLASSIFIED 1 Joint Capability Areas Status Update to WJTSC 10-1 29 March 2010 Joint Staff J-7, JFDID

16UNCLASSIFIED

UNCLASSIFIED

Strategy to Task

Page 17: UNCLASSIFIED 1 Joint Capability Areas Status Update to WJTSC 10-1 29 March 2010 Joint Staff J-7, JFDID

17UNCLASSIFIED

UNCLASSIFIED

Current DoD IT Mission AreasW

eap

on

Syste

m L

ife C

ycle

Mg

mt

Fin

an

cia

l M

gm

t

Hu

man

Resou

rce

Mg

mt

Real P

rop

ert

yIn

sta

llati

on

/Lif

e C

ycle

Mg

mt

Business Mission Area

DBSMC

BTA

Warfighting Mission Area

JROC

Batt

lesp

ace

Aw

are

ness

Com

man

d &

C

on

trol

Log

isti

cs

Bu

ild

ing

P

art

ners

hip

s

Forc

e

Ap

pli

cati

on

s

Forc

e S

up

port

Pro

tecti

on

Corp

ora

te M

gm

t

& S

up

port

Net

Cen

tric

DOD Intel Mission Area

ISR Council

An

aly

sis

&

Pro

du

cti

on

Exp

loit

ati

on

Coll

ecti

on

Dis

sem

inati

on

En

terp

rise I

T

En

terp

rise

Mg

mt

Mis

sio

n M

gm

t

USD(I)

DOD IT Portfolio Management Mission Areas and Governance

Enterprise Information Environment Mission Area

Information Assurance

Communications Computing Infrastructure

Core Enterprise Services

Deputy DOD Chief Information Officer

Enterprise Governance Board

Joint Staff J6

Page 18: UNCLASSIFIED 1 Joint Capability Areas Status Update to WJTSC 10-1 29 March 2010 Joint Staff J-7, JFDID

UNCLASSIFIED

18

UNCLASSIFIED

DoD EA Segments For OMB Reporting (Feb 27)

Notional segmentForce Management

Notional segmentTraining

Notional segmentForce Protection

Notional segmentForce Application

ASD(NII)/DoD CIOCommand & Control

ASD(NII)/DoD CIOInformation Assurance

DISA, USAF, USA, DON

DoD IT Infrastructure (4 segments)

ASD(NII)/DoD CIOBattlespace Networks

USD(I)Battlespace Awareness

TRANSCOMFocused Logistics

BTAMateriel Supply

ASD(HA)Health

BTAHuman Resource Management

BTAAcquisition

BTAFinancial Management

Report Lead“FY 11” Proposed Segments

Enterprise Information Environment Mission Area

Business Mission Area

Defense Intelligence Mission Area

Warfighting Mission Area

Official FY 10 Segments

Note: Only Part 1 submitted for all except the DoD IT Infrastructure

Enterprise Architecture Segments

EA Segments

Segments represent distinct portions of the enterprise (core mission, business or enterprise services) characterized by:

• Common governance

• Use of common and related services and functions; shared resources and data

• An ability to coordinate and achieve consensus across segment stakeholders

Strong OMB interest in:• Segments that include (or with potential) for cross Agency use

(e.g., financial management)

• Information sharing segments

• Segments that reflect new Administration priorities (e.g., health, Info Assurance)

• Information technology infrastructure segment

5

DoD’s existing Four Segments (Mission Areas) are no longer appropriate BUT FY 10 IT budget tied to them

6

“Future Looking”DoD Capability Segments and Segment Architectures

DoD Enterprise Architecture

Force Application Force Application

Building PartnershipsBuilding Partnerships

Command & ControlCommand & Control

ProtectionProtection

LogisticsLogistics

Force Support Force Support

Corporate Mgmt & SupportCorporate Mgmt & Support

Net-centricNet-centric

Battlespace AwarenessBattlespace Awareness

Force Application

Join

t C

apability

Are

as

Command and Control(Global C2, JIAMDO C2)

IT Infrastructure (MILDEP/DISA Fixed base architectures/plans)

Battlespace Awareness(Analysis and Production Arch)

Force Protection

Financial Management (BEA)

Focused Logistics(BEA, JDDA)

Battlespace Networks(NC CPM CJTF)

Info Assurance(GIG IA)

Segment (Segment Architectures)

Materiel Supply(BEA)

Human Resources Mgt(BEA, HRM)

Health (BEA, MHS)

Training

Financial Management (BEA)

Acquisition(BEA)

Segment (Segment Architectures)

(LandwarnetForcenet

ConstellationnetMAGTF C2

…..)

Force Mgt.

Page 19: UNCLASSIFIED 1 Joint Capability Areas Status Update to WJTSC 10-1 29 March 2010 Joint Staff J-7, JFDID

UNCLASSIFIED

19

UNCLASSIFIED

JCA to BEA Activity Mapping

Page 20: UNCLASSIFIED 1 Joint Capability Areas Status Update to WJTSC 10-1 29 March 2010 Joint Staff J-7, JFDID

UNCLASSIFIED

20

UNCLASSIFIED

On-going Work

• Joint Capability Area Management System (JCAMS)

– Spiral 3 on track for delivery at end of current PoP (31 Mar 2010)

– .mil domain migration, reusing 2 JTIMS servers (target Jul 2010)

• UJTL to JCA mapping

– Initial staffing and adjudication complete (5 Feb 2010)

– Flag-level staffing JSAP end of February

• Joint Capability Resource Manager (JCRM)

– JFCOM on task to integrate JCAs into JCRM structure utilizing JCAMS shared data (including UJTL to JCA mappings)

– Next phase is mapping JCAs to Joint Requirements Codes (JRC)

Page 21: UNCLASSIFIED 1 Joint Capability Areas Status Update to WJTSC 10-1 29 March 2010 Joint Staff J-7, JFDID

Task to JCA Mappings

FY10 JCA TimelineJAN FEB MAR APR MAY JUN JUL AUG SEPOCT NOV DEC

BEA to JCA Mapping

JAIWG

Proposed/PossibleScheduled/ Tentative

Spiral 3 Complete

QDR

FY12 IPLSubmission

Initial Staffing

Svc/CSAGuidance

NGDiscussions

WJTSC 10-1WJTSC 10-2Final Staffing Adjudication

Review Svc Mappings

JCA Refinement

JCAMS

Global Readiness

Conf

Integrate JCA in Joint Capability Requirements Manager (JCRM)

Data Exchange

Map JCAs to JRCs

Data Call

The DoD Enterprise Architecture Conf

StaffingFunction update

JCRM

JFRR

DRRS

Global Force Mgmt

Architectures

APEX

Readiness

Develop Operational Templates

DJSSignature

PDUSD(P)Signature

Re-formCore Tm

JCAMP

GFMB(Sourcing)GFMB (Request Review)

PublishJCAMP

GDF

BEA 7.0

Army Automated Architecture Framework Meeting

Page 22: UNCLASSIFIED 1 Joint Capability Areas Status Update to WJTSC 10-1 29 March 2010 Joint Staff J-7, JFDID

22UNCLASSIFIED

UNCLASSIFIED

Questions

Page 23: UNCLASSIFIED 1 Joint Capability Areas Status Update to WJTSC 10-1 29 March 2010 Joint Staff J-7, JFDID

23UNCLASSIFIED

UNCLASSIFIED

Capability PortfoliosCapability Portfolios

1.1. Force ApplicationForce Application

2.2. Battlespace AwarenessBattlespace Awareness

3.3. Command & ControlCommand & Control

4.4. Net-CentricNet-Centric

5.5. Force SupportForce Support

6.6. ProtectionProtection

7.7. Building PartnershipsBuilding Partnerships

8.8. LogisticsLogistics

9.9. Corporate Management Corporate Management & Support& Support

Capability PortfoliosCapability Portfolios

1.1. Force ApplicationForce Application

2.2. Battlespace AwarenessBattlespace Awareness

3.3. Command & ControlCommand & Control

4.4. Net-CentricNet-Centric

5.5. Force SupportForce Support

6.6. ProtectionProtection

7.7. Building PartnershipsBuilding Partnerships

8.8. LogisticsLogistics

9.9. Corporate Management Corporate Management & Support& Support

• Civilian and Military leads for each CPM

• 4 original “test cases” now formalized

• Experiment w/ remaining 5 portfolios

• Nine portfolios aligned to Joint Capability Area taxonomy

Capability Portfolio ManagementFebruary 7, 2008 Deputy Secretary of Defense Memorandum

DCMO

Page 24: UNCLASSIFIED 1 Joint Capability Areas Status Update to WJTSC 10-1 29 March 2010 Joint Staff J-7, JFDID

24UNCLASSIFIED

UNCLASSIFIED

Ongoing Initiatives

Immediate:

• JCAMP announcement / POC JSAP

• UJTL to JCA Mapping (Flag-level) JSAP

Near to Mid-term:

• JCAs at WJTSC 10-1

• Service Task to JCA Mapping

• JCA – Joint Capability Requirements Manager (JCRM) integration

• JCA – Chairman’s Readiness System integration (Opn’l templates)

• JCA Refinement – Oct 2010

Page 25: UNCLASSIFIED 1 Joint Capability Areas Status Update to WJTSC 10-1 29 March 2010 Joint Staff J-7, JFDID

25UNCLASSIFIED

UNCLASSIFIED

15 Mar 07

JCA Lineage

22 Mar 06

Aldridge Study recommended them…

OSD asked for them…

SECDEF directed them…

QDR and SPG re-affirmed them…

Jan 06

Jan 07

Jan 08

Jan 05

Dec 03

DSD directed Baseline Reassessment…

6 Feb 06

6 May 05

DSD JCA Memo – “the Department’s capability

management language…”

Jan 0912 Jan 09

JCA Refinement Tiers 1 – 7 approved

14 Feb 08

Jan 10

Mar 04Aldridge Study

JOINT DEFENSECAPABILITIES STUDYJOINT DEFENSECAPABILITIES STUDY

Jan 04

JCAMPapproved

27 Jan 10

Page 26: UNCLASSIFIED 1 Joint Capability Areas Status Update to WJTSC 10-1 29 March 2010 Joint Staff J-7, JFDID

UNCLASSIFIED

26

UNCLASSIFIED

DoD Architecture Framework Version 2.0