3
UNCCH HILL HALL RENOVATION + EXPANSION PROJECT INFORMATION SESSION Project Information Session & Tier 1/Tier 2 Outreach November 19, 2014 | 5:30PM UNCCH Kenan Stadium, Blue Zone, Upper Club Chapel Hill, North Carolina Barnhill Contracting Company/D.A. Everett Construction will conduct a project information session and outreach meeting to update all interested subcontractors, vendors, and suppliers on opportunities available at the UNCCH Hill Hall project on November 19, 2014 at 5:30PM at the UNCCH Kenan Stadium, Blue Zone, Upper Club. Meeting attendees will receive the latest information on: 1. Drawings and specifications 2. Site logistic plans 3. Safety requirements 4. Construction schedules 5. Available bid packages 6. Detailed scopes of work 7. Public Bid Instructions 8. Diversity goals and expectations for Tier 1/Tier 2 collaboration PROJECT DESCRIPTION This project consists of the interior renovations to the existing Recital Hall and Administration and classroom areas. In addi- tion, new Mechanical, Electrical, Fire Protection system upgrades, as well as some structural renovations to the existing build- ing to accommodate the new renovations and expansion. Get registered in Barnhill/D.A. Everett, A Joint Ventures database for this project. Barnhill/D.A. Everett, A Joint Venture is dedicated to ensuring Historically Underutilized Business & Minority Business participation in this project and would like to show our support of your business through our MWBE Informational Session. The targeted bid date is May 2015. Please RSVP to Kelsie Williamson at [email protected] by November 12, 2014.

UNCCH HILL HALL RENOVATION + EXPANSION PROJECT …...8. Diversity goals and expectations for Tier 1/Tier 2 collaboration PROJECT DESCRIPTION This project consists of the interior renovations

  • Upload
    others

  • View
    0

  • Download
    0

Embed Size (px)

Citation preview

Page 1: UNCCH HILL HALL RENOVATION + EXPANSION PROJECT …...8. Diversity goals and expectations for Tier 1/Tier 2 collaboration PROJECT DESCRIPTION This project consists of the interior renovations

UNCCH HILL HALL RENOVATION + EXPANSIONPROJECT INFORMATION SESSION

Project Information Session & Tier 1/Tier 2 OutreachNovember 19, 2014 | 5:30PMUNCCH Kenan Stadium, Blue Zone, Upper ClubChapel Hill, North Carolina

Barnhill Contracting Company/D.A. Everett Construction will conduct a project information session and outreach meeting to update all interested subcontractors, vendors, and suppliers on opportunities available at the UNCCH Hill Hall project on November 19, 2014 at 5:30PM at the UNCCH Kenan Stadium, Blue Zone, Upper Club.

Meeting attendees will receive the latest information on:1. Drawings and specifications2. Site logistic plans3. Safety requirements4. Construction schedules5. Available bid packages6. Detailed scopes of work7. Public Bid Instructions8. Diversity goals and expectations for Tier 1/Tier 2 collaboration

PROJECT DESCRIPTION This project consists of the interior renovations to the existing Recital Hall and Administration and classroom areas. In addi-tion, new Mechanical, Electrical, Fire Protection system upgrades, as well as some structural renovations to the existing build-ing to accommodate the new renovations and expansion. Get registered in Barnhill/D.A. Everett, A Joint Ventures database for this project. Barnhill/D.A. Everett, A Joint Venture is dedicated to ensuring Historically Underutilized Business & Minority Business participation in this project and would like to show our support of your business through our MWBE Informational Session.

The targeted bid date is May 2015.

Please RSVP to Kelsie Williamson at [email protected] by November 12, 2014.

Page 2: UNCCH HILL HALL RENOVATION + EXPANSION PROJECT …...8. Diversity goals and expectations for Tier 1/Tier 2 collaboration PROJECT DESCRIPTION This project consists of the interior renovations

QUICK TIPPark on the 3rd fl oor of ram’s head. This will place you on the same fl oor level as the entrance to the loudermilk center for excellence where the upper club is located.

From I-40 East (Raleigh)1. Take exit 273 (HWY 54) and go west towards Chapel Hill.2. Continue for 4 miles to top of the hill; get in the left lane.3. At the traffi c light at country club road, turn left.4. Take a quick right onto ridge road.5. Continue to the Ram’s Head Parking lot, on the right just past Stadium Drive.

From I-85 South (Charlotte, Greensboro, Winston-Salem)1. Take I-40 East towards Raleigh.2. Take exit 270 (Highway 15-501 South); turn right at the end of the exit ramp.3. Follow 15-501 South towards Chapel Hill; the highway will divide.4. Remain on 15-501 South, bearing left and away from Franklin Street.5. Turn right at Highway 54 exit; follow sign for “UNC-Chapel Hill.”6. Continue to top of the hill; get in the left lane.7. At the traffi c light at Country Club Road, turn left.8. Take a quick right onto Ridge Road.9. Continue to the Ram’s Head Parking Lot, on the right just past Stadium Drive.

From I-85 North (Durham)1. Follow I-85 to intersection with Highway 15-501 South.2. Follow 15-501 South towards Chapel Hill; the highway will divide.3. Remain on 15-501 South, bearing left and away from Franklin Street.4. Turn right at Highway 54 exit; follow sign for UNC-Chapel Hill.5. Continue to top of the hill; get in the left lane.6. At the traffi c light at Country Club Road, turn left.7. Take a quick right onto Ridge Road.8. Continue to the Ram’s Head Parking Lot, on the right just past Stadium Drive.

ADDITIONAL INFORMATION1. If possible, park on Level 3 of Ram’s Head Parking Deck. As you depart the deck toward Kenan Stadium, this will put you on the same level as the entrance to the Loudermilk Center for Excellence where the Upper Club is located.2. Enter the Loudermilk Center for Excellence, walk down the hallway to the fi rst elevator on your right. Take the elevator to the Upper Club on Level 5.

DIRECTIONS TO FREE PARKING -RAM’S HEAD PARKING DECK

Page 3: UNCCH HILL HALL RENOVATION + EXPANSION PROJECT …...8. Diversity goals and expectations for Tier 1/Tier 2 collaboration PROJECT DESCRIPTION This project consists of the interior renovations

ATTENTION MINORITY/HUB CONTRACTORS: Barnhill/D.A. Everett, A Joint Venture, the Construction Manager at Risk for the UNC Hill Hall Renovation and Expansion project will be conducting the following MWBE Informational Session. You are encouraged to attend the following session to learn more about project participation opportunities available to you. Informational Session will be held on Wednesday, November 19, 2014 at 5:30 PM at the UNCCH Kenan Stadium, Blue Zone, Upper Club. Plan to park in the Ram’s Head Parking Lot, on the right, just past Stadium Drive. If possible, park on Level 3 of Ram’s Head Parking Deck. As you depart the deck toward Kenan Stadium, this will put you on the same level as the entrance to the Loudermilk Center for Excellence where the Upper Club is located. The seminar will help to: Learn about the project and the scope of the bid packages; Inform and train Minority/HUB contractors in preparation for bidding this project; Assist in registration on the State of North Carolina Vendor link; Stimulate opportunities for Networking with other firms. The targeted bid date is May 2015. This project consists of the interior renovations to the existing Recital Hall and Administration and classroom areas. In addition, new Mechanical, Electrical, Fire Protection system upgrades, as well as some structural renovations to the existing building to accommodate the new renovations and expansion. Get registered in Barnhill/D.A. Everett, A Joint Ventures database for this project. Barnhill/D.A. Everett, A Joint Venture is dedicated to ensuring Historically Underutilized Business & Minority Business participation in this project and would like to show our support of your business through our MWBE Informational Session.