TomS.Chung,AIALEEDBD+CPrincipal,LeersWeinzapfelAssociates
Umass AmherstDesignBuildingLeadingtheWaywithMassTimberSolutions
Disclaimer: This presentation was developed by a third party and is not funded by WoodWorks or the Softwood Lumber Board.
Umass AmherstDesignBuildingLeadingtheWaywithMassTimberSolutions
CourseDescription
Currentlyunderconstruction, theDesignBuilding attheUniversityofMassachusetts Amherst isthefirstofitskindintheU.S.Atfourstoriesand87,000sf,thismasstimberproject,designed byLeersWeinzapfelAssociates, featuresaglue-laminated (glulam)timbercolumn-and-beamframe,masstimber lateral force-resisting systems,compositecross-laminated timber(CLT)floorsystems,andunconventionalcantilevered forms.Italso includes anopenfloorplan,exposedmasstimberframingthroughout,andacomposite glulamzippertrussspanningacentralcommons,withagreenroofcourtyardabove.
Thispresentation bytheproject’sprincipal architectwillreviewtheprocessandcollaborationrequiredtosee thisgroundbreakingstructuretofruitioninasteel-dominated construction industry.Topicswillinclude design,detailing, procurementofmaterials, codeapprovalsandconstruction,withanemphasis onissues andsolutions.
Umass AmherstDesignBuildingLeadingtheWaywithMassTimberSolutions
LearningObjectives
•Explorethedesign team’sapproachtomaterialandconstructionselection foramasstimberbuilding inlieuoftraditional steelsystems.
•Discuss theuseofcomposite CLTfloorsystemsandassociated designconsiderations.
•Reviewthecodeapprovalandlocalpermittingsteps takentoachievecompliance forafirst-of-its-kind masstimberbuilding.
•Highlight innovativestructuralsolutions implemented bythedesignteaminthecentralcommonsandcourtyardinordertomeetmassingandoccupancyneeds.
TomS.Chung,AIALEEDBD+CPrincipal,LeersWeinzapfelAssociates
AGENDA/ OUTLINE
Introduction• Background & Context • Design Concept
Process• Mass Timber Structure Design• Steel Systems vs Wood Systems • Assuring the Client: Budget, Procurement & Code
Design Details and Construction• Central Commons and Courtyard Design
Umass AmherstDesignBuildingLeadingtheWaywithMassTimberSolutions
RegionalContext
ViewfromSite
BuildingConceptDiagram
CampusCirculation
CampusModel
SiteModel
ProgramOrganization
ProgramOrganization
SitePlan
RegionalContext
FenestrationConcept
ViewfromCampusCore
ViewfromHistoricStockbridgeWay
DesignProcess
SteelColumnGrid
TimberColumnGrid
PostandBeamStructuralFramework
Revit Model
StructuralFramework
StructuralSystems
TimberStructureRevitModel
CarbonSummary
Steel Post & Beam
Steel/Concrete Floors
Steel Deck Roof
Concrete Shafts
Steel Braces
GL Post & Beam
CLT/Concrete Floors
CLT Roof
CLT Shafts
Glulam Braces
CHANGE IS POSSIBLE EVERYWHERE
Steel
PostandBeamStructuralFramework
PostandBeamStructuralFramework
Glulam
GlulamBeamtoColumnConnection
GlulamBeamtoColumnConnection
GlulamBeamtoColumnConnection
Steel and Concrete
FloorSystem
Steel and Concrete
FloorSystem
CLT and Concrete
FloorSystem
CLT and Concrete
FloorSystem
CLTandConcreteCompositeFloor
CLTandConcreteCompositeFloor
CLTandConcreteCompositeFloor
CLTandConcreteCompositeFloor
RoofDeck
Steel Decking
RoofDeck
CLT Panels
ShearWalls
Concrete Shaft CLT Shaft
LateralCrossBracing
Steel Bracing Glulam Bracing
LateralCrossBracing
LateralCrossBracing
ProjectTeamandStakeholdersProcess:AssuringtheClient
Project Team
• Client: University of Massachusetts Building Authority
• User: University of Massachusetts, AmherstArchitecture & Design, LARP, Building Construction & Technology
• Architectural / Structural Design Team: Architect: Leers Weinzapfel AssociatesStructural Design Engineer: Equilibrium ConsultingSER: SGH
• AHJ:MA State Building InspectorMA Board of Appeals
• Construction Team:Construction ManagerTimber Fabricator and Installer
ProjectTeamandStakeholdersProcess:AssuringtheClient
ProjectTeamandStakeholdersProcess:AssuringtheClient
Key Issues•Danger of “Over Estimating Contingency” by Construction Managers or Cost Estimators due to the “Unknown”
•Importance of multiple Bidders
•Coordination of Fabricator and Installer Team
•Proper scoping of work for Bids. Especially if based on Progress Drawings
•Consideration of Contractor Reputation and History. It’s a small world!
BiddingandProcurementProcess:AssuringtheClient
PreliminaryEstimatesProcess:AssuringtheClient
TimbervsSteelBudgetComparisonProcess:AssuringtheClient
Fabricator/InstallerBidQuotesProcess:AssuringtheClient
CLT roof/floor panels and shear walls
CLT floor panels and glulam beams with composite concrete
AlternativeStructuralSystemsProcess:CodeReview&Variance
AlternativeStructuralSystemsProcess:CodeReview&Variance
TESTING
CentralCommonsandCourtyardDesign
StructuralChallenges:
•Longspanwithheavyloadingabove
•Minimizestructuraldepth
•Wetgardenonawoodstructure
CourtyardConceptSketch
PreliminaryCourtyardPlan
PreliminaryCourtyardSection
CentralSpaceStructuralConcepts
ZipperTrussFinalConcept
ZipperTrussModel
StructuralLoadingEfficiency
CourtyardSoilProfileRequirements
ModifiedFinalCourtyardPlan
CourtyardModelViews
CourtyardPlan
ZipperTrussModel
ReflectedCeilingPlan
CentralConnectorStudies
CentralConnectorStudies
CentralConnectorStudies
GrasshopperParametricDefinition
RhinoModelDetail
Construction Documents
CentralConnectorDesignAssist
ZipperTrussInstallation
ZipperTrussInstallation
ZipperTrussInstallation
CutawayModel
SectionThroughCommonsandLearningCourtyard
CentralCommons
LearningCourtyard
Spring2016
THANKYOU!
DesigningtheDesignBuildingatUMassAmherst
QUESTIONS?