Tom S. Chung, AIA LEED BD+C Principal, Leers Weinzapfel Associates Umass Amherst Design Building Leading the Way with Mass Timber Solutions Disclaimer: This presentation was developed by a third party and is not funded by WoodWorks or the Softwood Lumber Board.

UMass Design Building

Embed Size (px)

Citation preview

Page 1: UMass Design Building

TomS.Chung,AIALEEDBD+CPrincipal,LeersWeinzapfelAssociates

Umass AmherstDesignBuildingLeadingtheWaywithMassTimberSolutions

Disclaimer: This presentation was developed by a third party and is not funded by WoodWorks or the Softwood Lumber Board.

Page 2: UMass Design Building

Umass AmherstDesignBuildingLeadingtheWaywithMassTimberSolutions

CourseDescription

Currentlyunderconstruction, theDesignBuilding attheUniversityofMassachusetts Amherst isthefirstofitskindintheU.S.Atfourstoriesand87,000sf,thismasstimberproject,designed byLeersWeinzapfelAssociates, featuresaglue-laminated (glulam)timbercolumn-and-beamframe,masstimber lateral force-resisting systems,compositecross-laminated timber(CLT)floorsystems,andunconventionalcantilevered forms.Italso includes anopenfloorplan,exposedmasstimberframingthroughout,andacomposite glulamzippertrussspanningacentralcommons,withagreenroofcourtyardabove.

Thispresentation bytheproject’sprincipal architectwillreviewtheprocessandcollaborationrequiredtosee thisgroundbreakingstructuretofruitioninasteel-dominated construction industry.Topicswillinclude design,detailing, procurementofmaterials, codeapprovalsandconstruction,withanemphasis onissues andsolutions.

Page 3: UMass Design Building

Umass AmherstDesignBuildingLeadingtheWaywithMassTimberSolutions

LearningObjectives

•Explorethedesign team’sapproachtomaterialandconstructionselection foramasstimberbuilding inlieuoftraditional steelsystems.

•Discuss theuseofcomposite CLTfloorsystemsandassociated designconsiderations.

•Reviewthecodeapprovalandlocalpermittingsteps takentoachievecompliance forafirst-of-its-kind masstimberbuilding.

•Highlight innovativestructuralsolutions implemented bythedesignteaminthecentralcommonsandcourtyardinordertomeetmassingandoccupancyneeds.

Page 4: UMass Design Building

TomS.Chung,AIALEEDBD+CPrincipal,LeersWeinzapfelAssociates

AGENDA/ OUTLINE

Introduction• Background & Context • Design Concept

Process• Mass Timber Structure Design• Steel Systems vs Wood Systems • Assuring the Client: Budget, Procurement & Code

Design Details and Construction• Central Commons and Courtyard Design

Umass AmherstDesignBuildingLeadingtheWaywithMassTimberSolutions

Page 5: UMass Design Building

RegionalContext

Page 6: UMass Design Building
Page 7: UMass Design Building

ViewfromSite

Page 8: UMass Design Building

BuildingConceptDiagram

Page 9: UMass Design Building

CampusCirculation

Page 10: UMass Design Building

CampusModel

Page 11: UMass Design Building

SiteModel

Page 12: UMass Design Building

ProgramOrganization

Page 13: UMass Design Building

ProgramOrganization

Page 14: UMass Design Building

SitePlan

Page 15: UMass Design Building

RegionalContext

Page 16: UMass Design Building

FenestrationConcept

Page 17: UMass Design Building

ViewfromCampusCore

Page 18: UMass Design Building

ViewfromHistoricStockbridgeWay

Page 19: UMass Design Building

DesignProcess

Page 20: UMass Design Building

SteelColumnGrid

Page 21: UMass Design Building

TimberColumnGrid

Page 22: UMass Design Building

PostandBeamStructuralFramework

Page 23: UMass Design Building

Revit Model

StructuralFramework

Page 24: UMass Design Building

StructuralSystems

Page 25: UMass Design Building

TimberStructureRevitModel

CarbonSummary

Page 26: UMass Design Building

Steel Post & Beam

Steel/Concrete Floors

Steel Deck Roof

Concrete Shafts

Steel Braces

GL Post & Beam

CLT/Concrete Floors

CLT Roof

CLT Shafts

Glulam Braces

CHANGE IS POSSIBLE EVERYWHERE

Page 27: UMass Design Building

Steel

PostandBeamStructuralFramework

Page 28: UMass Design Building

PostandBeamStructuralFramework

Glulam

Page 29: UMass Design Building

GlulamBeamtoColumnConnection

Page 30: UMass Design Building

GlulamBeamtoColumnConnection

Page 31: UMass Design Building

GlulamBeamtoColumnConnection

Page 32: UMass Design Building

Steel and Concrete

FloorSystem

Page 33: UMass Design Building

Steel and Concrete

FloorSystem

Page 34: UMass Design Building

CLT and Concrete

FloorSystem

Page 35: UMass Design Building

CLT and Concrete

FloorSystem

Page 36: UMass Design Building

CLTandConcreteCompositeFloor

Page 37: UMass Design Building

CLTandConcreteCompositeFloor

Page 38: UMass Design Building

CLTandConcreteCompositeFloor

Page 39: UMass Design Building

CLTandConcreteCompositeFloor

Page 40: UMass Design Building

RoofDeck

Steel Decking

Page 41: UMass Design Building

RoofDeck

CLT Panels

Page 42: UMass Design Building

ShearWalls

Concrete Shaft CLT Shaft

Page 43: UMass Design Building

LateralCrossBracing

Steel Bracing Glulam Bracing

Page 44: UMass Design Building

LateralCrossBracing

Page 45: UMass Design Building

LateralCrossBracing

Page 46: UMass Design Building

ProjectTeamandStakeholdersProcess:AssuringtheClient

Project Team

• Client: University of Massachusetts Building Authority

• User: University of Massachusetts, AmherstArchitecture & Design, LARP, Building Construction & Technology

• Architectural / Structural Design Team: Architect: Leers Weinzapfel AssociatesStructural Design Engineer: Equilibrium ConsultingSER: SGH

• AHJ:MA State Building InspectorMA Board of Appeals

• Construction Team:Construction ManagerTimber Fabricator and Installer

Page 47: UMass Design Building

ProjectTeamandStakeholdersProcess:AssuringtheClient

Page 48: UMass Design Building

ProjectTeamandStakeholdersProcess:AssuringtheClient

Page 49: UMass Design Building

Key Issues•Danger of “Over Estimating Contingency” by Construction Managers or Cost Estimators due to the “Unknown”

•Importance of multiple Bidders

•Coordination of Fabricator and Installer Team

•Proper scoping of work for Bids. Especially if based on Progress Drawings

•Consideration of Contractor Reputation and History. It’s a small world!

BiddingandProcurementProcess:AssuringtheClient

Page 50: UMass Design Building

PreliminaryEstimatesProcess:AssuringtheClient

Page 51: UMass Design Building

TimbervsSteelBudgetComparisonProcess:AssuringtheClient

Page 52: UMass Design Building

Fabricator/InstallerBidQuotesProcess:AssuringtheClient

Page 53: UMass Design Building

CLT roof/floor panels and shear walls

CLT floor panels and glulam beams with composite concrete

AlternativeStructuralSystemsProcess:CodeReview&Variance

Page 54: UMass Design Building

AlternativeStructuralSystemsProcess:CodeReview&Variance

Page 55: UMass Design Building

TESTING

Page 56: UMass Design Building

CentralCommonsandCourtyardDesign

StructuralChallenges:

•Longspanwithheavyloadingabove

•Minimizestructuraldepth

•Wetgardenonawoodstructure

Page 57: UMass Design Building

CourtyardConceptSketch

Page 58: UMass Design Building

PreliminaryCourtyardPlan

Page 59: UMass Design Building

PreliminaryCourtyardSection

Page 60: UMass Design Building

CentralSpaceStructuralConcepts

Page 61: UMass Design Building

ZipperTrussFinalConcept

Page 62: UMass Design Building

ZipperTrussModel

Page 63: UMass Design Building

StructuralLoadingEfficiency

Page 64: UMass Design Building

CourtyardSoilProfileRequirements

Page 65: UMass Design Building

ModifiedFinalCourtyardPlan

Page 66: UMass Design Building

CourtyardModelViews

Page 67: UMass Design Building

CourtyardPlan

Page 68: UMass Design Building

ZipperTrussModel

Page 69: UMass Design Building

ReflectedCeilingPlan

Page 70: UMass Design Building

CentralConnectorStudies

Page 71: UMass Design Building

CentralConnectorStudies

Page 72: UMass Design Building

CentralConnectorStudies

Page 73: UMass Design Building

GrasshopperParametricDefinition

Page 74: UMass Design Building

RhinoModelDetail

Page 75: UMass Design Building

Construction Documents

Page 76: UMass Design Building

CentralConnectorDesignAssist

Page 77: UMass Design Building

ZipperTrussInstallation

Page 78: UMass Design Building

ZipperTrussInstallation

Page 79: UMass Design Building

ZipperTrussInstallation

Page 80: UMass Design Building

CutawayModel

Page 81: UMass Design Building

SectionThroughCommonsandLearningCourtyard

Page 82: UMass Design Building

CentralCommons

Page 83: UMass Design Building

LearningCourtyard

Page 84: UMass Design Building

Spring2016

Page 85: UMass Design Building
Page 86: UMass Design Building

THANKYOU!

DesigningtheDesignBuildingatUMassAmherst

Page 87: UMass Design Building

QUESTIONS?

ThisconcludesTheAmericanInstituteofArchitectsContinuingEducationSystemsCourse

TomS.Chung,AIALEEDBD+CPrincipal,[email protected]