UL 2248 bulletin for Marina Fueling system .pdf

Embed Size (px)

Citation preview

  • 7/27/2019 UL 2248 bulletin for Marina Fueling system .pdf

    1/36

    UL2248 Marina Fueling Systems ProjectUL2248 Marina Fueling Systems Project

  • 7/27/2019 UL 2248 bulletin for Marina Fueling system .pdf

    2/36

    MARINA FUELING SYSTEMS

    PROJECT

    MARINA FUELING SYSTEMS

    PROJECT

    Maggie Carroll - Project Manager

    Paul Lloret - Standards DevelopmentSusan Stene - Piping

    Greg Okada - General Systems

    Phil York - Tanks

    Wendy Winter - Technical Support

    Maggie Carroll - Project Manager

    Paul Lloret - Standards DevelopmentSusan Stene - Piping

    Greg Okada - General Systems

    Phil York - Tanks

    Wendy Winter - Technical Support

  • 7/27/2019 UL 2248 bulletin for Marina Fueling system .pdf

    3/36

    ULs RoleULs Role

    Standards Writing Body NOT responsible for standards adoption or

    enforcement

    Obtain input from

    Authorities Having Jurisdiction (AHJs)

    Product Manufacturers

    Users (Marina Owners/Associations,

    Contractors) Other Interested Parties

    Maintain ULs Safety Mission

    Standards Writing Body NOT responsible for standards adoption or

    enforcement

    Obtain input from

    Authorities Having Jurisdiction (AHJs)

    Product Manufacturers

    Users (Marina Owners/Associations,

    Contractors) Other Interested Parties

    Maintain ULs Safety Mission

  • 7/27/2019 UL 2248 bulletin for Marina Fueling system .pdf

    4/36

    Scope of StandardScope of Standard

    These requirements apply to marina fueling

    systems intended for temporary storage (tank

    system), transporting (piping system fromtank to dispensing systems) and dispensing

    (dispensing system) of flammable or

    combustible liquids, such as gasoline or

    diesel fuel, on waterways serviced by landbased marinas intended to service floating

    vessels.

    These requirements apply to marina fueling

    systems intended for temporary storage (tank

    system), transporting (piping system fromtank to dispensing systems) and dispensing

    (dispensing system) of flammable or

    combustible liquids, such as gasoline or

    diesel fuel, on waterways serviced by landbased marinas intended to service floating

    vessels.

  • 7/27/2019 UL 2248 bulletin for Marina Fueling system .pdf

    5/36

    UL2248UL2248

    Tank System Dstnbution System Delivery System

  • 7/27/2019 UL 2248 bulletin for Marina Fueling system .pdf

    6/36

    ExclusionsExclusions

    Fuel Delivery to Vessels

    Fuel Delivery to Tank System

    Fueling Practices or Procedures

    Submerged or Floating Tanks

    Tank Foundation

    Anchoring of primary tank to pier or pier to shore

    Construction/Stability of Pier

    ADA Requirements

    Fuel Delivery to Vessels

    Fuel Delivery to Tank System

    Fueling Practices or Procedures

    Submerged or Floating Tanks

    Tank Foundation

    Anchoring of primary tank to pier or pier to shore Construction/Stability of Pier

    ADA Requirements

  • 7/27/2019 UL 2248 bulletin for Marina Fueling system .pdf

    7/36

    Consistent with Current Code

    Requirements

    Consistent with Current Code

    Requirements

    NFPA

    UFC

    IFC

    OSHA

    CCR -California Code of Regulations

    CFR - Code of Federal Regulations

    NFPA

    UFC

    IFC

    OSHA

    CCR -California Code of Regulations

    CFR - Code of Federal Regulations

  • 7/27/2019 UL 2248 bulletin for Marina Fueling system .pdf

    8/36

    Potential Hazards AddressedPotential Hazards Addressed

    Public Safety

    Fire Hazards

    Electrical Hazards

    Environmental Hazards

    Leak Prevention and Detection Other Hazards (Mechanical)

    Public Safety

    Fire Hazards

    Electrical Hazards

    Environmental Hazards

    Leak Prevention and Detection Other Hazards (Mechanical)

  • 7/27/2019 UL 2248 bulletin for Marina Fueling system .pdf

    9/36

    GeneralGeneral

    Ease in Determining Compliance with

    Requirements

    Address Environmental, Tidal and

    Situational Issues

    Consideration to Marina Owners

    Ease in Determining Compliance with

    Requirements

    Address Environmental, Tidal and

    Situational Issues

    Consideration to Marina Owners

  • 7/27/2019 UL 2248 bulletin for Marina Fueling system .pdf

    10/36

    Overall System RequirementsOverall System Requirements

    Secondary Containment

    Continuous Monitoring for Leakage Audible and Visual Alarms

    Secondary Containment

    Continuous Monitoring for Leakage Audible and Visual Alarms

  • 7/27/2019 UL 2248 bulletin for Marina Fueling system .pdf

    11/36

    Tank SystemTank System

    All tanks secondarily contained

    Tank Capacity per NFPARequirements

    12K gal. (individual) (15K if

    vaulted)40K gal. Aggregate Capacity

    All tanks secondarily contained

    Tank Capacity per NFPARequirements

    12K gal. (individual) (15K if

    vaulted)40K gal. Aggregate Capacity

  • 7/27/2019 UL 2248 bulletin for Marina Fueling system .pdf

    12/36

    Aboveground Storage TanksAboveground Storage Tanks

    Meet UL2085 Requirements

    Protected Tank - An aboveground atmospheric

    tank with secondary containment and an insulationsystem intended to reduce the heat transferred tothe primary tank when the tank is exposed to ahydrocarbon pool fire and provided with

    protection from physical damage Optional Projectile Protection

    If vaulted, must comply with UL2245Requirements

    Meet UL2085 Requirements

    Protected Tank - An aboveground atmospheric

    tank with secondary containment and an insulationsystem intended to reduce the heat transferred tothe primary tank when the tank is exposed to ahydrocarbon pool fire and provided with

    protection from physical damage Optional Projectile Protection

    If vaulted, must comply with UL2245Requirements

  • 7/27/2019 UL 2248 bulletin for Marina Fueling system .pdf

    13/36

    Underground Storage TanksUnderground Storage Tanks

    Comply with Existing Requirementsper:

    UL58 (Steel Tanks)

    API Specification 12B

    UL1316 (Fiberglass Reinforced)Flood Areas Additional NFPA 30requirements may apply

    Comply with Existing Requirementsper:

    UL58 (Steel Tanks)

    API Specification 12B

    UL1316 (Fiberglass Reinforced)

    Flood Areas Additional NFPA 30requirements may apply

  • 7/27/2019 UL 2248 bulletin for Marina Fueling system .pdf

    14/36

    Additional Tank IssuesAdditional Tank Issues

    Secondary Containment and Tank Supports

    Fill connection, Gauges, other openings

    Venting (Normal and Emergency)

    Flexible Connectors

    Less than 8 feet Comply with UL 2405

    Piping, Valves and Fittings

    Secondary Containment and Tank Supports

    Fill connection, Gauges, other openings

    Venting (Normal and Emergency)

    Flexible Connectors

    Less than 8 feet Comply with UL 2405

    Piping, Valves and Fittings

  • 7/27/2019 UL 2248 bulletin for Marina Fueling system .pdf

    15/36

    Distribution SystemDistribution System

    Aboveground Piping shallcomply with UL2405

    All Piping SystemComponents shall besecondarily contained

    Continuous Audible andVisual Alarm

    Pier Piping Secured andProtected

    Installed on pier opposite side of electricalwiring

    Aboveground Piping shallcomply with UL2405

    All Piping SystemComponents shall besecondarily contained

    Continuous Audible andVisual Alarm

    Pier Piping Secured andProtected

    Installed on pier opposite side of electricalwiring

  • 7/27/2019 UL 2248 bulletin for Marina Fueling system .pdf

    16/36

    ValvesValves

    Block Valves Isolate Tank and Piping

    Upstream of basic equipment Prevent

    release of Product

    Solenoid Valve

    Tank and Pier

    Every 40 feet of Distribution Piping

    Block Valves Isolate Tank and Piping

    Upstream of basic equipment Prevent

    release of Product

    Solenoid Valve

    Tank and Pier

    Every 40 feet of Distribution Piping

  • 7/27/2019 UL 2248 bulletin for Marina Fueling system .pdf

    17/36

    EmergencyEmergency

    Emergency Shut off Valves

    Fire Valve Approach to Pier

    DoublePoppeted Breakaway

    All product lines

    Directly Upstream from Pier

    Emergency Shut off Valves

    Fire Valve Approach to Pier

    DoublePoppeted Breakaway

    All product lines

    Directly Upstream from Pier

  • 7/27/2019 UL 2248 bulletin for Marina Fueling system .pdf

    18/36

    SumpsSumps

    Secondary Containment

    When used as secondary containment,

    sumps shall have a volume adequate to

    capture all fuel in the system from the

    solenoid valve directly before the sump to

    the point of exit from the sump.

    Secondary Containment

    When used as secondary containment,

    sumps shall have a volume adequate tocapture all fuel in the system from the

    solenoid valve directly before the sump to

    the point of exit from the sump.

  • 7/27/2019 UL 2248 bulletin for Marina Fueling system .pdf

    19/36

    Distribution SystemDistribution System

    Pipe Joints, Compounds and Gaskets

    Piping Materials

    Steel, Nodular Iron, Malleable Iron Brass,

    Bronze, Stainless Steel

    Exception: Non-metallic materials may

    be used when comply with UL971,

    UL2405 as applicable

    Pipe Joints, Compounds and Gaskets

    Piping Materials

    Steel, Nodular Iron, Malleable Iron Brass,

    Bronze, Stainless Steel

    Exception: Non-metallic materials may

    be used when comply with UL971,

    UL2405 as applicable

  • 7/27/2019 UL 2248 bulletin for Marina Fueling system .pdf

    20/36

    Leak DetectionLeak Detection

    Earliest possible detection

    Lesser of:

    Detecting 3 g/hr at 10 psi within one

    hour, or

    25% of the lower flammable liquid stored

    95% probability of detection, false alarm

    less than 5%

    Earliest possible detection

    Lesser of:

    Detecting 3 g/hr at 10 psi within one

    hour, or

    25% of the lower flammable liquid stored

    95% probability of detection, false alarm

    less than 5%

  • 7/27/2019 UL 2248 bulletin for Marina Fueling system .pdf

    21/36

    Secondary ContainmentSecondary Containment

    Contain 100% of usable capacity of primary

    containment system

    For multiple primaries in single secondary- whichever is greater:

    150% of the volume of the largest primary

    container

    10% or aggregate internal volume of all

    primary containers within the secondary system

    Contain 100% of usable capacity of primary

    containment system

    For multiple primaries in single secondary- whichever is greater:

    150% of the volume of the largest primary

    container

    10% or aggregate internal volume of all

    primary containers within the secondary system

  • 7/27/2019 UL 2248 bulletin for Marina Fueling system .pdf

    22/36

    Dispensing SystemDispensing System

    UL87 Dispenser

    UL330 Hose and Hose Assemblies

    UL1238 Control Equipment

    UL109 Fittings and Tubing

    UL25 Meters

    UL87 Dispenser

    UL330 Hose and Hose Assemblies

    UL1238 Control Equipment

    UL109 Fittings and Tubing

    UL25 Meters

  • 7/27/2019 UL 2248 bulletin for Marina Fueling system .pdf

    23/36

    Dispensing System RequirementsDispensing System Requirements

    Length 18 ft. or less unless protected from

    damage when not in use

    Rack, reel, retriever

    Automatic Closing

    Shall not have latch open capability

    Length 18 ft. or less unless protected from

    damage when not in use

    Rack, reel, retriever

    Automatic Closing

    Shall not have latch open capability

  • 7/27/2019 UL 2248 bulletin for Marina Fueling system .pdf

    24/36

    Electrical SystemElectrical System

    Per NEC Requirements

    Corrosion Resistant

    Wet Locations

    Grounding Requirements

    Opposite Side of Pier from FlammableLiquid Piping

    Emergency Disconnect

    Per NEC Requirements

    Corrosion Resistant

    Wet Locations

    Grounding Requirements

    Opposite Side of Pier from Flammable

    Liquid Piping

    Emergency Disconnect

    b d d ilUL2405 Ab d S d il

  • 7/27/2019 UL 2248 bulletin for Marina Fueling system .pdf

    25/36

    UL2405 Aboveground Secondarily-

    contained Piping For Flammable Liquids

    UL2405 Aboveground Secondarily-

    contained Piping For Flammable Liquids

    Requirements

    Separated from

    UL2248 UL971 (Non-metallic

    Underground Piping)

    ASTM A53, A106,

    A135, B31.3

    (Metallic)

    Requirements

    Separated from

    UL2248 UL971 (Non-metallic

    Underground Piping)

    ASTM A53, A106,

    A135, B31.3

    (Metallic)

  • 7/27/2019 UL 2248 bulletin for Marina Fueling system .pdf

    26/36

    Scope of StandardScope of Standard

    These requirements cover primary

    carrier pipe, secondary containment

    pipe, secondary containment pans,outer protective pipe and fittings

    intended for use aboveground in the

    distribution of petroleum-basedflammable and combustible liquids,

    alcohols, and alcohol-blended fuels.

    These requirements cover primary

    carrier pipe, secondary containment

    pipe, secondary containment pans,outer protective pipe and fittings

    intended for use aboveground in the

    distribution of petroleum-basedflammable and combustible liquids,

    alcohols, and alcohol-blended fuels.

  • 7/27/2019 UL 2248 bulletin for Marina Fueling system .pdf

    27/36

    Other ConsiderationsOther Considerations

    Corrosion Protection

    Permeability:

    Primary 2.05x10-5 lb/ft2/day

    Secondary 4.92x10-3 lb/ft2/day

    Corrosion Protection

    Permeability:

    Primary 2.05x10-5 lb/ft2/day

    Secondary 4.92x10-3 lb/ft2/day

  • 7/27/2019 UL 2248 bulletin for Marina Fueling system .pdf

    28/36

    Test ProgramTest Program

    Per Table 9.1 Per Table 9.1

  • 7/27/2019 UL 2248 bulletin for Marina Fueling system .pdf

    29/36

    Flammability Testing (1/4)Flammability Testing (1/4)

  • 7/27/2019 UL 2248 bulletin for Marina Fueling system .pdf

    30/36

    Flammability Testing (2/4)Flammability Testing (2/4)

  • 7/27/2019 UL 2248 bulletin for Marina Fueling system .pdf

    31/36

    Flammability Testing (3/4)Flammability Testing (3/4)

  • 7/27/2019 UL 2248 bulletin for Marina Fueling system .pdf

    32/36

    Flammability Testing (4/4)Flammability Testing (4/4)

  • 7/27/2019 UL 2248 bulletin for Marina Fueling system .pdf

    33/36

    Verification of ComplianceVerification of Compliance

    UL2405 Product Marking

    UL2248 Certificate Program

    UL2405 Product Marking

    UL2248 Certificate Program

    UL2248 Certificate ProgramUL2248 Certificate Program

  • 7/27/2019 UL 2248 bulletin for Marina Fueling system .pdf

    34/36

    UL2248 Certificate Program

    (Preliminary)

    UL2248 Certificate Program

    (Preliminary)

    Initial Inspection Certificate

    State Documents

    Ongoing Inspections by State

    Initial Inspection Certificate

    State Documents

    Ongoing Inspections by State

  • 7/27/2019 UL 2248 bulletin for Marina Fueling system .pdf

    35/36

    Where are we going?Where are we going?

    Comments on Current Draft Due by JULY

    22, 2002.

    First Edition Published

    National Standard

    ANSI

    Living Document, Ongoing Support

    Comments on Current Draft Due by JULY

    22, 2002.

    First Edition Published

    National Standard

    ANSI

    Living Document, Ongoing Support

  • 7/27/2019 UL 2248 bulletin for Marina Fueling system .pdf

    36/36

    Questions ?Questions ?