    UINT QTY DESCRIPTION OF ITEM RATE REMARKS

    UP TO DATE SINCE LAST

    1

    Earth work excavation and depositing on bankwith initial lead of 10m and initial lift of 2m inLoamy & Clayey Soils like BC Soils, Red Earth& Ordinary Gravelly Soils ( SS 20-B) includingshoring, strutting, sheeting, planking anddewatering including cost of hire charges of T& P, labour charges etc., complete for finished

    item of work for Foundation of Building.(APSS No. 308)

    2

    Plain Cement Concrete corresponding to M5grade as per IS 456 equivalent to (1:5:10)proportion nominal mix (cement: fineaggregate: Coarse aggregate) using 40mmsize HBG (SS5) metal from approved quarryincluding cost and conveyance of all materialslike cement, sand, coarse aggregate, water etc. to site, including seigniorage charges,

    sales & other taxes on all materials, alloperational, incidental, and labour chargessuch as mixing, laying and ramming concretein layers in position not exceeding 15cm,finishing top surface, curing concrete, etc.,complete for finished item of work for Foundations and flooring Bed (APSS No. 402)

    3

    Vibrated reinforced cement concretecorresponding M20 grade as per IS 456equivalent to (1:1.5:3) prop: nominal mix

    (Cement: fine aggregate: coarse aggregateusing 20mm size HBG (SS5) machine crushedmetal from approved quarry including cost andconveyance of all materials like cement, fineaggregate (Sand), coarse aggregate, water etc. to site including seigniorage charges,sales & other taxes on all materials, alloperational, incidental, and labour chargessuch as centering, shuttering, scaffolding, liftcharges, machine mixing, laying concrete,vibrating, curing concrete etc, complete butexcluding cost of steel and its fabricationcharges for finished item of work (APSSNo.402 & 403) for column footings.

    AMOUNT

  • 8/12/2019 u.kothapalli

    2/5

    4

    Vibrated reinforced cement concretecorresponding M20 grade as per IS 456equivalent to (1:1.5:3) prop: nominal mix(Cement: fine aggregate: coarse aggregateusing 20mm size HBG (SS5) machine crushedmetal from approved quarry including cost andconveyance of all materials like cement, fineaggregate (Sand), coarse aggregate, water etc. to site including seigniorage charges,sales & other taxes on all materials, alloperational, incidental, and labour chargessuch as centering, shuttering, scaffolding, liftcharges, machine mixing, laying concrete,vibrating, curing concrete etc, complete butexcluding cost of steel and its fabricationcharges for finished item of work (APSSNo.402 & 403) for plinth Beam

    Vibrated reinforced cement concretecorresponding M20 grade as per IS 456equivalent to (1:1.5:3) prop: nominal mix(Cement: fine aggregate: coarse aggregateusing 20mm size HBG (SS5) machine crushed

    metal from approved quarry including cost andconveyance of all materials like cement, fineaggregate (Sand), coarse aggregate, water etc. to site including seigniorage charges,sales & other taxes on all materials, alloperational, incidental, and labour chargessuch as centering, shuttering, scaffolding, liftcharges, machine mixing, laying concrete,vibrating, curing concrete etc, complete butexcluding cost of steel and its fabricationcharges for finished item of work (APSSNo.402 & 403) for pedastal

    6

    Vibrated reinforced cement concretecorresponding M20 grade as per IS 456equivalent to (1:1.5:3) prop: nominal mix(Cement: fine aggregate: coarse aggregateusing 20mm size HBG (SS5) machine crushedmetal from approved quarry including cost andconveyance of all materials like cement, fineaggregate (Sand), coarse aggregate, water etc. to site including seigniorage charges,sales & other taxes on all materials, alloperational, incidental, and labour chargessuch as centering, shuttering, scaffolding, liftcharges, machine mixing, laying concrete,

    vibrating, curing concrete etc, complete butexcluding cost of steel and its fabricationcharges for finished item of work (APSSNo.402 & 403)for Columns

  • 8/12/2019 u.kothapalli

    3/5

    7

    Vibrated reinforced cement concretecorresponding M20 grade as per IS 456equivalent to (1:1.5:3) prop: nominal mix(Cement: fine aggregate: coarse aggregateusing 20mm size HBG (SS5) machine crushedmetal from approved quarry including cost andconveyance of all materials like cement, fineaggregate (Sand), coarse aggregate, water etc. to site including seigniorage charges,sales & other taxes on all materials, alloperational, incidental, and labour chargessuch as centering, shuttering, scaffolding, liftcharges, machine mixing, laying concrete,vibrating, curing concrete etc, complete butexcluding cost of steel and its fabricationcharges for finished item of work (APSSNo.402 & 403)for roof beams

    8

    Vibrated reinforced cement concretecorresponding M20 grade as per IS 456equivalent to (1:1.5:3) prop: nominal mix(Cement: fine aggregate: coarse aggregate

    using 20mm size HBG (SS5) machine crushedmetal from approved quarry including cost andconveyance of all materials like cement, fineaggregate (Sand), coarse aggregate, water etc. to site including seigniorage charges,sales & other taxes on all materials, alloperational, incidental, and labour chargessuch as centering, shuttering, scaffolding, liftcharges, machine mixing, laying concrete,vibrating, curing concrete etc, complete butexcluding cost of steel and its fabricationcharges for finished item of work (APSSNo.402 & 403)for roof slabs 115MM

    9

    Vibrated reinforced cement concretecorresponding M20 grade as per IS 456equivalent to (1:1.5:3) prop: nominal mix(Cement: fine aggregate: coarse aggregateusing 20mm size HBG (SS5) machine crushedmetal from approved quarry including cost andconveyance of all materials like cement, fineaggregate (Sand), coarse aggregate, water etc. to site including seigniorage charges,sales & other taxes on all materials, alloperational, incidental, and labour chargessuch as centering, shuttering, scaffolding, liftcharges, machine mixing, laying concrete,vibrating, curing concrete etc, complete butexcluding cost of steel and its fabricationcharges for finished item of work (APSSNo.402 & 403)for waist slab 150MM

  • 8/12/2019 u.kothapalli

    4/5

    Filling with sand cnshion under for tings withinitial lead in layess not exceding 15cm thicksconrol dating each deposited layers bywatering and ramming including cost andconvenyance of water to work site and alloperational & incidental charges labour charges etc., complete for finished item of work (APSS NO. 309 & 310)

    Brick Masonry in superstructure with CM (1:6)prop: using FLY ASH bricks from approvedsource having minimum crushing strength of 50 Kg/Sqcm. including cost and conveyanceof all materials like cement, sand, bricks,water etc., to site, including seignioragecharges, sales & other taxes on all materials,all operational, incidental and labour chargessuch as mixing cement mortar, constructingmasonry, scaffolding charges, lift charges,curing, etc., complete for finished item of work.(APSS No. 501 & 504).

    Providing high yield strength deformed(HYSD) steel bars (Fe 415 grade as per IS1786-1985) of different diameters, cutting,bending, to required sizes and shapes placingin position with cover blocks of approved sizeand binding wire of 20SWG, forming grills for reinforcement work as per approved designsand drawings including cost and conveyanceof bars from approved sources to site of work,including cost and conveyance of binding wire,cover blocks and all operational, incidental,and labour charges such as cutting, bending,placing in position, tying etc., and sales &

    other taxes,on cost of all materials completefor finished item of work (APSS No.126) in allfloors.

    11

    Providing high yield strength deformed(HYSD) steel bars (Fe 415 grade as per IS1786-1985) of different diameters, cutting,bending, to required sizes and shapes placingin position with cover blocks of approved sizeand binding wire of 20SWG, forming grills for reinforcement work as per approved designsand drawings including cost and conveyanceof bars from approved sources to site of work,including cost and conveyance of binding wire,cover blocks and all operational, incidental,and labour charges such as cutting, bending,placing in position, tying etc., and sales &other taxes,on cost of all materials completefor finished item of work (APSS No.126) in allfloors.

  • 8/12/2019 u.kothapalli

    5/5

    supply and fixing of 25mm dia 2mm thick pvcpipe concealed in roof slab with all requiredaccessories including masonry work andlabour charges etc make sudhakar/avonplast/maru plast