UK Norway Share Fair 2005 - BP Norway March 3rd 2005, Aberdeen Hans Ole Lørup - Supply Chain Manager, BP Norge AS Chris Ruthven –Topsides Manager, Valhall Re-Development Project Kjell M. Madsen – SCM Lead, Developments PU

UK Norway Share Fair 2005 (ppt, 6414KB)

Embed Size (px)

DESCRIPTION

 

Citation preview

Page 1: UK Norway Share Fair 2005 (ppt, 6414KB)

UK Norway Share Fair 2005- BP NorwayMarch 3rd 2005, Aberdeen Hans Ole Lørup - Supply Chain Manager, BP Norge AS

Chris Ruthven –Topsides Manager, Valhall Re-Development Project

Kjell M. Madsen – SCM Lead, Developments PU

Page 2: UK Norway Share Fair 2005 (ppt, 6414KB)

Topics

• BP Norway – Assets & Licenses

• How to become a supplier to BP Norway

• What we look for in a supplier

• Estimated spend 2005

• Possible Contract Opportunities 2005

• Valhall Re-Development Project

• Skarv Development Project

• Entry points to BP Norway

Page 3: UK Norway Share Fair 2005 (ppt, 6414KB)

Our interests offshore Norway

• Partner in 22 licenses; operator of 15 of these

• BP operated producing fields :

• Ula & Tambar • Valhall & Hod

• Partner in the Draugen field

• BP net production 84 000 mboed

• 528 employees (onshore + offshore)= core areas

Page 4: UK Norway Share Fair 2005 (ppt, 6414KB)

Valhall and Hod

• Valhall production started 1982• License period to 2028 +• Remaining reserves 750 millioner boe• Estimated 2005 production 127 800 boe/d• 200 beds

• Hod production started 1990• Estimated 2005 production 5100 boe/d • Unmanned wellhead platform remotely controlled from Valhall

Page 5: UK Norway Share Fair 2005 (ppt, 6414KB)

Ula and Tambar

• Ula production started in 1986• Expects to produce until 2017+• Remaining reserves 92.7 mill boe• Estimated 2005 production 28375 boe/d• 169 beds

• Tambar production started 2000• Estimated 2005 production 25270 boe/d • Remaining reserves 24.2 mill boe• Unmanned wellhead platform remotely controlled from Ula

Page 6: UK Norway Share Fair 2005 (ppt, 6414KB)

How to become a supplier to BP Norway

• Identify and connect with customer (BP end user)

• Registered in Achilles as approved supplier with updated info

• HSE - Self assesment (NORSOK S-006)

• Products/Services

• Track Record of Documented Capabilities

• Meet minimum HSEQ Req.

• HSEQ System and Processes

• HSE Performance

HSE matters for allocation of work!

We will not find you if your capabilities are not registered!

Page 7: UK Norway Share Fair 2005 (ppt, 6414KB)

What we look for in a supplier

• Leadership in HSE .

• Track Record of Documented Capabilities

• The right Products / Services

• Execution Ability

• Desired Attributes

• Better use of technology

• Improved Ops Efficiency

• Value Creation

• Innovative, Creative, Proactive

• Willing to Share Ideas

BP’s SCM Strategy: STARS

Sector strategies – Clear strategies for each sector maximising value whilst ensuring security of supply, enabled by a deep understanding of both BP’s demand and the characteristics of the market

Transparency – Clarity on all major cost and performance elements within the supply chain and their comparability with industry benchmarks

Aggregation – Aggregating spend to the highest level feasible and to the extent that this increases value

Relationships – Distinctive relationships based on performance, market reality, and technology development – access intellectual capital

Supply Chain Management – BP’s role in the supply chain understood and optimised

Page 8: UK Norway Share Fair 2005 (ppt, 6414KB)

Planned investments

BP Norway Operated investments

-

200

400

600

800

1 000

1 200

2004 2005 2006 2007 2008 2009

Cap

ex (

US

$ g

ross

)

Wells Facility (base) Valhall Redevelopment Projects Exploration/Other

Page 9: UK Norway Share Fair 2005 (ppt, 6414KB)

Estimated 2005 Spend (mill USD gross)

21

37

51

63

147

449

Seismic

Facilities Engineering & Construction

Logistics

Business Office Support

Production Operations

Drilling & Wells

Page 10: UK Norway Share Fair 2005 (ppt, 6414KB)

Drilling & Wells• Drilling Fluids (NCS+UKCS)

• Directional Drilling (NCS+UKCS)

• Wireline Services (NCS+UKCS)

• Liner Hangers (NCS+UKCS)

• Coiled Tubing Services (NCS)

• Rig for Skarv Dev’t pre-drilling (NCS)

Logistics• Helicopter Transportation Service (NCS)

• Platform Supply Vessels (NCS)

Valhall Re-Development Project

Skarv Development Project

Operations• RE Maintenance (NCS+UKCS)

• Gas Turbines

• Compressors

• Pumps

• Vendor Based Maintenance Services (NCS)

• Lifeboats, Valves, Cranes & Lifting Eqm’t

• Inspection Services (NCS)

• Instrumentation FA’s; Gaskets FA’s (NCS)

• Industrial gas; Diesel fuel (NCS)

Other Projects• Tambar pipeline remedial work

• Ula Gas upgrade & Blane tie-in

• Hod water injection

Possible Contract Opportunities 2005

Page 11: UK Norway Share Fair 2005 (ppt, 6414KB)

Valhall Re-Development (VRD)Selected Concept

New Production & Hotel (PH) Facility

New Facility Design Life 40 yearsHotel 150 single bed cabinsOil production capacity 150 mbopdGas handling capacity 175 mmscf/dTotal liquid capacity 275 mbpd (oil & water)Design (Dry) Weight 10 000 tonnes (topsides process/utility)

2 200 tonnes (hotel module) 4 000 tonnes (jacket)

Project development cost Approx. 5.0 billion NOK (700 mm USD)

Power from Shore 280 km DC cable from Southern NorwayOil Export Provision for future offshore

loading/EOR

Page 12: UK Norway Share Fair 2005 (ppt, 6414KB)

Valhall Re-development (VRD)Contract Strategy 1

“Safe, intelligent, maintenance free and remotely operated facility”

• FEED contract with optional Engineering Procurement and Construction Management (EPcma) services.

• Control and Power from Shore providers integrated into FEED team

• Contract for control/SAS system will be awarded in parallel to the FEED contract

• Engineering contract to include procurement of critical equipment, integration with existing facilities and provision of construction management services

• Procurement of critical equipment will be to BP standards and ”Company provided” to fabricators

Page 13: UK Norway Share Fair 2005 (ppt, 6414KB)

Valhall Re-development (VRD)Contract Strategy 2

• Fabrication contracts will be awarded for: - Jacket

- Process & Utility Skid Packages [Clair Analogue) - Deck including installation and hook-up of skids - Living Quarters

• Separate contracts for: - brown-field modifications to existing facilities - offshore installation of jacket, topsides and living

quarters - tie-in of subsea pipelines

• BP will be manage commissioning and start up activities with resources provided by onshore deck fabricator & engineering contractor

Page 14: UK Norway Share Fair 2005 (ppt, 6414KB)

Valhall Re-Development (VRD) Contract Schedule

3q 4q 1q 2q 3q 4q 1q 2q 3q 4q 1q 2q 3q 4q 1q 2q 3q 4q 1q 2q 3q 4q

Key Milestones

FEED "PH" Platform

Detail Design/Procurement

Control/SAS System

Critical Equipment/Materials

Fabrication Topsides/bridge

Fabrication Hotel

Fabrication jacket

Sub Sea

Modifications

Offshore Installation

Hook-up/commissioning

Platform Ready for Operation

Tender Prep. Tender issue Award

Production & Hotel platf. (PH)

20092004 2005 2006 2007 2008

DG3 DG4

PUD First Oil

PRELIMINAR

Y

Page 15: UK Norway Share Fair 2005 (ppt, 6414KB)

Skarv Development Project

• Independent development by use of an FPSO together with the Idun Licence

• PDO is planned to be filed in November 2006

• Key challenges:

– Gas export solution

– Economical sound development

Page 16: UK Norway Share Fair 2005 (ppt, 6414KB)

Skarv Development ProjectContract Strategy

• Approach Global Market

• Separate tender activities for: FPSO FEED with responsibility for Overall System plus optional

EPcma SURF FEED – Subsea Production System, Umbilical, Risers &

Flowlines

• BP can nominate FEED contractors for Turret, SAS system and Hull

• Secure capacity for Hull fabrication early

• Tender for Hull and Topsides fabrication in parallel to maintain options for optimal fabrication quality, cost and schedule

• Separate contracts for SURF components: EPC contract for Subsea Production System, may include Umbilical

fabrication EPC contract Riser System EPCI contract for Flowlines including Riser and Umbilical installation

• Separate contract for Manifolds and FPSO mooring installation

• Separate FEED and EPcma for export pipeline

Page 17: UK Norway Share Fair 2005 (ppt, 6414KB)

Skarv Contract Schedule, 2010

PRELIMINARY

3q 4q 1q 2q 3q 4q 1q 2q 3q 4q 1q 2q 3q 4q 1q 2q 3q 4q 1q 2q 3q 4q 1q 2q 3q 4q

Sanctioning Dates

Overall System and FPSO Feed contract

Feed contract for SURF

Engineering & Proc. & Constr. Mngt.

Control System

Hull EPC

Topsides Fabrication

Subsea Production System EPC

Turret & Mooring EPC

Risers EPC

Flowlines EPCI + Riser & Umbilical Inst.

Mooring and Manifolds Inst

Drilling Rig

Reservation Tender Prep. Tender issue Award

Skarv Overall Contract Schedule 2004 2005 2006 20102007 2008 2009

DG 3 DG 4 PDO First Oil

Page 18: UK Norway Share Fair 2005 (ppt, 6414KB)

10/04/23 © BP presentation name

BP Norway SCMEntry Points

Supply Chain ManagerHans Ole Lørup

[email protected]

Operations & LogisticsArnfinn Bærheim

[email protected]

Jan-Fredrik Stø[email protected]

Crawford [email protected]

Wells

Claudia [email protected]

Reidar Hå[email protected]

MRO Mat’ls Proc. / Mat’ls Mgmt

Jarl [email protected]

Ove [email protected]

Operation / Performance

CoachTerje [email protected]

Business SupportReidar Håland

[email protected]

VRD Projects Services TL

Graeme [email protected]

Valhall and Ula PUs

Development Projects PU

Projects SCM LeadKjell Magne [email protected]