UC San Diego SEALED BID NO.: 4768/A4L372/966270 DATE: 4/15/2014 PROJECT: ARGO HALL FIRE & LIFE SAFETY UPGRADES TIME: 2:00 P.M. BID PACKAGE: 2A DEMOLITION ESTIMATED CONSTRUCTION COST: $450,000 CONTRACTOR'S NAME LUMP SUM ALTERNATE #1 ALTERNATE #2 ALTERNATE #3 ALTERNATE #4 TOTAL TIME BID RECEIVED YES NO BASE BID SOFFIT COVERS REDUCE SCOPE LAVATORY WALL SCAFFOLDING CASPER COMPANY NO BID CEMENT CUTTING 483,950.00 $ N/A (84,000.00) $ N/A N/A 399,950.00 $ CLANCY CONTRACTING NO BID PALM ENGINEERING NO BID US DEMOLITION NO BID LVI SERVICES NO BID x x x PREQUALIFIED x x x

UC San Diegormp-public.ucsd.edu/fdc/Bid Results/4768 Argo Hall Bid... · 2014. 4. 18. · bid package: 12a ‐ window coverings estimated construction cost: $30,000 contractor's name

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: UC San Diegormp-public.ucsd.edu/fdc/Bid Results/4768 Argo Hall Bid... · 2014. 4. 18. · bid package: 12a ‐ window coverings estimated construction cost: $30,000 contractor's name

UC San DiegoSEALED BID NO.: 4768/A4L‐372/966270 DATE: 4/15/2014PROJECT: ARGO HALL FIRE & LIFE SAFETY UPGRADES TIME: 2:00 P.M.BID PACKAGE: 2A ‐ DEMOLITION ESTIMATED CONSTRUCTION COST:  $450,000

CONTRACTOR'S NAMELUMP SUM ALTERNATE #1 ALTERNATE #2 ALTERNATE #3 ALTERNATE #4 TOTAL

TIME BID RECEIVED  YES NO BASE BID SOFFIT COVERS REDUCE SCOPE LAVATORY WALL SCAFFOLDING

CASPER COMPANY  NO BID 

CEMENT CUTTING 483,950.00$             N/A (84,000.00)$              N/A N/A 399,950.00$            

CLANCY CONTRACTING  NO BID 

PALM ENGINEERING   NO BID 

US DEMOLITION  NO BID 

LVI SERVICES  NO BID 

‐ ‐x ‐ ‐ ‐

‐ ‐ ‐ ‐ ‐

‐ ‐ ‐ ‐‐

x

x

PREQUALIFIED 

x

x

x

‐‐‐‐

‐ ‐ ‐ ‐

Page 2: UC San Diegormp-public.ucsd.edu/fdc/Bid Results/4768 Argo Hall Bid... · 2014. 4. 18. · bid package: 12a ‐ window coverings estimated construction cost: $30,000 contractor's name

UC San DiegoSEALED BID NO.: 4768/A4L‐372/966270 DATE: 4/15/2014PROJECT: ARGO HALL FIRE & LIFE SAFETY UPGRADES TIME: 2:00 P.M.BID PACKAGE: 2B ‐ HAZARDOUS ABATEMENT ESTIMATED CONSTRUCTION COST:  $100,000

CONTRACTOR'S NAMELUMP SUM ALTERNATE #1 ALTERNATE #2 ALTERNATE #3 ALTERNATE #4 TOTAL

TIME BID RECEIVED  YES NO BASE BID SOFFIT COVERS REDUCE SCOPE LAVATORY WALL SCAFFOLDING

ATI RESTORATION  NO BID 

CLANCY CONTRACTING  $            141,185.00  ‐$                            ‐$                            ‐$                            ‐$                            141,185.00$            

PARC ENVIRONMENTAL  NO BID 

LVI SERVICES, INC.  NO BID x ‐ ‐

‐ ‐

‐ ‐‐

x ‐ ‐ ‐

‐ ‐

x

PREQUALIFIED 

x ‐ ‐

Page 3: UC San Diegormp-public.ucsd.edu/fdc/Bid Results/4768 Argo Hall Bid... · 2014. 4. 18. · bid package: 12a ‐ window coverings estimated construction cost: $30,000 contractor's name

UC San DiegoSEALED BID NO.: 4768/A4L‐372/966270 DATE: 4/15/2014PROJECT: ARGO HALL FIRE & LIFE SAFETY UPGRADES TIME: 2:00 P.M.BID PACKAGE: 3A ‐ REINFORCING STEEL ESTIMATED CONSTRUCTION COST:  $25,000

CONTRACTOR'S NAMELUMP SUM ALTERNATE #1 ALTERNATE #2 ALTERNATE #3 ALTERNATE #4 TOTAL

TIME BID RECEIVED  YES NO BASE BID SOFFIT COVERS REDUCE SCOPE LAVATORY WALL SCAFFOLDING

GERDAU REINFORCING STEEL  $              41,853.00  ‐$                            ‐$                            ‐$                            ‐$                            41,853.00$              

QUALITY REINFORCING  $              39,832.00  ‐$                            ‐$                            ‐$                            ‐$                            39,832.00$              

PREQUALIFIED 

x

x

Page 4: UC San Diegormp-public.ucsd.edu/fdc/Bid Results/4768 Argo Hall Bid... · 2014. 4. 18. · bid package: 12a ‐ window coverings estimated construction cost: $30,000 contractor's name

UC San DiegoSEALED BID NO.: 4768/A4L‐372/966270 DATE: 4/15/2014PROJECT: ARGO HALL FIRE & LIFE SAFETY UPGRADES TIME: 2:00 P.M.BID PACKAGE: 5A ‐ MISC. METALS AND RAILINGS ESTIMATED CONSTRUCTION COST:  $800,000

CONTRACTOR'S NAMELUMP SUM ALTERNATE #1 ALTERNATE #2 ALTERNATE #3 ALTERNATE #4 TOTAL

TIME BID RECEIVED  YES NO BASE BID SOFFIT COVERS REDUCE SCOPE LAVATORY WALL SCAFFOLDINGANDERSON CHARNESKY STRUCTURAL STEEL, INC.  $            530,000.00  N/A N/A N/A N/A 530,000.00$            

MCMAHON STEEL COMPANY

PREQUALIFIED 

x

718,022.00$            x

 $            718,022.00  ‐$                            ‐$                            ‐$                            ‐$                           

Page 5: UC San Diegormp-public.ucsd.edu/fdc/Bid Results/4768 Argo Hall Bid... · 2014. 4. 18. · bid package: 12a ‐ window coverings estimated construction cost: $30,000 contractor's name

UC San DiegoSEALED BID NO.: 4768/A4L‐372/966270 DATE: 4/15/2014PROJECT: ARGO HALL FIRE & LIFE SAFETY UPGRADES TIME: 2:00 P.M.BID PACKAGE: 6A ‐ MILLWORK ESTIMATED CONSTRUCTION COST:  $75,000

CONTRACTOR'S NAMELUMP SUM ALTERNATE #1 ALTERNATE #2 ALTERNATE #3 ALTERNATE #4 TOTAL

TIME BID RECEIVED  YES NO BASE BID SOFFIT COVERS REDUCE SCOPE LAVATORY WALL SCAFFOLDING

ISEC INC.   NO BID  ‐ ‐ ‐ ‐ ‐

MCWORKMAN MILLWORKS  $              45,750.00  ‐$                            ‐$                            34,000.00$               ‐$                            79,750.00$              

MISSION VALLEY CABINET  NO BID  ‐ ‐ ‐ ‐ ‐

PROVIDENCE VENTURE (PVI) 56,793.00$               N/A N/A 13,500.00$               N/A 70,293.00$              

SPOONERS WOODWORKS 34,775.00$               N/A N/A 32,500.00$               N/A 67,275.00$              

WESTMARK PRODUCTS NO BID ‐ ‐ ‐ ‐ ‐x

x

x

x

PREQUALIFIED 

x

x

Page 6: UC San Diegormp-public.ucsd.edu/fdc/Bid Results/4768 Argo Hall Bid... · 2014. 4. 18. · bid package: 12a ‐ window coverings estimated construction cost: $30,000 contractor's name

UC San DiegoSEALED BID NO.: 4768/A4L‐372/966270 DATE: 4/15/2014PROJECT: ARGO HALL FIRE & LIFE SAFETY UPGRADES TIME: 2:00 P.M.BID PACKAGE: 6B ‐ SOLID SURFACE / STONE COUNTERS ESTIMATED CONSTRUCTION COST:  $140,000

CONTRACTOR'S NAMELUMP SUM ALTERNATE #1 ALTERNATE #2 ALTERNATE #3 ALTERNATE #4 TOTAL

TIME BID RECEIVED  YES NO BASE BID SOFFIT COVERS REDUCE SCOPE LAVATORY WALL SCAFFOLDING

AMERICAN MARBLE  $            162,240.00  ‐$                            ‐$                            250.00$                      ‐$                            162,490.00$            

MCWORKMAN MILLWORKS  $            254,620.00  ‐$                            ‐$                            7,500.00$                   ‐$                            262,120.00$            

PROVIDENCE VENTURE (PVI)  $            178,872.00  N/A N/A N/A N/A 178,872.00$            

SPOONERS WOODWORKS NO BID ‐ ‐ ‐ ‐ ‐

ISEC INC. NO BID ‐ ‐ ‐ ‐ ‐

x

x

x

PREQUALIFIED 

x

x

Page 7: UC San Diegormp-public.ucsd.edu/fdc/Bid Results/4768 Argo Hall Bid... · 2014. 4. 18. · bid package: 12a ‐ window coverings estimated construction cost: $30,000 contractor's name

UC San DiegoSEALED BID NO.: 4768/A4L‐372/966270 DATE: 4/15/2014PROJECT: ARGO HALL FIRE & LIFE SAFETY UPGRADES TIME: 2:00 P.M.BID PACKAGE: 7A ‐ DECK COATING ESTIMATED CONSTRUCTION COST:  $80,000

CONTRACTOR'S NAMELUMP SUM ALTERNATE #1 ALTERNATE #2 ALTERNATE #3 ALTERNATE #4 TOTAL

TIME BID RECEIVED  YES NO BASE BID SOFFIT COVERS REDUCE SCOPE LAVATORY WALL SCAFFOLDING

APPLIED RESTORATION  $            201,000.00  N/A N/A N/A N/A 201,000.00$            

MARK BEAMISH WATERPROOFING  NO BID 

PREQUALIFIED 

x

‐x ‐ ‐ ‐ ‐

Page 8: UC San Diegormp-public.ucsd.edu/fdc/Bid Results/4768 Argo Hall Bid... · 2014. 4. 18. · bid package: 12a ‐ window coverings estimated construction cost: $30,000 contractor's name

UC San DiegoSEALED BID NO.: 4768/A4L‐372/966270 DATE: 4/15/2014PROJECT: ARGO HALL FIRE & LIFE SAFETY UPGRADES TIME: 2:00 P.M.BID PACKAGE: 8A ‐ DOORS, FRAMES AND HARDWARE ESTIMATED CONSTRUCTION COST:  $200,000

CONTRACTOR'S NAMELUMP SUM ALTERNATE #1 ALTERNATE #2 ALTERNATE #3 ALTERNATE #4 TOTAL

TIME BID RECEIVED  YES NO BASE BID SOFFIT COVERS REDUCE SCOPE LAVATORY WALL SCAFFOLDING

JOHNSON, FINCH & MCCLURE CONST.  $            175,451.00  N/A N/A N/A N/A 175,451.00$            

RPG ENTERPRISES  $            227,396.00  N/A N/A N/A ‐ 227,396.00$            

SPOONERS WOODWORKS  NO BID  ‐ ‐ ‐ ‐ ‐

ISEC INC.  $            188,660.00  ‐$                            ‐$                            ‐$                            ‐$                            188,660.00$            

x

x

PREQUALIFIED 

x

x

Page 9: UC San Diegormp-public.ucsd.edu/fdc/Bid Results/4768 Argo Hall Bid... · 2014. 4. 18. · bid package: 12a ‐ window coverings estimated construction cost: $30,000 contractor's name

UC San DiegoSEALED BID NO.: 4768/A4L‐372/966270 DATE: 4/15/2014PROJECT: ARGO HALL FIRE & LIFE SAFETY UPGRADES TIME: 2:00 P.M.BID PACKAGE: 8B ‐ GLAZING ESTIMATED CONSTRUCTION COST:  $225,000

CONTRACTOR'S NAMELUMP SUM ALTERNATE #1 ALTERNATE #2 ALTERNATE #3 ALTERNATE #4 TOTAL

TIME BID RECEIVED  YES NO BASE BID SOFFIT COVERS REDUCE SCOPE LAVATORY WALL SCAFFOLDING

LA MESA GLASS  $            236,204.00  N/A N/A N/A N/A 236,204.00$            

PRIMARY GLAZING  NO BID  ‐ ‐ ‐ ‐ ‐

TOWER GLASS  $            359,487.00  N/A N/A N/A N/A 359,487.00$            x

PREQUALIFIED 

x

x

Page 10: UC San Diegormp-public.ucsd.edu/fdc/Bid Results/4768 Argo Hall Bid... · 2014. 4. 18. · bid package: 12a ‐ window coverings estimated construction cost: $30,000 contractor's name

UC San DiegoSEALED BID NO.: 4768/A4L‐372/966270 DATE: 4/15/2014PROJECT: ARGO HALL FIRE & LIFE SAFETY UPGRADES TIME: 2:00 P.M.BID PACKAGE: 9A ‐ FRAMING, DRYWALL & PLASTER ESTIMATED CONSTRUCTION COST:  $600,000

CONTRACTOR'S NAMELUMP SUM ALTERNATE #1 ALTERNATE #2 ALTERNATE #3 ALTERNATE #4 TOTAL

TIME BID RECEIVED  YES NO BASE BID SOFFIT COVERS REDUCE SCOPE LAVATORY WALL SCAFFOLDING

BEST INTERIORS  $            370,100.00  N/A N/A 16,780.00$               N/A 386,880.00$            

JOHNSON, FINCH & MCCLURE CONST. 471,765.00$             ‐$                            ‐$                            13,888.00$               ‐$                            485,653.00$            

KHS&S 555,125.00$             N/I N/I 25,800.00$               N/I 580,925.00$            

STANDARD DRYWALL 427,150.00$             N/A N/A 21,150.00$               N/A 448,300.00$            

x

x

PREQUALIFIED 

x

x

Page 11: UC San Diegormp-public.ucsd.edu/fdc/Bid Results/4768 Argo Hall Bid... · 2014. 4. 18. · bid package: 12a ‐ window coverings estimated construction cost: $30,000 contractor's name

UC San DiegoSEALED BID NO.: 4768/A4L‐372/966270 DATE: 4/15/2014PROJECT: ARGO HALL FIRE & LIFE SAFETY UPGRADES TIME: 2:00 P.M.BID PACKAGE: 9B ‐ CERAMIC AND STONE TILE ESTIMATED CONSTRUCTION COST:  $345,000

CONTRACTOR'S NAMELUMP SUM ALTERNATE #1 ALTERNATE #2 ALTERNATE #3 ALTERNATE #4 TOTAL

TIME BID RECEIVED  YES NO BASE BID SOFFIT COVERS REDUCE SCOPE LAVATORY WALL SCAFFOLDING

AMERICAN MARBLE  NO BID  ‐ ‐ ‐ ‐ ‐

CHRISTIAN BROTHERS  $            210,653.00  N/A N/A N/A N/A 210,653.00$            

CONTINENTAL MARBLE & TILE  NO BID  ‐ ‐ ‐ ‐ ‐

HOWARDS RUG 275,190.00$             ‐$                            ‐$                            ‐$                            ‐$                            275,190.00$            

PARAMOUNT TILE  NO BID  ‐ ‐ ‐ ‐ ‐

PRO SPECTRA CONTRACT FLOORING  NO BID  ‐ ‐ ‐ ‐ ‐

PROVIDENCE VENTURE (PVI)  NO BID  ‐ ‐ ‐ ‐ ‐x

x

x

x

x

PREQUALIFIED 

x

x

Page 12: UC San Diegormp-public.ucsd.edu/fdc/Bid Results/4768 Argo Hall Bid... · 2014. 4. 18. · bid package: 12a ‐ window coverings estimated construction cost: $30,000 contractor's name

UC San DiegoSEALED BID NO.: 4768/A4L‐372/966270 DATE: 4/15/2014PROJECT: ARGO HALL FIRE & LIFE SAFETY UPGRADES TIME: 2:00 P.M.BID PACKAGE: 9C ‐ ACOUSTICAL CEILINGS ESTIMATED CONSTRUCTION COST:  $12,500

CONTRACTOR'S NAMELUMP SUM ALTERNATE #1 ALTERNATE #2 ALTERNATE #3 ALTERNATE #4 TOTAL

TIME BID RECEIVED  YES NO BASE BID SOFFIT COVERS REDUCE SCOPE LAVATORY WALL SCAFFOLDING

BEST INTERIORS  $              16,475.00  N/A N/A N/A N/A 16,475.00$              

DARYL GRIFFIS ACOUSTICS  $              16,700.00  ‐$                            ‐$                            ‐$                            ‐$                            16,700.00$              

JOHNSON, FINCH & MCCLURE CONST.  NO BID  ‐ ‐ ‐ ‐ ‐

KHS&S 22,949.00$               N/I N/I N/I N/I 22,949.00$              

x

x

PREQUALIFIED 

x

x

Page 13: UC San Diegormp-public.ucsd.edu/fdc/Bid Results/4768 Argo Hall Bid... · 2014. 4. 18. · bid package: 12a ‐ window coverings estimated construction cost: $30,000 contractor's name

UC San DiegoSEALED BID NO.: 4768/A4L‐372/966270 DATE: 4/15/2014PROJECT: ARGO HALL FIRE & LIFE SAFETY UPGRADES TIME: 2:00 P.M.BID PACKAGE: 9D ‐ RESILIENT FLOORING, CARPET, BASE ESTIMATED CONSTRUCTION COST:  $300,000

CONTRACTOR'S NAMELUMP SUM ALTERNATE #1 ALTERNATE #2 ALTERNATE #3 ALTERNATE #4 TOTAL

TIME BID RECEIVED  YES NO BASE BID SOFFIT COVERS REDUCE SCOPE LAVATORY WALL SCAFFOLDING

CHRISTIAN BROTHERS  $            287,967.00  N/A (1,371.00)$                N/A N/A 286,596.00$            

HOWARDS RUG  $            414,352.00  ‐$                            ‐$                            ‐$                            ‐$                            414,352.00$            

PRO SPECTRA CONTRACT FLOORING  $            313,374.00  ‐$                            ‐$                            ‐$                            ‐$                            313,374.00$            x

PREQUALIFIED 

x

x

Page 14: UC San Diegormp-public.ucsd.edu/fdc/Bid Results/4768 Argo Hall Bid... · 2014. 4. 18. · bid package: 12a ‐ window coverings estimated construction cost: $30,000 contractor's name

UC San DiegoSEALED BID NO.: 4768/A4L‐372/966270 DATE: 4/15/2014PROJECT: ARGO HALL FIRE & LIFE SAFETY UPGRADES TIME: 2:00 P.M.BID PACKAGE: 9E ‐ PAINTING AND WALLCOVERING ESTIMATED CONSTRUCTION COST:  $515,000

CONTRACTOR'S NAMELUMP SUM ALTERNATE #1 ALTERNATE #2 ALTERNATE #3 ALTERNATE #4 TOTAL

TIME BID RECEIVED  YES NO BASE BID SOFFIT COVERS REDUCE SCOPE LAVATORY WALL SCAFFOLDING

GENERAL COATING  $            847,528.90  38,436.64$               ‐$                            ‐$                            ‐$                            885,965.54$            

MC PAINTING  $            425,836.00  ‐$                            ‐$                            ‐$                            ‐$                            425,836.00$            

PECORARO INC.  $            513,000.00  6,000.00$                   N/A N/A N/A 519,000.00$            

VASQUEZ CONSTRUCTION 538,749.00$             8,015.00$                   ‐$                            ‐$                            ‐$                            546,764.00$            

x

x

PREQUALIFIED 

x

x

Page 15: UC San Diegormp-public.ucsd.edu/fdc/Bid Results/4768 Argo Hall Bid... · 2014. 4. 18. · bid package: 12a ‐ window coverings estimated construction cost: $30,000 contractor's name

UC San DiegoSEALED BID NO.: 4768/A4L‐372/966270 DATE: 4/15/2014PROJECT: ARGO HALL FIRE & LIFE SAFETY UPGRADES TIME: 2:00 P.M.BID PACKAGE: 10A ‐ SIGNAGE AND GRAPHICS  ESTIMATED CONSTRUCTION COST:  $100,000

CONTRACTOR'S NAMELUMP SUM ALTERNATE #1 ALTERNATE #2 ALTERNATE #3 ALTERNATE #4 TOTAL

TIME BID RECEIVED  YES NO BASE BID SOFFIT COVERS REDUCE SCOPE LAVATORY WALL SCAFFOLDING

ALL STAR SIGNS  $              32,193.00  ‐$                            ‐$                            ‐$                            ‐$                            32,193.00$              

ACHITECTURAL DESIGN & SIGNS  $            127,135.00  127,135.00$            

CALIFORNIA NEAN PRODUCTS  NO BID 

MOTIVATIONAL SYSTEMS  NO BID 

VOMAR PRODUCTS  NO BID x ‐ ‐

x ‐ ‐ ‐

‐ ‐

‐ ‐

‐ ‐ ‐

x ‐ ‐ ‐

PREQUALIFIED 

x

x

Page 16: UC San Diegormp-public.ucsd.edu/fdc/Bid Results/4768 Argo Hall Bid... · 2014. 4. 18. · bid package: 12a ‐ window coverings estimated construction cost: $30,000 contractor's name

UC San DiegoSEALED BID NO.: 4768/A4L‐372/966270 DATE: 4/15/2014PROJECT: ARGO HALL FIRE & LIFE SAFETY UPGRADES TIME: 2:00 P.M.BID PACKAGE: 10B ‐ SPECIALTIES AND ACCESSORIES ESTIMATED CONSTRUCTION COST:  $135,000

CONTRACTOR'S NAMELUMP SUM ALTERNATE #1 ALTERNATE #2 ALTERNATE #3 ALTERNATE #4 TOTAL

TIME BID RECEIVED  YES NO BASE BID SOFFIT COVERS REDUCE SCOPE LAVATORY WALL SCAFFOLDING

DARYL GRIFFIS ACOUSTICS  NO BID  ‐ ‐ ‐ ‐ ‐

ISEC INC.  $            117,457.00  ‐$                            ‐$                            ‐$                            ‐$                            117,457.00$            

PROVIDENCE VENTURE (PVI)  $            155,156.00  N/A N/A N/A N/A 155,156.00$            

SOUTHWEST SPECIALTIES 113,522.00$             ‐$                            ‐$                            ‐$                            ‐$                            113,522.00$            

STUMBAUGH & ASSOCIATES 118,500.00$             N/A N/A N/A N/A 118,500.00$            

x

x

x

PREQUALIFIED 

x

x

Page 17: UC San Diegormp-public.ucsd.edu/fdc/Bid Results/4768 Argo Hall Bid... · 2014. 4. 18. · bid package: 12a ‐ window coverings estimated construction cost: $30,000 contractor's name

UC San DiegoSEALED BID NO.: 4768/A4L‐372/966270 DATE: 4/15/2014PROJECT: ARGO HALL FIRE & LIFE SAFETY UPGRADES TIME: 2:00 P.M.BID PACKAGE: 12A ‐ WINDOW COVERINGS ESTIMATED CONSTRUCTION COST:  $30,000

CONTRACTOR'S NAMELUMP SUM ALTERNATE #1 ALTERNATE #2 ALTERNATE #3 ALTERNATE #4 TOTAL

TIME BID RECEIVED  YES NO BASE BID SOFFIT COVERS REDUCE SCOPE LAVATORY WALL SCAFFOLDING

A1 QUALITY BLINDS  $                6,750.00  ‐ ‐ ‐ ‐ 6,750.00$                  

CONTRACT DÉCOR  NO BID  ‐ ‐ ‐ ‐ ‐

SHEWARDS & SONS  NO BID  ‐ ‐ ‐ ‐ ‐x

PREQUALIFIED 

x

x

Page 18: UC San Diegormp-public.ucsd.edu/fdc/Bid Results/4768 Argo Hall Bid... · 2014. 4. 18. · bid package: 12a ‐ window coverings estimated construction cost: $30,000 contractor's name

UC San DiegoSEALED BID NO.: 4768/A4L‐372/966270 DATE: 4/15/2014PROJECT: ARGO HALL FIRE & LIFE SAFETY UPGRADES TIME: 2:00 P.M.BID PACKAGE: 12B ‐ FFE MOVING AND STORAGE ESTIMATED CONSTRUCTION COST:  $135,000

CONTRACTOR'S NAMELUMP SUM ALTERNATE #1 ALTERNATE #2 ALTERNATE #3 ALTERNATE #4 TOTAL

TIME BID RECEIVED  YES NO BASE BID SOFFIT COVERS REDUCE SCOPE LAVATORY WALL SCAFFOLDING

ALEXANDER'S MOBILITY SERVICES  $            162,415.00  N/A N/A N/A N/A 162,415.00$            

BERNARDO MOVING  $            122,500.00  N/A ‐ ‐ ‐ 122,500.00$            

PREQUALIFIED 

x

x

Page 19: UC San Diegormp-public.ucsd.edu/fdc/Bid Results/4768 Argo Hall Bid... · 2014. 4. 18. · bid package: 12a ‐ window coverings estimated construction cost: $30,000 contractor's name

UC San DiegoSEALED BID NO.: 4768/A4L‐372/966270 DATE: 4/15/2014PROJECT: ARGO HALL FIRE & LIFE SAFETY UPGRADES TIME: 2:00 P.M.BID PACKAGE: 22A ‐ PLUMBING ESTIMATED CONSTRUCTION COST:  $500,000

CONTRACTOR'S NAMELUMP SUM ALTERNATE #1 ALTERNATE #2 ALTERNATE #3 ALTERNATE #4 TOTAL

TIME BID RECEIVED  YES NO BASE BID SOFFIT COVERS REDUCE SCOPE LAVATORY WALL SCAFFOLDING

ASTRO MECHANICAL  $            543,138.00  N/A N/A N/A N/A 543,138.00$            

INTERPIPE CONTRACTING  $            667,970.00  ‐$                            ‐$                            30,000.00$               ‐$                            697,970.00$            

JACKSON & BLANC  NO BID  ‐ ‐ ‐ ‐ ‐

JPI DEVELOPMENT NO BID ‐ ‐ ‐ ‐ ‐

MURRAY COMPANY Non‐Responsive ‐ ‐ ‐ ‐ ‐

UNIVERSITY MECHANICAL 533,692.00$             ‐$                            ‐$                            ‐$                            ‐$                            533,692.00$            x

x

x

x

PREQUALIFIED 

x

x

Page 20: UC San Diegormp-public.ucsd.edu/fdc/Bid Results/4768 Argo Hall Bid... · 2014. 4. 18. · bid package: 12a ‐ window coverings estimated construction cost: $30,000 contractor's name

UC San DiegoSEALED BID NO.: 4768/A4L‐372/966270 DATE: 4/15/2014PROJECT: ARGO HALL FIRE & LIFE SAFETY UPGRADES TIME: 2:00 P.M.BID PACKAGE: 23A ‐ HVAC ESTIMATED CONSTRUCTION COST:  $225,000

CONTRACTOR'S NAMELUMP SUM ALTERNATE #1 ALTERNATE #2 ALTERNATE #3 ALTERNATE #4 TOTAL

TIME BID RECEIVED  YES NO BASE BID SOFFIT COVERS REDUCE SCOPE LAVATORY WALL SCAFFOLDING

ACCO ENGINEERED SYSTEMS  $            184,000.00  N/A N/A N/A N/A 184,000.00$            

JACKSON & BLANC  $            208,075.00  N/A N/A N/A N/A 208,075.00$            

UNIVERSITY MECHANICAL  $            122,061.00  ‐$                            ‐$                            ‐$                            ‐$                            122,061.00$            x

PREQUALIFIED 

x

x

Page 21: UC San Diegormp-public.ucsd.edu/fdc/Bid Results/4768 Argo Hall Bid... · 2014. 4. 18. · bid package: 12a ‐ window coverings estimated construction cost: $30,000 contractor's name

UC San DiegoSEALED BID NO.: 4768/A4L‐372/966270 DATE: 4/15/2014PROJECT: ARGO HALL FIRE & LIFE SAFETY UPGRADES TIME: 2:00 P.M.BID PACKAGE: 26A ‐ ELECTRICAL AND FIRE ALARM ESTIMATED CONSTRUCTION COST:  $1,250,000

CONTRACTOR'S NAMELUMP SUM ALTERNATE #1 ALTERNATE #2 ALTERNATE #3 ALTERNATE #4 TOTAL

TIME BID RECEIVED  YES NO BASE BID SOFFIT COVERS REDUCE SCOPE LAVATORY WALL SCAFFOLDING

BAKER ELECTRIC  $         1,161,200.00  ‐$                            ‐$                            ‐$                            ‐$                            1,161,200.00$         

DYNALECTRIC  $         1,106,100.00  1,055.00$                   1,107,155.00$         

FULLER ELECTRIC  $            762,345.00  N/A N/A N/A N/A 762,345.00$            

NEAL ELECTRIC 543,026.00$             N/A N/A 5,000.00$                   N/A 548,026.00$            

x

x

PREQUALIFIED 

x

x

Page 22: UC San Diegormp-public.ucsd.edu/fdc/Bid Results/4768 Argo Hall Bid... · 2014. 4. 18. · bid package: 12a ‐ window coverings estimated construction cost: $30,000 contractor's name

UC San DiegoSEALED BID NO.: 4768/A4L‐372/966270 DATE: 4/15/2014PROJECT: ARGO HALL FIRE & LIFE SAFETY UPGRADES TIME: 2:00 P.M.BID PACKAGE: 32A ‐ LANDSCAPING AND GRADING ESTIMATED CONSTRUCTION COST:  $35,000

CONTRACTOR'S NAMELUMP SUM ALTERNATE #1 ALTERNATE #2 ALTERNATE #3 ALTERNATE #4 TOTAL

TIME BID RECEIVED  YES NO BASE BID SOFFIT COVERS REDUCE SCOPE LAVATORY WALL SCAFFOLDING

VALLEY CREST  $            114,222.00  N/A N/A N/A N/A 114,222.00$            

PALM ENGINEERING  Non‐Responsive  ‐ ‐ ‐ ‐ ‐

PREQUALIFIED 

x

x

Page 23: UC San Diegormp-public.ucsd.edu/fdc/Bid Results/4768 Argo Hall Bid... · 2014. 4. 18. · bid package: 12a ‐ window coverings estimated construction cost: $30,000 contractor's name

UC San DiegoSEALED BID NO.: 4768/A4L‐372/966270 DATE: 4/15/2014PROJECT: ARGO HALL FIRE & LIFE SAFETY UPGRADES TIME: 2:00 P.M.BID PACKAGE: 33A ‐ UNDERGROUND UTILITIES ESTIMATED CONSTRUCTION COST:  $25,000

CONTRACTOR'S NAMELUMP SUM ALTERNATE #1 ALTERNATE #2 ALTERNATE #3 ALTERNATE #4 TOTAL

TIME BID RECEIVED  YES NO BASE BID SOFFIT COVERS REDUCE SCOPE LAVATORY WALL SCAFFOLDING

ASTRO MECHANICAL  $              55,965.00  N/A N/A N/A N/A 55,965.00$              

INTERPIPE CONTRACTING  $              37,970.00  ‐$                            ‐$                            ‐$                            ‐$                            37,970.00$              

MURRAY COMPANY  NO BID  ‐ ‐ ‐ ‐ ‐x

PREQUALIFIED 

x

x

Page 24: UC San Diegormp-public.ucsd.edu/fdc/Bid Results/4768 Argo Hall Bid... · 2014. 4. 18. · bid package: 12a ‐ window coverings estimated construction cost: $30,000 contractor's name

UC San DiegoSEALED BID NO.: 4768/A4L‐372/966270 DATE: 4/15/2014PROJECT: ARGO HALL FIRE & LIFE SAFETY UPGRADES TIME: 2:00 P.M.BID PACKAGE: 49A ‐ FINAL CLEAN ESTIMATED CONSTRUCTION COST:  $25,000

CONTRACTOR'S NAMELUMP SUM ALTERNATE #1 ALTERNATE #2 ALTERNATE #3 ALTERNATE #4 TOTAL

TIME BID RECEIVED  YES NO BASE BID SOFFIT COVERS REDUCE SCOPE LAVATORY WALL SCAFFOLDING

BEST MAINTENANCE  Non‐responsive  ‐ ‐ ‐ ‐ ‐

PACIFIC COAST CLEANING  $              41,000.00  N/A N/A N/A N/A 41,000.00$              

PARAGON SERVICES JANITORIAL  Non‐responsive  ‐ ‐ ‐ ‐ ‐x

PREQUALIFIED 

x

x

Page 25: UC San Diegormp-public.ucsd.edu/fdc/Bid Results/4768 Argo Hall Bid... · 2014. 4. 18. · bid package: 12a ‐ window coverings estimated construction cost: $30,000 contractor's name

UC San DiegoSEALED BID NO.: 4768/A4L‐372/966270 DATE: 4/15/2014PROJECT: ARGO HALL FIRE & LIFE SAFETY UPGRADES TIME: 2:00 P.M.BID PACKAGE: 49B ‐ SCAFFOLDING ESTIMATED CONSTRUCTION COST:  $50,000

CONTRACTOR'S NAMELUMP SUM ALTERNATE #1 ALTERNATE #2 ALTERNATE #3 ALTERNATE #4 TOTAL

TIME BID RECEIVED  YES NO BASE BID SOFFIT COVERS REDUCE SCOPE LAVATORY WALL SCAFFOLDING

COMMERCIAL SCAFFOLDING OF CA, INC.  Non‐Responsive  ‐ ‐ ‐ ‐ ‐

SAFWAY SCAFFOLD  $              25,515.00  ‐$                            ‐$                            ‐$                            56,840.00$               82,355.00$              

PREQUALIFIED 

x

x

Page 26: UC San Diegormp-public.ucsd.edu/fdc/Bid Results/4768 Argo Hall Bid... · 2014. 4. 18. · bid package: 12a ‐ window coverings estimated construction cost: $30,000 contractor's name

UC San DiegoSEALED BID NO.: 4768/A4L‐372/966270 DATE: 4/15/2014PROJECT: ARGO HALL FIRE & LIFE SAFETY UPGRADES TIME: 2:00 P.M.BID PACKAGE: 49C ‐ MAN HOIST AND OPERATION ESTIMATED CONSTRUCTION COST:  $150,000

CONTRACTOR'S NAMELUMP SUM ALTERNATE #1 ALTERNATE #2 ALTERNATE #3 ALTERNATE #4 UNIT PRICE TOTAL

TIME BID RECEIVED  YES NO BASE BID SOFFIT COVERS REDUCE SCOPE LAVATORY WALL SCAFFOLDING OPERATOR

CABRILLO HOIST  $             113,000.00  N/A N/A N/A N/A 44,500.00$                157,500.00$             

89.00$                       

SHEEDY HOIST  $             101,150.00  N/A N/A N/A N/A 44,500.00$                145,650.00$             

89.00$                       

SAFWAY SCAFFOLD  $             116,860.00  ‐$                             ‐$                             ‐$                             ‐$                             36,710.00$                153,570.00$             

73.42$                       x

PREQUALIFIED 

x

x