UC San DiegoSEALED BID NO.: 4768/A4L‐372/966270 DATE: 4/15/2014PROJECT: ARGO HALL FIRE & LIFE SAFETY UPGRADES TIME: 2:00 P.M.BID PACKAGE: 2A ‐ DEMOLITION ESTIMATED CONSTRUCTION COST: $450,000
CONTRACTOR'S NAMELUMP SUM ALTERNATE #1 ALTERNATE #2 ALTERNATE #3 ALTERNATE #4 TOTAL
TIME BID RECEIVED YES NO BASE BID SOFFIT COVERS REDUCE SCOPE LAVATORY WALL SCAFFOLDING
CASPER COMPANY NO BID
CEMENT CUTTING 483,950.00$ N/A (84,000.00)$ N/A N/A 399,950.00$
CLANCY CONTRACTING NO BID
PALM ENGINEERING NO BID
US DEMOLITION NO BID
LVI SERVICES NO BID
‐ ‐x ‐ ‐ ‐
‐ ‐ ‐ ‐ ‐
‐ ‐ ‐ ‐‐
x
x
PREQUALIFIED
x
x
x
‐
‐
‐‐‐‐
‐ ‐ ‐ ‐
UC San DiegoSEALED BID NO.: 4768/A4L‐372/966270 DATE: 4/15/2014PROJECT: ARGO HALL FIRE & LIFE SAFETY UPGRADES TIME: 2:00 P.M.BID PACKAGE: 2B ‐ HAZARDOUS ABATEMENT ESTIMATED CONSTRUCTION COST: $100,000
CONTRACTOR'S NAMELUMP SUM ALTERNATE #1 ALTERNATE #2 ALTERNATE #3 ALTERNATE #4 TOTAL
TIME BID RECEIVED YES NO BASE BID SOFFIT COVERS REDUCE SCOPE LAVATORY WALL SCAFFOLDING
ATI RESTORATION NO BID
CLANCY CONTRACTING $ 141,185.00 ‐$ ‐$ ‐$ ‐$ 141,185.00$
PARC ENVIRONMENTAL NO BID
LVI SERVICES, INC. NO BID x ‐ ‐
‐ ‐
‐ ‐‐
x ‐ ‐ ‐
‐ ‐
x
‐
PREQUALIFIED
x ‐ ‐
UC San DiegoSEALED BID NO.: 4768/A4L‐372/966270 DATE: 4/15/2014PROJECT: ARGO HALL FIRE & LIFE SAFETY UPGRADES TIME: 2:00 P.M.BID PACKAGE: 3A ‐ REINFORCING STEEL ESTIMATED CONSTRUCTION COST: $25,000
CONTRACTOR'S NAMELUMP SUM ALTERNATE #1 ALTERNATE #2 ALTERNATE #3 ALTERNATE #4 TOTAL
TIME BID RECEIVED YES NO BASE BID SOFFIT COVERS REDUCE SCOPE LAVATORY WALL SCAFFOLDING
GERDAU REINFORCING STEEL $ 41,853.00 ‐$ ‐$ ‐$ ‐$ 41,853.00$
QUALITY REINFORCING $ 39,832.00 ‐$ ‐$ ‐$ ‐$ 39,832.00$
PREQUALIFIED
x
x
UC San DiegoSEALED BID NO.: 4768/A4L‐372/966270 DATE: 4/15/2014PROJECT: ARGO HALL FIRE & LIFE SAFETY UPGRADES TIME: 2:00 P.M.BID PACKAGE: 5A ‐ MISC. METALS AND RAILINGS ESTIMATED CONSTRUCTION COST: $800,000
CONTRACTOR'S NAMELUMP SUM ALTERNATE #1 ALTERNATE #2 ALTERNATE #3 ALTERNATE #4 TOTAL
TIME BID RECEIVED YES NO BASE BID SOFFIT COVERS REDUCE SCOPE LAVATORY WALL SCAFFOLDINGANDERSON CHARNESKY STRUCTURAL STEEL, INC. $ 530,000.00 N/A N/A N/A N/A 530,000.00$
MCMAHON STEEL COMPANY
PREQUALIFIED
x
718,022.00$ x
$ 718,022.00 ‐$ ‐$ ‐$ ‐$
UC San DiegoSEALED BID NO.: 4768/A4L‐372/966270 DATE: 4/15/2014PROJECT: ARGO HALL FIRE & LIFE SAFETY UPGRADES TIME: 2:00 P.M.BID PACKAGE: 6A ‐ MILLWORK ESTIMATED CONSTRUCTION COST: $75,000
CONTRACTOR'S NAMELUMP SUM ALTERNATE #1 ALTERNATE #2 ALTERNATE #3 ALTERNATE #4 TOTAL
TIME BID RECEIVED YES NO BASE BID SOFFIT COVERS REDUCE SCOPE LAVATORY WALL SCAFFOLDING
ISEC INC. NO BID ‐ ‐ ‐ ‐ ‐
MCWORKMAN MILLWORKS $ 45,750.00 ‐$ ‐$ 34,000.00$ ‐$ 79,750.00$
MISSION VALLEY CABINET NO BID ‐ ‐ ‐ ‐ ‐
PROVIDENCE VENTURE (PVI) 56,793.00$ N/A N/A 13,500.00$ N/A 70,293.00$
SPOONERS WOODWORKS 34,775.00$ N/A N/A 32,500.00$ N/A 67,275.00$
WESTMARK PRODUCTS NO BID ‐ ‐ ‐ ‐ ‐x
x
x
x
PREQUALIFIED
x
x
UC San DiegoSEALED BID NO.: 4768/A4L‐372/966270 DATE: 4/15/2014PROJECT: ARGO HALL FIRE & LIFE SAFETY UPGRADES TIME: 2:00 P.M.BID PACKAGE: 6B ‐ SOLID SURFACE / STONE COUNTERS ESTIMATED CONSTRUCTION COST: $140,000
CONTRACTOR'S NAMELUMP SUM ALTERNATE #1 ALTERNATE #2 ALTERNATE #3 ALTERNATE #4 TOTAL
TIME BID RECEIVED YES NO BASE BID SOFFIT COVERS REDUCE SCOPE LAVATORY WALL SCAFFOLDING
AMERICAN MARBLE $ 162,240.00 ‐$ ‐$ 250.00$ ‐$ 162,490.00$
MCWORKMAN MILLWORKS $ 254,620.00 ‐$ ‐$ 7,500.00$ ‐$ 262,120.00$
PROVIDENCE VENTURE (PVI) $ 178,872.00 N/A N/A N/A N/A 178,872.00$
SPOONERS WOODWORKS NO BID ‐ ‐ ‐ ‐ ‐
ISEC INC. NO BID ‐ ‐ ‐ ‐ ‐
x
x
x
PREQUALIFIED
x
x
UC San DiegoSEALED BID NO.: 4768/A4L‐372/966270 DATE: 4/15/2014PROJECT: ARGO HALL FIRE & LIFE SAFETY UPGRADES TIME: 2:00 P.M.BID PACKAGE: 7A ‐ DECK COATING ESTIMATED CONSTRUCTION COST: $80,000
CONTRACTOR'S NAMELUMP SUM ALTERNATE #1 ALTERNATE #2 ALTERNATE #3 ALTERNATE #4 TOTAL
TIME BID RECEIVED YES NO BASE BID SOFFIT COVERS REDUCE SCOPE LAVATORY WALL SCAFFOLDING
APPLIED RESTORATION $ 201,000.00 N/A N/A N/A N/A 201,000.00$
MARK BEAMISH WATERPROOFING NO BID
PREQUALIFIED
x
‐x ‐ ‐ ‐ ‐
UC San DiegoSEALED BID NO.: 4768/A4L‐372/966270 DATE: 4/15/2014PROJECT: ARGO HALL FIRE & LIFE SAFETY UPGRADES TIME: 2:00 P.M.BID PACKAGE: 8A ‐ DOORS, FRAMES AND HARDWARE ESTIMATED CONSTRUCTION COST: $200,000
CONTRACTOR'S NAMELUMP SUM ALTERNATE #1 ALTERNATE #2 ALTERNATE #3 ALTERNATE #4 TOTAL
TIME BID RECEIVED YES NO BASE BID SOFFIT COVERS REDUCE SCOPE LAVATORY WALL SCAFFOLDING
JOHNSON, FINCH & MCCLURE CONST. $ 175,451.00 N/A N/A N/A N/A 175,451.00$
RPG ENTERPRISES $ 227,396.00 N/A N/A N/A ‐ 227,396.00$
SPOONERS WOODWORKS NO BID ‐ ‐ ‐ ‐ ‐
ISEC INC. $ 188,660.00 ‐$ ‐$ ‐$ ‐$ 188,660.00$
x
x
PREQUALIFIED
x
x
UC San DiegoSEALED BID NO.: 4768/A4L‐372/966270 DATE: 4/15/2014PROJECT: ARGO HALL FIRE & LIFE SAFETY UPGRADES TIME: 2:00 P.M.BID PACKAGE: 8B ‐ GLAZING ESTIMATED CONSTRUCTION COST: $225,000
CONTRACTOR'S NAMELUMP SUM ALTERNATE #1 ALTERNATE #2 ALTERNATE #3 ALTERNATE #4 TOTAL
TIME BID RECEIVED YES NO BASE BID SOFFIT COVERS REDUCE SCOPE LAVATORY WALL SCAFFOLDING
LA MESA GLASS $ 236,204.00 N/A N/A N/A N/A 236,204.00$
PRIMARY GLAZING NO BID ‐ ‐ ‐ ‐ ‐
TOWER GLASS $ 359,487.00 N/A N/A N/A N/A 359,487.00$ x
PREQUALIFIED
x
x
UC San DiegoSEALED BID NO.: 4768/A4L‐372/966270 DATE: 4/15/2014PROJECT: ARGO HALL FIRE & LIFE SAFETY UPGRADES TIME: 2:00 P.M.BID PACKAGE: 9A ‐ FRAMING, DRYWALL & PLASTER ESTIMATED CONSTRUCTION COST: $600,000
CONTRACTOR'S NAMELUMP SUM ALTERNATE #1 ALTERNATE #2 ALTERNATE #3 ALTERNATE #4 TOTAL
TIME BID RECEIVED YES NO BASE BID SOFFIT COVERS REDUCE SCOPE LAVATORY WALL SCAFFOLDING
BEST INTERIORS $ 370,100.00 N/A N/A 16,780.00$ N/A 386,880.00$
JOHNSON, FINCH & MCCLURE CONST. 471,765.00$ ‐$ ‐$ 13,888.00$ ‐$ 485,653.00$
KHS&S 555,125.00$ N/I N/I 25,800.00$ N/I 580,925.00$
STANDARD DRYWALL 427,150.00$ N/A N/A 21,150.00$ N/A 448,300.00$
x
x
PREQUALIFIED
x
x
UC San DiegoSEALED BID NO.: 4768/A4L‐372/966270 DATE: 4/15/2014PROJECT: ARGO HALL FIRE & LIFE SAFETY UPGRADES TIME: 2:00 P.M.BID PACKAGE: 9B ‐ CERAMIC AND STONE TILE ESTIMATED CONSTRUCTION COST: $345,000
CONTRACTOR'S NAMELUMP SUM ALTERNATE #1 ALTERNATE #2 ALTERNATE #3 ALTERNATE #4 TOTAL
TIME BID RECEIVED YES NO BASE BID SOFFIT COVERS REDUCE SCOPE LAVATORY WALL SCAFFOLDING
AMERICAN MARBLE NO BID ‐ ‐ ‐ ‐ ‐
CHRISTIAN BROTHERS $ 210,653.00 N/A N/A N/A N/A 210,653.00$
CONTINENTAL MARBLE & TILE NO BID ‐ ‐ ‐ ‐ ‐
HOWARDS RUG 275,190.00$ ‐$ ‐$ ‐$ ‐$ 275,190.00$
PARAMOUNT TILE NO BID ‐ ‐ ‐ ‐ ‐
PRO SPECTRA CONTRACT FLOORING NO BID ‐ ‐ ‐ ‐ ‐
PROVIDENCE VENTURE (PVI) NO BID ‐ ‐ ‐ ‐ ‐x
x
x
x
x
PREQUALIFIED
x
x
UC San DiegoSEALED BID NO.: 4768/A4L‐372/966270 DATE: 4/15/2014PROJECT: ARGO HALL FIRE & LIFE SAFETY UPGRADES TIME: 2:00 P.M.BID PACKAGE: 9C ‐ ACOUSTICAL CEILINGS ESTIMATED CONSTRUCTION COST: $12,500
CONTRACTOR'S NAMELUMP SUM ALTERNATE #1 ALTERNATE #2 ALTERNATE #3 ALTERNATE #4 TOTAL
TIME BID RECEIVED YES NO BASE BID SOFFIT COVERS REDUCE SCOPE LAVATORY WALL SCAFFOLDING
BEST INTERIORS $ 16,475.00 N/A N/A N/A N/A 16,475.00$
DARYL GRIFFIS ACOUSTICS $ 16,700.00 ‐$ ‐$ ‐$ ‐$ 16,700.00$
JOHNSON, FINCH & MCCLURE CONST. NO BID ‐ ‐ ‐ ‐ ‐
KHS&S 22,949.00$ N/I N/I N/I N/I 22,949.00$
x
x
PREQUALIFIED
x
x
UC San DiegoSEALED BID NO.: 4768/A4L‐372/966270 DATE: 4/15/2014PROJECT: ARGO HALL FIRE & LIFE SAFETY UPGRADES TIME: 2:00 P.M.BID PACKAGE: 9D ‐ RESILIENT FLOORING, CARPET, BASE ESTIMATED CONSTRUCTION COST: $300,000
CONTRACTOR'S NAMELUMP SUM ALTERNATE #1 ALTERNATE #2 ALTERNATE #3 ALTERNATE #4 TOTAL
TIME BID RECEIVED YES NO BASE BID SOFFIT COVERS REDUCE SCOPE LAVATORY WALL SCAFFOLDING
CHRISTIAN BROTHERS $ 287,967.00 N/A (1,371.00)$ N/A N/A 286,596.00$
HOWARDS RUG $ 414,352.00 ‐$ ‐$ ‐$ ‐$ 414,352.00$
PRO SPECTRA CONTRACT FLOORING $ 313,374.00 ‐$ ‐$ ‐$ ‐$ 313,374.00$ x
PREQUALIFIED
x
x
UC San DiegoSEALED BID NO.: 4768/A4L‐372/966270 DATE: 4/15/2014PROJECT: ARGO HALL FIRE & LIFE SAFETY UPGRADES TIME: 2:00 P.M.BID PACKAGE: 9E ‐ PAINTING AND WALLCOVERING ESTIMATED CONSTRUCTION COST: $515,000
CONTRACTOR'S NAMELUMP SUM ALTERNATE #1 ALTERNATE #2 ALTERNATE #3 ALTERNATE #4 TOTAL
TIME BID RECEIVED YES NO BASE BID SOFFIT COVERS REDUCE SCOPE LAVATORY WALL SCAFFOLDING
GENERAL COATING $ 847,528.90 38,436.64$ ‐$ ‐$ ‐$ 885,965.54$
MC PAINTING $ 425,836.00 ‐$ ‐$ ‐$ ‐$ 425,836.00$
PECORARO INC. $ 513,000.00 6,000.00$ N/A N/A N/A 519,000.00$
VASQUEZ CONSTRUCTION 538,749.00$ 8,015.00$ ‐$ ‐$ ‐$ 546,764.00$
x
x
PREQUALIFIED
x
x
UC San DiegoSEALED BID NO.: 4768/A4L‐372/966270 DATE: 4/15/2014PROJECT: ARGO HALL FIRE & LIFE SAFETY UPGRADES TIME: 2:00 P.M.BID PACKAGE: 10A ‐ SIGNAGE AND GRAPHICS ESTIMATED CONSTRUCTION COST: $100,000
CONTRACTOR'S NAMELUMP SUM ALTERNATE #1 ALTERNATE #2 ALTERNATE #3 ALTERNATE #4 TOTAL
TIME BID RECEIVED YES NO BASE BID SOFFIT COVERS REDUCE SCOPE LAVATORY WALL SCAFFOLDING
ALL STAR SIGNS $ 32,193.00 ‐$ ‐$ ‐$ ‐$ 32,193.00$
ACHITECTURAL DESIGN & SIGNS $ 127,135.00 127,135.00$
CALIFORNIA NEAN PRODUCTS NO BID
MOTIVATIONAL SYSTEMS NO BID
VOMAR PRODUCTS NO BID x ‐ ‐
x ‐ ‐ ‐
‐ ‐
‐ ‐
‐ ‐ ‐
x ‐ ‐ ‐
PREQUALIFIED
x
x
UC San DiegoSEALED BID NO.: 4768/A4L‐372/966270 DATE: 4/15/2014PROJECT: ARGO HALL FIRE & LIFE SAFETY UPGRADES TIME: 2:00 P.M.BID PACKAGE: 10B ‐ SPECIALTIES AND ACCESSORIES ESTIMATED CONSTRUCTION COST: $135,000
CONTRACTOR'S NAMELUMP SUM ALTERNATE #1 ALTERNATE #2 ALTERNATE #3 ALTERNATE #4 TOTAL
TIME BID RECEIVED YES NO BASE BID SOFFIT COVERS REDUCE SCOPE LAVATORY WALL SCAFFOLDING
DARYL GRIFFIS ACOUSTICS NO BID ‐ ‐ ‐ ‐ ‐
ISEC INC. $ 117,457.00 ‐$ ‐$ ‐$ ‐$ 117,457.00$
PROVIDENCE VENTURE (PVI) $ 155,156.00 N/A N/A N/A N/A 155,156.00$
SOUTHWEST SPECIALTIES 113,522.00$ ‐$ ‐$ ‐$ ‐$ 113,522.00$
STUMBAUGH & ASSOCIATES 118,500.00$ N/A N/A N/A N/A 118,500.00$
x
x
x
PREQUALIFIED
x
x
UC San DiegoSEALED BID NO.: 4768/A4L‐372/966270 DATE: 4/15/2014PROJECT: ARGO HALL FIRE & LIFE SAFETY UPGRADES TIME: 2:00 P.M.BID PACKAGE: 12A ‐ WINDOW COVERINGS ESTIMATED CONSTRUCTION COST: $30,000
CONTRACTOR'S NAMELUMP SUM ALTERNATE #1 ALTERNATE #2 ALTERNATE #3 ALTERNATE #4 TOTAL
TIME BID RECEIVED YES NO BASE BID SOFFIT COVERS REDUCE SCOPE LAVATORY WALL SCAFFOLDING
A1 QUALITY BLINDS $ 6,750.00 ‐ ‐ ‐ ‐ 6,750.00$
CONTRACT DÉCOR NO BID ‐ ‐ ‐ ‐ ‐
SHEWARDS & SONS NO BID ‐ ‐ ‐ ‐ ‐x
PREQUALIFIED
x
x
UC San DiegoSEALED BID NO.: 4768/A4L‐372/966270 DATE: 4/15/2014PROJECT: ARGO HALL FIRE & LIFE SAFETY UPGRADES TIME: 2:00 P.M.BID PACKAGE: 12B ‐ FFE MOVING AND STORAGE ESTIMATED CONSTRUCTION COST: $135,000
CONTRACTOR'S NAMELUMP SUM ALTERNATE #1 ALTERNATE #2 ALTERNATE #3 ALTERNATE #4 TOTAL
TIME BID RECEIVED YES NO BASE BID SOFFIT COVERS REDUCE SCOPE LAVATORY WALL SCAFFOLDING
ALEXANDER'S MOBILITY SERVICES $ 162,415.00 N/A N/A N/A N/A 162,415.00$
BERNARDO MOVING $ 122,500.00 N/A ‐ ‐ ‐ 122,500.00$
PREQUALIFIED
x
x
UC San DiegoSEALED BID NO.: 4768/A4L‐372/966270 DATE: 4/15/2014PROJECT: ARGO HALL FIRE & LIFE SAFETY UPGRADES TIME: 2:00 P.M.BID PACKAGE: 22A ‐ PLUMBING ESTIMATED CONSTRUCTION COST: $500,000
CONTRACTOR'S NAMELUMP SUM ALTERNATE #1 ALTERNATE #2 ALTERNATE #3 ALTERNATE #4 TOTAL
TIME BID RECEIVED YES NO BASE BID SOFFIT COVERS REDUCE SCOPE LAVATORY WALL SCAFFOLDING
ASTRO MECHANICAL $ 543,138.00 N/A N/A N/A N/A 543,138.00$
INTERPIPE CONTRACTING $ 667,970.00 ‐$ ‐$ 30,000.00$ ‐$ 697,970.00$
JACKSON & BLANC NO BID ‐ ‐ ‐ ‐ ‐
JPI DEVELOPMENT NO BID ‐ ‐ ‐ ‐ ‐
MURRAY COMPANY Non‐Responsive ‐ ‐ ‐ ‐ ‐
UNIVERSITY MECHANICAL 533,692.00$ ‐$ ‐$ ‐$ ‐$ 533,692.00$ x
x
x
x
PREQUALIFIED
x
x
UC San DiegoSEALED BID NO.: 4768/A4L‐372/966270 DATE: 4/15/2014PROJECT: ARGO HALL FIRE & LIFE SAFETY UPGRADES TIME: 2:00 P.M.BID PACKAGE: 23A ‐ HVAC ESTIMATED CONSTRUCTION COST: $225,000
CONTRACTOR'S NAMELUMP SUM ALTERNATE #1 ALTERNATE #2 ALTERNATE #3 ALTERNATE #4 TOTAL
TIME BID RECEIVED YES NO BASE BID SOFFIT COVERS REDUCE SCOPE LAVATORY WALL SCAFFOLDING
ACCO ENGINEERED SYSTEMS $ 184,000.00 N/A N/A N/A N/A 184,000.00$
JACKSON & BLANC $ 208,075.00 N/A N/A N/A N/A 208,075.00$
UNIVERSITY MECHANICAL $ 122,061.00 ‐$ ‐$ ‐$ ‐$ 122,061.00$ x
PREQUALIFIED
x
x
UC San DiegoSEALED BID NO.: 4768/A4L‐372/966270 DATE: 4/15/2014PROJECT: ARGO HALL FIRE & LIFE SAFETY UPGRADES TIME: 2:00 P.M.BID PACKAGE: 26A ‐ ELECTRICAL AND FIRE ALARM ESTIMATED CONSTRUCTION COST: $1,250,000
CONTRACTOR'S NAMELUMP SUM ALTERNATE #1 ALTERNATE #2 ALTERNATE #3 ALTERNATE #4 TOTAL
TIME BID RECEIVED YES NO BASE BID SOFFIT COVERS REDUCE SCOPE LAVATORY WALL SCAFFOLDING
BAKER ELECTRIC $ 1,161,200.00 ‐$ ‐$ ‐$ ‐$ 1,161,200.00$
DYNALECTRIC $ 1,106,100.00 1,055.00$ 1,107,155.00$
FULLER ELECTRIC $ 762,345.00 N/A N/A N/A N/A 762,345.00$
NEAL ELECTRIC 543,026.00$ N/A N/A 5,000.00$ N/A 548,026.00$
x
x
PREQUALIFIED
x
x
UC San DiegoSEALED BID NO.: 4768/A4L‐372/966270 DATE: 4/15/2014PROJECT: ARGO HALL FIRE & LIFE SAFETY UPGRADES TIME: 2:00 P.M.BID PACKAGE: 32A ‐ LANDSCAPING AND GRADING ESTIMATED CONSTRUCTION COST: $35,000
CONTRACTOR'S NAMELUMP SUM ALTERNATE #1 ALTERNATE #2 ALTERNATE #3 ALTERNATE #4 TOTAL
TIME BID RECEIVED YES NO BASE BID SOFFIT COVERS REDUCE SCOPE LAVATORY WALL SCAFFOLDING
VALLEY CREST $ 114,222.00 N/A N/A N/A N/A 114,222.00$
PALM ENGINEERING Non‐Responsive ‐ ‐ ‐ ‐ ‐
PREQUALIFIED
x
x
UC San DiegoSEALED BID NO.: 4768/A4L‐372/966270 DATE: 4/15/2014PROJECT: ARGO HALL FIRE & LIFE SAFETY UPGRADES TIME: 2:00 P.M.BID PACKAGE: 33A ‐ UNDERGROUND UTILITIES ESTIMATED CONSTRUCTION COST: $25,000
CONTRACTOR'S NAMELUMP SUM ALTERNATE #1 ALTERNATE #2 ALTERNATE #3 ALTERNATE #4 TOTAL
TIME BID RECEIVED YES NO BASE BID SOFFIT COVERS REDUCE SCOPE LAVATORY WALL SCAFFOLDING
ASTRO MECHANICAL $ 55,965.00 N/A N/A N/A N/A 55,965.00$
INTERPIPE CONTRACTING $ 37,970.00 ‐$ ‐$ ‐$ ‐$ 37,970.00$
MURRAY COMPANY NO BID ‐ ‐ ‐ ‐ ‐x
PREQUALIFIED
x
x
UC San DiegoSEALED BID NO.: 4768/A4L‐372/966270 DATE: 4/15/2014PROJECT: ARGO HALL FIRE & LIFE SAFETY UPGRADES TIME: 2:00 P.M.BID PACKAGE: 49A ‐ FINAL CLEAN ESTIMATED CONSTRUCTION COST: $25,000
CONTRACTOR'S NAMELUMP SUM ALTERNATE #1 ALTERNATE #2 ALTERNATE #3 ALTERNATE #4 TOTAL
TIME BID RECEIVED YES NO BASE BID SOFFIT COVERS REDUCE SCOPE LAVATORY WALL SCAFFOLDING
BEST MAINTENANCE Non‐responsive ‐ ‐ ‐ ‐ ‐
PACIFIC COAST CLEANING $ 41,000.00 N/A N/A N/A N/A 41,000.00$
PARAGON SERVICES JANITORIAL Non‐responsive ‐ ‐ ‐ ‐ ‐x
PREQUALIFIED
x
x
UC San DiegoSEALED BID NO.: 4768/A4L‐372/966270 DATE: 4/15/2014PROJECT: ARGO HALL FIRE & LIFE SAFETY UPGRADES TIME: 2:00 P.M.BID PACKAGE: 49B ‐ SCAFFOLDING ESTIMATED CONSTRUCTION COST: $50,000
CONTRACTOR'S NAMELUMP SUM ALTERNATE #1 ALTERNATE #2 ALTERNATE #3 ALTERNATE #4 TOTAL
TIME BID RECEIVED YES NO BASE BID SOFFIT COVERS REDUCE SCOPE LAVATORY WALL SCAFFOLDING
COMMERCIAL SCAFFOLDING OF CA, INC. Non‐Responsive ‐ ‐ ‐ ‐ ‐
SAFWAY SCAFFOLD $ 25,515.00 ‐$ ‐$ ‐$ 56,840.00$ 82,355.00$
PREQUALIFIED
x
x
UC San DiegoSEALED BID NO.: 4768/A4L‐372/966270 DATE: 4/15/2014PROJECT: ARGO HALL FIRE & LIFE SAFETY UPGRADES TIME: 2:00 P.M.BID PACKAGE: 49C ‐ MAN HOIST AND OPERATION ESTIMATED CONSTRUCTION COST: $150,000
CONTRACTOR'S NAMELUMP SUM ALTERNATE #1 ALTERNATE #2 ALTERNATE #3 ALTERNATE #4 UNIT PRICE TOTAL
TIME BID RECEIVED YES NO BASE BID SOFFIT COVERS REDUCE SCOPE LAVATORY WALL SCAFFOLDING OPERATOR
CABRILLO HOIST $ 113,000.00 N/A N/A N/A N/A 44,500.00$ 157,500.00$
89.00$
SHEEDY HOIST $ 101,150.00 N/A N/A N/A N/A 44,500.00$ 145,650.00$
89.00$
SAFWAY SCAFFOLD $ 116,860.00 ‐$ ‐$ ‐$ ‐$ 36,710.00$ 153,570.00$
73.42$ x
PREQUALIFIED
x
x