TRAINING REPOR T Turbo Generators & Exciters BHEL Haridwar, Production Block-1, HEEP Presented By: - Sorab Attri (362/07) Akshay Dhar (377/07) Sachin Kangotra (354/07) Manpree t Singh (402/07) Deepak Kumar Verma (350/07) & Harpreet Singh(239/07)

TURBOALTERNATORS (BHEL Haridwar)

Embed Size (px)

Citation preview

Page 1: TURBOALTERNATORS (BHEL Haridwar)

8/8/2019 TURBOALTERNATORS (BHEL Haridwar)

http://slidepdf.com/reader/full/turboalternators-bhel-haridwar 1/8

TRAINING REPORT

Turbo Generators & Exciters

BHEL Haridwar, Production Block-1, HEEP

Presented By: -

Sorab Attri (362/07)

Akshay Dhar (377/07)

Sachin Kangotra (354/07)

Manpreet Singh (402/07)

Deepak Kumar Verma (350/07)

& Harpreet Singh(239/07)

Page 2: TURBOALTERNATORS (BHEL Haridwar)

8/8/2019 TURBOALTERNATORS (BHEL Haridwar)

http://slidepdf.com/reader/full/turboalternators-bhel-haridwar 2/8

BHEL is the largest engineering &manufacturing enterprise in India.

Established 50 years ago.

It is ranked among the top 10companies in the world,

manufacturing power generation

equipment.

Earns profits continuously since

1971-72, & paying dividends since

1976-77

OverviewOverview -- B.H.E.LB.H.E.L

Page 3: TURBOALTERNATORS (BHEL Haridwar)

8/8/2019 TURBOALTERNATORS (BHEL Haridwar)

http://slidepdf.com/reader/full/turboalternators-bhel-haridwar 3/8

Installed equipment for over 90,000 MW of power generation.

Supplied over 225000 MVA Transformer capacity.

Supplied 25000 motors with drive control system.

Supplied traction electrics & A.C./D.C. locos to power over 12000

kms railway networks.

BHEL DELIVERSBHEL DELIVERS

Page 4: TURBOALTERNATORS (BHEL Haridwar)

8/8/2019 TURBOALTERNATORS (BHEL Haridwar)

http://slidepdf.com/reader/full/turboalternators-bhel-haridwar 4/8

History of development in BHELHistory of development in BHEL

In 1950s: At Bhopal with British collaboration 30 MW &

120 MW Hydrogen cooled.

In 1960s: At Haridwar with Russian collaboration

100MW & 200 MW Hydrogen cooled.

In 1970s: At Hyderabad with Germany Collaboration

60MW Air Cooled & 110MW Hydrogencooled.

Page 5: TURBOALTERNATORS (BHEL Haridwar)

8/8/2019 TURBOALTERNATORS (BHEL Haridwar)

http://slidepdf.com/reader/full/turboalternators-bhel-haridwar 5/8

Vision

A world class engineering enterprise committed to enhancingstakeholder values.

 Mission

To be an Indian multinational engineering enterprise providingtotal business solution through quality products.

Values

Meeting commitments made to external & internal customers.

R espect for dignity & potential of individuals.

Integrity and fairness in all matters.

Vision, Mission & Values

Page 6: TURBOALTERNATORS (BHEL Haridwar)

8/8/2019 TURBOALTERNATORS (BHEL Haridwar)

http://slidepdf.com/reader/full/turboalternators-bhel-haridwar 6/8

BHEL Haridwar Complex

Location:-

Complex is situated in the

foot hills of shivalik range in Haridwar district

of Uttarakhand state.

Page 7: TURBOALTERNATORS (BHEL Haridwar)

8/8/2019 TURBOALTERNATORS (BHEL Haridwar)

http://slidepdf.com/reader/full/turboalternators-bhel-haridwar 7/8

HEEP

Block-1(ElectricalMachines)

Block-2(Fabrication

Block)

Block-3(Turbine

andAuxiliary

block)

Block-4(FeederBlock)

Block -5Block-6

(Machining)

Block ± 7(Stamping and

dia.manufacturing)