TSR Compliance
702-AZ Electrical Power Outage
Type
CONTINUOUS Document No.
TO-260-101 Rev/Mod
E-3 Release Date
09/05/2018 Page
1 of 26
Tank Farm Plant Operating Procedure AZ-FARM
USQ # GCX-2
CHANGE HISTORY ( LAST 5 REV-MODS )
Rev-Mod Release Date Justification: Summary of Changes
E-3 09/05/2018 Inconsequential Change Changed some format items, updated the records section, and
unshaded signature lines in the records section.
E-2 04/12/2018 Operations request
Changed title, Added AZ-156 to the scope, SOE to the terms
and definitions, Modified note at beginning of Section 3.3,
added new step 3.3.1 and new step 3.3.5, modified field prep
section: new steps for fire protection to provide permits, steps to
post VCS, opening pressure control valves, shut down control
room computers, Modified Section 5.2 for SM/OE to position
breakers and authorize power outage, fill out data sheets, New
steps in 5.3 to perform maint.. activities and replace any admin
locks, Modified Section 5.4 restoration to inform fire dept.
outage is ending, fill out data sheets, and step for notifying
additional personnel. Updated records section, Replace old data
sheets with new ones.
E-1 02/09/2017 Inconsequential Change Change to page 8 to correct title of TO-060-356.
E-0 09/26/2016 Periodic Review
Changed Rad/Con statement to meet writer’s standard. Changed
multiple NOTE's to Special Instruction. Added (first & last) to
signature lines. Added (first & last) to signature lines. Personnel
trained in the operation of breakers and disconnects will wear
the following PPE as a minimum: Added Affected tank AZ-301
Primary ENRAF to Step 4.3.3.Reworded Step 5.2.3, 5.4.3.
Below 3.3.1 Special Instruction: Change "must be" to "should
be" to allow procedure to be used for emergent outage.
Below 5.1 Delete Special Instruction, Fire Maintenance no
longer does this.
D-2 06/22/2016 Inconsequential Change Changed Record Section to meet Standard
Table of Contents Page
1.0 PURPOSE AND SCOPE ................................................................................................................ 3
1.1 Purpose ................................................................................................................................ 3
1.2 Scope ................................................................................................................................... 3
2.0 INFORMATION............................................................................................................................. 3
2.1 Terms and Definitions......................................................................................................... 3
3.0 PRECAUTIONS AND LIMITATIONS......................................................................................... 4
3.1 Personnel Safety.................................................................................................................. 4
3.2 Radiation and Contamination Control ................................................................................ 4
3.3 Environmental Compliance ................................................................................................ 5
TSR Compliance
702-AZ Electrical Power Outage
Type
CONTINUOUS Document No.
TO-260-101 Rev/Mod
E-3 Release Date
09/05/2018 Page
2 of 26
3.4 Limits .................................................................................................................................. 7
4.0 PREREQUISITES .......................................................................................................................... 8
4.1 Special Tools, Equipment, and Supplies............................................................................. 8
4.2 Performance Documents ..................................................................................................... 8
4.3 Field Preparation ................................................................................................................. 9
5.0 PROCEDURE ............................................................................................................................... 14
5.1 Monitoring and Surveillance............................................................................................. 14
5.2 Shedding Loads and Lock and Tag Validations ............................................................... 14
5.3 Perform Electrical Maintenance Activities ....................................................................... 15
5.4 Restoration ........................................................................................................................ 16
5.5 Records ............................................................................................................................. 19
Data Sheet 1 - Distribution Panel PP-1 ..................................................................................................... 21
Data Sheet 2- - Distribution Panel PP-2 ................................................................................................... 23
Data Sheet 3 - Main Service Disconnect .................................................................................................. 25
Signature Sheet 1 ...................................................................................................................................... 26
TSR Compliance
702-AZ Electrical Power Outage
Type
CONTINUOUS Document No.
TO-260-101 Rev/Mod
E-3 Release Date
09/05/2018 Page
3 of 26
1.0 PURPOSE AND SCOPE
1.1 Purpose
This procedure supports a planned 702-AZ building and 702-AZ primary ventilation
system and associated systems power outage for maintenance, inspection, replacement of
electrical equipment, cleaning, or to support construction and project work that requires a
power outage.
1.2 Scope
This procedure may be performed by de-energizing main farm isolations fed from main
pole utility feed C8X687 to main breakers on distribution panel boards PP-1 and PP-2.
(See Drawings H-14-030007 SH 3, 4, &5).
Individual panel boards, automatic transfer switches, stand-by panel boards, and
disconnect switches fed from these panel boards will be operated to the applicable
maintenance procedures and PM Data Sheets.
Power will be lost to the 241-AZ-702, 241-AZ-701, 241-AZ-271 buildings, the
241-AZ-702 Building Exhaust, AY/AZ Primary Exhaust Fans, HMI, TFLAN facility
communication system, Cathodic Protection, Chiller Pad, Raw water skid, 241-AZ-701,
702, 271 & AZ-156 fire systems.
2.0 INFORMATION
2.1 Terms and Definitions
2.1.1 Resources needed:
NCO
Instrument Tech
IHT
HPT
Electricians
SOE.
TSR Compliance
702-AZ Electrical Power Outage
Type
CONTINUOUS Document No.
TO-260-101 Rev/Mod
E-3 Release Date
09/05/2018 Page
4 of 26
3.0 PRECAUTIONS AND LIMITATIONS
3.1 Personnel Safety
3.1.1 Personnel trained in the operation of breakers and disconnects will wear the
following PPE as a minimum:
Non-melting (untreated natural fiber) long-sleeved shirt
Safety glasses
Leather or insulating gloves
Hearing protection.
3.1.2 Compliance with DOE-0336, Hanford Site Lockout/Tagout Procedure or
DOE–0359, Hanford Site Electrical Safety Program is required when
working this procedure.
3.1.3 Ensure an Electrical Hazard Evaluation has been completed to address shock
and arc flash hazards.
3.1.4 All exposed energized electrical conductors shall be shielded with voltage
rated plastic, within a restricted workspace.
3.2 Radiation and Contamination Control
3.2.1 This Procedure is supporting a Maintenance activity. Work will be done in
accordance with a Radiological Work Permit incorporated in a specific work
package.
3.2.2 When this procedure is worked in radiological areas, an approved
radiological work permit (RWP) is required. If radiological conditions or
work performed falls outside the scope of the RWP, all work activities must
be discontinued until a new or revised RWP has been issued in accordance
with TFC-ESHQ-RP_RWP-C-03.
TSR Compliance
702-AZ Electrical Power Outage
Type
CONTINUOUS Document No.
TO-260-101 Rev/Mod
E-3 Release Date
09/05/2018 Page
5 of 26
3.3 Environmental Compliance
NOTE - The following systems will be inoperable for the duration of the power outage:
AY/AZ Primary ventilation systems
241-AZ-702 Building ventilation system
HMI
TFLAN
Cathodic.
3.3.1 NOTIFY TMACS prior to (morning of) power outage.
/ /
Signature Print (First & Last) Date
OE
3.3.2 The following conditions should be reported to the Central Shift Office and
Environmental On-call point of contact for evaluation per
TFC-ESHQ-ENV_FS-C-01 and TF-REC-001:
Planned and unplanned exhauster outages
Planned and unplanned exhauster abatement control equipment
outages
Planned and unplanned exhauster abatement control equipment failure
or bypass
Planned and unplanned stack record sample and stack CAM outages.
TSR Compliance
702-AZ Electrical Power Outage
Type
CONTINUOUS Document No.
TO-260-101 Rev/Mod
E-3 Release Date
09/05/2018 Page
6 of 26
3.3 Environmental Compliance (Cont.)
Special Instruction
Environmental Field representative should be notified within seven (7) days prior to a
planned facility power shutdown that will render the leak detection system, leak detection
device, cathodic protection system, air emission equipment or other environmental
equipment inoperable for a period of greater than 24 hours.
3.3.3 The Environmental representative shall verify that the following are
completed per OSD-T-151-00031:
3.3.3.1 Washington State Department of Ecology is notified of the
outage and/or use of any alternate leak detection systems.
3.3.3.2 Alternate leak detection requirements during the outage are
documented in a letter/internal memo from the Environmental
Compliance manager to the Senior Level 1 manager of
Production Operations.
3.3.3.3 Ecology is notified of Out-of-Service (OOS) conditions, with a
schedule from 3.3.5.1a, extending beyond 90 days.
3.3.4 Operations shall:
3.3.4.1 For outages greater than 24 hours and requiring alternative leak
detection, implement monitoring requirements per internal memo
generated in 3.3.3.2.
3.3.5 ENSURE Environmental has been informed per Environmental On Call List,
of the intended planned outage (suggested 7 days) and of the Cathodic
Protection System.
/ /
Signature Print (First & Last) Date
OE
TSR Compliance
702-AZ Electrical Power Outage
Type
CONTINUOUS Document No.
TO-260-101 Rev/Mod
E-3 Release Date
09/05/2018 Page
7 of 26
3.3 Environmental Compliance (Cont.)
Special Instruction
OSD-T-151-00031 required leak detection systems shall be restored to service
as soon as possible.
3.3.5.1 Track the leak detection system or device outage on the
TSR/Environmental Equipment OOS section of the TOC Daily
Report with an initial “Required By Date” not to exceed 90 days.
a. Prepare a recovery plan representing returning the leak
detection system, or device, back to service as soon as
possible should the OOS condition reach 90 days..
Provide the recovery plan schedule to the Environmental
Representative for completion of 3.3.3.3.
3.3.6 Per WAC 173-303-640 and TFC-ESHQ-ENV-FS-C-01, Environmental
Notification, Environmental must be notified if Cathodic Protection System will
be de energized.
3.4 Limits
HNF-SD-WM-TSR-006, Tank Farms Technical Safety Requirements
LCO 3.1, DST Primary Tank Ventilation Systems
LCO 3.4, DST Induced Gas Release Event Flammable Gas Control.
TSR Compliance
702-AZ Electrical Power Outage
Type
CONTINUOUS Document No.
TO-260-101 Rev/Mod
E-3 Release Date
09/05/2018 Page
8 of 26
4.0 PREREQUISITES
4.1 Special Tools, Equipment, and Supplies
The following equipment and materials may be needed to perform this outage.
Equipment:
Portable air compressor
Portable light plants
Portable generators
Signs and barricades
Voltage-rated gloves.
4.2 Performance Documents
The following procedures and drawings may be needed to perform this procedure:
TF-OR-DR-AZ, AZ Daily Rounds
TF-OR-PWR-01, Power Operator Rounds
TO-060-350, Start, Stop and Operate AY/AZ Tank Ventilation Primary Exhaust
System
TO-060-356, Perform 702-AZ Exhauster Monitor and Control Operations
TO-060-357, Start, Stop and Operate 241-AZ-702 Building Ventilation System
TO-200-110, Operate 241-AZ-301 Condensate Distribution System
5-EDS-341, International Power Machines, Model IBP+10 Uninterruptible Power
Supply, Cooling Fans Maintenance
2-GENI-810, Maintain ABB System AC800M Controller and S800 IO Hardware
H-14-030007, Electrical One Line Diagram
DOE-0336, Hanford Site Lockout/Tagout Procedure
5-CATH-221, Inspection of Cathodic Protection System Rectifiers.
TSR Compliance
702-AZ Electrical Power Outage
Type
CONTINUOUS Document No.
TO-260-101 Rev/Mod
E-3 Release Date
09/05/2018 Page
9 of 26
4.3 Field Preparation
NOTE - Steps 4.3.1 through 4.3.22 may be performed in any logical order or
concurrently.
- Signature sheet requirement is ongoing, as new individuals become involved in
the procedure.
4.3.1 ENSURE all personnel involved in the performance of this procedure enter
their printed name, signature, and initials on the procedure performer
Signature Sheet 1.
4.3.2 REQUEST Shift Manager to evaluate LCO 3.4 for the need to ventilate tank
during waste disturbing activities and for time durations. (LCO 3.4)
4.3.3 DETERMINE if alternate power for the following are available for the
electrical outage:
Alternate power is available for the electrical
outage
Check
() Yes
Check
() No
HMI
TFLAN
CATHODIC
ENRAF (AZ-301*)
/ /
Signature Print (first & last) Date
Shift Manager /OE
* Affected tank AZ-301 Primary ENRAF.
4.3.4 CONDUCT a review of all applicable farm rounds for outage impact to TSR
and Environmental surveillance requirements AND
IMPLEMENT any required mitigating actions.
/ /
Signature Print (first & last) Date
OE
TSR Compliance
702-AZ Electrical Power Outage
Type
CONTINUOUS Document No.
TO-260-101 Rev/Mod
E-3 Release Date
09/05/2018 Page
10 of 26
4.3 Field Preparation (Cont.)
NOTE - The fire alarm system is fed from a power source at pole C8X687.
- A Radio Frequency Alarm Reporter (RFAR) is located outside of 241-AZ-271
Control Building. Buildings 241-AZ-701, 241-AZ-702 and 241-AZ-156 alarm
to reporter 241-AZ-271.
4.3.5 FWS/OE/Shift Manager REQUEST Fire Protection provide a Fire Permit
e.g., planned impairment permit (at least one month) prior to the date of the
scheduled outage.
4.3.6 ENSURE Hanford Fire Department (373-2845) has been notified
(12 working days) prior to the outage.
4.3.6.1 FWS/OE/Shift Manager PROVIDE MSA work package number:
______________.
4.3.6.2 REQUEST Fire Systems Maintenance appropriately configure
RFAR and/or FACP per MSA work package provided in Step
4.3.6.1 to support facility outage.
/ /
Signature Print (First & Last) Date
OE
4.3.7 WHEN directed by Fire Protection Engineer on failure of the Radio Fire
Alarm Reporter (RFAR) and Fire Alarm Control Panel (FACP) or other
failure of the fire alarm system, FILL out fire watch sheet(s).
4.3.8 IF needed to support outage activities, ENSURE Utilities has been notified
at 373-2077 prior to outage.
4.3.9 BEFORE taking down systems affected by electrical power outage to
AZ Farm, NOTIFY the following personnel:
TMACS operator (373-2618)
HLAN representative (376-2902).
4.3.10 REVIEW "Lock & Tag Logbook" and "Administrative Lock Logbook" to
determine whether currently installed locks and tags and Administrative
Locks will interfere with this work scope.
4.3.11 CONFIRM no intrusive or waste-disturbing activities are to be performed in
AY and AZ Farms during power outage.
TSR Compliance
702-AZ Electrical Power Outage
Type
CONTINUOUS Document No.
TO-260-101 Rev/Mod
E-3 Release Date
09/05/2018 Page
11 of 26
4.3 Field Preparation (Cont.)
4.3.12 VERIFY Environmental has been notified per the Environmental On-Call
List that this is a planned electrical outage of AZ Farm and will affect the
primary tank ventilation system for both AY and AZ Farms.
/ /
Signature Print (first & last) Date
EC/Delegate
4.3.13 SHUT DOWN building ventilation per TO-060-357.
/ /
Signature Print (first & last) Date
Shift Manager /OE
NOTE - Procedure TO-060-350 should totally isolate AY/AZ primary ventilation
system and associated equipment using individual procedures identified within
TO-060-350.
4.3.14 WITHIN 72 hours prior to shutting down 241-AZ-702 primary exhauster,
CONFIRM sample papers from record sampler and CAM have been read.
4.3.15 POST AY/AZ Farm VCZ (Vapor Control Zone)
4.3.16 NCO’s at 702-AZ ENSURE current printed screen shots or photographs of
ALL 702-AZ MCS graphic screens and the current alarm list are obtained.
4.3.17 PRIOR to powering down the control system, RECORD the primary sample
system and building sample system Total Record Sample Flow below:
Building Record Sample Total Flow volume (FQI-702K3-3):
Primary Record Sample Total Flow volume (FQI-AZK1-3):
/ /
Signature Print (first & last) Date
Shift Manager /OE
TSR Compliance
702-AZ Electrical Power Outage
Type
CONTINUOUS Document No.
TO-260-101 Rev/Mod
E-3 Release Date
09/05/2018 Page
12 of 26
4.3 Field Preparation (Cont.)
4.3.18 IF directed by Shift Manager/OE, OPEN/CHECK OPEN Inlet Station
pressure control valves per TO-060-350 (MCS control or local control
method).
/ /
Signature Print (first & last) Date
Shift Manager /OE
4.3.19 Shift Manager/OE, DIRECT the SHUT DOWN of the primary ventilation
system per TO-060-350.
/ /
Signature Print (first & last) Date
Shift Manager /OE
4.3.20 WHEN AY/AZ Farm Primary Ventilation system is shutdown, NOTIFY
Shift Manager to initiate time monitoring per LCO 3.1.A. (LCO 3.1)
/ /
Signature Print (first & last) Date
Shift Manager /OE
4.3.21 SHUT DOWN Control room computers per TO-060-356.
4.3.22 IF directed by Shift Manager/OE, OPEN/CHECK OPEN Inlet Station
pressure control valves per TO-060-350.
/ /
Signature Print (first & last) Date
Shift Manager /OE
TSR Compliance
702-AZ Electrical Power Outage
Type
CONTINUOUS Document No.
TO-260-101 Rev/Mod
E-3 Release Date
09/05/2018 Page
13 of 26
4.3 Field Preparation (Cont.)
4.3.23 SHUT DOWN each PLC for MCS system as follows:
4.3.23.1 UNPLUG power cords PS-1 and PS-2 located in
AZ702-WT-ENCL-110.
4.3.23.2 UNPLUG power cords PS-1 and PS-2 located in
AZ702-WT-ENCL-109.
4.3.23.3 TURN OFF the following:
circuit breaker CB-1 and CB-2 located in LCU1
circuit breaker CB-1 and CB-2 located in LCU2
circuit breaker CB-1 and CB-2 located in LCU3
circuit breaker CB-1 and CB-2 located in LCU4
circuit breaker CB-1 and CB-2 located in LCU7.
4.3.23.4 TURN OFF the following:
circuit breaker CB-1 located in RCU5
circuit breaker CB-1 located in RCU6.
NOTE - Individual "As-Found" breaker positions may be entered at any time prior to
cleaning, and may be done in any sequence as directed by the field work
supervisor.
- As directed by Shift Manager/OE, depending on work to be performed during
the power outage, breaker positions on Data Sheet 1, Data Sheet 2 and Data
Sheet 3 may be NA.
- The following step and sub-step allows for variations of full or partial electrical
power outages.
4.3.24 REVIEW Section 4.3 AND
VERIFY all steps in section 4.3 are satisfactorily complete.
/ /
Signature Print (first & last) Date
Shift Manager /OE
TSR Compliance
702-AZ Electrical Power Outage
Type
CONTINUOUS Document No.
TO-260-101 Rev/Mod
E-3 Release Date
09/05/2018 Page
14 of 26
5.0 PROCEDURE
5.1 Monitoring and Surveillance
5.1.1 IF directed by OE, PERFORM fire watch surveillance during electrical
outage.
5.2 Shedding Loads and Lock and Tag Validations
5.2.1 OBTAIN Shift Manager’s permission to commence power outage.
/ /
Signature Print (first & last) Date
Shift Manager /OE
5.2.2 ENSURE personnel trained in the operation of breakers and disconnects
dons PPE (refer to Section 3.1).
5.2.3 Shift Manager/OE ENTER breaker positions for outage on facility outage
section of Data Sheets.
5.2.4 Shift Manager/OE AUTHORIZE start of 702-AZ power outage.
/ /
Signature Print (first & last) Date
Shift Manager /OE
5.2.5 ENTER as found position for breakers identified on Data Sheet 1,
Data Sheet 2 and Data Sheet 3.
5.2.6 IF Administrative locks (A), Danger Lock and Tags (D), or Caution Tags (C)
are installed on breakers identified on Data Sheets, ENTER a check [] in
the appropriate box.
5.2.7 POSITON breakers for outage as identified on Data Sheet 1, Data Sheet 2
and Data Sheet 3 AND
INITIAL and DATE the Positioning Complete block for each breaker.
5.2.8 WHEN breaker positioning to begin outage activities have been completed,
Shift Manager/OE SIGN and DATE bottom of each Data Sheet.
TSR Compliance
702-AZ Electrical Power Outage
Type
CONTINUOUS Document No.
TO-260-101 Rev/Mod
E-3 Release Date
09/05/2018 Page
15 of 26
5.3 Perform Electrical Maintenance Activities
5.3.1 ENSURE electrical power is isolated to applicable farm isolations fed from
main pole utility feed C8X687, per applicable work package.
5.3.2 IF Administrative Locks are to be removed to support maintenance activities,
PERFORM the following:
5.3.2.1 NOTIFY Shift Manager/Delegate to specify and implement the
correct administrative lock controls per TFC-OPS-OPER-C-22.
5.3.2.2 REMOVE any existing Administrative Locks as necessary to
complete the maintenance activities.
5.3.3 REMOVE any existing locks and tags as necessary to complete the
maintenance activities, in accordance with DOE-0336, Hanford Site
Lockout/Tagout Procedure.
5.3.4 REMOVE any existing caution tags as necessary to complete the
maintenance activities, in accordance with TFC-OPS-OPER-C-39 Caution
Tag Program.
5.3.5 ENSURE all electrical circuits that will be locked out after restoration of
power, have their power supply breakers/switches in the OPEN/OFF position.
5.3.6 PERFORM Maintenance activities per applicable work document.
5.3.7 ENSURE locks/tags removed to perform maintenance and cleaning activities
are re-installed, in accordance with DOE-0336, Hanford Site Lockout/Tagout
Procedure.
5.3.8 INSTALL any existing caution tags following completion of maintenance
activities, in accordance with TFC-OPS-OPER-C-39 Caution Tag Program.
5.3.9 REPLACE any Admin locks removed prior to power restoration in
accordance with TFC-OPS-OPER-C-22, Control and use of Administrative
Locks.
5.3.10 PLACE all farm electrical equipment to be re-energized in a SAFE
configuration.
5.3.11 CONFIRM all work is complete and tools/test equipment are removed from
work areas.
/ /
Signature Print (first & last) Date
FWS /OE
TSR Compliance
702-AZ Electrical Power Outage
Type
CONTINUOUS Document No.
TO-260-101 Rev/Mod
E-3 Release Date
09/05/2018 Page
16 of 26
5.4 Restoration
5.4.1 INFORM Hanford Fire Department (373-2845) when the outage is to end
AND
REQUEST restoration of fire protection systems.
5.4.2 OBTAIN permission from Shift Manager/OE to clear lock and tag AND
COMMENCE startup of Facility.
/ /
Signature Print (first & last) Date
Shift Manager /OE
5.4.3 ENSURE personnel trained in the operation of breakers and disconnects
dons PPE (refer to Section 3.1).
NOTE - Actions in Step 5.4.6 for Data Sheet 1, Data Sheet 2 and Data Sheet 3 may be
worked in sequence, parallel, or simultaneously, as directed by the Field Work
Supervisor FWS/OE.
5.4.4 Shift Manager/OE ENTER breaker as left outage complete positions on
facility Restoration section on Data Sheets.
5.4.5 ENTER a [] in the appropriate box for any Administrative locks (A),
Danger Lock and Tags (D), or Caution Tags (C) installed on breakers
identified on Data Sheets.
5.4.6 POSITION breakers to as left outage complete position for facility
restoration as identified on Data Sheet 1, Data Sheet 2 and Data Sheet 3 AND
INITIAL and DATE the outage complete block for each breaker.
5.4.7 Shift Manager/OE SIGN and DATE for 702-AZ restoration section at the
bottom of each Data Sheet.
TSR Compliance
702-AZ Electrical Power Outage
Type
CONTINUOUS Document No.
TO-260-101 Rev/Mod
E-3 Release Date
09/05/2018 Page
17 of 26
5.4 Restoration (Cont.)
5.4.8 STARTUP each PLC for MCS system as follows:
5.4.8.1 TURN ON the following:
circuit breaker CB-1 and CB-2 located in LCU1
circuit breaker CB-1 and CB-2 located in LCU2
circuit breaker CB-1 and CB-2 located in LCU3
circuit breaker CB-1 and CB-2 located in LCU4
circuit breaker CB-1 and CB-2 located in LCU7.
5.4.8.2 TURN ON the following:
circuit breaker CB-1 located in RCU5
circuit breaker CB-1 located in RCU6.
5.4.8.3 PLUG IN power cords PS-1 and PS-2 located in
AZ702-WT-ENCL-110.
5.4.8.4 PLUG IN power cords PS-1 and PS-2 located in
AZ702-WT-ENCL-109.
5.4.9 IF directed by SM/OE, STARTUP Control Room computers per
TO-060-356.
5.4.10 CONFIRM all required Systems are operational.
5.4.11 IF directed by Shift Manager/OE, STARTUP 702-AZ building ventilation
per TO-060-357.
5.4.12 IF directed by Shift Manager/OE, STARTUP control room HVAC.
5.4.13 IF directed by Shift Manager/OE, STARTUP 702-AZ primary ventilation
and support systems per TO-060-350.
5.4.14 IF directed by Shift Manager/OE, CLOSE inlet station pressure control
valves as needed per TO-060-350.
5.4.15 WHEN primary exhaust system is returned to operation, NOTIFY Shift
Manager to stop time monitoring per LCO 3.1.A. (LCO 3.1)
TSR Compliance
702-AZ Electrical Power Outage
Type
CONTINUOUS Document No.
TO-260-101 Rev/Mod
E-3 Release Date
09/05/2018 Page
18 of 26
5.4 Restoration (Cont.)
5.4.16 CONFIRM any applicable alarms have cleared AND
INFORM TMACS and Shift Manager that Maintenance Outage is Complete.
5.4.17 NOTIFY Environmental Field Representative of Date and Time power
outage was completed.
5.4.18 COMPLETE Inspection of Cathodic Protection System Rectifiers per
5-CATH-221 to verify all rectifiers are operational.
5.4.19 CONFIRM all field work is complete and applicable documentation in this
procedure is filled out and signed.
5.4.20 NOTIFY the following personnel outage has completed:
TMACS operator (373-2618)
Fire maintenance (373-2845)
HLAN representative (376-2902)
AN Team Cathodic (373-1754)
Environmental Representative (373-6967)
Process & Control Systems Engineering Support (373-7674).
TSR Compliance
702-AZ Electrical Power Outage
Type
CONTINUOUS Document No.
TO-260-101 Rev/Mod
E-3 Release Date
09/05/2018 Page
19 of 26
5.5 Records
5.5.1 PERFORM the following for records identified within this procedure.
5.5.1.1 RECORD the number of times the record was generated in
applicable column,
OR
PLACE a check mark () in the N/A column.
5.5.1.2 SUBMIT the package for verification of completed records.
Records Submittal Checklist
Number
of times
completed
N/A
()
3.3 Environmental Compliance
Step 3.3.1
Step 3.3.5
4.3 Field Preparation
Step 4.3.3
Step 4.3.4
Step 4.3.6.1
Step 4.3.6.2
Step 4.3.12
Step 4.3.13
Step 4.3.17
Step 4.3.18
Step 4.3.19
Step 4.3.20
Step 4.3.22
Step 4.3.24
(Continued on Next Page)
TSR Compliance
702-AZ Electrical Power Outage
Type
CONTINUOUS Document No.
TO-260-101 Rev/Mod
E-3 Release Date
09/05/2018 Page
20 of 26
5.5 Records (Cont.)
Records Submittal Checklist
Number
of times
completed
N/A
()
5.2 Shedding Loads and Lock and Tag Validations
Step 5.2.1
Step 5.2.4
5.3 Perform Electrical Maintenance Activities
Step 5.3.11
5.4 Restoration
Step 5.4.2
Data Sheets
Data Sheet 1 - Distribution Panel PP-1
Data Sheet 2- - Distribution Panel PP-2
Data Sheet 3 - Main Service Disconnect
Signature Sheets
Signature Sheet 1
FWS/OE/Shift Manager SEND the completed records to the Central Shift Office for
records retention.
/ /
Signature Print (First & Last) Date
FWS/OE/Shift Manager
The record custodian identified in the Company Level Records Inventory and Disposition
Schedule (RIDS) is responsible for record retention in accordance with
TFC-BSM-IRM_DC-C-02.
TSR Compliance
702-AZ Electrical Power Outage
Type
CONTINUOUS Document No.
TO-260-101 Rev/Mod
E-3 Release Date
09/05/2018 Page
21 of 26
Data Sheet 1 - Distribution Panel PP-1
DISTRIBUTION PANEL PP-1
(FED FROM POLE SWITCH : C8X687 VIA F8X709 H-14-030007 Sht. 3)
Facility Outage Facility Restoration
COMPT
.
EQUIPMENT I. D.
NUMBER
*AS FOUND BKR.
POS. ON/OFF ( A,D,C ) []
POSITION
FOR
OUTAGE
POSITIONING
COMPLETE * AS LEFT
OUTAGE COMPLETE
ON/OFF ( A,D,C ) []
OUTAGE
COMPLETE
(AS LEFT) INITIAL DATE
INITIAL DATE
1A EVAP. TWR.
AY-101
A D C A D C
1B EVAP. TWR.
AY-102
A D C A D C
2A
MAIN
DISCONNECT
101AY TANK
RECIRC.
241-AY-401
A D C A D C
2B
MAIN
DISCONNECT
102AY TANK
RECIRC.
241-AY-402
A D C A D C
3A XFMR T-1/PP-3
241-AZ-701
A D C A D C
3B XFMR T-2/PP-4
241-AZ-271
A D C A D C
4A SPARE
A D C A D C
4B SPARE
A D C A D C
5A SPARE
A D C A D C
BREAKER POSITIONING TO BEGIN
OUTAGE ACTIVITY COMPLETE
Sign/Print/Date
/ /
Signature Print (First and Last) Date
Shift Manager /OE
BREAKER POSITIONING FOR
FACILITY RESTORATION
COMPLETE
Sign/Print/Date
/ /
Signature Print (First and Last) Date
Shift Manager /OE
* NOTE - THIS PROCEDURE DOES NOT AUTHORIZE THE REMOVAL ON INSTALLATION OF LOCK &
TAGS.
- The “AS FOUND” column is a visual verification only, initials (A, D, C,) are for craft “INFORMATION
ONLY” and may be identified by means of a []. This DOES NOT AUTHORIZE removal or reinstallation
of, lock and tags. A= Administrative lock, D = Danger Lock and Tag C= Caution tag
** Shift Manager/OE to check required position of breaker for outage.
(Continued on Next Page)
TSR Compliance
702-AZ Electrical Power Outage
Type
CONTINUOUS Document No.
TO-260-101 Rev/Mod
E-3 Release Date
09/05/2018 Page
22 of 26
Data Sheet 1 - Distribution Panel PP-1 (Cont.)
DISTRIBUTION PANEL PP-1
(FED FROM POLE SWITCH : C8X687 VIA F8X709 H-14-030007 Sht. 3)
Facility Outage Facility Restoration
COMPT. EQUIPMENT I. D.
NUMBER
*AS FOUND BKR.
POS. ON/OFF ( A,D,C ) []
POSITION
FOR
OUTAGE
POSITIONING
COMPLETE * AS LEFT
OUTAGE COMPLETE
ON/OFF ( A,D,C ) []
OUTAGE
COMPLETE
(AS LEFT) INITIAL DATE
INITIAL DATE
5B SPARE
A D C A D C
6 TRANSFER
SWITCH NO.1
A D C A D C
7
FUTURE
OPERATIONS
FACILITY
A D C A D C
8 MAIN DISC. PP-1
A D C A D C
A D C A D C
BREAKER POSITIONING
TO BEGIN OUTAGE
ACTIVITY COMPLETE
Sign/Print/Date
/ /
Signature Print (First and Last) Date
Shift Manager /OE
BREAKER POSITIONING
FOR FACILITY
RESTORATION
COMPLETE
Sign/Print/Date
/ /
Signature Print (First and Last) Date
Shift Manager /OE
* NOTE - THIS PROCEDURE DOES NOT AUTHORIZE THE REMOVAL ON INSTALLATION OF LOCK &
TAGS.
- The “AS FOUND” column is a visual verification only, initials (A, D, C,) are for craft “INFORMATION
ONLY” and may be identified by means of a []. This DOES NOT AUTHORIZE removal or reinstallation
of, lock and tags. A= Administrative lock, D = Danger Lock and Tag C= Caution tag
** Shift Manager/OE to check required position of breaker for outage.
TSR Compliance
702-AZ Electrical Power Outage
Type
CONTINUOUS Document No.
TO-260-101 Rev/Mod
E-3 Release Date
09/05/2018 Page
23 of 26
Data Sheet 2- - Distribution Panel PP-2
DISTRIBUTION PANEL PP-2
( FED FROM POLE SWITCH : C8X687 VIA F8X709 H-14-030007 Sht. 3 )
Facility Outage Facility Restoration
COMPT. EQUIPMENT I. D.
NUMBER
*AS FOUND BKR.
POS. ON/OFF ( A,D,C ) []
POSITION
FOR
OUTAGE
POSITIONING
COMPLETE * AS LEFT
OUTAGE COMPLETE
ON/OFF ( A,D,C ) []
OUTAGE
COMPLETE
(AS LEFT) INITIAL DATE
INITIAL DATE
1A EVAP. TWR.
AZ-101
A D C A D C
1B EVAP. TWR.
AZ-102
A D C A D C
2A
MAIN
DISCONNECT
101AZ TANK
RECIRC.
241-AZ-401
A D C A D C
2B
MAIN
DISCONNECT
102AZ TANK
RECIRC.
241-AZ-402
A D C A D C
3A SPARE
A D C A D C
A D C A D C
BREAKER POSITIONING
TO BEGIN OUTAGE
ACTIVITY COMPLETE
Sign/Print/Date
/ /
Signature Print (First and Last) Date
Shift Manager /OE
BREAKER POSITIONING
FOR FACILITY
RESTORATION
COMPLETE
Sign/Print/Date
/ /
Signature Print (First and Last) Date
Shift Manager /OE
* NOTE - THIS PROCEDURE DOES NOT AUTHORIZE THE REMOVAL ON INSTALLATION OF LOCK &
TAGS.
- The “AS FOUND” column is a visual verification only, initials (A, D, C,) are for craft “INFORMATION
ONLY” and may be identified by means of a []. This DOES NOT AUTHORIZE removal or reinstallation
of, lock and tags. A= Administrative lock, D = Danger Lock and Tag C= Caution tag
** Shift Manager/OE to check required position of breaker for outage.
(Continued on Next Page)
TSR Compliance
702-AZ Electrical Power Outage
Type
CONTINUOUS Document No.
TO-260-101 Rev/Mod
E-3 Release Date
09/05/2018 Page
24 of 26
Data Sheet 2- - Distribution Panel PP-2 (Cont.)
DISTRIBUTION PANEL PP-2
( FED FROM POLE SWITCH : C8X687 VIA F8X709 H-14-030007 Sht. 3 )
Facility Outage Facility Restoration
COMPT. EQUIPMENT I. D.
NUMBER
*AS FOUND BKR.
POS. ON/OFF ( A,D,C ) []
POSITION
FOR
OUTAGE
POSITIONING
COMPLETE * AS LEFT
OUTAGE COMPLETE
ON/OFF ( A,D,C ) []
OUTAGE
COMPLETE
(AS LEFT) INITIAL DATE
INITIAL DATE
3B SPARE
A D C A D C
4 PANELBOARD
PP-16
A D C A D C
5
CHILLER PAD
STARTER
ASSEMBLY
A D C A D C
6 TRANSFER
SWITCH NO.2
A D C A D C
7 MAIN DISC. PP-2
A D C A D C
A D C A D C
BREAKER POSITIONING
TO BEGIN OUTAGE
ACTIVITY COMPLETE
Sign/Print/Date
/ /
Signature Print (First and Last) Date
Shift Manager /OE
BREAKER POSITIONING
FOR FACILITY
RESTORATION
COMPLETE
Sign/Print/Date
/ /
Signature Print (First and Last) Date
Shift Manager /OE
* NOTE - THIS PROCEDURE DOES NOT AUTHORIZE THE REMOVAL ON INSTALLATION OF LOCK &
TAGS.
- The “AS FOUND” column is a visual verification only, initials (A, D, C,) are for craft “INFORMATION
ONLY” and may be identified by means of a []. This DOES NOT AUTHORIZE removal or reinstallation
of, lock and tags. A= Administrative lock, D = Danger Lock and Tag C= Caution tag
** Shift Manager/OE to check required position of breaker for outage.
TSR Compliance
702-AZ Electrical Power Outage
Type
CONTINUOUS Document No.
TO-260-101 Rev/Mod
E-3 Release Date
09/05/2018 Page
25 of 26
Data Sheet 3 - Main Service Disconnect
F8X709 MAIN SERVICE DISCONNECT
( LOCATED NEXT TO PP-1 AND PP-2 IN ROOM 105 OF ELECTRICAL DISTRIBUTION BUILDING )
( FED FROM POLE SWITCH : C8X687 H-14-030007 Sht. 3 )
Facility Outage Facility Restoration
COMPT. EQUIPMENT I. D.
NUMBER
*AS FOUND BKR.
POS. ON/OFF ( A,D,C ) []
POSITION
FOR
OUTAGE
POSITIONING
COMPLETE * AS LEFT
OUTAGE COMPLETE
ON/OFF ( A,D,C ) []
OUTAGE
COMPLETE
(AS LEFT) INITIAL DATE
INITIAL DATE
F8X709
CABIN
ET
F8X709
MAIN SERVICE
DISCONNECT
A D C A D C
A D C A D C
BREAKER POSITIONING
TO BEGIN OUTAGE
ACTIVITY COMPLETE
Sign/Print/Date
/ /
Signature Print (First and Last) Date
Shift Manager /OE
BREAKER POSITIONING
FOR FACILITY
RESTORATION
COMPLETE
Sign/Print/Date
/ /
Signature Print (First and Last) Date
Shift Manager /OE
* NOTE - THIS PROCEDURE DOES NOT AUTHORIZE THE REMOVAL ON INSTALLATION OF LOCK &
TAGS.
- The “AS FOUND” column is a visual verification only, initials (A, D, C,) are for craft “INFORMATION
ONLY” and may be identified by means of a []. This DOES NOT AUTHORIZE removal or reinstallation
of, lock and tags. A= Administrative lock, D = Danger Lock and Tag C= Caution tag
** Shift Manager/OE to check required position of breaker for outage.
TSR Compliance
702-AZ Electrical Power Outage
Type
CONTINUOUS Document No.
TO-260-101 Rev/Mod
E-3 Release Date
09/05/2018 Page
26 of 26
Signature Sheet 1
All persons participating in the performance of this Procedure shall enter their printed name, signature,
and initials below.
Name (Printed First & Last)) Signature Initials