Trenchless Rehabilitation Technologies
Maine’s water distribution
infrastructure is considered some of the oldest in the United States with many systems with active water mains over 100 years old. With a significant need for rehabilitation or replacement, trenchless rehabilitation technologies should be considered. This training program will provide the most current technical considerations for planning, design, and construction utilizing SIPP (cementitious and epoxy), CIPP, Pipe Bursting, Slip Lining, and Directional Drilling to cost effectively upgrade this critical infrastructure.
Instructors
Lance Secrest, Spray In Place Solutions utilizes
a computerized Spray In Place Pipe Process
(SIPP).
Mike Moore, Hammerhead Trenchless, is the
Business Development Manager representing RS
Technic, a leader in Cured In Place Pipe (CIPP)
technology.
Matt Timberlake, Ted Berry Company, Inc. Ted Berry Company is a national leader in Pipe
Bursting and Slip Lining Technology.
Shawn Ready, Ted Berry Company, Inc., is the
Trenchless Services Manager.
Scott W. Kelly, President, Enterprise
Trenchless Technologies, Inc. ETTI is an
industry leader in Horizontal Directional Drilling
Technology.
April 18, 2018 Portland Water District’s Nixon Room
Portland
April 19, 2018 Jeff’s Catering & Event Center
Brewer
April 20, 2018 Caribou Inn & Convention Center
Caribou
4.0 Training Contact Hours – DWP & DEP
Presented by:
Maine Water Utilities Association Partial Funding Provided by:
Maine Drinking Water Program
Main
e W
ate
r U
tili
tie
s A
sso
ciati
on
150 C
ap
ito
l S
treet,
Su
ite 5
Au
gu
sta, M
ain
e 0
4330
Trenchless Rehabilitation Technologies
Trenchless Rehabilitation
Technologies
Training Session Locations:
April 18, 2018: Portland Water District’s Nixon Room
225 Douglass Street Portland, ME 04104
http://www.pwd.org/ (207) 774-5961
April 19, 2018: Jeff’s Catering & Event Center
15 Littlefield Road Brewer, ME 04412
www.jeffscatering.com (207) 989-1811
April 20, 2018: Caribou Inn & Convention Center
19 Main Street Caribou, ME 04736
www.caribouinn.com (207) 498-3733
Trenchless Rehabilitation Technologies
4.0 Training Contact Hours–DWP & DEP
Please register by April 11, 2018
Please use separate registration form for each person.
_____ Portland April 18, 2018
_____ Bangor April 19, 2018
_____ Caribou April 20, 2018
Name: ______________________________________________
DW and/or WW License #: _______________________
Utility: ______________________________________________
Business Address: _________________________________
_______________________________________________________
Phone #: ____________________________________________
E-mail: ______________________________________________
Registration Fee: Register by 4/11/18: $40.00 After 4/11/18: $50.00
* Lunch included *
Register online: www.mwua.org Or mail registration & payment to:
Maine Water Utilities Association 150 Capitol Street, Suite 5
Augusta, Maine 04330
Ph: (207) 623-9511 Fax: (207) 623-9522
AGENDA
7:30 Registration & Continental Breakfast
Each Presentation will include the
history, planning, design, and construction considerations and case studies. 8:00 Spray In Place Pipe (SIPP)
Cementious Epoxy
9:00 Cured In Place Pipe (CIPP) 10:00 Pipe-Bursting 10:45 Break 11:00 Slip Lining 11:45 Lunch 12:15 Directional Drilling 1:15 Q & A 1:30 Adjourn