© 2013, All Rights Reserved. Transportation Funding Options: Thinking Outside of the Box! Transportation Summit November 15, 2013 1 System Traffic Interchange, Mesa

Transportation Funding Options: Thinking Outside of the Box! · 11/11/2013  · Loop 101 Frontage Rd.: Hayden Rd to Scottsdale Rd. Pima Rd.: SR101L to Thompson Peak Pkwy. Pima Rd./Happy

  • Upload
    others

  • View
    2

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Transportation Funding Options: Thinking Outside of the Box! · 11/11/2013  · Loop 101 Frontage Rd.: Hayden Rd to Scottsdale Rd. Pima Rd.: SR101L to Thompson Peak Pkwy. Pima Rd./Happy

© 2013, All Rights Reserved.

Transportation Funding Options: Thinking Outside of the Box! Transportation Summit November 15, 2013

1 System Traffic Interchange, Mesa

Page 2: Transportation Funding Options: Thinking Outside of the Box! · 11/11/2013  · Loop 101 Frontage Rd.: Hayden Rd to Scottsdale Rd. Pima Rd.: SR101L to Thompson Peak Pkwy. Pima Rd./Happy

2 © 2013, All Rights Reserved.

Page 3: Transportation Funding Options: Thinking Outside of the Box! · 11/11/2013  · Loop 101 Frontage Rd.: Hayden Rd to Scottsdale Rd. Pima Rd.: SR101L to Thompson Peak Pkwy. Pima Rd./Happy

Loop 303 Interstate 10 to US-60

Construction Complete by 2014

Projects Recently Completed and Underway MAG REGIONAL FREEWAY AND HIGHWAY PROGRAM

© 2013, All Rights Reserved. 3

US-60 Widening to 6-lanes from 83rd Ave to Loop 303

31-Miles of new HOV Lanes on Loop 101

11-Miles of new HOV Lanes on Loop 202

New DHOV Ramp Loop 101 at Loop 202

New DHOV Ramp I-10 at Loop 202

(Pecos Stack)

Loop 303 13-mi of New Freeway

US-60 Reconstruction from 83rd Ave to 19th Ave

SR-24 Loop 202 to Ellsworth Rd

Page 4: Transportation Funding Options: Thinking Outside of the Box! · 11/11/2013  · Loop 101 Frontage Rd.: Hayden Rd to Scottsdale Rd. Pima Rd.: SR101L to Thompson Peak Pkwy. Pima Rd./Happy

Projects Still to Come

© 2013, All Rights Reserved. 4

Loop 101, I-17 to Loop 202 Add Lanes

Loop 101, US-60 to Loop 202 Add Lanes

Loop 202, Loop 101 to Broadway Add HOV and General Lanes I-10/I-17 Spine, Loop 101 to Loop 202

Add Lanes

Loop 202/South Mountain New Freeway

US-60/Grand Ave Loop 303 to Loop 101

Intersection Improvements

Loop 303, Interstate 10 to MC-85 New Freeway

Loop 303, US-60 to Happy Valley Rd Add Lanes

Page 5: Transportation Funding Options: Thinking Outside of the Box! · 11/11/2013  · Loop 101 Frontage Rd.: Hayden Rd to Scottsdale Rd. Pima Rd.: SR101L to Thompson Peak Pkwy. Pima Rd./Happy

Regional Transit Program

Planned Service Improvements: Bus Rapid Transit

Super Grid Bus System Expansion

High Capacity Transit

Northwest LRT Phase I and II

Central Mesa (to Mesa Dr)

Central Mesa (to Gilbert Rd)

Tempe Streetcar

Phoenix West (planning)

© 2013, All Rights Reserved. 5

Page 6: Transportation Funding Options: Thinking Outside of the Box! · 11/11/2013  · Loop 101 Frontage Rd.: Hayden Rd to Scottsdale Rd. Pima Rd.: SR101L to Thompson Peak Pkwy. Pima Rd./Happy

Arterial Life Cycle Program MORE THAN 30 PROJECTS COMPLETED Arizona Ave. at Chandler Blvd.: Intersection

Improvements

Arizona Ave. at Elliot Rd.: Intersection Improvements

Arizona Ave. at Ray Rd.: Intersection Improvement

Beardsley Rd.: Loop 101 to 83rd Ave/Lake Pleasant Parkway

Chandler Blvd. at Dobson Rd.: Intersection Improvements

Dobson Rd. at Guadalupe Rd.: Intersection Improvements

El Mirage Rd.: Bell Rd to Deer Valley Dr.

El Mirage Rd.: Deer Valley Drive to Loop 303

Gilbert Rd. at University Dr.: Intersection Improvements

Gilbert Rd.: SR-202L/Germann Road to Queen Creek Rd.

Greenfield Rd.: Baseline Rd. to Southern Ave.

Guadalupe Rd./Cooper Rd.: Intersection Improvements

Happy Valley Rd.: Lake Pleasant Pkwy to 67th Ave.

Happy Valley: I-17 to 35th Ave.

© 2013, All Rights Reserved. 6

Hawes Rd.: Santan Freeway to Ray Rd.

Lake Pleasant Pkwy.: Union Hills to Dynamite Rd.

Loop 101 at Beardsley Rd/Union Hills Dr.

Loop 101 Frontage Rd.: Hayden Rd to Scottsdale Rd.

Pima Rd.: SR101L to Thompson Peak Pkwy.

Pima Rd./Happy Valley Rd.: Intersection Improvements

Power Rd at Pecos: Intersection Improvements

Power Rd.: Baseline Rd. to East Maricopa Floodway

Queen Creek Rd.: Arizona Ave. to McQueen Rd.

Ray Rd.: Sossaman Rd. to Ellsworth Rd.

Shea Blvd. at 90th/92nd/96th: Intersection Improvements

Shea Blvd. at Mayo/134th St.: Intersection Improvements

Shea Blvd. at Via Linda (Phase1): Intersection Improvements

Shea Blvd.: Palisades Blvd. to Fountain Hills Blvd.

Warner Rd. at Cooper Rd.: Intersection Improvements

Val Vista Dr.: Warner Rd to Pecos Rd.

Page 7: Transportation Funding Options: Thinking Outside of the Box! · 11/11/2013  · Loop 101 Frontage Rd.: Hayden Rd to Scottsdale Rd. Pima Rd.: SR101L to Thompson Peak Pkwy. Pima Rd./Happy

© 2013, All Rights Reserved. 7

Metro Phoenix Congestion Comparing Phoenix to Houston, Atlanta, Dallas-Ft. Worth and Portland

Page 8: Transportation Funding Options: Thinking Outside of the Box! · 11/11/2013  · Loop 101 Frontage Rd.: Hayden Rd to Scottsdale Rd. Pima Rd.: SR101L to Thompson Peak Pkwy. Pima Rd./Happy

Source: TomTom Americas Traffic Index 2013 Report © 2013, All Rights Reserved. 8

Los Angeles #4: Congestion Level 35%

Portland #13: Congestion Level 25%

Houston #20: Congestion Level 22%

Atlanta #23: Congestion Level 22%

Dallas –Ft Worth #39: Congestion Level 16%

PHOENIX #56: Congestion Level 12%

Metro Phoenix Congestion 2013 TomTom Traffic Index Phoenix is 56 of 61 metro areas in the Americas

Page 9: Transportation Funding Options: Thinking Outside of the Box! · 11/11/2013  · Loop 101 Frontage Rd.: Hayden Rd to Scottsdale Rd. Pima Rd.: SR101L to Thompson Peak Pkwy. Pima Rd./Happy

Interstate 10/Interstate 17 Corridor

Near-Term Improvements

• Immediate Needs addressing bottlenecks. •Within ADOT Rights-of-

Way (ROW). •Near Term Construction.

CORRIDOR MASTER PLAN

• Joint Project Management. •MAG Procurement. • Identify Corridor

Operating Principles. • Coordinate with

Stakeholders. • Frame next environmental

and design efforts.

Environmental Studies

• Joint Project Management. • ADOT Procurement. •Multiple Studies and

Efforts. • Consistent with Corridor

Master Plan.

Design, Construction,

Operation

• Implementation.

© 2013, All Rights Reserved. 9

2017-2021 2014-2017 2014-2015 After 2021

Page 10: Transportation Funding Options: Thinking Outside of the Box! · 11/11/2013  · Loop 101 Frontage Rd.: Hayden Rd to Scottsdale Rd. Pima Rd.: SR101L to Thompson Peak Pkwy. Pima Rd./Happy

© 2013, All Rights Reserved. 10

$0

$200

$400

$600

$800

$1,000

$1,200

$1,400

RTP 2003 October 2012

(Mill

ions

of D

olla

rs)

Sales tax revenues

$6.0 billion below 2003

forecast

$1,000$1,200$1,400$1,600$1,800$2,000$2,200$2,400$2,600

2003 RTP HURF Projection October 2012 HURF Projection

(Tho

usan

ds o

f Dol

lars

)

Statewide HURF revenues $7.5 billion below 2003 forecast

Page 11: Transportation Funding Options: Thinking Outside of the Box! · 11/11/2013  · Loop 101 Frontage Rd.: Hayden Rd to Scottsdale Rd. Pima Rd.: SR101L to Thompson Peak Pkwy. Pima Rd./Happy

Deferred Projects REGIONAL FREEWAY AND HIGHWAY PROGRAM

© 2013, All Rights Reserved. 11

Page 12: Transportation Funding Options: Thinking Outside of the Box! · 11/11/2013  · Loop 101 Frontage Rd.: Hayden Rd to Scottsdale Rd. Pima Rd.: SR101L to Thompson Peak Pkwy. Pima Rd./Happy

Impact of Funding Loss on BRT/Express and Grid Routes

© 2013, All Rights Reserved. 12

2003 Regional Transportation Plan

Current Transit Life Cycle Program

Page 13: Transportation Funding Options: Thinking Outside of the Box! · 11/11/2013  · Loop 101 Frontage Rd.: Hayden Rd to Scottsdale Rd. Pima Rd.: SR101L to Thompson Peak Pkwy. Pima Rd./Happy

ADOT Roadways within MAG Region

© 2013, All Rights Reserved. 13

7,000 Lane-Miles

5,300 Freeway Lane-Miles

2,700 Highway Lane-Miles

Page 14: Transportation Funding Options: Thinking Outside of the Box! · 11/11/2013  · Loop 101 Frontage Rd.: Hayden Rd to Scottsdale Rd. Pima Rd.: SR101L to Thompson Peak Pkwy. Pima Rd./Happy

Pavement Preservation (not Quiet Pave).

Bridge Scour and Deck Maintenance.

Drainage/Pumps.

Deck Park Tunnel.

Lighting.

Traffic Operations.

Litter/Graffiti.

Signs, Signals, and Striping.

2013 Operations and Maintenance Costs

© 2013, All Rights Reserved. 14

$80.8 million Ideal

$31.2 million

GAP

$49.6 million ACTUAL

Source: FY2013-FY2017 State Transportation Improvement Program, ADOT, retrieved September 2013.

Page 15: Transportation Funding Options: Thinking Outside of the Box! · 11/11/2013  · Loop 101 Frontage Rd.: Hayden Rd to Scottsdale Rd. Pima Rd.: SR101L to Thompson Peak Pkwy. Pima Rd./Happy

Operations and Maintenance Costs with New Corridors

© 2013, All Rights Reserved. 15

$80.8 million

Existing System

2013

$91.6 million

With

Opening of Loop 303, Loop 202, I-10/I-17

by 2025

Total Operations and Maintenance thru 2040 $2.4 billion

Page 16: Transportation Funding Options: Thinking Outside of the Box! · 11/11/2013  · Loop 101 Frontage Rd.: Hayden Rd to Scottsdale Rd. Pima Rd.: SR101L to Thompson Peak Pkwy. Pima Rd./Happy

“Big Budget” Maintenance Items

By 2040: Quiet Pavement Replacement – up to

three applications.

Interstate 10/Interstate 17 traffic interchange - “The Stack” - structure rehabilitation and deck replacement.

Deck Park Tunnel Maintenance.

Pump Replacement and Rehabilitation.

Rough Estimate - $1.0 billion © 2013, All Rights Reserved. 16

Page 17: Transportation Funding Options: Thinking Outside of the Box! · 11/11/2013  · Loop 101 Frontage Rd.: Hayden Rd to Scottsdale Rd. Pima Rd.: SR101L to Thompson Peak Pkwy. Pima Rd./Happy

© 2013, All Rights Reserved. 17

I-11/Hassayampa New Freeway, Interstate 10 to US-93

Arizona SR-30 Freeway Conversion, SR-85 to Loop 303

Add Lanes, Loop 303 to Loop 202 New Freeway, Loop 202 to I-17

Loop 303 New Freeway, SR-238 to SR-30

SR-24/Gateway Meridian Rd to US-60/SR-79

Pinal North-South New Freeway, SR-287 to US-60

Arizona SR-85 Freeway Conversion, I-8 Interchange

Interstate 8 to Interstate 10

Loop 303 Add Lanes, SR-30 to Interstate 17

Interstate 17 Add Lanes, Anthem Way to Yavapai County

Interstate 10/Interstate 17 Spine Add Lanes, Loop 202 to Loop 101

SR-238 Add Lanes, Loop 303 to SR-347

SR-347 Add Lanes, Maricopa to I-10

Interstate 10 Add Lanes, Riggs Rd to SR-

387

SR-79 Add Lanes, SR-79B (South)

to Hunt Hwy

Interstate 10/Papago Add Lanes, 459th Ave to Verrado Way

US-60/Grand Ave COMPASS Improvements

REPRESENTATIVE PROJECTS FOR PRESENTATION PURPOSES ONLY. Final determination will be completed with the fiscally-constrained NexGen Regional Transportation Plan.

Page 18: Transportation Funding Options: Thinking Outside of the Box! · 11/11/2013  · Loop 101 Frontage Rd.: Hayden Rd to Scottsdale Rd. Pima Rd.: SR101L to Thompson Peak Pkwy. Pima Rd./Happy

Scenario 1

© 2013, All Rights Reserved. 18

Minimal service expansion: Many deficiencies not addressed.

Shifts Light Rail operation costs to regional service.

New Express routes and increase frequencies (32 to 192 trips) for select express routes.

Page 19: Transportation Funding Options: Thinking Outside of the Box! · 11/11/2013  · Loop 101 Frontage Rd.: Hayden Rd to Scottsdale Rd. Pima Rd.: SR101L to Thompson Peak Pkwy. Pima Rd./Happy

Scenario 2

Higher speed options: Express, Bus Rapid Transit, Light Rail and Commuter Rail.

Improves regional transit service levels.

Suburban activity centers connected by frequent express routes.

Peer Region: Denver.

© 2013, All Rights Reserved. 19

Page 20: Transportation Funding Options: Thinking Outside of the Box! · 11/11/2013  · Loop 101 Frontage Rd.: Hayden Rd to Scottsdale Rd. Pima Rd.: SR101L to Thompson Peak Pkwy. Pima Rd./Happy

Scenario 3

Provides a comprehensive regional transit system.

Nearly all deficiencies are addressed.

Most aggressive service expansion with many of high speed options.

Peer Regions: Seattle and Salt Lake City.

© 2013, All Rights Reserved. 20

Page 21: Transportation Funding Options: Thinking Outside of the Box! · 11/11/2013  · Loop 101 Frontage Rd.: Hayden Rd to Scottsdale Rd. Pima Rd.: SR101L to Thompson Peak Pkwy. Pima Rd./Happy

Needs Summary

© 2013, All Rights Reserved. 21

Regional Freeways and

Highways

$15.6 billion

Regional Transit Options

$6.3 billion

Base

Cas

e

$8.2 billion

Scen

ario

1

$21.7 billion

Scen

ario

2

$32.7 billion

Scen

ario

3

Regional Arterials-Parkways

$3 billion

Page 22: Transportation Funding Options: Thinking Outside of the Box! · 11/11/2013  · Loop 101 Frontage Rd.: Hayden Rd to Scottsdale Rd. Pima Rd.: SR101L to Thompson Peak Pkwy. Pima Rd./Happy

Potential Highway Revenue Sources Projected 2025 to 2040

Federal Highway Funds • MAG STP and MAG CMAQ

ADOT Funds • Includes Highway Users Revenue Fund (HURF)

and Federal Aid

Regional Area Roadway Fund (RARF) • Half Cent Sales Tax

© 2013, All Rights Reserved. 22

$5.7 billion

$200 million

$7.8 billion

Source: MAG 2035 Regional Transportation Plan (2013 Draft), September 2013.

Page 23: Transportation Funding Options: Thinking Outside of the Box! · 11/11/2013  · Loop 101 Frontage Rd.: Hayden Rd to Scottsdale Rd. Pima Rd.: SR101L to Thompson Peak Pkwy. Pima Rd./Happy

US Average 49.5¢/gal

Federal and State Gas Rates

© 2013, All Rights Reserved. 23 Source: American Petroleum Institute, July 2013.

Arizona #43 37.4¢/gal

Western USA 47.2¢/gal

Page 24: Transportation Funding Options: Thinking Outside of the Box! · 11/11/2013  · Loop 101 Frontage Rd.: Hayden Rd to Scottsdale Rd. Pima Rd.: SR101L to Thompson Peak Pkwy. Pima Rd./Happy

Major Components and Revenue Categories

© 2013, All Rights Reserved. 24

Sales Tax

Options

• AZ Transportation Sales Tax • Fuel Sales Tax

Fuel Tax Options

• Increase fuel tax • Index to inflation • County option

Other Options

• Property tax •Driver’s license fee

Registration fee • Sin tax

Operations and Maintenance funding for transit, streets and highways – permanent and sustainable.

Capital program – project specific and limited term for the tax (20-year sunset?).

Tools – redevelopment and value capture.

Page 25: Transportation Funding Options: Thinking Outside of the Box! · 11/11/2013  · Loop 101 Frontage Rd.: Hayden Rd to Scottsdale Rd. Pima Rd.: SR101L to Thompson Peak Pkwy. Pima Rd./Happy

Annual Average Net New Statewide Revenue 2013 to 2022 (millions of dollars)

© 2013, All Rights Reserved. 25 Source: Maricopa Association of Governments, August 2013.

$1,041.2

$820.1

$604.9

$429.8

$337.0

$316.4

$228.7

$178.0

$116.0

$115.2

$108.6

$96.8

$53.4

$42.6

$13.1

$0 $200 $400 $600 $800 $1,000 $1,200

Add state & local sales tax in addition to current fuel taxes

Add state sales tax in addition to current fuel taxes

1/2 cent State Transportation Sales Tax

Add 5 cents and index state & federal fuel taxes to CPI

Replace fuel tax with state & local sales tax

Add 5 cents and index state fuel taxes to CPI

Index current state & federal fuel tax to CPI (state & federal)

Add 5 cents to fuel tax

Replace fuel tax with state sales tax

Index current state fuel tax to CPI

5 Cent Local Option Fuel Tax in Maricopa County Indexed

Property tax for transportation

$10 registration fee increase

10% Surcharge on Luxury Tax Collections

$10 drivers' license fee increase 0.9%

3.0%

3.8%

6.8%

7.7%

8.1 %

8.2 %

12.6 %

16.2 %

22.4 %

23.8 %

30.4 %

42.8 %

73.6 %

58.0 %

Local $221.06

Percent Increase in HURF Revenues Compared to Projections for 2013 to 2022

Local $221.06

Page 26: Transportation Funding Options: Thinking Outside of the Box! · 11/11/2013  · Loop 101 Frontage Rd.: Hayden Rd to Scottsdale Rd. Pima Rd.: SR101L to Thompson Peak Pkwy. Pima Rd./Happy

Phased Fuel Tax Increase

7.5-cents to 10-cents per gallon increase to meet average of Western states.

10-cents, phased in at 2-cents per year for five years, indexed for inflation.

Average annual increase of $434 million over next 10 years, increasing HURF by 30 percent.

Total new revenues: $4.3 billion (2013 to 2022)

ADOT: $2.2 billion

Cities: $1.3 billion

Counties: $0.8 billion

Provides short-term funding to support road maintenance needs while alternatives to fuel taxes explored.

© 2013, All Rights Reserved. 26 Source: Maricopa Association of Governments, September 2013.

Page 27: Transportation Funding Options: Thinking Outside of the Box! · 11/11/2013  · Loop 101 Frontage Rd.: Hayden Rd to Scottsdale Rd. Pima Rd.: SR101L to Thompson Peak Pkwy. Pima Rd./Happy

What is the Big Picture?

1955 551,000

2000 3.25 Million

2010 4.2 Million

2040 7.1 Million

© 2013, All Rights Reserved. 27

Page 28: Transportation Funding Options: Thinking Outside of the Box! · 11/11/2013  · Loop 101 Frontage Rd.: Hayden Rd to Scottsdale Rd. Pima Rd.: SR101L to Thompson Peak Pkwy. Pima Rd./Happy

© 2013, All Rights Reserved. 28

Page 29: Transportation Funding Options: Thinking Outside of the Box! · 11/11/2013  · Loop 101 Frontage Rd.: Hayden Rd to Scottsdale Rd. Pima Rd.: SR101L to Thompson Peak Pkwy. Pima Rd./Happy

Population 2012 Phoenix MSA 4.3 million (66% of AZ) Phoenix + Tucson 5.3 million (81% of AZ )

© 2013, All Rights Reserved. 29

82% of AZ Tax receipts

Page 30: Transportation Funding Options: Thinking Outside of the Box! · 11/11/2013  · Loop 101 Frontage Rd.: Hayden Rd to Scottsdale Rd. Pima Rd.: SR101L to Thompson Peak Pkwy. Pima Rd./Happy

Population 2040 Phoenix MSA 7.1 million (70% of AZ) Phoenix + Tucson 8.4 million (83% of AZ) © 2013, All Rights Reserved. 30

Page 31: Transportation Funding Options: Thinking Outside of the Box! · 11/11/2013  · Loop 101 Frontage Rd.: Hayden Rd to Scottsdale Rd. Pima Rd.: SR101L to Thompson Peak Pkwy. Pima Rd./Happy

© 2013, All Rights Reserved. 31

Employment 2012 Phoenix MSA 1.8 million (71% of AZ) Phoenix + Tucson 2.2 million (86% of AZ )

Page 32: Transportation Funding Options: Thinking Outside of the Box! · 11/11/2013  · Loop 101 Frontage Rd.: Hayden Rd to Scottsdale Rd. Pima Rd.: SR101L to Thompson Peak Pkwy. Pima Rd./Happy

© 2013, All Rights Reserved. 32

Employment 2040 Phoenix MSA 3.4 million (75% of AZ) Phoenix + Tucson 3.9 million (88% of AZ)

Page 33: Transportation Funding Options: Thinking Outside of the Box! · 11/11/2013  · Loop 101 Frontage Rd.: Hayden Rd to Scottsdale Rd. Pima Rd.: SR101L to Thompson Peak Pkwy. Pima Rd./Happy

Megapolitan 2000

© 2013, All Rights Reserved. 33

Page 34: Transportation Funding Options: Thinking Outside of the Box! · 11/11/2013  · Loop 101 Frontage Rd.: Hayden Rd to Scottsdale Rd. Pima Rd.: SR101L to Thompson Peak Pkwy. Pima Rd./Happy

© 2013, All Rights Reserved. 34

Megapolitan 2050 Scenario

Page 35: Transportation Funding Options: Thinking Outside of the Box! · 11/11/2013  · Loop 101 Frontage Rd.: Hayden Rd to Scottsdale Rd. Pima Rd.: SR101L to Thompson Peak Pkwy. Pima Rd./Happy

Long Range Planning Hassayampa and Hidden Valley Framework Studies Highway and Parkways

© 2013, All Rights Reserved. 35

Page 36: Transportation Funding Options: Thinking Outside of the Box! · 11/11/2013  · Loop 101 Frontage Rd.: Hayden Rd to Scottsdale Rd. Pima Rd.: SR101L to Thompson Peak Pkwy. Pima Rd./Happy

© 2013, All Rights Reserved. 36

Page 37: Transportation Funding Options: Thinking Outside of the Box! · 11/11/2013  · Loop 101 Frontage Rd.: Hayden Rd to Scottsdale Rd. Pima Rd.: SR101L to Thompson Peak Pkwy. Pima Rd./Happy

© 2013, All Rights Reserved. 37

Page 38: Transportation Funding Options: Thinking Outside of the Box! · 11/11/2013  · Loop 101 Frontage Rd.: Hayden Rd to Scottsdale Rd. Pima Rd.: SR101L to Thompson Peak Pkwy. Pima Rd./Happy

Impact of the Economy on Sales Tax Revenues

© 2013, All Rights Reserved. 38

-20.0%

-15.0%

-10.0%

-5.0%

0.0%

5.0%

10.0%

15.0%

20.0%

25.0%

4 /1

987

2 /1

988

4 /1

988

2 /1

989

4 /1

989

2 /1

990

4 /1

990

2 /1

991

4 /1

991

2 /1

992

4 /1

992

2 /1

993

4 /1

993

2 /1

994

4 /1

994

2 /1

995

4 /1

995

2 /1

996

4 /1

996

2 /1

997

4 /1

997

2 /1

998

4 /1

998

2 /1

999

4 /1

999

2 /2

000

4 /2

000

2 /2

001

4 /2

001

2 /2

002

4 /2

002

2 /2

003

4 /2

003

2 /2

004

4 /2

004

2 /2

005

4 /2

005

2 /2

006

4 /2

006

2 /2

007

4 /2

007

2 /2

008

4 /2

008

2 /2

009

4 /2

009

2 /2

010

4 /2

010

2 /2

011

4 /2

011

2 /2

012

4 /2

012

2 /2

013

4 /2

013

Annual Percent Change in Quarterly Transportation Sales Tax RevenuesFiscal Year Quarter / Same Quarter Previous Fiscal Year

Page 39: Transportation Funding Options: Thinking Outside of the Box! · 11/11/2013  · Loop 101 Frontage Rd.: Hayden Rd to Scottsdale Rd. Pima Rd.: SR101L to Thompson Peak Pkwy. Pima Rd./Happy

Residential Completions by Year and Unit Type

© 2013, All Rights Reserved. 39

0

10,000

20,000

30,000

40,000

50,000

1990* 1991 1992 1993 1994 1995 1996 1997 1998 1999 2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012

Single Family Townhouse/Condo Apartment Mobile Home

Source: MAG Analysis. *1990 Data is from April 1 to December 31.

Page 40: Transportation Funding Options: Thinking Outside of the Box! · 11/11/2013  · Loop 101 Frontage Rd.: Hayden Rd to Scottsdale Rd. Pima Rd.: SR101L to Thompson Peak Pkwy. Pima Rd./Happy

Combined (State, County, and Local) Sales Tax Rates for Cities within MAG Planning Area

10.3

9.3 9.3 9.3 9.3 9.3 9.3 9.2 9.1 8.95 8.9 8.9 8.8 8.8 8.8 8.8 8.7 8.7 8.55 8.5 8.5 8.5 8.3 8.3 8.1 8.05 7.95 7.8 7.8

0.0

2.0

4.0

6.0

8.0

10.0

12.0

City County State

State Average 8.16%

Source: The Tax Foundation (TaxFoundation.org)

© 2013, All Rights Reserved. 40

Page 41: Transportation Funding Options: Thinking Outside of the Box! · 11/11/2013  · Loop 101 Frontage Rd.: Hayden Rd to Scottsdale Rd. Pima Rd.: SR101L to Thompson Peak Pkwy. Pima Rd./Happy

© 2013, All Rights Reserved. 41

Page 42: Transportation Funding Options: Thinking Outside of the Box! · 11/11/2013  · Loop 101 Frontage Rd.: Hayden Rd to Scottsdale Rd. Pima Rd.: SR101L to Thompson Peak Pkwy. Pima Rd./Happy

State Land is

64% of remaining developable land

State Lands Will Guide Future Development Land Development Status : Central Arizona

© 2013, All Rights Reserved. 42

40% developable 26% remaining developable

Page 43: Transportation Funding Options: Thinking Outside of the Box! · 11/11/2013  · Loop 101 Frontage Rd.: Hayden Rd to Scottsdale Rd. Pima Rd.: SR101L to Thompson Peak Pkwy. Pima Rd./Happy

Peak Period Congestion 2035

© 2013, All Rights Reserved. 43

Page 44: Transportation Funding Options: Thinking Outside of the Box! · 11/11/2013  · Loop 101 Frontage Rd.: Hayden Rd to Scottsdale Rd. Pima Rd.: SR101L to Thompson Peak Pkwy. Pima Rd./Happy

Some Integration Movements

© 2013, All Rights Reserved. 44

Page 45: Transportation Funding Options: Thinking Outside of the Box! · 11/11/2013  · Loop 101 Frontage Rd.: Hayden Rd to Scottsdale Rd. Pima Rd.: SR101L to Thompson Peak Pkwy. Pima Rd./Happy

America’s Trade Corridor Connecting Canada, the United States, and Mexico

© 2013, All Rights Reserved. 45

Page 46: Transportation Funding Options: Thinking Outside of the Box! · 11/11/2013  · Loop 101 Frontage Rd.: Hayden Rd to Scottsdale Rd. Pima Rd.: SR101L to Thompson Peak Pkwy. Pima Rd./Happy

Commodity Flows to and From Arizona

© 2013, All Rights Reserved. 46

Page 47: Transportation Funding Options: Thinking Outside of the Box! · 11/11/2013  · Loop 101 Frontage Rd.: Hayden Rd to Scottsdale Rd. Pima Rd.: SR101L to Thompson Peak Pkwy. Pima Rd./Happy

- 50,000

100,000 150,000 200,000 250,000 300,000 350,000 400,000 450,000

2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012

Crossings at Arizona/Mexico POEs

Trucks Rail Containers

Imports From Mexico in U.S. Dollars: 2004-2012

© 2013, All Rights Reserved. 47

Arizona Losing Share in Trade with Mexico’s Fast-Growing Economy

Page 48: Transportation Funding Options: Thinking Outside of the Box! · 11/11/2013  · Loop 101 Frontage Rd.: Hayden Rd to Scottsdale Rd. Pima Rd.: SR101L to Thompson Peak Pkwy. Pima Rd./Happy
Page 49: Transportation Funding Options: Thinking Outside of the Box! · 11/11/2013  · Loop 101 Frontage Rd.: Hayden Rd to Scottsdale Rd. Pima Rd.: SR101L to Thompson Peak Pkwy. Pima Rd./Happy

Dennis Smith Bob Hazlett (602) 254-6300 www.azmag.gov