SPLOST Project List
Mission:
3/3/2016
Transportation Division
Promote roadway safety, encourage multi-modal transportation, and minimize traffic congestion in ways that are sensitive to the priorities of DeKalb County’s citizens.
3/3/2016
Transportation Division
• Sidewalks
• Multi-Use Trails
• Intersection Improvements
• Bridge Rehabilitation/Replacement
• Traffic Signals (New and Upgraded)
• New roadways
• Safety improvements (guardrail, signage, etc.)
Types of Transportation Projects
3/3/2016
Outreach Efforts Technical & Community Advisory Committees, Focus
Groups, Adjacent Communities, Cities, CIDs, Public Meetings, Statistically Valid Public Opinion Survey, Website, Social Media, Kiosks, email and phone.
Policy Recommendations Road Functional Classification, Truck Routes, Complete
Streets, Bicycle & Pedestrian Level of Service Goals
Comprehensive Transportation Plan
Transportation Division
3/3/2016
Funding and Project Constraining Projects broken into Tiers 1, 2 & 3 based on funding assumptions
Divided into Asset Management (Maintenance) & Capital Projects
Project Recommendations Over 3000 project analyzed taken from 60+ plans with a
transportation component
Project Evaluation Process on next slide
Approximately 230 projects selected
3/3/2016
Evaluated across four categories: Roadway (corridor), Roadway intersection, Bicycle and Pedestrian
Evaluation Criteria included: Community Values, Technical Merit, Public Input, Costs & Funding Opportunities
Evaluation 1
Projects that included more that one mode were evaluated under all applicable categories
High scores for projects that are near activity centers, transit stations, schools, etc. or on high-priority corridors such as regional thoroughfares and priority bike networks
Evaluation 2
Based on technical merit. Vehicular projects rely heavily on results from the travel demand model. Bicycle & Pedestrian Projects rely heavily on the Bike/Pedestrian Level of Service and Latent Demand
Evaluation 3
Feedback from Stakeholders used to finalize list in Evaluation 3
CTP Project Prioritization
Transportation Division
3/3/2016
Atlanta Regional Commission – periodic calls for projects that meet
specific criteria (bike/ped, freight, etc.)
Development of conceptual design for new projects will assist in
project selection.
2015 TIP Solicitation included additional funds for DeKalb County
GDOT – Transportation Funding Act has generated additional state funding
that GDOT can devote to road maintenance and to new transportation
projects
Priorities include bridge rehab/replacement, safety improvements,
improvements to major interchanges and interstate corridors.
Other Sources of Funding
Transportation Division
3/3/2016
Transportation Division
• All major projects currently include federal funding obtained through ARC
or GDOT.
• Limited county funding has prevented the county from taking full advantage
of available federal funding.
• Projects on draft project list currently leverage $34,790,000 in federal
funding.
Leveraging GDOT and ARC Funding
3/3/2016
• Transportation Improvement Program (TIP) - Federally funded project list for 6-year period approved by Atlanta Regional Commission
• Regional Transportation Plan (RTP) – 25-year plan which also includes long range projects that are not funded (still needs to be synched with DeKalb County’s CTP)
• Comprehensive Transportation Plan (CTP) – DeKalb County’s 25 year plan for transportation improvements which includes a prioritized list of desired projects
Transportation Plans
Transportation Division
3/3/2016
• Top priorities are to fund county matches on projects already programmed
in the TIP
• Most other projects are drawn from the priority list in the adopted CTP
with no federal or state funding assumed.
• Seeking federal funding will significantly increase the amount of time
needed to complete projects.
Prioritization of SPLOST Project List
Transportation Division
3/3/2016
Transportation Division
• I-20 Heavy Rail and Bus Rapid Transit to Wesley Chapel Rd. ($1.5B)
• Clifton Corridor Light Rail, Phase 1 to Emory ($1.74B)
• Transit projects not included in draft SPLOST list because of long
implementation timeline and uncertain Federal funding.
• $200,000 from Economic Development office for matching funds for
MARTA related Federal Transit Administration (FTA) Transit-Oriented
Development
Potential Transit Projects
3/3/2016
Transportation Division
• Henderson Rd., Flat Shoal Rd. & Salem Rd. (Fed $) $1,600,000
• Covington Highway (S. Hairston Rd. to DeKalb Med. Pkwy.) $8,000,000
• Mountain View Road (Memorial Dr. to Owen Mills Ct.) $2,000,000
• Lavista Road (Oak Grove Rd. to Pangborn Rd.) $3,000,000
• McAfee Road (Second Ave. to Candler Rd.) $4,000,000
• Glenwood Road (Columbia Dr. to Covington Hwy.) $4,200,000
• Sidewalk Gaps and ADA Upgrades $5,000,000
Highest Priority Sidewalk Projects
3/3/2016
Transportation Division
• Panola Rd. (Fairington Rd. to Browns Mill Rd.) (Fed $) $5,500,000
• Rockbridge Rd. (Rowland Rd. to Allgood Rd.) (Fed $) $1,000,000
• Turner Hill Rd. (Mall Pkwy. to Rockland Rd.) (Fed $) $5,300,000
• Clifton Rd. at Old Briarcliff Rd. $3,500,000
Highest Priority Roadway and Operations
Improvements
3/3/2016
Transportation Division
• Clifton Rd., Church St., and Clairmont Rd. (upgrades)(Fed $) $400,000
• North Clarendon Ave. at East Ponce (railroad preemption) $300,000
• Goldsmith Rd. at East Ponce (railroad preemption) $300,000
• Redan Rd. at S. Stone Mtn. Lithonia Rd. (new signal) $350,000
Highest Priority Traffic Signal Improvements
3/3/2016
Transportation Division
• Mercer University Dr. at N. Fork Peachtree Creek (12.6) $1,500,000
• North Druid Hills Rd. at CSX Railroad (27.3) $5,000,000
• Houston Mill Rd. at S. Fork Peachtree Creek (55) $1,700,000
Highest Priority Bridge Replacements
Estimated project list cost
3/3/2016
Project Estimated Cost
TIP Commitments $16,450,000
New Projects $56,180,000
Category Projects $15,750,000
Total $88,380,000
Transportation Division
Project list Project:
Project description:
Estimated cost:
Implementation timeline:
3/3/2016
DeKalb Sidewalk Program Phase 2
Sidewalks on Henderson Road from Lavista Road to Henderson Mill
Road, Flat Shoals Road from 2nd Ave. to Whites Mill Road, and Salem
Road east of Panola Road. Project has $3,059,000 in GDOT funds.
$1,600,000
Transportation Division
30-36 months
Project list Project:
Project description:
Estimated cost:
Implementation timeline:
3/3/2016
South River Trail – Phase V
New multi-use trail from Panthersville Road, which is the end of the
existing trail, to Waldrop Road. Project has $700,000 in GDOT
funds.
$2,050,000
Transportation Division
24-30 months
Project list Project:
Project description:
Estimated cost:
Implementation timeline:
3/3/2016
Panola Road Improvements
Panola Road safety and operations improvements including turn lanes
and sidewalks from Fairington Road to Browns Mill Road. Project has
$14,898,708 in GDOT funds.
$5,500,000
Transportation Division
66-72 months
Project list Project:
Project description:
Estimated cost:
Implementation timeline:
3/3/2016
Rockbridge Road Improvements
New sidewalk, turn lanes, and bicycle lanes on Rockbridge Road
from Allgood Road to Rowland Road. Project has $1,491,000 in
GDOT funds.
$1,000,000
Transportation Division
30-36 months
Project list Project:
Project description:
Estimated cost:
Implementation timeline:
3/3/2016
Tucker Streetscapes Phase 2
Sidewalk and streetscape improvements on 1st Avenue, 2nd Street, 4th
Street, and Lynburn Drive. Project has $1,340,000 in GDOT funds.
$600,000
Transportation Division
30-36 months
Project list Project:
Project description:
Estimated cost:
Implementation timeline:
3/3/2016
Traffic Signal Upgrades on Clifton Rd., Church St., and Clairmont Road
Upgrades to existing traffic signals on portions of Clifton Road,
Church Street, and Clairmont Road. DeKalb County is covering
some right-of-way cost and GDOT is funding construction and some
right-of-way cost. Project has $6,348,251 in GDOT funds.
$400,000
Transportation Division
36-42 months
Project list Project:
Project description:
Estimated cost:
Implementation timeline:
3/3/2016
Turner Hill Road Widening
Widen Turner Hill Road to a 4-lane road with a raised median from
Mall Parkway to Rockland Road. Project has $8,280,000 in GDOT
funding.
$5,300,000
Transportation Division
66-72 months
Project list Project:
Project description:
Estimated cost:
Implementation timeline:
3/3/2016
Sidewalk Gaps and ADA Upgrades
Fill sidewalk gap and upgrade existing sidewalk to meet ADA
requirements at locations throughout the county.
$5,000,000
Transportation Division
60 months
Project list Project:
Project description:
Estimated cost:
Implementation timeline:
3/3/2016
North Clarendon Ave. at East Ponce Railroad Preemption
Coordinate the traffic signal at the North Clarendon at East Ponce
intersection to clear out traffic when trains approach the adjacent
CSX railroad crossing.
$300,000
Transportation Division
18-24 months
Project list Project:
Project description:
Estimated cost:
Implementation timeline:
3/3/2016
Goldsmith Rd. at East Ponce Railroad Preemption
Coordinate the traffic signal at the Goldsmith at East Ponce
intersection to clear out traffic when trains approach the adjacent
CSX railroad crossing.
$300,000
Transportation Division
18-24 months
Project list Project:
Project description:
Estimated cost:
Implementation timeline:
3/3/2016
Covington Highway Sidewalks
Add sidewalk on both sides of Covington Highway from South
Hairston Road to Covington Highway.
$8,000,000
Transportation Division
48-60 months
Project list Project:
Project description:
Estimated cost:
Implementation timeline:
3/3/2016
Mountain View Road Sidewalks
Add sidewalk to both sides of Mountain View Road from Memorial
Drive to Owen Mills Court.
$2,000,000
Transportation Division
24-30 months
Project list Project:
Project description:
Estimated cost:
Implementation timeline:
3/3/2016
Lavista Road Sidewalks and Turn Lanes
Add sidewalk on both sides of Lavista Road from Oak Grove Road to
Pangborn Road. Also add turn lanes at selected locations.
$3,000,000
Transportation Division
24-30 months
Project list Project:
Project description:
Estimated cost:
Implementation timeline:
3/3/2016
McAfee Road Sidewalks
Add sidewalk on both sides of McAfee Road from Second Avenue to
Candler Road.
$4,000,000
Transportation Division
24-30 months
Project list Project:
Project description:
Estimated cost:
Implementation timeline:
3/3/2016
Glenwood Road Sidewalks
Sidewalk on both sides of Glenwood Road from Columbia Drive to
Covington Highway.
$4,200,000
Transportation Division
24-30 months
Project list Project:
Project description:
Estimated cost:
Implementation timeline:
3/3/2016
North Decatur Road Safety Improvements
Safety improvements including sidewalk on the south side of North
Decatur Road from Scott Blvd to Clairmont Road.
$2,000,000
Transportation Division
18-24 months
Project list Project:
Project description:
Estimated cost:
Implementation timeline:
3/3/2016
Redan Road at South Stone Mountain Lithonia Road Traffic Signal
Construct already designed traffic signal at the Redan Road at South
Stone Mountain Lithonia Road intersection. Includes railroad
preemption.
$350,000
Transportation Division
12-18 months
Project list Project:
Project description:
Estimated cost:
Implementation timeline:
3/3/2016
Mercer University Bridge at North Fork Peachtree Creek
Replace existing deficient bridge.
$1,500,000
Transportation Division
18-24 months
Project list Project:
Project description:
Estimated cost:
Implementation timeline:
3/3/2016
North Druid Hills / CSX Bridge
Replace existing North Druid Hills Road Bridge over CSX Railroad
with wider bridge to allow for sidewalk, bike lanes, and a dedicated
left-turn lane at a nearby traffic signal for two apartment complexes.
$5,000,000
Transportation Division
48-60 months
Project list Project:
Project description:
Estimated cost:
Implementation timeline:
3/3/2016
Houston Mill Road Bridge at South Fork Peachtree Creek
Replace deficient bridge.
$1,700,000
Transportation Divsion
18-24 months
Project list Project:
Project description:
Estimated cost:
Implementation timeline:
3/3/2016
Multi-Use Trail Connection to Kensington MARTA Station
Multi-Use Trail connecting the Kensington MARTA Station with the
Indian Creek MARTA Station.
$4,000,000
Transportation Division
30-36 months
Project list Project:
Project description:
Estimated cost:
Implementation timeline:
3/3/2016
North Druid Hills Road Sidewalk
Add sidewalk on south side of North Druid Hills Road from
Clairmont Road to Spring Creek Road. Will connect to the end of the
South Fork Peachtree Creek Trail.
$300,000
Transportation Division
12 months
Project list Project:
Project description:
Estimated cost:
Implementation timeline:
3/3/2016
Clifton Road at Old Briarcliff Road Intersection Improvements
Add dedicated left-turn lanes on Clifton Road at the Old Briarcliff
Road / Wesley Woods intersection. Requires widening adjacent
bridge over South Fork Peachtree Creek.
$3,500,000
Transportation Division
18-24 months
Project list Project:
Project description:
Estimated cost:
Implementation timeline:
3/3/2016
HF Shepherd Drive Sidewalk
Add sidewalk on HF Shepherd Drive from Lloyd Road to Candler
Road.
$630,000
Transportation Division
12 months
Project list Project:
Project description:
Estimated cost:
Implementation timeline:
3/3/2016
Idlewood Road Sidewalk
Add sidewalk on Idlewood Road from Tucker Middle School to
Lawrenceville Highway.
$200,000
Transportation Division
12 months
Project list Project:
Project description:
Estimated cost:
Implementation timeline:
3/3/2016
Turner Hill Road Sidewalks
Add sidewalk on both sides of Turner Hill Road from Covington
Highway to Stonecrest Parkway.
$450,000
Transportation Division
12 months
Project list Project:
Project description:
Estimated cost:
Implementation timeline:
3/3/2016
Pleasantdale Road Pedestrian Crossings
Add pedestrian crossings with refuge islands and possible HAWK
signals at two locations, including at park.
$250,000
Transportation Division
12 months
Project list Project:
Project description:
Estimated cost:
Implementation timeline:
3/3/2016
South River Multi-Use Trail
New multi-use trail from where current trail ends in Entrenchment
Creek Park to the Atlanta City limits. Part of eventual connect to the
Atlanta Belt Line.
$3,000,000
Transportation Division
24-36 months
Project list Project:
Project description:
Estimated cost:
Implementation timeline:
3/3/2016
Panthersville Road at Clifton Springs Road Intersection Improvements
Improve existing intersection to include additional turn lanes and
sidewalk.
$2,700,000
Transportation Divsion
24-36 months
Project list Project:
Project description:
Estimated cost:
Implementation timeline:
3/3/2016
Shadow Rock Road at South Stone Mountain Lithonia Rd. Traffic Signal
New warranted traffic signal.
$200,000
Transportation Division
12 months
Project list Project:
Project description:
Estimated cost:
Implementation timeline:
3/3/2016
North Decatur Road at DeKalb Industrial Way Additional Turn Lane
Add separate right turn lane from eastbound North Decatur Road to
southbound DeKalb Industrial Way.
$500,000
Transportation Division
12-18 months
Project list Project:
Project description:
Estimated cost:
Implementation timeline:
3/3/2016
DeKalb Industrial Way at Milscott Drive Pedestrian Improvements
Add sidewalk and at least one crosswalk with a HAWK signal on
DeKalb Industrial Way.
$300,000
Transportation Division
12 months
Project list Project:
Project description:
Estimated cost:
Implementation timeline:
3/3/2016
Lawrenceville Highway Pedestrian Improvements
Mid-block crossings, ADA improvements, and sidewalk
improvements along Lawrenceville Highway from Montreal Road to
Hugh Howell Road.
$3,000,000
Transportation Division
30-42 months
Project list Project:
Project description:
Estimated cost:
Implementation timeline:
3/3/2016
South Fork Peachtree Creek Trail
Multi-use trail from Mason Mill Park to Emory University.
$500,000
Transportation Division
18-24 months
Project list Project:
Project description:
Estimated cost:
Implementation timeline:
3/3/2016
Pleasantdale Road ATMS
Install fiber optic interconnect and upgrade existing traffic signals on
Pleasantdale Road near I-85.
$400,000
Transportation Division
12 months
Project list Project:
Project description:
Estimated cost:
Implementation timeline:
3/3/2016
Fellowship Road Diet and Sidewalks
Convert existing four lane section of Fellowship Road (between
Lawrenceville Highway and Lavista Road) to three lanes with bike
lanes. Also add sidewalk where needed.
$600,000
Transportation Division
12-18 months
Project list Project:
Project description:
Estimated cost:
Implementation timeline:
3/3/2016
Church Street Road Diet
Convert existing four lane section of Church Street (from Forkner
Road to North Dectur Road) to three lanes with bike lanes.
$800,000
Transportation Division
12-18 months
Project list Project:
Project description:
Estimated cost:
Implementation timeline:
3/3/2016
Chamblee Tucker Road Diet
Convert existing four lane section of Chamblee Tucker Road
(between Tucker-Norcross Road and Lavista Road) to three lanes
with bike lanes. Add pedestrian crossings at key locations.
$2,000,000
Transportation Division
18-24 months
Project list Project:
Project description:
Estimated cost:
Implementation timeline:
3/3/2016
Stephenson Road at South Deshon Road Intersection
Add right turn lane on Stephenson Road to southbound South
Deshon Road.
$500,000
Transportation Division
24-30 months
Project list Project:
Project description:
Estimated cost:
Implementation timeline:
3/3/2016
Glenwood Road Sidewalks
Sidewalk on both sides of Glenwood Road from Candler Road to
Columbia Drive. Project has $3,196,371 in GDOT funding. County
matching funding in draft 2016 budget.
$1,800,000
Transportation Division
24-36 months
Project list Project:
Project description:
Estimated cost:
Implementation timeline:
3/3/2016
Northlake Area Streetscapes
Sidewalks along portions of Northlake Parkway, Henderson Mill
Road, Parklake Drive, and Briarcliff Road near Northlake Mall.
Project has $1,194,920 in GDOT funding. County matching funding
in draft 2016 budget.
$300,000
Transportation Division
12-18 months
Project list Project:
Project description:
Estimated cost:
Implementation timeline:
3/3/2016
Lithonia Industrial Boulevard Extension
New four lane roadway from I-20 to Woodrow Road. Project has
$4,000,000 in GDOT funds. County matching funding in draft 2016
budget.
$200,000
Transportation Division
30-36 months
Project list Project:
Project description:
Estimated cost:
Implementation timeline:
3/3/2016
South Stone Mountain Lithonia Road Bike Lanes and Sidewalk
Bike lanes on both sides of South Stone Mountain Lithonia Road and
sidewalk on one side from downtown Stone Mountain to Rockbridge
Road. Project has $3,377,000 in GDOT funds. County matching
funding in draft 2016 budget.
$500,000
Transportation Division
18-24 months
Project list Project:
Project description:
Estimated cost:
Implementation timeline:
3/3/2016
Signal Timing and Technology Upgrades
Signal timing and technology upgrades across the county as needed.
$2,000,000
Transportation Division
60 months
Project list Project:
Project description:
Estimated cost:
Implementation timeline:
3/3/2016
CID Matches
Various safety, sidewalk, and operational improvements to be
performed on cooperation with Community Improvement Districts.
$4,000,000
Transportation Division
60 months
Project list Project:
Project description:
Estimated cost:
Implementation timeline:
3/3/2016
Guardrail Improvements
Add guardrail at various locations throughout the county where
warranted.
$1,000,000
Transportation Division
60 months