Two major implications

• Handling inside building 180

• Logistics from/to Prevessin reception

12 May 2015

Page 3: Transport and handling at CERN for FAIR Caterina Bertone – EN/HE 12 May 2015

Cranes in building 180

60t plus 40t. 60t cranes FAIR sideCan work coupled, hook distance 10,3mFree height under crane profiles 9,61m

12 May 2015

Page 4: Transport and handling at CERN for FAIR Caterina Bertone – EN/HE 12 May 2015

Magnets (approved)• 57 magnets with a mass fro 35t to 55t, divided in 5 types

12 May 2015

Page 5: Transport and handling at CERN for FAIR Caterina Bertone – EN/HE 12 May 2015

Coupling spreader for cranes

• In case than the weight to be lifted overpasses 60t (no margin) including: complete magnet + supports + lifting spreader, the cranes needs to be coupled

• Margin is too few with 55t magnets

• A 100t coupling spreader is being developed as compact as possible (delivery end 2015)

12 May 2015

Page 6: Transport and handling at CERN for FAIR Caterina Bertone – EN/HE 12 May 2015

Integration of handling volumes

• Magnets test bench – predefined

• Path from truck to preparation areas to bench integrated

• Outcome is the space to be reserved for handling

12 May 2015

Page 7: Transport and handling at CERN for FAIR Caterina Bertone – EN/HE 12 May 2015

3D of handling volumes

12 May 2015

Page 8: Transport and handling at CERN for FAIR Caterina Bertone – EN/HE 12 May 2015

Space limitation in height

12 May 2015

Page 9: Transport and handling at CERN for FAIR Caterina Bertone – EN/HE 12 May 2015

Constraint on tooling

• Overall height of the lifting spreader and tooling < 1,3m from top of the magnet to lifting point of the crane (including converging slings and accessories)

• Condition can be relaxed only if: weight of the final magnet + supporting structure + spreader + slings&rigging equipment (overall gross load to be lifted) < 60t

• In this case, overall height can be 2,51m

12 May 2015

Page 10: Transport and handling at CERN for FAIR Caterina Bertone – EN/HE 12 May 2015

For future magnets

• The weight of the spreader is ~11t, implication being that the maximum gross mass of future magnets (including supports, spreader and any kind of ancillary system to be handled with) that can be handled at CERN is 89t

• Same volumes shall be respected: if we can have an overview of the proposed magnets, we can feedback on maximum dimensions of the lifting tooling

12 May 2015

Page 11: Transport and handling at CERN for FAIR Caterina Bertone – EN/HE 12 May 2015

Logistics from Prevessin

• The possibility to unload the external trucks on Prevessin site (FR) and transfer the magnet on CERN means has been analysed

• Internal transport services at CERN are not equipped for road transfers of more than 50t loads

• Even for <= 50t, the logistics implications will be very severe (mobile crane operation, special truck….)

• It is possible for the external transporter to register the material on Prevessin site (so that is officially delivered in Europe) and transport to Meyrin site with an official ‘transfer slip’ that proves that the transfer is made on the account of CERN

12 May 2015

Page 12: Transport and handling at CERN for FAIR Caterina Bertone – EN/HE 12 May 2015

Conclusion

• Transport services is ready now for the installation of the support services in building 180 and will be ready in January 2016 to receive the GSI magnets

• Road transport from b. 180 to Prevessin site and back should be done by the external transporter via an official transfer slip (to avoid custom problems CH-FR)

• More precise information about the masses to be lifted (gross) and lifting tooling to be used is needed now to final check the handling volumes and tooling

12 May 2015