22
Transport Alain Baron European Commission, DG Mobility and Transport (DG MOVE) Strengthening the transport system of the Northern Dimension: when TEN-T meets NDPTL 1 Europforum XIX, Umeå, 24 October 2013

Transport Alain Baron European Commission, DG Mobility and Transport (DG MOVE) Strengthening the transport system of the Northern Dimension: when TEN-T

Embed Size (px)

Citation preview

Page 1: Transport Alain Baron European Commission, DG Mobility and Transport (DG MOVE) Strengthening the transport system of the Northern Dimension: when TEN-T

TransportTransport

Alain BaronEuropean Commission,

DG Mobility and Transport (DG MOVE)

Strengthening the transport system of the Northern

Dimension: when TEN-T meets NDPTL

1

Europforum XIX, Umeå, 24 October 2013

Page 2: Transport Alain Baron European Commission, DG Mobility and Transport (DG MOVE) Strengthening the transport system of the Northern Dimension: when TEN-T

TransportTransport

1.THE NEW TEN-T POLICY

2

Page 3: Transport Alain Baron European Commission, DG Mobility and Transport (DG MOVE) Strengthening the transport system of the Northern Dimension: when TEN-T

TransportTransport

TEN-T development since 1996

1996 TEN-T Guidelines for EU 15 (Dec. 1692/96/EC):dense basic network + 14 Priority Projects (“Essen”);

1997 Pan-European Corridors I – X (“Helsinki Corridors”);

1999 TINA (“Transport Infrastructure Needs Assessment”);

2004 Guidelines revision - EU27 (Dec. 884/2004/EC): dense basic network (“old” MS)+ TINA network (“new” MS)+ 30 Priority Projects (TEN-T PP's: “Van Miert”);

2007 Extension of major TEN axes to neighbouring countries(“De Palacio”: COM/2007/0032);

2010 Recast of the TEN-T Guidelines (Dec. 661/2010/EU);

2013 TEN-T Policy Review+ Connecting Europe Facility (CEF). 3

Page 4: Transport Alain Baron European Commission, DG Mobility and Transport (DG MOVE) Strengthening the transport system of the Northern Dimension: when TEN-T

TransportTransport

• Correspond with the objectives of the Treaty;

• Reflect a European planning perspective;

• Form a dual layer (Comprehensive and Core) “network” connecting EU with neighbouring countriesand the rest of the world;

• Comprise all modes of transport (and their linkages):road, rail, sea and inland waterway, ports, RRT's, airports;

• Take into account environment and climate needs,

• Comprise technological innovation:traffic information and management systems,infrastructure for innovative power and fuel distribution

• "Absorb" the other concepts: TEN-T PP's, De Palacio axes;ERTMS and rail freight corridors.

The new TEN-T

4

Page 5: Transport Alain Baron European Commission, DG Mobility and Transport (DG MOVE) Strengthening the transport system of the Northern Dimension: when TEN-T

TransportTransport

TEN-T Comprehensive & Core Network

The Comprehensive Network is the dense basic network,•to ensure regional accessibility,•comprising all modes of transport;•determined by Member States, acc. to certain rules (updating the TEN-T of 1996)

The Core Network is a subset of the Comprehensive Network:•the strategically most important nodes and links,•comprising all modes of transport,•equipped with innovative technology applications;•determined by a special methodology:mixed geographical-traffic demand driven approach,2 steps: nodes and links(replacing the TEN-T PP's of 2004);•implementation by 2030. 5

Page 6: Transport Alain Baron European Commission, DG Mobility and Transport (DG MOVE) Strengthening the transport system of the Northern Dimension: when TEN-T

TransportTransport

TEN-T Core Network Corridors (1)

9 Core Network Corridors selected within the Core Network,

•to improve coordination of implementation:governance structure:11 European Coordinators (1 per Corridor, + MoS, ERTMS)Corridor Forum (all relevant stakeholders);

•to optimise multimodal operation for passengers & freight(with particular focus on nodes);

•to enhance deployment of innovative technologies(pilot applications);

•Selected to include politically complex projects, in particular border crossing, following previous priorities.

•Rail and inland waterway considered as the backbone.

6

Page 7: Transport Alain Baron European Commission, DG Mobility and Transport (DG MOVE) Strengthening the transport system of the Northern Dimension: when TEN-T

TransportTransport

7

Page 8: Transport Alain Baron European Commission, DG Mobility and Transport (DG MOVE) Strengthening the transport system of the Northern Dimension: when TEN-T

TransportTransport

2."CONNECTING EUROPE FACILITY"

(CEF)

8

Page 9: Transport Alain Baron European Commission, DG Mobility and Transport (DG MOVE) Strengthening the transport system of the Northern Dimension: when TEN-T

TransportTransport

• 23,2 B€,of which 10 B€ from Cohesion Fundare earmarked for cohesion countries;

• 80 – 85 % (“multi-annual programme”) for:- 3 horizontal priorities,- Core Network Corridors,- other sections of the Core Network.

• 15 – 20 % (“annual programme”) for- further projects of the Core Network

and of the Comprehensive Network(in particular innovation, ITS);

• Innovative financing instruments (project bonds, PPP);

• In general, CEF does not apply for road projects(except: ITS, safe parking areas, alternative fuels).

9

CEF Allocation (2014 – 2020)

Page 10: Transport Alain Baron European Commission, DG Mobility and Transport (DG MOVE) Strengthening the transport system of the Northern Dimension: when TEN-T

TransportTransport

• up to 50% for studies;

• up to 20% for investments in general;

• up to 30% for bottlenecks;

• up to 40% for border crossing projects(only rail and inland waterway);

• up to 50% for ITS-projects and innovation;

• up to 85% in cohesion countries(acc. to the rules of Cohesion Fund).

• Actual allocation of funds upon project applications:- calls by TEN-TEA,- project evaluation (by independent experts),- "EU added value",- project maturity (to ensure absorption of money),- ratio applied volumes vs. available budget.

10

CEF Funding Rates

Page 11: Transport Alain Baron European Commission, DG Mobility and Transport (DG MOVE) Strengthening the transport system of the Northern Dimension: when TEN-T

TransportTransport

3.The NDPTL

11

Page 12: Transport Alain Baron European Commission, DG Mobility and Transport (DG MOVE) Strengthening the transport system of the Northern Dimension: when TEN-T

| 12Transeuropean Transport Network

• Art 1. of the NDPTL MoU states that "the specific needs of the Northern Dimension Partnership for Transport and Logistics are to assist in accelerating the implementation of transport and logistic projects[…] and facilitating the approval of projects of mutual interest".

• Main goals of NDPTL are the following:

1. to strenghten the cooperation in the field of transport and logistics in the Northern Dimension area.

2. to accelerate the removal of non-infrastructure related bottlenecks, affecting the flow of transport in and across the region

3. to identify cross-regional projects of high priority in the transport and logistics area.

4. to provide the necessary assistance (including financial one) to project promoters, with the view to implement projects identified at point (3).

NDPTL

Page 13: Transport Alain Baron European Commission, DG Mobility and Transport (DG MOVE) Strengthening the transport system of the Northern Dimension: when TEN-T

| 13Transeuropean Transport Network

NDPTL : what has been achieved until now? (1)

In 2011 - Setting up of the secretariat.

- First indentification of transport / logistics needs through a study « NORDIM » financed by COM.

– Financing of 4 « small scale » projects (2 infrastructure and 2 « soft measures».Total 600 K€ (EU budget) -> finalization of the studies late autumn 2013.

In 2012

- Fund rules adopted

- Amounts allocated from some partners (1st assembly of donors) COM = 1.4 M€, FI = 1 M€, NO = 0.5 M€ DE = 0.1 M€

- Endorsement of the maps of the NDPTL network -> possible inclusion of the maps in the new TEN-T (delegated acts).

Page 14: Transport Alain Baron European Commission, DG Mobility and Transport (DG MOVE) Strengthening the transport system of the Northern Dimension: when TEN-T

| 14Transeuropean Transport Network

Page 15: Transport Alain Baron European Commission, DG Mobility and Transport (DG MOVE) Strengthening the transport system of the Northern Dimension: when TEN-T

| 15Transeuropean Transport Network

NDPTL Fund (1)In 2013 - First call for projects.

- Call open to all interested parties.

- Assessment made by NDPTL secretariat through an agreed methodology. Does not rank projects, but give them a "value".

- 11 proposals received and 8 endorsed by the NDPTL Steering committee.

- Studies / most of them are "phased" projects / average requested a200.000 € / few cross border but most of them present an interest for the entire region

- Assembly of donors has now to select the most interesting projects to be supported (co-financing, maximum rate = 50%)

- Next steps : new call (end 1st Q 2014) – if enough funds available an additional call may take place before end of 2014.

Page 16: Transport Alain Baron European Commission, DG Mobility and Transport (DG MOVE) Strengthening the transport system of the Northern Dimension: when TEN-T

| 16Transeuropean Transport Network

NDPTL Fund (2)

• Created to support projects complying with the NDPTL objectives.

• Projects to be eligible must have a clear regional added value (cross-border : not mandatory).

• Financial participation to the fund : on a voluntary basis, but all NDPTL partners are eligible to it.

• Projects can be submitted by all stakeholders (State and regional administrations, public or private entities).

Page 17: Transport Alain Baron European Commission, DG Mobility and Transport (DG MOVE) Strengthening the transport system of the Northern Dimension: when TEN-T

| 17Transeuropean Transport Network

NDPTL Fund (3)• If projects are supported by private entities/

regions they can be submitted to the seceatariat even prior to the approval by given MS, approval will be given through SC.

• However, the financial coverage (at least 50%) must be secured.

• The Fund aims at bridging the gap between the start phase and the maturity stage of the project (leverage effect).

• Other actors may then intervene (IFIs / EU/ MS)• Our targets : concrete actions / small scale/

soft/logistics.

Page 18: Transport Alain Baron European Commission, DG Mobility and Transport (DG MOVE) Strengthening the transport system of the Northern Dimension: when TEN-T

| 18Transeuropean Transport Network

EU Transport cooperation in the Northern Dimension: a challenging environment (I)

Weakeness and difficulties:

• Multiplication of initiatives : not managed by the same bodies / often not coordinated or overlapping.

• Scarcity of resources compared to other programmes.

• EU culture versus non-EU partners.

• Border effects (interoperability)

• Multiplication of interlocutors (customs / police / transport agencies / finance and FA ministries)

• Cross-regional interests not always recognized

This initiative is a mix between Infrastructure cooperation and policy integration. At this stage, covers mainly Eastern Partnership.

Page 19: Transport Alain Baron European Commission, DG Mobility and Transport (DG MOVE) Strengthening the transport system of the Northern Dimension: when TEN-T

| 19Transeuropean Transport Network

Conclusions of the TEN-T round table (2)(1) new business opportunities will require

adaptation of the transport system;

(2) there are many initiatives that compete in the region (NDPTL, BEATA etc..). Participants strongly supported the need to develop synergies between these initiatives (best use of ressources) and identified NDPTL as the main policy body to steer these initiatives;

(3) strong support on "ready to go projects" - putting more emphasis on logistics or small scale projects that could bring immeditate benefit to the region;

Page 20: Transport Alain Baron European Commission, DG Mobility and Transport (DG MOVE) Strengthening the transport system of the Northern Dimension: when TEN-T

| 20Transeuropean Transport Network

Conclusions of the TEN-T round table (1)

(4) High sensitivity of the region to environment and weather conditions - new transport developments (such as North Sea Route) will have to face such constraints;

(5) Financing : no miracle expected but need to clearly identify priorities and set up the appropriate regulatory framework to implement projects. IFIs ready to contribute to the projects if such conditions are met.

(6) Suggested closer involvement of stakeholders (including industry) to define these priorities, this could also be the way to attract private companies to participate in project financing through PPP.

Page 21: Transport Alain Baron European Commission, DG Mobility and Transport (DG MOVE) Strengthening the transport system of the Northern Dimension: when TEN-T

| 21Transeuropean Transport Network

How can regional Transport cooperation in the Northern Dimension be improved?• Joining forces not dividing:

(1) Inside EC

(2) At regional level

(3) Between EU MS and with non-EU MS

• Defining common objectives

(1) Accessibility

(2) Sustainability

(3) Complementarity of actions

• Pooling financial resources to lever projects

This initiative is a mix between Infrastructure cooperation and policy integration. At this stage, covers mainly Eastern Partnership.

Page 22: Transport Alain Baron European Commission, DG Mobility and Transport (DG MOVE) Strengthening the transport system of the Northern Dimension: when TEN-T

TransportTransport

THANK YOUFOR YOUR ATTENTION!

Alain BaronDG MOVE

22