TRANSNATIONAL SKILL STANDARDS FOR CONSTRUCTION INDUSTRY Transnational Skill Standards Foreman Electrical Works (Construction) REFERENCE ID: TOS/CON/Q0102

Transnational Skill Standards Foreman Electrical Works ... · conduit enclosures are in accordance with: P6.1 the electrical system’s ... concealed, exposed, electrical wiring work

  • Upload
    others

  • View
    3

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Transnational Skill Standards Foreman Electrical Works ... · conduit enclosures are in accordance with: P6.1 the electrical system’s ... concealed, exposed, electrical wiring work

TRANSNATIONAL SKILL STANDARDS FOR CONSTRUCTION INDUSTRY

Transnational Skill Standards

Foreman Electrical Works (Construction) REFERENCE ID: TOS/CON/Q0102

Page 2: Transnational Skill Standards Foreman Electrical Works ... · conduit enclosures are in accordance with: P6.1 the electrical system’s ... concealed, exposed, electrical wiring work

TRANSNATIONAL SKILL STANDARDS FOR CONSTRUCTION INDUSTRY

Mapping for Foreman Electrical Works (Construction) (CON/Q0604) with UK Qualification NVQ Level 3Diploma in Installing Electrotechnical Systems and Equipment (Buildings, Structures and the Environment) Link to Indian Qualification Pack: http://www.nsdcindia.org/sites/default/files/files/Foreman_Electrical_Works.pdf

Link to UK Qualification: NA

How to Read this Document This document has two sections - Section I and Section II.

Section I: Compares the NOS listing in the Indian QP -Foreman Electrical Works with Installation Electrician /NOSinUK Qualification NVQ Level 3.

Section II: Compares the competencies described in each of the Indian NOS with those of UK.

The language of the compared competencies of the two countries differs. However, the competency pointers of the described competency can be mapped. Wherever the competency pointer maps it is reported as ‘None’ underthe column ‘Gap in Indian NOS’. Wherever the competency pointers do not map with the pointers or scope and range, it is identified as a gap and the corresponding UK competency is noted under the column ‘Gap in Indian NOS’.

Usage of Benchmarked Transnational Standards

There will be two types of users of these benchmarked standards. One type will be of those individuals who are already trained and are certified on the corresponding Indian QP. This set of individuals will have to undergo a bridge course comprising of the identified gaps only. Thereafter, they will be assessed under the aegis of a UK Awarding body through the Indian SSC on the competency portions acquired via the bridge course. All qualifying individuals will be awarded a co-branded certificate comprising of logo of Skill India, Indian SSC and UK Awarding Body.

Those individuals who wish to be certified afresh will have to undergo training on both the Indian QP and the gaps in the Indian NOS with regard to UK competencies. Thereafter, they will be assessed under the aegis of a UK Awarding body through the Indian SSC and they will obtain a co-branded certificate comprising of logo of Skill India, Indian SSC and UK Awarding Body.

1

Page 3: Transnational Skill Standards Foreman Electrical Works ... · conduit enclosures are in accordance with: P6.1 the electrical system’s ... concealed, exposed, electrical wiring work

TRANSNATIONAL SKILL STANDARDS FOR CONSTRUCTION INDUSTRY

Section I:NOS Mapping of Foreman Electrical Works (Construction) QP (CON/Q0604) with the Installation ElectricianLevel 3 NVQ Diploma in Installing Electrotechnical Systems and Equipment (Buildings, Structures and the Environment) in UK

NOS Mapping: A Summary

Indian NOS Code

Indian NOS UK NOS Code

UK NOS Remarks, if any

CON/N0613 Conduct permanent wiring, maintenance work in buildings

SUMET04 Install enclosures for electrical cables, conductors and wiring systems

Two of UK NOS are covered in one Indian NOS

CON/N0613 Conduct permanent wiring, maintenance work in buildings

SUMET05 Install and connect electrical cables, conductors, wiring

CON/N0612 Establish electrical connections during erection of plant and heavy construction machineries

SUMET06 systems and equipment

CON/N0611

CON/N0612"

"Monitor regular electrical works (installation, maintenance and repairing) at a construction site

Establish electrical connections during erection of plant and heavy construction machineries"

SUMET07 Inspect and test electrical systems and equipment

Two of Indian NOS are covered in one UK NOS

CON/N0611 Monitor regular electrical works (installation, maintenance and repairing) at a construction site

SUMET08 Commission electrical systems and equipment

CON/N0613 Conduct permanent wiring, maintenance work in buildings

SUMET09 Identify and rectify faults in electrical systems and equipment

CON/N9002 Manage workplace for safe and healthy work environment

SUMBSE01 Maintain electrical systems and equipment

2

Page 4: Transnational Skill Standards Foreman Electrical Works ... · conduit enclosures are in accordance with: P6.1 the electrical system’s ... concealed, exposed, electrical wiring work

TRANSNATIONAL SKILL STANDARDS FOR CONSTRUCTION INDUSTRY

NOS Mapping: A Summary

Indian NOS Code

Indian NOS UK NOS Code

UK NOS Remarks, if any

CON/N8001

CON/N8002

CON/N8003

CON/N9002

"Work effectively in a team to deliver desired results at the workplace

Plan and organize work to meet expected outcomes

Supervise, monitor and evaluate performance of subordinates at workplace

Manage workplace for safe and healthy work environment"

SUMBSE02 Apply health and safety and environmental legislation in the building services engineering sector

Four of Indian NOS are covered in one UK NOS

CON/N8003

CON/N0611

Supervise, monitor and evaluate performance of subordinates at workplace

Monitor regular electrical works (installation, maintenance and repairing) at a construction site

SUMBSE03 Establish and maintain relationships in the building services engineering sector

Two of Indian NOS are covered in one UK NOS

3

Page 5: Transnational Skill Standards Foreman Electrical Works ... · conduit enclosures are in accordance with: P6.1 the electrical system’s ... concealed, exposed, electrical wiring work

TRANSNATIONAL SKILL STANDARDS FOR CONSTRUCTION INDUSTRY

Section II:Compares the competencies in Indian NOS Conduct permanent wiring, maintenance work in buildings (CON/Q0613) with those of UK NOS Install enclosures for electrical cables, conductors and wiring systems (SUMET04).

NOS Mapping Descriptions

Indian QP Title Foreman Electrical Works (Construction)

UK Qualification Level 3 NVQ Diploma in Installing Electrotechnical Systems and Equipment (Buildings, Structures and the Environment)

Indian QP Code CON/Q0604 UK Qualification Code NA

Indian NOS Code CON/N0613 UK NOS Code SUMET04

Indian NOS Conduct permanent wiring, maintenance work in buildings

UK NOS Install enclosures for electrical cables, conductors and wiring systems

Scope

This scope covers the following:

• Calculate material requirement from drawing specifications or as per customer requirement following standard practice

• Conduct installation/ maintenance of wiring, electrical fixtures, and equipment as per requirement /specification ensuring safety of equipment

Overview

This standard is for people who install enclosures for electrical cables,

conductors and wiring systems internally and externally.

The person carrying out this work must be able to comply with the procedures

and methods for installing enclosures for electrical cables, conductors and

wiring systems in accordance with the current versions of the appropriate

4

Page 6: Transnational Skill Standards Foreman Electrical Works ... · conduit enclosures are in accordance with: P6.1 the electrical system’s ... concealed, exposed, electrical wiring work

TRANSNATIONAL SKILL STANDARDS FOR CONSTRUCTION INDUSTRY

Scope

Overview

industry standards and regulations, the specification, industry

recognised working practices, the working environment and the natural

environment. They must know and understand the different types of

enclosures for electrical cables, conductors and wiring systems, their

limitations, applications and the techniques for the positioning, fitting, fixing and

connection of the enclosures, their components and accessories.

5

Page 7: Transnational Skill Standards Foreman Electrical Works ... · conduit enclosures are in accordance with: P6.1 the electrical system’s ... concealed, exposed, electrical wiring work

TRANSNATIONAL SKILL STANDARDS FOR CONSTRUCTION INDUSTRY

Competency Mapping: Thefollowingtable, the Indian NOS maps with the UK NOS SUMET04 ‘Install enclosures for electrical cables, conductors and wiring systems’ UK NOS.

Performance Criteria - Indian NOS

Performance Criteria - UK NOS Gaps w.r.t to Scope and Range in Indian NOS

To be competent, the user/individual on the job must be able to-

You must be able to-

PC1. go through electrical drawing, guidelines to ascertain electrical requirement of the work to be undertaken

P1 confirm the existing electrical supply is suitable for the electrical system

None

PC2. calculate electrical material requirement considering customer requirement and preferences or standard requirements of home electrical systems as per standard practice if drawing / diagram is not available

P2 confirm before work starts that the work location and work area can be accessed safely and has been checked for the risk to other personnel on the site, and take appropriate action if a risk is present

None

PC3. derive list of electrical equipment and fixtures to be used in circuits/electrical systems from drawing for considering power rating of the equipment

P3 produce a risk assessment and method statement for the work to be carried out, including the identification and use of personal protective equipment

None

PC4. calculate requirement of wiring materials as per drawing customer requirement and standard practice

P4 verify that job information and documentation is current and relevant and that the plant, instruments, access equipment and tools are fit for purpose

None

PC5. prepare and document as- built drawing of temporary and permanent – embedded electrical lines/ connection in order to be available in the final as built drawing

P5 select enclosures and confirm that they are: P5.1 of the right type and size P5.2 fit for purpose in accordance with the electrical system’s design

None

PC6. monitor and ensure wall chasing work as per standard procedure prior to laying

P6 determine at the outset, that the plans for positioning and fixing the components and accessories of the selected

None

6

Page 8: Transnational Skill Standards Foreman Electrical Works ... · conduit enclosures are in accordance with: P6.1 the electrical system’s ... concealed, exposed, electrical wiring work

TRANSNATIONAL SKILL STANDARDS FOR CONSTRUCTION INDUSTRY

Performance Criteria - Indian NOS

Performance Criteria - UK NOS Gaps w.r.t to Scope and Range in Indian NOS

conduit enclosures are in accordance with: P6.1 the electrical system’s design P6.2 manufacturers’ instructions

PC7. conduct conduit laying for RCC structures and ensure specification of conduits are as per requirement

P7 comply with industry practices and organisational procedures to ensure the co-ordination of site services and the activities of other trades

None

PC8. conduct cable laying through conduit and ensure right specification of cables are being used considering electrical voltage/ load requirement

P8 identify the correct means of electrical isolation prior to commencing installation work

None

PC9. conduct/ carry out concealed, exposed, electrical wiring work as per standard method and customer’s requirement

P9 complete the correct safe-isolation procedures, as and when required, to ensure the safe installation of the enclosures

None

PC10. carry out or inspect electrical isolation at the main and secondary power source as per standard procedure and ensure work safety prior to conducting maintenance to electrical wiring or pre-installed units

P10 measure and mark out the locations for fitting and fixing the selected enclosures components and accessories in accordance with: P10.1 the electrical system’s design P10.2 manufacturers’ instructions

None

PC11. fix complex electrical fixtures, installs fire alarm systems as per requirement

P11 fit, fix and connect the selected enclosures its components and accessories in accordance with: P11.1 the electrical system’s design P11.2 industry recognised methods P11.3 manufacturers’

None

7

Page 9: Transnational Skill Standards Foreman Electrical Works ... · conduit enclosures are in accordance with: P6.1 the electrical system’s ... concealed, exposed, electrical wiring work

TRANSNATIONAL SKILL STANDARDS FOR CONSTRUCTION INDUSTRY

Performance Criteria - Indian NOS

Performance Criteria - UK NOS Gaps w.r.t to Scope and Range in Indian NOS

instructions

PC12. conduct/ carry out earthing of installed electrical circuit as per standard method and using standard earthing components

P12 confirm with the relevant people: P12.1 those necessary variations to the planned programme of work that may have the potential to introduce a hazard and/or impact on the installation work to be undertaken P12.2 the correct actions to be undertaken to ensure that any variations to the planned programme of work will not introduce a hazard and have minimum impact on the installation work to be undertaken

None

PC13. conduct required tests/ inspections as and when necessary to ensure safe working of electrical circuits or to determine any fault in the circuit

P13 implement organisational procedures for the safe transport and/or disposal of waste materials, substances and liquids in accordance with suppliers’ and manufacturers’ instructions

None

PC14. suggest suitable methods of maintenance of a part of electrical circuit and conduct/ carry out maintenance work as per requirement adhering specification of parts and general electrical guidelines

PC15. change parts, fixture, wirings as per requirement

8

Page 10: Transnational Skill Standards Foreman Electrical Works ... · conduit enclosures are in accordance with: P6.1 the electrical system’s ... concealed, exposed, electrical wiring work

TRANSNATIONAL SKILL STANDARDS FOR CONSTRUCTION INDUSTRY

Performance Criteria - Indian NOS

Performance Criteria - UK NOS Gaps w.r.t to Scope and Range in Indian NOS

PC16. carry out basic maintenance of household equipment like water pump, motor etc.

Knowledge & Understanding Indian NOS

Knowledge & Understanding UK NOS

A. Organizational Context KA1. standard practices for conduct permanent wiring and maintenance work

K1 the operation, applications, advantages and limitations of different electrical systems

None

KA2. safety rules and regulations for handling and storing required electrical tools, equipment and materials

K2 the appropriate industry standards and regulations relevant to installing enclosures

None

KA3. personal protection including the use of related safety gears & equipment

K3 how to produce a risk assessment and method statement for the work to be carried out, including the identification and use of personal protective equipment, in accordance with: K3.1 the electrical system’s design K3.2 organisational procedures

None

KA4. how to request for tools and materials as per set procedures maintenance of tools and equipment

K4 how to verify that job information and documentation is current and relevant and that the plant, instruments, access equipment and tools are fit for purpose

None

B. Technical Knowledge KB1. guidelines provided in Indian Standard code of practice applicable for establishing and inspecting electrical wiring works

K5 the applications, advantages and limitations of types of personal protective equipment

None

9

Page 11: Transnational Skill Standards Foreman Electrical Works ... · conduit enclosures are in accordance with: P6.1 the electrical system’s ... concealed, exposed, electrical wiring work

TRANSNATIONAL SKILL STANDARDS FOR CONSTRUCTION INDUSTRY

Performance Criteria - Indian NOS

Performance Criteria - UK NOS Gaps w.r.t to Scope and Range in Indian NOS

KB2. statutory guidelines provided by ISI for LV wiring operations

K6 the applications, advantages and limitations of types of enclosures

None

KB3. electrical safety norms as per standard practice and organizational policy, procedure of providing CPR, first aids, use of regular and job specific PPEs as per requirement

K7 the industry recognised methods for determining the type and size of enclosures

None

KB4. classification of fire and use of fire protection devices

K8 how to interpret diagrams and drawings for the electrical system to locate site services

None

KB5. read and interpret drawings, SLDs related schematics for single and three phase wiring system

K9 how to interpret diagrams and drawings for the electrical system to identify the planned location of the enclosures

None

KB6. how to develop electrical drawings using appropriate symbols and abbreviations as per standard practice

K10 the methods and techniques for fitting, fixing and connecting the selected enclosures and their components and accessories in accordance with: K10.1 the electrical system’s design K10.2 manufacturers’ instructions

None

KB7. how to estimate required material quantity from electrical drawings

K11 the correct procedures for safe isolation

None

KB8. acceptance criteria of electrical materials, devices, fixtures and protective arrangements

K12 the organisational procedures for confirming with the relevant people the appropriate actions to be taken to ensure that any variations to the planned programme of work will not introduce a hazard and have minimum negative impact on the installation work to be

None

10

Page 12: Transnational Skill Standards Foreman Electrical Works ... · conduit enclosures are in accordance with: P6.1 the electrical system’s ... concealed, exposed, electrical wiring work

TRANSNATIONAL SKILL STANDARDS FOR CONSTRUCTION INDUSTRY

Performance Criteria - Indian NOS

Performance Criteria - UK NOS Gaps w.r.t to Scope and Range in Indian NOS

undertaken

KB9. how to verify authentication of ISI mark provided with electrical materials, fixtures and devices

K13 the methods for the safe transport and/or disposal of waste material, substances and liquids in accordance with suppliers’ and manufacturers’ instructions

None

KB10. principles of electrical theory as applied to electrical circuits and wiring systems

KB11. properties of different components used in electrical earthing work

KB12. acceptance criteria of material to be used during performing earthing work

KB13. current tentative market rate of common electrical items

KB14. common brands and their products

KB15. customer preferences regarding brands and trends

KB16. right procedure for handling electrical fixtures

KB17. standard practice of joining, termination and color coding of cables and wires

KB18. concept of electrical isolation procedures and their applications in LV electrical works

KB19. use of circuit breakers and its replacement

11

Page 13: Transnational Skill Standards Foreman Electrical Works ... · conduit enclosures are in accordance with: P6.1 the electrical system’s ... concealed, exposed, electrical wiring work

TRANSNATIONAL SKILL STANDARDS FOR CONSTRUCTION INDUSTRY

Performance Criteria - Indian NOS

Performance Criteria - UK NOS Gaps w.r.t to Scope and Range in Indian NOS

KB20. use of ladders, scaffolds during working/ performing electrical works

KB21. basic maintenance of common household equipment

KB22. use of electrical power tools and their maintenance

KB23. use of measuring and diagnostic tools in electrical circuits

KB24. standards procedure of storing, stacking electrical tools and equipment

KB25. computer basics – MS Office, Internet, E-mail

KB26. basic arithmetic and use of calculator

KB27. methods and techniques of inspection that are approved by the organization

KB28. calibration of equipment and authorization procedures as per the organization policy

KB29. calibration schedule of equipment and machineries

General Note: In the Construction SSC NOS, Range statement is not separated out. It is integrated holistically into the PCs and knowledge within the QPs

12

Page 14: Transnational Skill Standards Foreman Electrical Works ... · conduit enclosures are in accordance with: P6.1 the electrical system’s ... concealed, exposed, electrical wiring work

TRANSNATIONAL SKILL STANDARDS FOR CONSTRUCTION INDUSTRY

Section II continued:Compares the competencies in Indian NOS Conduct permanent wiring, maintenance work in buildings (CON/N0613) with the UK NOS Install and connect electrical cables, conductors, wiring systems and equipment(SUMET05).

NOS Mapping Descriptions

Indian QP Title Foreman Electrical Works (Construction)

UK Qualification Level 3 NVQ Diploma in Installing Electrotechnical Systems and Equipment (Buildings, Structures and the Environment)

Indian QP Code CON/Q0604 UK Qualification Code NA

Indian NOS Code CON/N0613 UK NOS Code SUMET05

Indian NOS Conduct permanent wiring, maintenance work in buildings

UK NOS Install and connect electrical cables, conductors, wiring systems and equipment

Scope

This scope covers the following:

• Calculate material requirement from drawing specifications or as per customer requirement following standard practice

• Conduct installation/ maintenance of wiring, electrical fixtures, and equipment as per requirement /specification ensuring safety of equipment

Overview

This standard is for people who install and connect electrical cables,

conductors, wiring systems, equipment, accessories and components.

The person carrying out this work must be able to comply with the procedures

and methods for installing and connecting electrical cables, conductors,

wiring systems, equipment, accessories and components in

13

Page 15: Transnational Skill Standards Foreman Electrical Works ... · conduit enclosures are in accordance with: P6.1 the electrical system’s ... concealed, exposed, electrical wiring work

TRANSNATIONAL SKILL STANDARDS FOR CONSTRUCTION INDUSTRY

Scope Overview

accordance with

with the current versions of the appropriate industry standards and regulations,

the specification, industry recognised working practices, the working

environment and the natural environment. They must know and understand

the different types of cables, conductors, wiring systems, equipment,

accessories and components, their limitations, applications and the techniques

for their positioning, fitting, fixing and connection.

14

Page 16: Transnational Skill Standards Foreman Electrical Works ... · conduit enclosures are in accordance with: P6.1 the electrical system’s ... concealed, exposed, electrical wiring work

TRANSNATIONAL SKILL STANDARDS FOR CONSTRUCTION INDUSTRY

Competency Mapping: Thefollowingtable, the Indian NOS maps with the UK NOS SUMET05 ‘Install and connect electrical cables, conductors, wiringsystems and equipment’ UK NOS.

Performance Criteria - Indian NOS

Performance Criteria - UK NOS Gaps w.r.t to Scope and Range in Indian NOS

To be competent, the user/individual on the job must be able to-

You must be able to-

PC1. go through electrical drawing, guidelines to ascertain electrical requirement of the work to be undertaken

P1 confirm the existing electrical supply is suitable for the electrical system

None

PC2. calculate electrical material requirement considering customer requirement and preferences or standard requirements of home electrical systems as per standard practice if drawing / diagram is not available

P2 produce a risk assessment and method statement for the work to be carried out, including the identification and use of personal protective equipment

None

PC3. derive list of electrical equipment and fixtures to be used in circuits/electrical systems from drawing for considering power rating of the equipment

P3 verify that job information and documentation is current and relevant and that the plant, instruments, access equipment and tools are fit for purpose

None

PC4. calculate requirement of wiring materials as per drawing customer requirement and standard practice

P4 select the associated equipment, accessories and components and confirm that they are: P4.1 of the right type and size P4.2 fit for purpose in accordance with the electrical system’s design

None

PC5. prepare and document as- built drawing of temporary and permanent – embedded electrical lines/ connection in order to be available in the final as built drawing

P5 select electrical cables, conductors, wiring systems and confirm that they are: P5.1 of the right size and type P5.2 fit for purpose in accordance with the electrical system’s design

None

15

Page 17: Transnational Skill Standards Foreman Electrical Works ... · conduit enclosures are in accordance with: P6.1 the electrical system’s ... concealed, exposed, electrical wiring work

TRANSNATIONAL SKILL STANDARDS FOR CONSTRUCTION INDUSTRY

Performance Criteria - Indian NOS

Performance Criteria - UK NOS Gaps w.r.t to Scope and Range in Indian NOS

PC6. monitor and ensure wall chasing work as per standard procedure prior to laying conduit

P6 comply with industry practices and organisational procedures to ensure the co-ordination of site services and the activities of other trades

None

PC7. conduct conduit laying for RCC structures and ensure specification of conduits are as per requirement

P7 identify the correct means of electrical isolation prior to commencing installation and connection work

None

PC8. conduct cable laying through conduit and ensure right specification of cables are being used considering electrical voltage/ load requirement

P8 complete safe-isolation as and when required to ensure the safe installation and connection of electrical cables, conductors and wiring systems and their associated equipment, accessories and components

None

PC9. conduct/ carry out concealed, exposed, electrical wiring work as per standard method and customer’s requirement

P9 install, fix and connect electrical cables, conductors and wiring systems and their associated equipment, accessories and components in accordance with the requirements of: P9.1 the electrical system’s design P9.2 industry recognised methods P9.3 manufacturers’ instructions

None

PC10. carry out or inspect electrical isolation at the main and secondary power source as per standard procedure and ensure work safety prior to conducting maintenance to electrical wiring or pre-installed units

P10 check that the connections and joints of the electrical cables, conductors and wiring systems and their associated equipment, accessories and components are of proper construction as regards to conductance, insulation, mechanical strength and protection, and ensure that they are identified correctly and

None

16

Page 18: Transnational Skill Standards Foreman Electrical Works ... · conduit enclosures are in accordance with: P6.1 the electrical system’s ... concealed, exposed, electrical wiring work

TRANSNATIONAL SKILL STANDARDS FOR CONSTRUCTION INDUSTRY

Performance Criteria - Indian NOS

Performance Criteria - UK NOS Gaps w.r.t to Scope and Range in Indian NOS

clearly in accordance with the requirements of the electrical system

PC11. fix complex electrical fixtures, installs fire alarm systems as per requirement

P11 confirm with the relevant people: P11.1 those necessary variations to the planned programme of work that may have the potential to introduce a hazard and/or impact on the installation work to be undertaken P11.2 the correct actions to be taken to ensure that any variations to the planned programme of work will not introduce a hazard and have minimum impact on the installation to be undertaken

None

PC12. conduct/ carry out earthing of installed electrical circuit as per standard method and using standard earthing components

P12 implement organisational procedures for the safe transport and/or disposal of waste material, substances and liquids in accordance with suppliers’ and manufacturers’ instructions

None

PC13. conduct required tests/ inspections as and when necessary to ensure safe working of electrical circuits or to determine any fault in the circuit

PC14. suggest suitable methods of maintenance of a part of electrical circuit and conduct/ carry out maintenance work as per requirement adhering specification of parts and

17

Page 19: Transnational Skill Standards Foreman Electrical Works ... · conduit enclosures are in accordance with: P6.1 the electrical system’s ... concealed, exposed, electrical wiring work

TRANSNATIONAL SKILL STANDARDS FOR CONSTRUCTION INDUSTRY

Performance Criteria - Indian NOS

Performance Criteria - UK NOS Gaps w.r.t to Scope and Range in Indian NOS

general electrical guidelines

PC15. change parts, fixture, wirings as per requirement

PC16. carry out basic maintenance of household equipment like water pump, motor etc.

Knowledge & Understanding Indian NOS

Knowledge & Understanding UK NOS

A. Organizational Context KA1. standard practices for conduct permanent wiring and maintenance work

K1 the operation, applications, advantages and limitations of different electrical systems

None

KA2. safety rules and regulations for handling and storing required electrical tools, equipment and materials

K2 the appropriate industry standards and regulations relevant to installing and connecting electrical cables, conductors, wiring systems, associated equipment, accessories and components

None

KA3. personal protection including the use of related safety gears & equipment

K3 how to produce a risk assessment and method statement for the work to be carried out, including the identification and use of personal protective equipment, in accordance with: K3.1 the electrical system’s design K3.2 organisational procedures

None

KA4. how to request for tools and materials as per set procedures maintenance of tools and equipment

K4 how to verify that job information and documentation is current and relevant, and that the plant, instruments, access equipment and tools are fit for

None

18

Page 20: Transnational Skill Standards Foreman Electrical Works ... · conduit enclosures are in accordance with: P6.1 the electrical system’s ... concealed, exposed, electrical wiring work

TRANSNATIONAL SKILL STANDARDS FOR CONSTRUCTION INDUSTRY

Performance Criteria - Indian NOS

Performance Criteria - UK NOS Gaps w.r.t to Scope and Range in Indian NOS

purpose

B. Technical Knowledge KB1. guidelines provided in Indian Standard code of practice applicable for establishing and inspecting electrical wiring works

K5 the applications, advantages and limitations of types of personal protective equipment

None

KB2. statutory guidelines provided by ISI for LV wiring operations

K6 the applications, advantages and limitations of types of electrical cables, conductors, wiring systems, associated equipment, accessories and components

None

KB3. electrical safety norms as per standard practice and organizational policy, procedure of providing CPR, first aids, use of regular and job specific PPEs as per requirement

K7 the industry recognised methods for determining the type, size and rating of electrical cables, conductors, wiring systems, associated equipment, accessories and components in relation to the electrical system’s design

None

KB4. classification of fire and use of fire protection devices

K8 how to interpret diagrams and drawings for the electrical system to locate site services

None

KB5. read and interpret drawings, SLDs related schematics for single and three phase wiring system

K9 how to interpret diagrams and drawings for the electrical system to identify the planned location of the electrical cables, conductors, wiring systems, associated equipment, accessories and components

None

KB6. how to develop electrical drawings using appropriate symbols and abbreviations as per standard practice

K10 the methods and techniques for installing, fixing and connecting electrical cables, conductors, wiring systems, associated equipment, accessories and components in

None

19

Page 21: Transnational Skill Standards Foreman Electrical Works ... · conduit enclosures are in accordance with: P6.1 the electrical system’s ... concealed, exposed, electrical wiring work

TRANSNATIONAL SKILL STANDARDS FOR CONSTRUCTION INDUSTRY

Performance Criteria - Indian NOS

Performance Criteria - UK NOS Gaps w.r.t to Scope and Range in Indian NOS

accordance with: K10.1 the electrical system’s design K10.2 manufacturers’ instructions

KB7. how to estimate required material quantity from electrical drawings

K11 the different types and methods of joining and connecting electrical cables, conductors, wiring systems, their applications, advantages and limitations

None

KB8. acceptance criteria of electrical materials, devices, fixtures and protective arrangements

K12 the correct procedures for safe-isolation

None

KB9. how to verify authentication of ISI mark provided with electrical materials, fixtures and devices

K13 the organisational procedures for confirming with the relevant people the appropriate actions to be taken to ensure that any variations to the planned programme of work will not introduce a hazard and have minimum negative impact on the installation work to be undertaken

None

KB10. principles of electrical theory as applied to electrical circuits and wiring systems

K14 the methods for the safe transport and/or disposal of waste material, substances and liquids in accordance with suppliers’ and manufacturers’ instructions

None

KB11. properties of different components used in electrical earthing work

KB12. acceptance criteria of material to be used during performing earthing work

20

Page 22: Transnational Skill Standards Foreman Electrical Works ... · conduit enclosures are in accordance with: P6.1 the electrical system’s ... concealed, exposed, electrical wiring work

TRANSNATIONAL SKILL STANDARDS FOR CONSTRUCTION INDUSTRY

Performance Criteria - Indian NOS

Performance Criteria - UK NOS Gaps w.r.t to Scope and Range in Indian NOS

KB13. current tentative market rate of common electrical items

KB14. common brands and their products

KB15. customer preferences regarding brands and trends

KB16. right procedure for handling electrical fixtures

KB17. standard practice of joining, termination and color coding of cables and wires

KB18. concept of electrical isolation procedures and their applications in LV electrical works

KB19. use of circuit breakers and its replacement

KB20. use of ladders, scaffolds during working/ performing electrical works

KB21. basic maintenance of common household equipment

KB22. use of electrical power tools and their maintenance

KB23. use of measuring and diagnostic tools in electrical circuits

KB24. standards procedure of storing, stacking electrical tools and equipment

KB25. computer basics – MS Office, Internet, E-mail

21

Page 23: Transnational Skill Standards Foreman Electrical Works ... · conduit enclosures are in accordance with: P6.1 the electrical system’s ... concealed, exposed, electrical wiring work

TRANSNATIONAL SKILL STANDARDS FOR CONSTRUCTION INDUSTRY

Performance Criteria - Indian NOS

Performance Criteria - UK NOS Gaps w.r.t to Scope and Range in Indian NOS

KB26. basic arithmetic and use of calculator

KB27. methods and techniques of inspection that are approved by the organization

KB28. calibration of equipment and authorization procedures as per the organization policy

KB29. calibration schedule of equipment and machineries

General Note: In the Construction SSC NOS, Range statement is not separated out. It is integrated holistically into the PCs and knowledge within the QPs

22

Page 24: Transnational Skill Standards Foreman Electrical Works ... · conduit enclosures are in accordance with: P6.1 the electrical system’s ... concealed, exposed, electrical wiring work

TRANSNATIONAL SKILL STANDARDS FOR CONSTRUCTION INDUSTRY

Section II continued:Compares the competencies in Indian Establish electrical connections during erection of plant and heavy construction machineries(CON/N0612) with the UK NOS Inspect and test electrical systems and equipment (SUMET06).

NOS Mapping Descriptions

Indian QP Title Foreman Electrical Works (Construction)

UK Qualification Level 3 NVQ Diploma in Installing Electrotechnical Systems and Equipment (Buildings, Structures and the Environment)

Indian QP Code CON/Q0604 UK Qualification Code NA

Indian NOS Code CON/N0612 UK NOS Code SUMET06

Indian NOS Establish electrical connections during erection of plant and heavy construction machineries

UK NOS Inspect and test electrical systems and equipment

Scope

This scope covers the following:

Organize resources prior to taking up electrification of heavy machineries

Conduct electrification of heavy plant & machineries such as batching, hot mix plant, tower cranes, diesel generators, transformers

Overview

This standard is for people who inspect and test electrical systems and equipment

The person carrying out this work must be able to comply with the processes and procedures for initial and periodic inspection and testing of an electrical system in accordance with the current versions of the appropriate industry standards and regulations, the specification, industry recognised working practices, the working

23

Page 25: Transnational Skill Standards Foreman Electrical Works ... · conduit enclosures are in accordance with: P6.1 the electrical system’s ... concealed, exposed, electrical wiring work

TRANSNATIONAL SKILL STANDARDS FOR CONSTRUCTION INDUSTRY

Scope

Overview

environment and the natural environment.

They must know, understand and apply the correct methods and procedures for the inspection and testing of electrical systems and equipment, including the:

identification and use of the correct instruments

completion of the relevant documentation

recording of relevant data and information.

Competency Mapping: Thefollowingtable, the Indian NOS maps with the UK NOS SUMET06 ‘Inspect and test electrical systems and equipment’ UK NOS.

Performance Criteria - Indian NOS

Performance Criteria - UK NOS Gaps w.r.t to Scope and Range in Indian NOS

To be competent, the user/individual on the job must be able to-

You must be able to-

PC1. read manufacturer’s guidelines to ascertain electrical requirement of the machinery to be installed

P1 confirm a programme of work with the relevant people in accordance with organisational procedures

None

PC2. prepare material requirement from electrical drawing/ diagram if available with machinery as per standard practice

P2 determine and obtain the resources required, as relevant, to undertake: P2.1 initial inspection and testing P2.2 periodic inspection and testing

None

PC3. derive specification of electrical materials to be used in

P3 select the instruments to be used for carrying out the

None

24

Page 26: Transnational Skill Standards Foreman Electrical Works ... · conduit enclosures are in accordance with: P6.1 the electrical system’s ... concealed, exposed, electrical wiring work

TRANSNATIONAL SKILL STANDARDS FOR CONSTRUCTION INDUSTRY

Performance Criteria - Indian NOS

Performance Criteria - UK NOS Gaps w.r.t to Scope and Range in Indian NOS

circuits/ electrical systems relevant tests

PC4. pass material requirement to senior authority after checking with material availability at store

P4 confirm that the instruments are fit for purpose and have a current calibration certificate

None

PC5. perform visual inspection of available material in terms of their specification and physical condition

P5 conduct a visual inspection on the enclosures for cables, conductors and wiring systems to confirm they are: P5.1 located and secured correctly P5.2 electronically and mechanically sound

None

PC6. coordinate with superiors for allocation of desired manpower

P6 conduct a visual inspection on the electrical cable, conductor and wiring systems to confirm they are: P6.1 located and secured correctly P6.2 identified and/or labelled correctly

None

PC7. provide inputs in planning and preparing work schedules required to complete the erection

P7 conduct a visual inspection on the equipment, accessories and components to confirm they are: P7.1 located and secured correctly P7.2 identified and/or labelled correctly

None

PC8. check for completion of required preparatory works and availability of safety devices at workplace, prior to starting installation works

P8 comply with industry practices and organisational procedures to ensure the co-ordination of site services and the activities of other trades affected by: P8.1 the inspection process and procedures

None

25

Page 27: Transnational Skill Standards Foreman Electrical Works ... · conduit enclosures are in accordance with: P6.1 the electrical system’s ... concealed, exposed, electrical wiring work

TRANSNATIONAL SKILL STANDARDS FOR CONSTRUCTION INDUSTRY

Performance Criteria - Indian NOS

Performance Criteria - UK NOS Gaps w.r.t to Scope and Range in Indian NOS

P8.2 the testing process and procedures

PC9. carry out or inspect electrical isolation at the main and secondary power source as per standard procedure and ensure work safety prior to conducting maintenance to electrical units

P9 identify the correct means of electrical isolation prior to commencing the inspection and/or testing process

None

PC10. inspect electrical panel, transformers to ensure conformance to manufacturer’s specification, compatibility of devices, power ratings of devices to be connected adhering electrical safety norms

P10 complete safe-isolation as and when required to ensure the safe inspection and testing of electrical cables, conductors and/or wiring system and the associated equipment, accessories and components

None

PC11. erect electrical panel as power source if required and get it activated

P11 perform the tests in the correct sequence that ensure safe and efficient operation of the electrical system

None

PC12. conduct and carry out electrical connection works between machinery and power source

P12 comply with organisational procedures for: completion of the relevant documentation P12.2 the recording of relevant data and information P12.3 informing relevant people P12.4 addressing issues and problems

None

PC13. install earthing arrangement and protective devices at appropriate locations as per manufacturer’s guidelines

PC14. ensure safe joining (straight through joint as per applicability), and termination

26

Page 28: Transnational Skill Standards Foreman Electrical Works ... · conduit enclosures are in accordance with: P6.1 the electrical system’s ... concealed, exposed, electrical wiring work

TRANSNATIONAL SKILL STANDARDS FOR CONSTRUCTION INDUSTRY

Performance Criteria - Indian NOS

Performance Criteria - UK NOS Gaps w.r.t to Scope and Range in Indian NOS

of cables as per standard practice

PC15. conduct required electrical tests using appropriate measuring and diagnostic devices to ensure safe and desired working of machineries

PC16. conduct trial run and required tests to ensure safe working of plant and machineries

PC17. check panels, transformers, machineries for factors responsible for electrical distribution system failure like loose connections/ parts, moisture, line disturbance, defective/ inadequate insulations, short circuiting, collision, overloading, dust/dirt or oil accumulation and other possible unsafe acts

PC18. conduct preventive maintenance to electrical panels and electrical machineries parts as and when necessary

PC19. ensure electrical safety to workers, equipment, materials and fixtures by adopting standard safe working procedures as per organizational norms, at workplace

PC20. prepare field reports, hand sketches etc. as and when necessary for documentation of related works

27

Page 29: Transnational Skill Standards Foreman Electrical Works ... · conduit enclosures are in accordance with: P6.1 the electrical system’s ... concealed, exposed, electrical wiring work

TRANSNATIONAL SKILL STANDARDS FOR CONSTRUCTION INDUSTRY

Knowledge & Understanding Indian NOS

Knowledge & Understanding UK NOS

A. Organizational Context KA1. standard practices for establishing electrical connections during erection of plant and heavy construction machinery

K1 the operation, applications, advantages and limitations of different electrical systems

None

KA2. safety rules and regulations for handling and storing required electrical tools, equipment and materials

K2 the organisational procedures to confirm a programme of work with the relevant people

None

KA3. personal protection including the use of related safety gears & equipment

K3 how to determine and obtain the resources required, as relevant, to undertake: K3.1 initial inspection and testing K3.2 periodic inspection and testing

None

KA4. how to request for tools and materials as per set procedures maintenance of tools and equipment

K4 how to select the instruments to be used for carrying our relevant tests

None

B. Technical Knowledge KB1. guidelines provided in Indian Standard code of practice applicable for establishing and inspecting electrical wiring works

K5 how to confirm that the test instruments are fit for purpose and have a current calibration certificate

None

KB2. statutory guidelines provided by ISI for LV wiring operations

K6 the methods and procedures for conducting a visual inspection on the enclosures for cables, conductors and wiring systems to confirm they are: K6.1 located and secured correctly K6.2 electrically and mechanically sound

None

28

Page 30: Transnational Skill Standards Foreman Electrical Works ... · conduit enclosures are in accordance with: P6.1 the electrical system’s ... concealed, exposed, electrical wiring work

TRANSNATIONAL SKILL STANDARDS FOR CONSTRUCTION INDUSTRY

Performance Criteria - Indian NOS

Performance Criteria - UK NOS Gaps w.r.t to Scope and Range in Indian NOS

KB3. electrical safety norms as per standard practice and organizational policy, procedure of providing CPR, first aids, use of regular and job specific PPEs as er requirement

K7 the methods and procedures for conducting a visual inspection on the electrical cable, conductor and wiring systems to confirm they are: K7.1 located and secured correctly K7.2 identified and/or labelled correctly

None

KB4. classification of fire and use of fire protection devices

K8 the methods and procedures for conducting a visual inspection on the equipment, accessories and components to confirm they are: K8.1 located and secured correctly K8.2 identified and/or labelled correctly

None

KB5. read and interpret drawings, SLDs related schematics for single and three phase wiring system

K9 the industry practices and organisational procedures to ensure the co-ordination of site services and the activities of other trades affected by: K9.1 the inspection process and procedures K9.2 the testing process and procedures

None

KB6. how to develop electrical drawings using appropriate symbols and abbreviations as per standard practice

K10 the correct procedures for safe-isolation

None

KB7. how to estimate required material quantity from electrical drawings

K11 the methods and processes to carry out correctly the tests that ensure safe and efficient operation of the electrical system

None

KB8. sequencing of electrical works to be carried out

K12 the organisational procedures for:

None

29

Page 31: Transnational Skill Standards Foreman Electrical Works ... · conduit enclosures are in accordance with: P6.1 the electrical system’s ... concealed, exposed, electrical wiring work

TRANSNATIONAL SKILL STANDARDS FOR CONSTRUCTION INDUSTRY

Performance Criteria - Indian NOS

Performance Criteria - UK NOS Gaps w.r.t to Scope and Range in Indian NOS

depending upon requirement of construction works

K12.1 completion of the relevant documentation K12.2 the recording of relevant data and information K12.3 informing relevant people K12.4 addressing issues and problems identified

KB9. acceptance criteria of electrical materials, devices, fixtures and protective arrangements

KB10. how to verify authentication of ISI mark provided with electrical materials, fixtures and devices

KB11. principles of electrical theory as applied to electrical circuits and wiring systems

KB12. complex electrical circuits including schematics, SLDs, etc.

KB13. area of application & specification of electrical protective devices

KB14. correct alternative use of electrical parts if required one is unavailable

KB15. detailed concept of 3 phase connections and its distribution at construction sites

KB16. detailed concept of AC and DC circuits, their properties and area of application

KB17. concept about safe procedure of troubleshooting in

30

Page 32: Transnational Skill Standards Foreman Electrical Works ... · conduit enclosures are in accordance with: P6.1 the electrical system’s ... concealed, exposed, electrical wiring work

TRANSNATIONAL SKILL STANDARDS FOR CONSTRUCTION INDUSTRY

Performance Criteria - Indian NOS

Performance Criteria - UK NOS Gaps w.r.t to Scope and Range in Indian NOS

3 phase connections

KB18. concept of working principle and components of electrical panels and transformers and generators

KB19. operational characteristics of electrical panels and power distribution through the same

KB20. concept of electrical isolation procedures and their applications in LV electrical works

KB21. advance troubleshooting in electrical panels, transformers and generators

KB22. working principle and connection of AC single phase and AC three phase motors, submersible pumps and their maintenance

KB23. selection and use of starters such as DOL, Star Delta, Step down Transformer starter

KB24. line and phase voltage, current and power in a 3 phase circuits with balanced and unbalanced load

KB25. principle of different methods of earthing. i.e. Pipe, Plate, etc.

KB26. measurement of Earth resistance by earth tester, testing of Earth Leakage by ELCB and relay, etc.

31

Page 33: Transnational Skill Standards Foreman Electrical Works ... · conduit enclosures are in accordance with: P6.1 the electrical system’s ... concealed, exposed, electrical wiring work

TRANSNATIONAL SKILL STANDARDS FOR CONSTRUCTION INDUSTRY

Performance Criteria - Indian NOS

Performance Criteria - UK NOS Gaps w.r.t to Scope and Range in Indian NOS

KB27. use of electrical power tools and their maintenance

KB28. use of measuring and diagnostic tools in electrical circuits

KB29. standards procedure of storing, stacking electrical tools and equipment

KB30. computer basics – MS Office, Internet, E-mail

KB31. basic arithmetic and use of calculator

KB32. methods and techniques of inspection that are approved by the organization

General Note: In the Construction SSC NOS, Range statement is not separated out. It is integrated holistically into the PCs and knowledge within the QPs

32

Page 34: Transnational Skill Standards Foreman Electrical Works ... · conduit enclosures are in accordance with: P6.1 the electrical system’s ... concealed, exposed, electrical wiring work

TRANSNATIONAL SKILL STANDARDS FOR CONSTRUCTION INDUSTRY

Section II:Compares the competencies in Indian Establish electrical connections during erection of plant and heavy construction machineries (CON/N0612) with the UK NOS Commission electrical systems and equipment (SUMET07).

NOS Mapping Descriptions

Indian QP Title Foreman Electrical Works (Construction)

UK Qualification Level 3 NVQ Diploma in Installing Electrotechnical Systems and Equipment (Buildings, Structures and the Environment)

Indian QP Code CON/Q0604 UK Qualification Code NA

Indian NOS Code CON/N0611 UK NOS Code SUMET07

Indian NOS Monitor regular electrical works (installation, maintenance and repairing) at a construction site

UK NOS Commission electrical systems and equipment

Scope

This scope covers the following:

Monitor and check wiring / connections for LV works at a construction site.

Conduct installation/ maintenance of construction equipment and machineries.

Overview

This standard is for people who commission electrical systems and equipment

The person carrying out this work must be able to comply with the processes and procedures for the commissioning and handing over of an electrical system and equipment in accordance with the current versions of the appropriate industry standards and regulations, the specification; industry

33

Page 35: Transnational Skill Standards Foreman Electrical Works ... · conduit enclosures are in accordance with: P6.1 the electrical system’s ... concealed, exposed, electrical wiring work

TRANSNATIONAL SKILL STANDARDS FOR CONSTRUCTION INDUSTRY

Scope

Overview

recognised working practices, the working environment and the natural environment

They must know, understand and apply the correct methods and procedures for the commissioning and handing over the electrical system and equipment including the:

identification and use of the correct instruments

completion of the relevant documentation

recording of relevant data and information

identification and consideration of the customer’s need for electrical systems and equipment configuration

planning of the resources required to carry out the commissioning process

34

Page 36: Transnational Skill Standards Foreman Electrical Works ... · conduit enclosures are in accordance with: P6.1 the electrical system’s ... concealed, exposed, electrical wiring work

TRANSNATIONAL SKILL STANDARDS FOR CONSTRUCTION INDUSTRY

Competency Mapping: Thefollowingtable, the Indian NOS maps with the UK NOS SUMET07 ‘Commission electrical systems and equipment’ UK NOS.

Performance Criteria - Indian NOS

Performance Criteria - UK NOS Gaps w.r.t to Scope and Range in Indian NOS

To be competent, the user/individual on the job must be able to-

You must be able to-

PC2. check and ensure materials, fixtures and devices being used in repairing or maintenance works are ISI certified

PC3. inspect completed LV electrical arrangements for conformance with specifications, requirements and compliance with applicable statutory and HSE requirements

P1 identify the customer/client’s requirements

None

PC7. diagnose malfunctioning of wiring systems, circuits, temporary panels and its components, using appropriate measuring equipment and hand tools

PC16. prepare schedule of maintenance for common equipment and machineries such as motor, bar cutting/ bending machines, vibratos, tower cranes etc.PC16. prepare schedule of maintenance for common equipment and machineries such as motor, bar cutting/ bending machines, vibratos, tower cranes etc.

P2 plan the commissioning process

None

CON/N0612: Establish electrical connections during erection of plant and heavy construction machineries

P3 determine and obtain the resources required to undertake the process

None

35

Page 37: Transnational Skill Standards Foreman Electrical Works ... · conduit enclosures are in accordance with: P6.1 the electrical system’s ... concealed, exposed, electrical wiring work

TRANSNATIONAL SKILL STANDARDS FOR CONSTRUCTION INDUSTRY

Performance Criteria - Indian NOS

Performance Criteria - UK NOS Gaps w.r.t to Scope and Range in Indian NOS

PC3. inspect completed LV electrical arrangements for conformance with specifications, requirements and compliance with applicable statutory and HSE requirements

P4 ensure methods and organisational procedures are implemented correctly

None

PC11. supervise electrical works by providing instructions, directions ensuring completion of the same within specified time as per applicable schematics, specification, guidelines and safety norms

P5 verify that the customer/client’s requirements are met

None

PC8. carry out troubleshooting and take immediate actions in case of emergency repairing requirements related to short circuit or malfunction in wiring systems, temporary electrical panels or lighting arrangements

P6 resolve any problems identified

None

CON/N0612: Establish electrical connections during erection of plant and heavy construction machineries

P7 specify methods and organisational procedures which conform with customer/client requirements

None

PC3. inspect completed LV electrical arrangements for conformance with specifications, requirements and compliance with applicable statutory and HSE requirements

PC4. check & ensure that lighting arrangements and its components are in safe condition working properly

PC5. conduct periodical checks/ tests to insulation, joints, physical condition and termination of wires and cables

P8 confirm that conditions are suitable for commissioning to take place

None

36

Page 38: Transnational Skill Standards Foreman Electrical Works ... · conduit enclosures are in accordance with: P6.1 the electrical system’s ... concealed, exposed, electrical wiring work

TRANSNATIONAL SKILL STANDARDS FOR CONSTRUCTION INDUSTRY

Performance Criteria - Indian NOS

Performance Criteria - UK NOS Gaps w.r.t to Scope and Range in Indian NOS

to ensure safe working of wiring systems

PC18. take necessary steps or report to concerned authorities on observing any hazardous conditions at work place

PC19. ensure erection of safety signage and barricading, surrounding the faulty or electrically hazardous equipment/ locations to avoid unsafe conditions

PC20. carry out checks for adverse situation like vicinity of water, fire prior, during and after establishing any electrical system at regular intervals

CON/N0612: Establish electrical connections during erection of plant and heavy construction machineries

P9 complete the commissioning process

None

PC24. prepare data sheet, report and note readings as per applicability according to organizational procedures

P10 record and assess information in accordance with organisational procedures

None

PC24. prepare data sheet, report and note readings as per applicability according to organizational procedures

P11 ensure that the results are recorded in the appropriate information systems and passed to the relevant people

None

37

Page 39: Transnational Skill Standards Foreman Electrical Works ... · conduit enclosures are in accordance with: P6.1 the electrical system’s ... concealed, exposed, electrical wiring work

TRANSNATIONAL SKILL STANDARDS FOR CONSTRUCTION INDUSTRY

Performance Criteria - Indian NOS

Performance Criteria - UK NOS Gaps w.r.t to Scope and Range in Indian NOS

PC22. ensure occurrence of trial run and obtain clearance from respective authority relevant to electrical works prior to leave any equipment for working

PC25. ensure electrical safety to workers, equipment, materials and fixtures by adopting standard safe working procedures as per organizational norms, at workplace

P12 ensure that the electrical system and equipment is ready for hand over to the customer/client

None

SA3. record and document key details during the related works like actual and expected outcomes, deviations from tolerance levels, etc. SA4. prepare basic status updates for the supervisor in the prescribed format as per the requirements of the client / contractor

P13 identify and explain any variations

None

PC22. ensure occurrence of trial run and obtain clearance from respective authority relevant to electrical works prior to leave any equipment for working

P14 obtain customer/client acceptance of the electrical system and equipment in accordance with organisational procedures

38

Page 40: Transnational Skill Standards Foreman Electrical Works ... · conduit enclosures are in accordance with: P6.1 the electrical system’s ... concealed, exposed, electrical wiring work

TRANSNATIONAL SKILL STANDARDS FOR CONSTRUCTION INDUSTRY

Performance Criteria - Indian NOS

Performance Criteria - UK NOS Gaps w.r.t to Scope and Range in Indian NOS

SA3. record and document key details during the related works like actual and expected outcomes, deviations from tolerance levels, etc.

SA4. prepare basic status updates for the supervisor in the prescribed format as per the requirements of the client / contractor

P15 ensure that all relevant documentation is correctly completed and recorded in the appropriate information systems in accordance with organisational procedures

Knowledge & Understanding Indian NOS

Knowledge & Understanding UK NOS

KB11. principles of electrical theory as applied to electrical circuits and wiring systems

KB12. understand working principle of complex electrical circuits and manufacturer's guidelines/ specifications of repairing

KB15. correct alternative use of electrical parts if required one is unavailable

KB16. detailed concept of 3 phase connections and its distribution at construction sites

K1 the operation, applications, advantages and limitations of different electrical systems

None

KB1. guidelines provided in Indian Standard code of practice applicable for establishing and inspecting electrical wiring works

KB2. statutory guidelines provided by ISI for LV wiring operations

KB3. electrical safety norms

K2 the requirements for the commissioning process

None

39

Page 41: Transnational Skill Standards Foreman Electrical Works ... · conduit enclosures are in accordance with: P6.1 the electrical system’s ... concealed, exposed, electrical wiring work

TRANSNATIONAL SKILL STANDARDS FOR CONSTRUCTION INDUSTRY

Performance Criteria - Indian NOS

Performance Criteria - UK NOS Gaps w.r.t to Scope and Range in Indian NOS

as per standard practice and organizational policy, procedure of providing CPR, first aids, use of regular and job specific PPEs as per requirement

KB5. read and interpret drawings, SLDs related schematics for single and three phase wiring system

KB7. how to estimate required material quantity from electrical drawings

KB10. how to verify authentication of ISI mark provided with electrical materials, fixtures and devices

KB7. how to estimate required material quantity from electrical drawings

K3 the resources required to undertake the commissioning process

None

KB35. quality control systems and site documentation procedures for electrical connections

K4 methods, organisational procedures and systems to: K4.1 record and assess information K4.2 ensure that the results are recorded in the appropriate information systems and passed to the relevant people

None

KB20. operational characteristics of electrical panels and power distribution through the same

KB21. advance troubleshooting in electrical panels, transformers and generators

KB22. working principle and connection of AC single phase and AC three phase motors,

K5 the correct methods and organisational procedures for implementing the commissioning process

None

40

Page 42: Transnational Skill Standards Foreman Electrical Works ... · conduit enclosures are in accordance with: P6.1 the electrical system’s ... concealed, exposed, electrical wiring work

TRANSNATIONAL SKILL STANDARDS FOR CONSTRUCTION INDUSTRY

Performance Criteria - Indian NOS

Performance Criteria - UK NOS Gaps w.r.t to Scope and Range in Indian NOS

submersible pumps and their maintenance

KB23. selection and use of starters such as DOL, Star Delta, Step down Transformer starter

KB24. line and phase voltage, current and power in a 3 phase circuits with balanced and unbalanced load

KB25. principle of different methods of earthing. i.e. Pipe, Plate, etc.

KB26. measurement of Earth resistance by earth tester, testing of Earth Leakage by ELCB and relay, etc.

KB27. use of electrical power tools and their maintenance

KB28. use of measuring and diagnostic tools in electrical circuits

KB29. standards procedure of storing, stacking electrical tools and equipment

K6 conditions that are suitable to implementation

KB13. concept of electrical isolation procedures and their applications in LV electrical works

KB14. area of application & specification of electrical protective devices

KB15. correct alternative use of electrical parts if required one is

K7 how to resolve any problems identified

None

41

Page 43: Transnational Skill Standards Foreman Electrical Works ... · conduit enclosures are in accordance with: P6.1 the electrical system’s ... concealed, exposed, electrical wiring work

TRANSNATIONAL SKILL STANDARDS FOR CONSTRUCTION INDUSTRY

Performance Criteria - Indian NOS

Performance Criteria - UK NOS Gaps w.r.t to Scope and Range in Indian NOS

unavailable

KB16. detailed concept of 3 phase connections and its distribution at construction sites

KB17. detailed concept of AC and DC circuits, their properties and area of application

KB18. concept about safe procedure of troubleshooting in 3 phase connections

KB32. methods and techniques of inspection that are approved by the organization

SA8. speak in at least one language, preferably in one of the local language of the site

SA9. listen and interpret instructions / communication by co-workers

SA10. convey information clearly and concisely to the co-worker

K7 how to ensure that the electrical system and equipment is ready for hand over to the customer/client

None

SA2. provide clear and simple written instructions to the workers at site regarding errors and suggestive corrective action

SA3. record and document key details during the related works like actual and expected outcomes, deviations from tolerance levels, etc.

SA4. prepare basic status updates for the supervisor in the prescribed format as per the requirements of the client /

K8 methods for providing clear and accurate information to relevant people

None

42

Page 44: Transnational Skill Standards Foreman Electrical Works ... · conduit enclosures are in accordance with: P6.1 the electrical system’s ... concealed, exposed, electrical wiring work

TRANSNATIONAL SKILL STANDARDS FOR CONSTRUCTION INDUSTRY

Performance Criteria - Indian NOS

Performance Criteria - UK NOS Gaps w.r.t to Scope and Range in Indian NOS

contractor

KB35. quality control systems and site documentation procedures for electrical connections

SA2. provide clear and simple written instructions to the workers at site regarding errors and suggestive corrective action

SA3. record and document key details during the related works like actual and expected outcomes, deviations from tolerance levels, etc.

SA4. prepare basic status updates for the supervisor in the prescribed format as per the requirements of the client / contractor

K9 the organisational procedures for: K9.1 notifying relevant people of any variations K9.2 obtaining customer/client acceptance of the electrical system and equipment K9.3 the completion of all relevant documentation K9.4 recording of information and/or data in the appropriate information systems

None

General Note: In the Construction SSC NOS, Range statement is not separated out. It is integrated holistically into the PCs and knowledge within the QPs

43

Page 45: Transnational Skill Standards Foreman Electrical Works ... · conduit enclosures are in accordance with: P6.1 the electrical system’s ... concealed, exposed, electrical wiring work

TRANSNATIONAL SKILL STANDARDS FOR CONSTRUCTION INDUSTRY

Section II continued:Compares the competencies in Indian Establish electrical connections during erection of plant and heavy construction machineries (CON/N0612) with the UK NOS Commission electrical systems and equipment (SUMET07).

NOS Mapping Descriptions

Indian QP Title Foreman Electrical Works (Construction)

UK Qualification Level 3 NVQ Diploma in Installing Electrotechnical Systems and Equipment (Buildings, Structures and the Environment)

Indian QP Code CON/Q0604 UK Qualification Code NA

Indian NOS Code CON/N0612 UK NOS Code SUMET07

Indian NOS Establish electrical connections during erection of plant and heavy construction machineries

UK NOS Commission electrical systems and equipment

Scope

This scope covers the following:

Organize resources prior to taking up electrification of heavy machineries

Conduct electrification of heavy plant & machineries such as batching, hot mix plant, tower cranes, diesel generators, transformers

Overview

This standard is for people who commission electrical systems and equipment

The person carrying out this work must be able to comply with the processes and procedures for the commissioning and handing over of an electrical system and equipment in accordance with the current versions of the appropriate industry standards and regulations, the specification; industry recognised working

44

Page 46: Transnational Skill Standards Foreman Electrical Works ... · conduit enclosures are in accordance with: P6.1 the electrical system’s ... concealed, exposed, electrical wiring work

TRANSNATIONAL SKILL STANDARDS FOR CONSTRUCTION INDUSTRY

Scope Overview

practices, the working environment and the natural environment

They must know, understand and apply the correct methods and procedures for the commissioning and handing over the electrical system and equipment including the:

identification and use of the correct instruments

completion of the relevant documentation

recording of relevant data and information

identification and consideration of the customer’s need for electrical systems and equipment configuration

planning of the resources required to carry out the commissioning process

45

Page 47: Transnational Skill Standards Foreman Electrical Works ... · conduit enclosures are in accordance with: P6.1 the electrical system’s ... concealed, exposed, electrical wiring work

TRANSNATIONAL SKILL STANDARDS FOR CONSTRUCTION INDUSTRY

Competency Mapping: Thefollowingtable, the Indian NOS maps with the UK NOS SUMET07 ‘Commission electrical systems and equipment’ UK NOS.

Performance Criteria - Indian NOS

Performance Criteria - UK NOS Gaps w.r.t to Scope and Range in Indian NOS

To be competent, the user/individual on the job must be able to-

You must be able to-

PC2. prepare material requirement from electrical drawing/ diagram if available with machinery as per standard practice

P1 identify the customer/client’s requirements

None

PC7. provide inputs in planning and preparing work schedules required to complete the erection

P2 plan the commissioning process

None

PC3. derive specification of electrical materials to be used in circuits/ electrical systems

PC4. pass material requirement to senior authority after checking with material availability at store

PC5. perform visual inspection of available material in terms of their specification and physical condition

PC6. coordinate with superiors for allocation of desired manpower

P3 determine and obtain the resources required to undertake the process

None

PC19. ensure electrical safety to workers, equipment, materials and fixtures by adopting standard safe working procedures as per organizational norms, at workplace

P4 ensure methods and organisational procedures are implemented correctly

None

46

Page 48: Transnational Skill Standards Foreman Electrical Works ... · conduit enclosures are in accordance with: P6.1 the electrical system’s ... concealed, exposed, electrical wiring work

TRANSNATIONAL SKILL STANDARDS FOR CONSTRUCTION INDUSTRY

Performance Criteria - Indian NOS

Performance Criteria - UK NOS Gaps w.r.t to Scope and Range in Indian NOS

CON/N0611: Monitor regular electrical works (installation, maintenance and repairing) at a construction site

P5 verify that the customer/client’s requirements are met

None

PC15. conduct required electrical tests using appropriate measuring and diagnostic devices to ensure safe and desired working of machineries

PC16. conduct trial run and required tests to ensure safe working of plant and machineries

PC17. check panels, transformers, machineries for factors responsible for electrical distribution system failure like loose connections/ parts, moisture, line disturbance, defective/ inadequate insulations, short circuiting, collision, overloading, dust/dirt or oil accumulation and other possible unsafe acts

PC18. conduct preventive maintenance to electrical panels and electrical machineries parts as and when necessary

P6 resolve any problems identified

None

PC19. ensure electrical safety to workers, equipment, materials and fixtures by adopting standard safe working procedures as per organizational norms, at workplace

P7 specify methods and organisational procedures which conform with customer/client requirements

None

47

Page 49: Transnational Skill Standards Foreman Electrical Works ... · conduit enclosures are in accordance with: P6.1 the electrical system’s ... concealed, exposed, electrical wiring work

TRANSNATIONAL SKILL STANDARDS FOR CONSTRUCTION INDUSTRY

Performance Criteria - Indian NOS

Performance Criteria - UK NOS Gaps w.r.t to Scope and Range in Indian NOS

PC8. check for completion of required preparatory works and availability of safety devices at workplace, prior to starting installation works

PC9. carry out or inspect electrical isolation at the main and secondary power source as per standard procedure and ensure work safety prior to conducting maintenance to electrical units

PC10. inspect electrical panel, transformers to ensure conformance to manufacturer’s specification, compatibility of devices, power ratings of devices to be connected adhering electrical safety norms

P8 confirm that conditions are suitable for commissioning to take place

None

PC11. erect electrical panel as power source if required and get it activated

PC12. conduct and carry out electrical connection works between machinery and power source

PC13. install earthing arrangement and protective devices at appropriate locations as per manufacturer’s guidelines

PC14. ensure safe joining (straight through joint as per applicability), and termination of cables as per standard practice

PC15. conduct required electrical tests using appropriate

P9 complete the commissioning process

None

48

Page 50: Transnational Skill Standards Foreman Electrical Works ... · conduit enclosures are in accordance with: P6.1 the electrical system’s ... concealed, exposed, electrical wiring work

TRANSNATIONAL SKILL STANDARDS FOR CONSTRUCTION INDUSTRY

Performance Criteria - Indian NOS

Performance Criteria - UK NOS Gaps w.r.t to Scope and Range in Indian NOS

measuring and diagnostic devices to ensure safe and desired working of machineries

PC16. conduct trial run and required tests to ensure safe working of plant and machineries

PC17. check panels, transformers, machineries for factors responsible for electrical distribution system failure like loose connections/ parts, moisture, line disturbance, defective/ inadequate insulations, short circuiting, collision, overloading, dust/dirt or oil accumulation and other possible unsafe acts

PC20. prepare field reports, hand sketches etc. as and when necessary for documentation of related works

P10 record and assess information in accordance with organisational procedures

None

PC20. prepare field reports, hand sketches etc. as and when necessary for documentation of related works

P11 ensure that the results are recorded in the appropriate information systems and passed to the relevant people

None

PC16. conduct trial run and required tests to ensure safe working of plant and machineries

PC19. ensure electrical safety to workers, equipment, materials and fixtures by adopting standard safe working procedures as per organizational norms, at workplace

P12 ensure that the electrical system and equipment is ready for hand over to the customer/client

None

49

Page 51: Transnational Skill Standards Foreman Electrical Works ... · conduit enclosures are in accordance with: P6.1 the electrical system’s ... concealed, exposed, electrical wiring work

TRANSNATIONAL SKILL STANDARDS FOR CONSTRUCTION INDUSTRY

Performance Criteria - Indian NOS

Performance Criteria - UK NOS Gaps w.r.t to Scope and Range in Indian NOS

SA3. record and document key details during the related works like actual and expected outcomes, deviations from tolerance levels, etc.

SA4. prepare basic status updates for the supervisor in the prescribed format as per the requirements of the client / contractor

P13 identify and explain any variations

None

CON/N0611: Monitor regular electrical works (installation, maintenance and repairing) at a construction site

P14 obtain customer/client acceptance of the electrical system and equipment in accordance with organisational procedures

SA3. record and document key details during the related works like actual and expected outcomes, deviations from tolerance levels, etc.

SA4. prepare basic status updates for the supervisor in the prescribed format as per the requirements of the client / contractor

P15 ensure that all relevant documentation is correctly completed and recorded in the appropriate information systems in accordance with organisational procedures

50

Page 52: Transnational Skill Standards Foreman Electrical Works ... · conduit enclosures are in accordance with: P6.1 the electrical system’s ... concealed, exposed, electrical wiring work

TRANSNATIONAL SKILL STANDARDS FOR CONSTRUCTION INDUSTRY

Knowledge & Understanding Indian NOS

Knowledge & Understanding UK NOS

Gaps in Indian NOS

KB11. principles of electrical theory as applied to electrical circuits and wiring systems

KB12. complex electrical circuits including schematics, SLDs, etc.

KB13. area of application & specification of electrical protective devices

KB15. detailed concept of 3 phase connections and its distribution at construction sites

KB16. detailed concept of AC and DC circuits, their properties and area of application

KB18. concept of working principle and components of electrical panels and transformers and generators

KB19. operational characteristics of electrical panels and power distribution through the same

K1 the operation, applications, advantages and limitations of different electrical systems

None

KB1. guidelines provided in Indian Standard code of practice applicable for establishing and inspecting electrical wiring works"

KB2. statutory guidelines provided by ISI for LV wiring operations

KB3. electrical safety norms as per standard practice and

K2 the requirements for the commissioning process

None

51

Page 53: Transnational Skill Standards Foreman Electrical Works ... · conduit enclosures are in accordance with: P6.1 the electrical system’s ... concealed, exposed, electrical wiring work

TRANSNATIONAL SKILL STANDARDS FOR CONSTRUCTION INDUSTRY

Knowledge & Understanding Indian NOS

Knowledge & Understanding UK NOS

Gaps in Indian NOS

organizational policy, procedure of providing CPR, first aids, use of regular and job specific PPEs as per requirement

KB5. read and interpret drawings, SLDs related schematics for single and three phase wiring system

KB7. how to estimate required material quantity from electrical drawings

KB8. sequencing of electrical works to be carried out depending upon requirement of construction works

KB9. acceptance criteria of electrical materials, devices, fixtures and protective arrangements

KB10. how to verify authentication of ISI mark provided with electrical materials, fixtures and devices

KB7. how to estimate required material quantity from electrical drawings

K3 the resources required to undertake the commissioning process

None

KB35. quality control systems and site documentation procedures for electrical connections

"K4 methods, organisational procedures and systems to:

K4.1 record and assess information

K4.2 ensure that the results are recorded in the appropriate information systems and passed to the relevant people"

None

52

Page 54: Transnational Skill Standards Foreman Electrical Works ... · conduit enclosures are in accordance with: P6.1 the electrical system’s ... concealed, exposed, electrical wiring work

TRANSNATIONAL SKILL STANDARDS FOR CONSTRUCTION INDUSTRY

Knowledge & Understanding Indian NOS

Knowledge & Understanding UK NOS

Gaps in Indian NOS

KB20. concept of electrical isolation procedures and their applications in LV electrical works

KB21. advance troubleshooting in electrical panels, transformers and generators

KB22. working principle and connection of AC single phase and AC three phase motors, submersible pumps and their maintenance

KB23. selection and use of starters such as DOL, Star Delta, Step down Transformer starter

KB24. line and phase voltage, current and power in a 3 phase circuits with balanced and unbalanced load

KB25. principle of different methods of earthing. i.e. Pipe, Plate, etc.

KB26. measurement of Earth resistance by earth tester, testing of Earth Leakage by ELCB and relay, etc.

KB27. use of electrical power tools and their maintenance

KB28. use of measuring and diagnostic tools in electrical circuits

KB29. standards procedure of storing, stacking electrical tools and equipment

K5 the correct methods and organisational procedures for implementing the commissioning process

None

53

Page 55: Transnational Skill Standards Foreman Electrical Works ... · conduit enclosures are in accordance with: P6.1 the electrical system’s ... concealed, exposed, electrical wiring work

TRANSNATIONAL SKILL STANDARDS FOR CONSTRUCTION INDUSTRY

Knowledge & Understanding Indian NOS

Knowledge & Understanding UK NOS

Gaps in Indian NOS

K6 conditions that are suitable to implementation

KB15. detailed concept of 3 phase connections and its distribution at construction sites

KB16. detailed concept of AC and DC circuits, their properties and area of application

K7 how to resolve any problems identified

None

KB32. methods and techniques of inspection that are approved by the organization

KB33. calibration of equipment and authorization procedures as per the organization policy

KB34. calibration schedule of equipment and machineries

K7 how to ensure that the electrical system and equipment is ready for hand over to the customer/client

None

SA2. provide clear and simple written instructions to the workers at site regarding errors and suggestive corrective action

SA3. record and document key details during the related works like actual and expected outcomes, deviations from tolerance levels, etc.

SA4. prepare basic status updates for the supervisor in the prescribed format as per the requirements of the client / contractor

K8 methods for providing clear and accurate information to relevant people

None

54

Page 56: Transnational Skill Standards Foreman Electrical Works ... · conduit enclosures are in accordance with: P6.1 the electrical system’s ... concealed, exposed, electrical wiring work

TRANSNATIONAL SKILL STANDARDS FOR CONSTRUCTION INDUSTRY

Knowledge & Understanding Indian NOS

Knowledge & Understanding UK NOS

Gaps in Indian NOS

KB35. quality control systems and site documentation procedures for electrical connections

SA2. provide clear and simple written instructions to the workers at site regarding errors and suggestive corrective action

SA3. record and document key details during the related works like actual and expected outcomes, deviations from tolerance levels, etc.

SA4. prepare basic status updates for the supervisor in the prescribed format as per the requirements of the client / contractor

K9 the organisational procedures for:

K9.1 notifying relevant people of any variations

K9.2 obtaining customer/client acceptance of the electrical system and equipment

K9.3 the completion of all relevant documentation

K9.4 recording of information and/or data in the appropriate information systems"

None

General Note: In the Construction SSC NOS, Range statement is not separated out. It is integrated holistically into the PCs and knowledge within the QPs

55

Page 57: Transnational Skill Standards Foreman Electrical Works ... · conduit enclosures are in accordance with: P6.1 the electrical system’s ... concealed, exposed, electrical wiring work

TRANSNATIONAL SKILL STANDARDS FOR CONSTRUCTION INDUSTRY

Section II continued:Compares the competencies in Indian Monitor regular electrical works (installation, maintenance and repairing) at a construction site (CON/N0611) with the UK NOS Identify and rectify faults in electrical systems and equipment (SUMET08).

NOS Mapping Descriptions

Indian QP Title Foreman Electrical Works (Construction)

UK Qualification Level 3 NVQ Diploma in Installing Electrotechnical Systems and Equipment (Buildings, Structures and the Environment)

Indian QP Code CON/Q0604 UK Qualification Code NA

Indian NOS Code CON/N0611 UK NOS Code SUMET08

Indian NOS Monitor regular electrical works (installation, maintenance and repairing) at a construction site

UK NOS Identify and rectify faults in electrical systems and equipment

Scope

This scope covers the following:

Monitor and check wiring / connections for LV works at a construction site.

Conduct installation/ maintenance of construction equipment and machineries.

Overview

This standard is for people who identify and rectify faults in electrical systems and equipment

The person carrying out this work must be able to carry out the processes and procedures for the identification and rectification of faults in accordance with

the current versions of the appropriate industry standards and regulations, the specification, industry recognised working

56

Page 58: Transnational Skill Standards Foreman Electrical Works ... · conduit enclosures are in accordance with: P6.1 the electrical system’s ... concealed, exposed, electrical wiring work

TRANSNATIONAL SKILL STANDARDS FOR CONSTRUCTION INDUSTRY

NOS Mapping Descriptions

Scope

Overview

practices, the working environment and the natural environment.

They must understand and apply the correct methods and procedures when identifying and rectifying faults in electrical systems and equipment, including:

the identification and use of the correct instruments

how to identify and locate faults

how to rectify the faults that are identified, located and diagnosed

the completion of the relevant documentation

the recording of relevant data and information.

57

Page 59: Transnational Skill Standards Foreman Electrical Works ... · conduit enclosures are in accordance with: P6.1 the electrical system’s ... concealed, exposed, electrical wiring work

TRANSNATIONAL SKILL STANDARDS FOR CONSTRUCTION INDUSTRY

Competency Mapping: Thefollowingtable, the Indian NOS maps with the UK NOS SUMET08 ‘Identify and rectify faults in electrical systems and equipment’ UK NOS.

Performance Criteria - Indian NOS

Performance Criteria - UK NOS Gaps w.r.t to Scope and Range in Indian NOS

To be competent, the user/individual on the job must be able to-

You must be able to-

PC3. inspect completed LV electrical arrangements for conformance with specifications, requirements and compliance with applicable statutory and HSE requirements PC5. conduct periodical checks/ tests to insulation, joints, physical condition and termination of wires and cables to ensure safe working of wiring systems PC6. check condition and safety of isolation and ensure safe condition for undertaking maintenance/ repairing in wires, cables, lights and fixtures PC7. diagnose malfunctioning of wiring systems, circuits, temporary panels and its components, using appropriate measuring equipment and hand tools

P1 obtain clear and detailed information about the reported fault(s) and any components which need to be replaced from relevant: P1.1 sources of information P1.2 documentation"

P2 advise the relevant people clearly and accurately about the potential disruption and consequences of carrying out the processes and procedures for the identification and rectification of faults

None

CON/N0612: Establish electrical connections during erection of plant and heavy construction machineries

P3 confirm a programme of work with the relevant people in accordance with organisational procedures

PC6. check condition and safety of isolation and ensure safe condition for undertaking

P4 determine and obtain the resources required, as relevant, to undertake:

58

Page 60: Transnational Skill Standards Foreman Electrical Works ... · conduit enclosures are in accordance with: P6.1 the electrical system’s ... concealed, exposed, electrical wiring work

TRANSNATIONAL SKILL STANDARDS FOR CONSTRUCTION INDUSTRY

Performance Criteria - Indian NOS

Performance Criteria - UK NOS Gaps w.r.t to Scope and Range in Indian NOS

maintenance/ repairing in wires, cables, lights and fixtures PC7. diagnose malfunctioning of wiring systems, circuits, temporary panels and its components, using appropriate measuring equipment and hand tools PC8. carry out troubleshooting and take immediate actions in case of emergency repairing requirements related to short circuit or malfunction in wiring systems, temporary electrical panels or lighting arrangements

P4.1 the identification and location of the fault(s) P4.2 the rectification of the fault(s)"

PC7. diagnose malfunctioning of wiring systems, circuits, temporary panels and its components, using appropriate measuring equipment and hand tools PC9. ensure proper functioning of power tools and diagnostic tools by conducting maintenance as per manufacturer’s guidelines at scheduled intervals

P5 select the instruments to be used

PC12. adhere to schedule of calibration (if any) and conduct calibration periodically to ensure correct working of testing equipment and ensure removal of faulty ones from worksite

P6 confirm that the instruments are fit for purpose and have a current calibration certificate the fault identification and rectification process

PC6. check condition and safety of isolation and ensure safe condition for undertaking maintenance/ repairing in wires, cables, lights and fixtures PC13. check condition and safety of isolation and ensure safe condition for undertaking maintenance/ repairing in construction equipments

P7 identify the correct means of electrical isolation prior to commencing

P8 complete safe-isolation

59

Page 61: Transnational Skill Standards Foreman Electrical Works ... · conduit enclosures are in accordance with: P6.1 the electrical system’s ... concealed, exposed, electrical wiring work

TRANSNATIONAL SKILL STANDARDS FOR CONSTRUCTION INDUSTRY

Performance Criteria - Indian NOS

Performance Criteria - UK NOS Gaps w.r.t to Scope and Range in Indian NOS

as and when required to ensure the safe fault identification and rectification in electrical cables, conductors and/or wiring system and the associated equipment, accessories and components

PC2. check and ensure materials, fixtures and devices being used in repairing or maintenance works are ISI certified PC4. check & ensure that lighting arrangements and its components are in safe condition working properly PC5. conduct periodical checks/ tests to insulation, joints, physical condition and termination of wires and cables to ensure safe working of wiring systems PC8. carry out troubleshooting and take immediate actions in case of emergency repairing requirements related to short circuit or malfunction in wiring systems, temporary electrical panels or lighting arrangements

P9 comply with industry practices and organisational procedures to ensure the co-ordination of site services and the activities of other trades affected by: P9.1 the identification and location of the fault(s) P9.2 the rectification of the fault(s)

PC1. ensure that preventive maintenance of electrical wiring, equipment and fixtures deployed at construction works is being carried out regularly as per requirement PC3. inspect completed LV electrical arrangements for conformance with specifications, requirements and compliance with applicable statutory and HSE requirements PC5. conduct periodical checks/ tests to insulation, joints, physical condition and

P10 identify, locate, diagnose and rectify faults

60

Page 62: Transnational Skill Standards Foreman Electrical Works ... · conduit enclosures are in accordance with: P6.1 the electrical system’s ... concealed, exposed, electrical wiring work

TRANSNATIONAL SKILL STANDARDS FOR CONSTRUCTION INDUSTRY

Performance Criteria - Indian NOS

Performance Criteria - UK NOS Gaps w.r.t to Scope and Range in Indian NOS

termination of wires and cables to ensure safe working of wiring systems PC7. diagnose malfunctioning of wiring systems, circuits, temporary panels and its components, using appropriate measuring equipment and hand tools PC8. carry out troubleshooting and take immediate actions in case of emergency repairing requirements related to short circuit or malfunction in wiring systems, temporary electrical panels or lighting arrangements PC14. conduct installation, electrical maintenance and repair of equipment like electrical distribution panels and its accessories, common construction equipment like bar cutting/bending machine, different types of common pumps used in construction sites, transformers and tower cranes

P11 repair, remove and replace in accordance with industry recognised methods and procedures, as appropriate: P11.1 electrical cables, conductors and/or wiring system P11.2 equipment, accessories and components

PC19. ensure erection of safety signage and barricading, surrounding the faulty or electrically hazardous equipment/ locations to avoid unsafe conditions PC25. ensure electrical safety to workers, equipment, materials and fixtures by adopting standard safe working procedures as per organizational norms, at workplace

P12 ensure, if the fault(s) cannot be corrected immediately, the safety of the relevant: P12.1 electrical cables, conductors and/or wiring system P12.2 equipment, accessories and components

PC2. check and ensure materials, fixtures and devices being used in repairing or maintenance works are ISI

P13 inspect and test, as appropriate and in accordance with industry recognised methods and practices the

61

Page 63: Transnational Skill Standards Foreman Electrical Works ... · conduit enclosures are in accordance with: P6.1 the electrical system’s ... concealed, exposed, electrical wiring work

TRANSNATIONAL SKILL STANDARDS FOR CONSTRUCTION INDUSTRY

Performance Criteria - Indian NOS

Performance Criteria - UK NOS Gaps w.r.t to Scope and Range in Indian NOS

certified PC3. inspect completed LV electrical arrangements for conformance with specifications, requirements and compliance with applicable statutory and HSE requirements PC7. diagnose malfunctioning of wiring systems, circuits, temporary panels and its components, using appropriate measuring equipment and hand tools PC15. ensure proper termination of cables as per applicability at power source and equipment PC21. ensure proper earthing of electrical circuits as per relevant specifications or manufacturer’s guidelines

repaired and/or replaced: P13.1 electrical cables, conductors and/or wiring system P13.2 equipment, accessories and components

PC22. ensure occurrence of trial run and obtain clearance from respective authority relevant to electrical works prior to leave any equipment for working PC24. prepare data sheet, report and note readings as per applicability according to organizational procedures

P14 provide clear and accurate information to relevant people about the electrical system and equipment in terms of: P14.1 hand over to the customer/client P14.2 any variations to the original system and/or its equipment P14.3 customer/client acceptance of the completed work in accordance with organisational procedures P14.4 relevant documentation being completed and recorded in the appropriate information systems in accordance with organisational procedures

62

Page 64: Transnational Skill Standards Foreman Electrical Works ... · conduit enclosures are in accordance with: P6.1 the electrical system’s ... concealed, exposed, electrical wiring work

TRANSNATIONAL SKILL STANDARDS FOR CONSTRUCTION INDUSTRY

Knowledge & Understanding Indian NOS

Knowledge & Understanding UK NOS

Gaps in Indian NOS

KB11. principles of electrical theory as applied to electrical circuits and wiring systems

KB12. understand working principle of complex electrical circuits and manufacturer's guidelines/ specifications of repairing

KB15. correct alternative use of electrical parts if required one is unavailable

KB16. detailed concept of 3 phase connections and its distribution at construction sites

K1 the operation, applications, advantages and limitations of different electrical systems

None

KB12. understand working principle of complex electrical circuits and manufacturer's guidelines/ specifications of repairing

KB28. use of measuring and diagnostic tools in electrical circuits

KB32. methods and techniques of inspection that are approved by the organization

"K2 how to obtain clear and detailed information about the reported fault(s) and any components which need to be replaced from:

K2.1 relevant sources of information

K2.2 relevant documentation"

None

SB2. decide on areas where AC or DC current may be required

SB7. conduct required tests to ensure safe working of plant and machineries

K3 the organisational procedures and industry practices when carrying out the processes for the identification and rectification of faults for:

K3.1 advising the relevant people about the potential disruption and consequences

K3.2 confirming a programme of

None

63

Page 65: Transnational Skill Standards Foreman Electrical Works ... · conduit enclosures are in accordance with: P6.1 the electrical system’s ... concealed, exposed, electrical wiring work

TRANSNATIONAL SKILL STANDARDS FOR CONSTRUCTION INDUSTRY

Knowledge & Understanding Indian NOS

Knowledge & Understanding UK NOS

Gaps in Indian NOS

work with the relevant people

K3.3 ensuring the coordination of site services and the activities of other trades affected"

SB10. ensure use of electrical materials, protective devices and fixtures conform with required specification and certified by ISI

SB13. assess quantity and quality of materials for day work

SB22. access, analyse and ensure nature of preventive maintenance of electrical wiring, equipment, and fixtures

SB23. evaluate the complexity of the task and seek assistance and support wherever required

"K4 how to determine and obtain the resources required, as relevant, to undertake:

K4.1 the identification and location of the fault(s)

K4.2 the rectification of the fault(s)"

KB18. concept about safe procedure of troubleshooting in 3 phase connections

KB23. selection and use of starters such as DOL, Star Delta, Step down Transformer starter

KB26. measurement of Earth resistance by earth tester, testing of Earth Leakage by ELCB and relay, etc.

KB27. use of electrical power tools and their maintenance

KB28. use of measuring and diagnostic tools in electrical circuits

K5 how to select the instruments to be used

None

64

Page 66: Transnational Skill Standards Foreman Electrical Works ... · conduit enclosures are in accordance with: P6.1 the electrical system’s ... concealed, exposed, electrical wiring work

TRANSNATIONAL SKILL STANDARDS FOR CONSTRUCTION INDUSTRY

Knowledge & Understanding Indian NOS

Knowledge & Understanding UK NOS

Gaps in Indian NOS

KB33. calibration of equipment and authorization procedures as per the organization policy

KB34. calibration schedule of equipment and machineries

K6 how to confirm that the instruments are fit for purpose and have a current calibration certificate

None

KB13. concept of electrical isolation procedures and their applications in LV electrical works

K7 the correct procedures for safe-isolation

None

KB18. concept about safe procedure of troubleshooting in 3 phase connections

KB21. advance troubleshooting in electrical panels, transformers and generators

KB24. line and phase voltage, current and power in a 3 phase circuits with balanced and unbalanced load

KB27. use of electrical power tools and their maintenance

KB28. use of measuring and diagnostic tools in electrical circuits

K8 the techniques to identify, locate, diagnose and rectify faults

None

"B. Technical Knowledge

KB1. guidelines provided in Indian Standard code of practice applicable for establishing and inspecting electrical wiring works"

KB2. statutory guidelines provided by ISI for LV wiring operations

KB3. electrical safety norms

"K9 how to repair, remove and replace in accordance with industry practices, as appropriate:

K9.1 electrical cables, conductors and/or wiring system

K9.2 equipment, accessories and components"

65

Page 67: Transnational Skill Standards Foreman Electrical Works ... · conduit enclosures are in accordance with: P6.1 the electrical system’s ... concealed, exposed, electrical wiring work

TRANSNATIONAL SKILL STANDARDS FOR CONSTRUCTION INDUSTRY

Knowledge & Understanding Indian NOS

Knowledge & Understanding UK NOS

Gaps in Indian NOS

as per standard practice and organizational policy, procedure of providing CPR, first aids, use of regular and job specific PPEs as per requirement

KB5. read and interpret drawings, SLDs related schematics for single and three phase wiring system

KB9. acceptance criteria of electrical materials, devices, fixtures and protective arrangements

KB14. area of application & specification of electrical protective devices

KB15. correct alternative use of electrical parts if required one is unavailable

SB24. bring to the notice of the superiors any requirement of the requisite material and resources

SB25. bring to the notice of the superiors violation of any safety norms which may lead to accidents

"K10 how to ensure, if the fault(s) cannot be corrected immediately, the safety of the relevant:

K10.1 electrical cables, conductors and/or wiring system

K10.2 equipment, accessories and components"

KB1. guidelines provided in Indian Standard code of practice applicable for establishing and inspecting electrical wiring works"

KB2. statutory guidelines

K11 the methods and processes to inspect and test, as appropriate and in accordance with industry practices, the repaired and/or replaced: K11.11 electrical cables, conductors and/or wiring

66

Page 68: Transnational Skill Standards Foreman Electrical Works ... · conduit enclosures are in accordance with: P6.1 the electrical system’s ... concealed, exposed, electrical wiring work

TRANSNATIONAL SKILL STANDARDS FOR CONSTRUCTION INDUSTRY

Knowledge & Understanding Indian NOS

Knowledge & Understanding UK NOS

Gaps in Indian NOS

provided by ISI for LV wiring operations

KB3. electrical safety norms as per standard practice and organizational policy, procedure of providing CPR, first aids, use of regular and job specific PPEs as per requirement

KB5. read and interpret drawings, SLDs related schematics for single and three phase wiring system

KB9. acceptance criteria of electrical materials, devices, fixtures and protective arrangements

KB14. area of application & specification of electrical protective devices

KB15. correct alternative use of electrical parts if required one is unavailable

KB25. principle of different methods of earthing. i.e. Pipe, Plate, etc.

system K11.12 equipment, accessories and components

KB35. quality control systems and site documentation procedures for electrical connections

SA2. provide clear and simple written instructions to the workers at site regarding errors and suggestive corrective action

K12 how to provide clear and accurate information to relevant people about the electrical system and equipment in terms of: K12.1 hand over to the customer/client K12.2 any variations to the original system and/or its

67

Page 69: Transnational Skill Standards Foreman Electrical Works ... · conduit enclosures are in accordance with: P6.1 the electrical system’s ... concealed, exposed, electrical wiring work

TRANSNATIONAL SKILL STANDARDS FOR CONSTRUCTION INDUSTRY

Knowledge & Understanding Indian NOS

Knowledge & Understanding UK NOS

Gaps in Indian NOS

SA3. record and document key details during the related works like actual and expected outcomes, deviations from tolerance levels, etc.

equipment K12.3 customer/client acceptance of the completed work in accordance with organisational procedures K12.4 relevant documentation being completed and recorded in the appropriate information systems in accordance with organisational procedures

General Note: In the Construction SSC NOS, Range statement is not separated out. It is integrated holistically into the PCs and knowledge within the QPs

68

Page 70: Transnational Skill Standards Foreman Electrical Works ... · conduit enclosures are in accordance with: P6.1 the electrical system’s ... concealed, exposed, electrical wiring work

TRANSNATIONAL SKILL STANDARDS FOR CONSTRUCTION INDUSTRY

Section II continued:Compares the competencies in Indian NOS Conduct permanent wiring, maintenance work in buildings (CON/N0613) with the UK NOS Maintain electrical systems and equipment(SUMET09).

NOS Mapping Descriptions

Indian QP Title Foreman Electrical Works (Construction)

UK Qualification Level 3 NVQ Diploma in Installing Electrotechnical Systems and Equipment (Buildings, Structures and the Environment)

Indian QP Code CON/Q0604 UK Qualification Code NA

Indian NOS Code CON/N0613 UK NOS Code SUMET09

Indian NOS Conduct permanent wiring, maintenance work in buildings

UK NOS Maintain electrical systems and equipment

Scope

This scope covers the following:

• Calculate material requirement from drawing specifications or as per customer requirement following standard practice

• Conduct installation/ maintenance of wiring, electrical fixtures, and equipment as per requirement /specification ensuring safety of equipment

Overview

This standard is for

people who maintain

electrical systems

and equipment

The person carrying

out this work must be

able to carry out

maintenance

activities in

accordance with

proceduresandthe

current versions of

the appropriate

industry standards

and regulations, the

specification; industry

recognised working

practices, the working

69

Page 71: Transnational Skill Standards Foreman Electrical Works ... · conduit enclosures are in accordance with: P6.1 the electrical system’s ... concealed, exposed, electrical wiring work

TRANSNATIONAL SKILL STANDARDS FOR CONSTRUCTION INDUSTRY

Scope

Overview

environment and the

natural environment.

They must

understand and apply

the correct methods

and procedures for

the maintenance of

electrical systems

and equipment,

including:

routine and non-

routine

maintenance

the identification

and use of the

correct

instruments

how to identify

and locate faults

how to rectify the

faults that are

identified, located

and diagnosed

the completion of

the relevant

documentation

the recording of

relevant data and

information

70

Page 72: Transnational Skill Standards Foreman Electrical Works ... · conduit enclosures are in accordance with: P6.1 the electrical system’s ... concealed, exposed, electrical wiring work

TRANSNATIONAL SKILL STANDARDS FOR CONSTRUCTION INDUSTRY

Competency Mapping: Thefollowingtable, the Indian NOS maps with the UK NOS SUMET08 ‘Identify and rectify faults in electrical systems and equipment’ UK NOS.

Performance Criteria - Indian NOS

Performance Criteria - UK NOS Gaps w.r.t to Scope and Range in Indian NOS

To be competent, the user/individual on the job must be able to-

You must be able to-

PC1. go through electrical drawing, guidelines to ascertain electrical requirement of the work to be undertaken

PC2. calculate electrical material requirement considering customer requirement and preferences or standard requirements of home electrical systems as per standard practice if drawing / diagram is not available

PC3. derive list of electrical equipment and fixtures to be used in circuits/ electrical systems from drawing considering power rating of the equipment

P1 obtain clear and detailed information about the electrical system and equipment to be maintained from relevant: P1.1 sources of information P1.2 documentation

None

PC3. derive list of electrical equipment and fixtures to be used in circuits/ electrical systems from drawing considering power rating of the equipment

PC4. calculate requirement of wiring materials as per drawing customer requirement and standard practice

PC5. prepare and document as- built drawing of temporary and permanent – embedded electrical lines/ connection in order to be available in the final

P2 confirm a programme of work with the relevant people in accordance with organisational procedures

None

71

Page 73: Transnational Skill Standards Foreman Electrical Works ... · conduit enclosures are in accordance with: P6.1 the electrical system’s ... concealed, exposed, electrical wiring work

TRANSNATIONAL SKILL STANDARDS FOR CONSTRUCTION INDUSTRY

Performance Criteria - Indian NOS

Performance Criteria - UK NOS Gaps w.r.t to Scope and Range in Indian NOS

as built drawing

PC6. monitor and ensure wall chasing work as per standard procedure prior to laying conduit

PC14. suggest suitable methods of maintenance of a part of electrical circuit and conduct/ carry out maintenance work as per requirement adhering specification of parts and general electrical guidelines

PC6. monitor and ensure wall chasing work as per standard procedure prior to laying conduit

PC14. suggest suitable methods of maintenance of a part of electrical circuit and conduct/ carry out maintenance work as per requirement adhering specification of parts and general electrical guidelines

P3 advise the relevant people clearly and accurately about the potential disruption and consequences of carrying out the maintenance activity

None

PC2. calculate electrical material requirement considering customer requirement and preferences or standard requirements of home electrical systems as per standard practice if drawing / diagram is not available

PC3. derive list of electrical equipment and fixtures to be used in circuits/ electrical systems from drawing considering power rating of the equipment

P4 determine and obtain the resources required, as relevant, to undertake the maintenance activity

None

72

Page 74: Transnational Skill Standards Foreman Electrical Works ... · conduit enclosures are in accordance with: P6.1 the electrical system’s ... concealed, exposed, electrical wiring work

TRANSNATIONAL SKILL STANDARDS FOR CONSTRUCTION INDUSTRY

Performance Criteria - Indian NOS

Performance Criteria - UK NOS Gaps w.r.t to Scope and Range in Indian NOS

PC4. calculate requirement of wiring materials as per drawing customer requirement and standard practice

PC3. derive list of electrical equipment and fixtures to be used in circuits/ electrical systems from drawing considering power rating of the equipment

PC4. calculate requirement of wiring materials as per drawing customer requirement and standard practice

P5 select the instruments to be used

None

CON/N0611: Monitor regular electrical works (installation, maintenance and repairing) at a construction site

P6 confirm that the instruments are fit for purpose and have a current calibration certificate

None

PC10. carry out or inspect electrical isolation at the main and secondary power source as per standard procedure and ensure work safety prior to conducting maintenance to electrical wiring or pre-installed units

P7 identify the correct means of electrical isolation prior to commencing the maintenance activity

None

PC10. carry out or inspect electrical isolation at the main and secondary power source as per standard procedure and ensure work safety prior to conducting maintenance to electrical wiring or pre-installed units

P8 complete safe-isolation as and when required to ensure the safe maintenance of, as appropriate, electrical cables, conductors and/or wiring system and the associated equipment, accessories and components

None

CON/N0611: Monitor regular electrical works (installation, maintenance and repairing) at a

P9 comply with industry practices and organisational procedures to ensure the co-ordination of site services and

None

73

Page 75: Transnational Skill Standards Foreman Electrical Works ... · conduit enclosures are in accordance with: P6.1 the electrical system’s ... concealed, exposed, electrical wiring work

TRANSNATIONAL SKILL STANDARDS FOR CONSTRUCTION INDUSTRY

Performance Criteria - Indian NOS

Performance Criteria - UK NOS Gaps w.r.t to Scope and Range in Indian NOS

construction site the activities of other trades affected by the maintenance activity

PC16. carry out basic maintenance of household equipment like water pump, motor etc.

P10 carry out maintenance activity

None

PC15. change parts, fixture, wirings as per requirement

P11 repair, remove, replace and/or maintain in accordance with industry practices, as appropriate: P11.1 electrical cables, conductors and/or wiring systems P11.2 equipment, accessories and components

None

CON/N0611: Monitor regular electrical works (installation, maintenance and repairing) at a construction site

P12 ensure, if the maintenance activity cannot be completed immediately, the safety of the relevant: P12.1 electrical cables, conductors and/or wiring systems P12.2 electrical cables, conductors and/or wiring systems equipment, accessories and components

None

PC16. carry out basic maintenance of household equipment like water pump, motor etc.

P13 complete the specified maintenance activity in accordance with industry recognised methods and practices

None

PC10. carry out or inspect electrical isolation at the main and secondary power source as per standard procedure and ensure work safety prior to

P14 inspect and test, as appropriate and in accordance with industry recognised methods and practices the repaired, replaced and/or

None

74

Page 76: Transnational Skill Standards Foreman Electrical Works ... · conduit enclosures are in accordance with: P6.1 the electrical system’s ... concealed, exposed, electrical wiring work

TRANSNATIONAL SKILL STANDARDS FOR CONSTRUCTION INDUSTRY

Performance Criteria - Indian NOS

Performance Criteria - UK NOS Gaps w.r.t to Scope and Range in Indian NOS

conducting maintenance to electrical wiring or pre-installed units

PC12. conduct/ carry out earthing of installed electrical circuit as per standard method and using standard earthing components

PC13. conduct required tests/ inspections as and when necessary to ensure safe working of electrical circuits or to determine any fault in the circuit

maintained: P14.1 electrical cables, conductors and/or wiring system P14.2 equipment, accessories and components

CON/N0611: Monitor regular electrical works (installation, maintenance and repairing) at a construction site

P15 provide clear and accurate information to relevant people about the electrical system and equipment in terms of: 15.1 hand over to the customer/client P15.2 any variations to the original system and/or its equipment P15.3 customer/client acceptance of the completed work in accordance with organisational procedures P15.4 relevant documentation being completed and recorded in the appropriate information systems in accordance with organisational procedures

None

75

Page 77: Transnational Skill Standards Foreman Electrical Works ... · conduit enclosures are in accordance with: P6.1 the electrical system’s ... concealed, exposed, electrical wiring work

TRANSNATIONAL SKILL STANDARDS FOR CONSTRUCTION INDUSTRY

Knowledge & Understanding Indian NOS

Knowledge & Understanding UK NOS

Gaps in Indian NOS

KB10. principles of electrical theory as applied to electrical circuits and wiring systems

KB11. properties of different components used in electrical earthing work

KB18. concept of electrical isolation procedures and their applications in LV electrical works

K1 the operation, applications, advantages and limitations of different electrical systems

None

"B. Technical Knowledge

KB1. guidelines provided in Indian Standard code of practice applicable for establishing and inspecting electrical wiring works"

KB2. statutory guidelines provided by ISI for LV wiring operations

KB5. read and interpret drawings, SLDs related schematics for single and three phase wiring system

KB6. how to develop electrical drawings using appropriate symbols and abbreviations as per standard practice

"K2 how to obtain clear and detailed information about the electrical system and equipment to be maintained from relevant:

K2.1 sources of information

K2.2 documentation"

None

KB27. methods and techniques of inspection that are approved by the organization

"K3 the organisational procedures and industry practices when carrying out the maintenance activity for:

K3.1 advising the relevant people about the potential disruption and consequences

None

76

Page 78: Transnational Skill Standards Foreman Electrical Works ... · conduit enclosures are in accordance with: P6.1 the electrical system’s ... concealed, exposed, electrical wiring work

TRANSNATIONAL SKILL STANDARDS FOR CONSTRUCTION INDUSTRY

Knowledge & Understanding Indian NOS

Knowledge & Understanding UK NOS

Gaps in Indian NOS

K3.2 confirming a programme of work with the relevant people

K3.3 ensuring the coordination of site services and the activities of other trades affected"

KB7. how to estimate required material quantity from electrical drawings

K4 how to determine and obtain the resources required, as relevant, to undertake the maintenance activity

None

KB8. acceptance criteria of electrical materials, devices, fixtures and protective arrangements

KB9. how to verify authentication of ISI mark provided with electrical materials, fixtures and devices

KB12. acceptance criteria of material to be used during performing earthing work

K5 how to select the instruments to be used

None

KB28. calibration of equipment and authorization procedures as per the organization policy

KB29. calibration schedule of equipment and machineries

K6 how to confirm that the instruments are fit for purpose and have a current calibration certificate

None

KB18. concept of electrical isolation procedures and their applications in LV electrical works

K7 the correct procedures for safe-isolation

None

KB21. basic maintenance of common household equipment

KB22. use of electrical power tools and their maintenance

KB23. use of measuring and

K8 the techniques for the maintenance of electrical systems and equipment including how to identify, locate, diagnose and rectify

None

77

Page 79: Transnational Skill Standards Foreman Electrical Works ... · conduit enclosures are in accordance with: P6.1 the electrical system’s ... concealed, exposed, electrical wiring work

TRANSNATIONAL SKILL STANDARDS FOR CONSTRUCTION INDUSTRY

Knowledge & Understanding Indian NOS

Knowledge & Understanding UK NOS

Gaps in Indian NOS

diagnostic tools in electrical circuits

faults

KB17. standard practice of joining, termination and color coding of cables and wires

KB19. use of circuit breakers and its replacement

"K9 how to repair, remove, replace and maintain, in accordance with industry practices, as appropriate:

K9.1 electrical cables, conductors and/or wiring system

K9.2 equipment, accessories and components

None

SB17. bring to the notice of the superiors any requirement of the requisite material and resources

SB18. bring to the notice of the superiors violation of any safety norms which may lead to accidents

"K10 how to ensure, if the maintenance activity cannot be completed immediately, the safety of the relevant:

K10.1 electrical cables, conductors and/or wiring system

K10.2 equipment, accessories and components"

None

KB21. basic maintenance of common household equipment

KB22. use of electrical power tools and their maintenance

KB23. use of measuring and diagnostic tools in electrical circuits

KB27. methods and techniques of inspection that are approved by the organization

"K11 the methods and processes to inspect and test, as appropriate and in accordance with industry practices the repaired, replaced and/or maintained:

K11.1 electrical cables, conductors and/or wiring system

K11.2 equipment, accessories and components"

None

SB16. evaluate the complexity of the task and seek assistance and support wherever

"K12 how to provide clear and accurate information to relevant people about the electrical system and equipment in terms

None

78

Page 80: Transnational Skill Standards Foreman Electrical Works ... · conduit enclosures are in accordance with: P6.1 the electrical system’s ... concealed, exposed, electrical wiring work

TRANSNATIONAL SKILL STANDARDS FOR CONSTRUCTION INDUSTRY

Knowledge & Understanding Indian NOS

Knowledge & Understanding UK NOS

Gaps in Indian NOS

required

SB17. bring to the notice of the superiors any requirement of the requisite material and resources

of:

K12.1 hand over to the customer/client

K12.2 any variations to the original system and/or its equipment

K12.3 customer/client acceptance of the completed work in accordance with organisational procedures

K12.4 relevant documentation being completed and recorded in the appropriate information systems in accordance with organisational procedures"

General Note: In the Construction SSC NOS, Range statement is not separated out. It is integrated holistically into the PCs and knowledge within the QPs

79

Page 81: Transnational Skill Standards Foreman Electrical Works ... · conduit enclosures are in accordance with: P6.1 the electrical system’s ... concealed, exposed, electrical wiring work

TRANSNATIONAL SKILL STANDARDS FOR CONSTRUCTION INDUSTRY

Section II:Compares the competencies in Indian NOS Manage workplace for safe and healthy work environment (CON/Q9002) with those of UK NOS Apply health and safety and environmental legislation in the building services engineering sector (SUMBSE01).

NOS Mapping Descriptions

Indian QP Title Foreman Electrical Works (Construction)

UK Qualification Level 3 NVQ Diploma in Installing Electrotechnical Systems and Equipment (Buildings, Structures and the Environment)

Indian QP Code CON/Q0604 UK Qualification Code NA

Indian NOS Code CON/N9002 UK NOS Code SUMBSE01

Indian NOS Manage workplace for safe and healthy work environment

UK NOS Apply health and safety and environmental legislation in the building services engineering sector

Scope

The scope covers the following:

• Ensure healthy and safe working environment for subordinates.

• Ensure effective implementation of health, safety and environment policies and procedures

• Identify and respond to risks / fire and emergencies associated with the work practices, workplace and ensure related organizational &

Overview

This standard is about establishing and maintaining working practices and procedures across a specified range of building services engineering sector installation and/or maintenance activities that give consideration to health and safety, the natural environment and the working environment. This would include identifying hazards and risks, applying appropriate procedures and working practices

80

Page 82: Transnational Skill Standards Foreman Electrical Works ... · conduit enclosures are in accordance with: P6.1 the electrical system’s ... concealed, exposed, electrical wiring work

TRANSNATIONAL SKILL STANDARDS FOR CONSTRUCTION INDUSTRY

Scope statuary requirement as followed

Overview

to protect yourself and others.

This work may be carried out in the context of plumbing, electrotechnical, refrigeration and air conditioning, heating and ventilation, or consumer electrical and electronic products.

The person carrying out this work must possess the skills and knowledge to be able to use building services engineering sector equipment, components, materials and substances effectively, efficiently, in accordance with the specification giving consideration to the natural environment and the working environment in terms of waste materials and if appropriate water usage.

81

Page 83: Transnational Skill Standards Foreman Electrical Works ... · conduit enclosures are in accordance with: P6.1 the electrical system’s ... concealed, exposed, electrical wiring work

TRANSNATIONAL SKILL STANDARDS FOR CONSTRUCTION INDUSTRY

Competency Mapping: Thefollowingtable, the Indian NOS maps with the UK NOS SUMBSE01 ‘Apply health and safety and environmental legislation in the building services engineering sector’ UK NOS.

Performance Criteria - Indian NOS

Performance Criteria - UK NOS Gaps w.r.t to Scope and Range in Indian NOS

To be competent, the user/individual on the job must be able to-

You must be able to-

PC1. ensure proper housekeeping at workplace

P1 identify the appropriate industry standards and regulations

None

PC2. implement safe handling , stacking methods at workplace / store

P2 apply relevant organisational procedures

None

PC3. ensure that health and safety plan is followed by all subordinates

P3 identify hazards and risks None

PC4. identify any hazard in workplace and notify them to appropriate authority

P4 complete documentation in accordance with the requirements of the organisational procedures

None

PC5. ensure that all safety and protection installation are correctly placed & adequate

P5 review the organisational procedures to ensure that they will not cause potential hazards and risks

None

PC6. ensure safe access is available at work place for movement of workers & materials

P6 implement organisational procedures, suppliers’ and manufacturers’ instructions appropriate to the safe use, maintenance, handling, transport and storage of: P6.1 tools, plant and access equipment P6.2 equipment and components P6.3 materials and substances

None

PC7. ensure safe use of tools and tackles by the workmen as per applicability

P7 report to the relevant people in accordance with organisational procedures:

None

82

Page 84: Transnational Skill Standards Foreman Electrical Works ... · conduit enclosures are in accordance with: P6.1 the electrical system’s ... concealed, exposed, electrical wiring work

TRANSNATIONAL SKILL STANDARDS FOR CONSTRUCTION INDUSTRY

Performance Criteria - Indian NOS

Performance Criteria - UK NOS Gaps w.r.t to Scope and Range in Indian NOS

P7.1 potential hazards and risks P7.2 potentially harmful materials and substances

PC8. ensure appropriate use of following Personal Protective Equipment (PPE) as per applicability: Head Protection (Helmets) Ear Protection Fall Protection Foot Protection Face and Eye Protection, Hand and Body Protection Respiratory Protection

P8 ensure that the conduct of people when undertaking the installation and/or maintenance activity does not cause potential hazards and risks

None

PC9. maintain entrances & exit from confined spaces , excavated pits and other location in concurrence with safety parameters or instruction form safety personals

P9 comply with organisational procedures in the event of: P9.1 injuries to self and/or others P9.2 emergencies P9.3 evacuation procedures

None

PC10. ensure organizational policies and procedures are followed for health, safety and welfare, in relation to: methods of receiving or sourcing information dealing with accidents and emergencies associated with the work and environment reporting stooping work evacuation fire risks and safe exit procedures

P10 implement organisational procedures for the safe transport and/or disposal of waste material, substances and liquids in accordance with suppliers’ and manufacturers’ instructions

None

PC11. follow procedures for accident recording and reporting as per organizational and statuary requirements

None

83

Page 85: Transnational Skill Standards Foreman Electrical Works ... · conduit enclosures are in accordance with: P6.1 the electrical system’s ... concealed, exposed, electrical wiring work

TRANSNATIONAL SKILL STANDARDS FOR CONSTRUCTION INDUSTRY

Performance Criteria - Indian NOS

Performance Criteria - UK NOS Gaps w.r.t to Scope and Range in Indian NOS

PC12. ensure effective adherence to response to emergency procedures / protocols

None

PC13. report any case of emergency / risks to the concern people at the construction site

None

PC14. report any perceived risk hazards to the superiors / concerned EHS

PC15. demonstrate the use of fire protection equipments for different type of fire hazard

PC16. implement control measures to reduce risk & meet legal requirement as per organizational policies

Knowledge & Understanding Indian NOS

Knowledge & Understanding UK NOS

Gaps in Indian NOS

A. Organizational Context KA1. the policies, procedures and protocol set up by the EHS Department With respect to Health, Safety and Environment at the respective construction site

K1 appropriate industry standards and regulations

None

KA2. reporting procedures in cases of breaches or hazards in site safety, accidents or emergency situations

K2 your responsibilities in accordance with organisational procedures

None

KA3. safe working practices for tools, tackles and equipment

K3 the application, advantages and limitations of different working practices

None

84

Page 86: Transnational Skill Standards Foreman Electrical Works ... · conduit enclosures are in accordance with: P6.1 the electrical system’s ... concealed, exposed, electrical wiring work

TRANSNATIONAL SKILL STANDARDS FOR CONSTRUCTION INDUSTRY

Knowledge & Understanding Indian NOS

Knowledge & Understanding UK NOS

Gaps in Indian NOS

KA4. workplace policies and health and safety requirements for dealing with potential risks as defined by the EHS department

K4 how to recognise materials and substances that can potentially be harmful

None

B. Technical Knowledge KB1. how to respond to accidents & emergencies

K5 the documentation associated with the organisational procedures’ requirements

None

KB2. the appropriate personal protective equipment to be used based on various working conditions

K6 the organisational procedures for dealing with the presence of harmful materials and substances

None

KB3. how to use necessary material ,tools, tackles and equipment in a safe and appropriate manner as specified by site EHS for each level and respective workman gang

K7 where and how to locate relevant health and safety information needed to complete the installation and/or maintenance activity in accordance with organisational procedures

None

KB4. how to monitor working in workplace keeping safety & health in mind

K8 what constitutes a hazard or risk

None

K9 the methods for handling of hazardous materials and substances in accordance with organisational procedures

None

K10 the organisational procedures, suppliers’ and manufacturers’ instructions for safe use, maintenance, handling, transport and storage of: K10.1 tools, plant and access equipment K10.2 equipment and components

None

85

Page 87: Transnational Skill Standards Foreman Electrical Works ... · conduit enclosures are in accordance with: P6.1 the electrical system’s ... concealed, exposed, electrical wiring work

TRANSNATIONAL SKILL STANDARDS FOR CONSTRUCTION INDUSTRY

Knowledge & Understanding Indian NOS

Knowledge & Understanding UK NOS

Gaps in Indian NOS

K10.3 materials and substances

K11 the warning signs for hazardous materials and substances

None

K12 the methods for the safe transport and/or disposal of waste material, substances and liquids in accordance with: K12.1 organisational procedures K12.2 suppliers’ and manufacturers’ instructions

None

K13 the organisational procedures relevant to reporting issues relating to: K13.1 health and safety K13.2 harmful substances and material K13.3 emergencies on site

None

General Note: In the Construction SSC NOS, Range statement is not separated out. It is integrated holistically into the PCs and knowledge within the QPs

86

Page 88: Transnational Skill Standards Foreman Electrical Works ... · conduit enclosures are in accordance with: P6.1 the electrical system’s ... concealed, exposed, electrical wiring work

TRANSNATIONAL SKILL STANDARDS FOR CONSTRUCTION INDUSTRY

Section II continued:Compares the competencies in Indian NOS Work effectively in a team to deliver desired results at the workplace(CON/N8001) with the UK NOS Establish and maintain relationships in the building services engineering sector(SUMBSE02).

NOS Mapping Descriptions

Indian QP Title Foreman Electrical Works (Construction)

UK Qualification Level 3 NVQ Diploma in Installing Electrotechnical Systems and Equipment (Buildings, Structures and the Environment)

Indian QP Code CON/Q0604 UK Qualification Code NA

Indian NOS Code CON/N8001 UK NOS Code SUMBSE02

Indian NOS Work effectively in a team to deliver desired results at the workplace

UK NOS Establish and maintain relationships in the building services engineering sector

Scope

The scope covers the following: Interact and

communicate effectively with co-workers, superiors and sub-ordinates across different teams

Support co-workers,

superiors and sub-ordinates within the team and across interfacing teams to ensure effective execution of assigned task

Overview

This standard is for people who are required to develop and maintain positive relationships with clients and customers associated with installation and/or maintenance activities in the building services engineering sector in accordance with appropriate industry standards and regulations, the specification, working practices, the working environment and the natural environment

This standard is

87

Page 89: Transnational Skill Standards Foreman Electrical Works ... · conduit enclosures are in accordance with: P6.1 the electrical system’s ... concealed, exposed, electrical wiring work

TRANSNATIONAL SKILL STANDARDS FOR CONSTRUCTION INDUSTRY

Scope

Overview

appropriate to the air conditioning, electrotechnical, consumer electrical and electronic products, heating & ventilating, plumbing, and refrigeration, industries.

The person undertaking the responsibility for establishing and maintaining client and customer relationships must be able to:

• present and provide accurate technical and functional information, advice and guidance

• liaise with clients and customers with respect to their needs and expectations

• respond as appropriate to client and customer needs and expectations

Please note that industry specific terminology is identified by italic text and its explanation and/or meaning can be found in the glossary of this standard.

Competency Mapping: Thefollowingtable, the Indian NOS maps with the UK NOS SUMBSE02 ‘Establish and maintain relationships in the building services engineering sector’ UK NOS.

88

Page 90: Transnational Skill Standards Foreman Electrical Works ... · conduit enclosures are in accordance with: P6.1 the electrical system’s ... concealed, exposed, electrical wiring work

TRANSNATIONAL SKILL STANDARDS FOR CONSTRUCTION INDUSTRY

Performance Criteria - Indian NOS

Performance Criteria - UK NOS Gaps w.r.t to Scope and Range in Indian NOS

To be competent, the user/individual on the job must be able to-

You must be able to-

PC1. pass on work related information/ requirement clearly to the team members

P1 identify the clients and customers that need to be supplied with technical and functional information

None

PC2. inform co-workers and superiors about any kind of deviations from work

P2 obtain the current and relevant technical and functional information that needs to be provided to the clients and customers

None

PC3. address the problems effectively and report if required to immediate supervisor appropriately

P3 provide accurate guidance and advice to the clients and customers on technical and functional matters associated with the building services engineering system that has been installed and/or maintained in terms of: P3.1 health and safety issues P3.2 safe and effective operation

None

PC4. receive instructions clearly from superiors and respond effectively on the same

P4 provide information in accordance with organisational procedures

None

PC5. communicate to team members/subordinates for appropriate work technique and method

P5 demonstrate to the clients and customers, as appropriate, the operation of the building services engineering system that has been installed and/or maintained

None

PC6. seek clarification and advice as per the requirement and applicability

P6 confirm in relation to the installation and/or maintenance activity: P6.1 the client and customer expectations and requirements P6.2 the building services engineering system is in a

None

89

Page 91: Transnational Skill Standards Foreman Electrical Works ... · conduit enclosures are in accordance with: P6.1 the electrical system’s ... concealed, exposed, electrical wiring work

TRANSNATIONAL SKILL STANDARDS FOR CONSTRUCTION INDUSTRY

Performance Criteria - Indian NOS

Performance Criteria - UK NOS Gaps w.r.t to Scope and Range in Indian NOS

satisfactory condition P6.3 the hand over process

PC7. hand over the required material, tools tackles, equipment and work fronts

P7 establish and maintain productive working relationships with clients and customers, including dealing with disagreements in an amicable and constructive way, so that good relationships are maintained

None

PC8. work together with co-workers in a synchronized manner

P8 respond effectively to requests for technical and functional information from clients and customers

None

P9 report, record and recommend, in accordance with organisational procedures and as appropriate, any variation to the installation and/or maintenance activity to the clients, customers and other relevant people

None

P10 comply with organisational standards for appearance and behaviour

None

Knowledge & Understanding Indian NOS

Knowledge & Understanding UK NOS

Gaps in Indian NOS

A. Organizational Context KA1. own roles and responsibilities

K1 the importance of customer service in relation to installation and/or maintenance activity

None

KA2. importance of effective communication and establishing strong working relationships with co-workers

K2 how to identify the clients and customers that need to be supplied with technical and functional information

None

90

Page 92: Transnational Skill Standards Foreman Electrical Works ... · conduit enclosures are in accordance with: P6.1 the electrical system’s ... concealed, exposed, electrical wiring work

TRANSNATIONAL SKILL STANDARDS FOR CONSTRUCTION INDUSTRY

Performance Criteria - Indian NOS

Performance Criteria - UK NOS Gaps w.r.t to Scope and Range in Indian NOS

KA3. risks of a failure in teamwork in terms of effects on project outcomes, timelines, safety at the construction site, etc.

K3 sources of technical and functional information such as: K3.1 the specification for the building services engineering system K3.2 the specification for the installation and/or maintenance activity K3.3 the manufacturer’s instructions

None

KA4. different modes of communication, and its appropriate usage

K4 the responsibilities and limitations of your job role with respect to supplying technical and functional information

None

KA5. importance of creating healthy and cooperative work environment among the gangs of workers

K5 the technical and functional information that you are providing and its implications on the operation of the building services engineering system and/or its equipment, accessories and components that have been installed and/or maintained

None

B. Technical Knowledge KB1. different activities within his work area where an interaction with other workers is required

K6 the organisational procedures and policies regarding the handover and demonstration of an building services engineering system and/or its equipment, accessories and components that have been installed and/or maintained

None

KB2. applicable techniques of work, properties of materials used, tools and tackles used, safety standards that co- workers might need as per the requirement

K7 the operating principles, controls and settings of the building services engineering system and/or its equipment, accessories and components that have been installed and/or maintained importance of providing technical and functional information clearly,

None

91

Page 93: Transnational Skill Standards Foreman Electrical Works ... · conduit enclosures are in accordance with: P6.1 the electrical system’s ... concealed, exposed, electrical wiring work

TRANSNATIONAL SKILL STANDARDS FOR CONSTRUCTION INDUSTRY

Performance Criteria - Indian NOS

Performance Criteria - UK NOS Gaps w.r.t to Scope and Range in Indian NOS

courteously and professionally

KB3. importance of proper and effective communication and the expected adverse effects in case of failure relating to quality, timelines, safety, risks at the construction project site

K8 the methods and organisational procedures for establishing positive relations with clients and customers

None

KB4. importance and need of supporting co-workers facing problems for smooth functioning of work

K9 the working requirements and practices of the clients and customers in the working environment where the installation and/or maintenance activity is taking place

None

K10 which situations warrant written technical and functional information

None

K11 the safety implications and operational consequences of supplying inaccurate or incomplete technical and functional information to clients and customers

None

K12 methods of checking the clients’ and customers’ understanding of the technical and functional information provided

None

K13 legislation regarding health and safety, data protection, equal opportunities and regulations that affect the way that technical and functional information is delivered to clients and customers

None

92

Page 94: Transnational Skill Standards Foreman Electrical Works ... · conduit enclosures are in accordance with: P6.1 the electrical system’s ... concealed, exposed, electrical wiring work

TRANSNATIONAL SKILL STANDARDS FOR CONSTRUCTION INDUSTRY

Performance Criteria - Indian NOS

Performance Criteria - UK NOS Gaps w.r.t to Scope and Range in Indian NOS

K14 the clients’ and customers’ rights including any contractual agreements

None

General Note: In the Construction SSC NOS, Range statement is not separated out. It is integrated holistically into the PCs and knowledge within the QPs

93

Page 95: Transnational Skill Standards Foreman Electrical Works ... · conduit enclosures are in accordance with: P6.1 the electrical system’s ... concealed, exposed, electrical wiring work

TRANSNATIONAL SKILL STANDARDS FOR CONSTRUCTION INDUSTRY

Section II continued:Compares the competencies in Indian NOS Work effectively in a team to deliver desired results at the workplace(CON/N8002) with the UK NOS Establish and maintain relationships in the building services engineering sector(SUMBSE02).

NOS Mapping Descriptions

Indian QP Title Foreman Electrical Works (Construction)

UK Qualification Level 3 NVQ Diploma in Installing Electrotechnical Systems and Equipment (Buildings, Structures and the Environment)

Indian QP Code CON/Q0604 UK Qualification Code NA

Indian NOS Code CON/N8002 UK NOS Code SUMBSE02

Indian NOS Plan and organize work to meet expected outcomes

UK NOS Establish and maintain relationships in the building services engineering sector

Scope

The scope covers the following: Prioritize work

activities to achieve desired results

Organize desired

resources prior to commencement of work

Overview

This standard is for people who are required to develop and maintain positive relationships with clients and customers associated with installation and/or maintenance activities in the building services engineering sector in accordance with appropriate industry standards and regulations, the specification, working practices, the working environment and the natural environment

This standard is

94

Page 96: Transnational Skill Standards Foreman Electrical Works ... · conduit enclosures are in accordance with: P6.1 the electrical system’s ... concealed, exposed, electrical wiring work

TRANSNATIONAL SKILL STANDARDS FOR CONSTRUCTION INDUSTRY

Scope

Overview

appropriate to the air conditioning, electrotechnical, consumer electrical and electronic products, heating & ventilating, plumbing, and refrigeration, industries.

The person undertaking the responsibility for establishing and maintaining client and customer relationships must be able to:

• present and provide accurate technical and functional information, advice and guidance

• liaise with clients and customers with respect to their needs and expectations

• respond as appropriate to client and customer needs and expectations

Please note that industry specific terminology is identified by italic text and its explanation and/or meaning can be found in the glossary of this standard.

Competency Mapping: Thefollowingtable, the Indian NOS maps with the UK NOS SUMBSE02 ‘Establish and maintain relationships in the building services engineering sector’ UK NOS.

95

Page 97: Transnational Skill Standards Foreman Electrical Works ... · conduit enclosures are in accordance with: P6.1 the electrical system’s ... concealed, exposed, electrical wiring work

TRANSNATIONAL SKILL STANDARDS FOR CONSTRUCTION INDUSTRY

Performance Criteria - Indian NOS

Performance Criteria - UK NOS Gaps w.r.t to Scope and Range in Indian NOS

To be competent, the user/individual on the job must be able to-

You must be able to-

PC1. understand clearly the targets and timelines set by superiors

P1 identify the clients and customers that need to be supplied with technical and functional information

None

PC2. plan activities as per schedule and sequence

P2 obtain the current and relevant technical and functional information that needs to be provided to the clients and customers

None

PC3. provide guidance to the subordinates to obtain desired outcome

P3 provide accurate guidance and advice to the clients and customers on technical and functional matters associated with the building services engineering system that has been installed and/or maintained in terms of: P3.1 health and safety issues P3.2 safe and effective operation

None

PC4. plan housekeeping activities prior to and post completion of work

P4 provide information in accordance with organisational procedures

None

PC5. list and arrange required resources prior to commencement of work

P5 demonstrate to the clients and customers, as appropriate, the operation of the building services engineering system that has been installed and/or maintained

None

PC6. select and employ correct tools, tackles and equipment for completion of desired work

P6 confirm in relation to the installation and/or maintenance activity: P6.1 the client and customer expectations and requirements P6.2 the building services engineering system is in a

None

96

Page 98: Transnational Skill Standards Foreman Electrical Works ... · conduit enclosures are in accordance with: P6.1 the electrical system’s ... concealed, exposed, electrical wiring work

TRANSNATIONAL SKILL STANDARDS FOR CONSTRUCTION INDUSTRY

Performance Criteria - Indian NOS

Performance Criteria - UK NOS Gaps w.r.t to Scope and Range in Indian NOS

satisfactory condition P6.3 the hand over process

PC7. complete the work with allocated resources

P7 establish and maintain productive working relationships with clients and customers, including dealing with disagreements in an amicable and constructive way, so that good relationships are maintained

None

PC8. engage allocated manpower in an appropriate manner

P8 respond effectively to requests for technical and functional information from clients and customers

None

PC9. use resources in an optimum manner to avoid any unnecessary wastage

P9 report, record and recommend, in accordance with organisational procedures and as appropriate, any variation to the installation and/or maintenance activity to the clients, customers and other relevant people

None

PC10. employ tools, tackles and equipment with care to avoid damage to the same

P10 comply with organisational standards for appearance and behaviour

None

PC11. organize work output, materials used, tools and tackles deployed,

PC12. processes adopted to be in line with the specified standards and instructions

97

Page 99: Transnational Skill Standards Foreman Electrical Works ... · conduit enclosures are in accordance with: P6.1 the electrical system’s ... concealed, exposed, electrical wiring work

TRANSNATIONAL SKILL STANDARDS FOR CONSTRUCTION INDUSTRY

Knowledge & Understanding Indian NOS

Knowledge & Understanding UK NOS

Gaps in Indian NOS

A. Organizational Context KA1. importance of proper housekeeping

K1 the importance of customer service in relation to installation and/or maintenance activity

None

KA2. policies, procedures and work targets set by superiors

K2 how to identify the clients and customers that need to be supplied with technical and functional information

None

KA3. roles and responsibilities in executing the work for subordinates and self

K3 sources of technical and functional information such as: K3.1 the specification for the building services engineering system K3.2 the specification for the installation and/or maintenance activity K3.3 the manufacturer’s instructions

None

B. Technical Knowledge KB1. standard practices of work to be adopted for assigned task

K4 the responsibilities and limitations of your job role with respect to supplying technical and functional information

None

KB2. how to use available resources in a judicious and appropriate manner to minimize wastages or damage

K5 the technical and functional information that you are providing and its implications on the operation of the building services engineering system and/or its equipment, accessories and components that have been installed and/or maintained

None

K6 the organisational procedures and policies regarding the handover and demonstration of an building services engineering system and/or its equipment,

None

98

Page 100: Transnational Skill Standards Foreman Electrical Works ... · conduit enclosures are in accordance with: P6.1 the electrical system’s ... concealed, exposed, electrical wiring work

TRANSNATIONAL SKILL STANDARDS FOR CONSTRUCTION INDUSTRY

Knowledge & Understanding Indian NOS

Knowledge & Understanding UK NOS

Gaps in Indian NOS

accessories and components that have been installed and/or maintained

K7 the operating principles, controls and settings of the building services engineering system and/or its equipment, accessories and components that have been installed and/or maintained importance of providing technical and functional information clearly, courteously and professionally

None

K8 the methods and organisational procedures for establishing positive relations with clients and customers

None

K9 the working requirements and practices of the clients and customers in the working environment where the installation and/or maintenance activity is taking place

None

K10 which situations warrant written technical and functional information

None

K11 the safety implications and operational consequences of supplying inaccurate or incomplete technical and functional information to clients and customers

None

99

Page 101: Transnational Skill Standards Foreman Electrical Works ... · conduit enclosures are in accordance with: P6.1 the electrical system’s ... concealed, exposed, electrical wiring work

TRANSNATIONAL SKILL STANDARDS FOR CONSTRUCTION INDUSTRY

Knowledge & Understanding Indian NOS

Knowledge & Understanding UK NOS

Gaps in Indian NOS

K12 methods of checking the clients’ and customers’ understanding of the technical and functional information provided

None

K13 legislation regarding health and safety, data protection, equal opportunities and regulations that affect the way that technical and functional information is delivered to clients and customers

None

K14 the clients’ and customers’ rights including any contractual agreements

None

General Note: In the Construction SSC NOS, Range statement is not separated out. It is integrated holistically into the PCs and knowledge within the QPs

100

Page 102: Transnational Skill Standards Foreman Electrical Works ... · conduit enclosures are in accordance with: P6.1 the electrical system’s ... concealed, exposed, electrical wiring work

TRANSNATIONAL SKILL STANDARDS FOR CONSTRUCTION INDUSTRY

Section II continued:Compares the competencies in Indian NOS Supervise, monitor and evaluate performance of subordinates at workplace (CON/N8003) with the UK NOS Establish and maintain relationships in the building services engineering sector(SUMBSE02).

NOS Mapping Descriptions

Indian QP Title Foreman Electrical Works (Construction)

UK Qualification Level 3 NVQ Diploma in Installing Electrotechnical Systems and Equipment (Buildings, Structures and the Environment)

Indian QP Code CON/Q0604 UK Qualification Code NA

Indian NOS Code CON/N8003 UK NOS Code SUMBSE02

Indian NOS Supervise, monitor and evaluate performance of subordinates at workplace

UK NOS Establish and maintain relationships in the building services engineering sector

Scope

The scope covers the following:

Monitor all construction work activities performed by subordinates, evaluate their performance and ensure strict adherence to quality instructions and timelines as per organizational policies and procedures

Overview

This standard is for people who are required to develop and maintain positive relationships with clients and customers associated with installation and/or maintenance activities in the building services engineering sector in accordance with appropriate industry standards and regulations, the specification, working practices, the working environment and the natural environment

This standard is

101

Page 103: Transnational Skill Standards Foreman Electrical Works ... · conduit enclosures are in accordance with: P6.1 the electrical system’s ... concealed, exposed, electrical wiring work

TRANSNATIONAL SKILL STANDARDS FOR CONSTRUCTION INDUSTRY

Scope

Overview

appropriate to the air conditioning, electrotechnical, consumer electrical and electronic products, heating & ventilating, plumbing, and refrigeration, industries.

The person undertaking the responsibility for establishing and maintaining client and customer relationships must be able to:

• present and provide accurate technical and functional information, advice and guidance

• liaise with clients and customers with respect to their needs and expectations

• respond as appropriate to client and customer needs and expectations

Please note that industry specific terminology is identified by italic text and its explanation and/or meaning can be found in the glossary of this standard.

Competency Mapping: Thefollowingtable, the Indian NOS maps with the UK NOS SUMBSE02 ‘Establish and maintain relationships in the building services engineering sector’ UK NOS.

102

Page 104: Transnational Skill Standards Foreman Electrical Works ... · conduit enclosures are in accordance with: P6.1 the electrical system’s ... concealed, exposed, electrical wiring work

TRANSNATIONAL SKILL STANDARDS FOR CONSTRUCTION INDUSTRY

Performance Criteria - Indian NOS

Performance Criteria - UK NOS Gaps w.r.t to Scope and Range in Indian NOS

To be competent, the user/individual on the job must be able to-

You must be able to-

PC1. fix expected targets for the respective gang as per site requirements and allocate work to subordinates

P1 identify the clients and customers that need to be supplied with technical and functional information

None

PC2. establish expected performance standards and expectations for the respective gang of workers to meet the desired outcomes

P2 obtain the current and relevant technical and functional information that needs to be provided to the clients and customers

None

PC3. inspect assigned work to the respected gang of workers through progressive checking

P3 provide accurate guidance and advice to the clients and customers on technical and functional matters associated with the building services engineering system that has been installed and/or maintained in terms of: P3.1 health and safety issues P3.2 safe and effective operation

None

PC4. observe and verify the work activities performed by the subordinates at the construction site

P4 provide information in accordance with organisational procedures

None

PC5. monitor overall performance of subordinates on the designed measures to ensure quality requirements set by the concerned authority

P5 demonstrate to the clients and customers, as appropriate, the operation of the building services engineering system that has been installed and/or maintained

None

PC6. ensure adherence to the organizational policies and procedures for all relevant construction activities by the workmen subordinations

P6 confirm in relation to the installation and/or maintenance activity: P6.1 the client and customer expectations and requirements P6.2 the building services

None

103

Page 105: Transnational Skill Standards Foreman Electrical Works ... · conduit enclosures are in accordance with: P6.1 the electrical system’s ... concealed, exposed, electrical wiring work

TRANSNATIONAL SKILL STANDARDS FOR CONSTRUCTION INDUSTRY

Performance Criteria - Indian NOS

Performance Criteria - UK NOS Gaps w.r.t to Scope and Range in Indian NOS

engineering system is in a satisfactory condition P6.3 the hand over process

P7 establish and maintain productive working relationships with clients and customers, including dealing with disagreements in an amicable and constructive way, so that good relationships are maintained

None

P8 respond effectively to requests for technical and functional information from clients and customers

None

P9 report, record and recommend, in accordance with organisational procedures and as appropriate, any variation to the installation and/or maintenance activity to the clients, customers and other relevant people

None

P10 comply with organisational standards for appearance and behaviour

None

Knowledge & Understanding Indian NOS

Knowledge & Understanding UK NOS

Gaps in Indian NOS

A. Organizational Context KA1. policies, procedures and work targets for performance evaluation and appraisals

K1 the importance of customer service in relation to installation and/or maintenance activity

None

KA2. organizational policies, procedures and protocol for smooth completion of work at

K2 how to identify the clients and customers that need to be supplied with technical and

None

104

Page 106: Transnational Skill Standards Foreman Electrical Works ... · conduit enclosures are in accordance with: P6.1 the electrical system’s ... concealed, exposed, electrical wiring work

TRANSNATIONAL SKILL STANDARDS FOR CONSTRUCTION INDUSTRY

Knowledge & Understanding Indian NOS

Knowledge & Understanding UK NOS

Gaps in Indian NOS

the respective workplace functional information

B. Technical Knowledge KB1. how to complete work/task accurately by following standard specifications and procedures by optimized and correct used of materials , tools, tackles and equipment

K3 sources of technical and functional information such as: K3.1 the specification for the building services engineering system K3.2 the specification for the installation and/or maintenance activity K3.3 the manufacturer’s instructions

None

K4 the responsibilities and limitations of your job role with respect to supplying technical and functional information

None

K5 the technical and functional information that you are providing and its implications on the operation of the building services engineering system and/or its equipment, accessories and components that have been installed and/or maintained

None

K6 the organisational procedures and policies regarding the handover and demonstration of an building services engineering system and/or its equipment, accessories and components that have been installed and/or maintained

None

K7 the operating principles, controls and settings of the building services engineering system and/or its equipment, accessories and components that have been installed and/or

None

105

Page 107: Transnational Skill Standards Foreman Electrical Works ... · conduit enclosures are in accordance with: P6.1 the electrical system’s ... concealed, exposed, electrical wiring work

TRANSNATIONAL SKILL STANDARDS FOR CONSTRUCTION INDUSTRY

Knowledge & Understanding Indian NOS

Knowledge & Understanding UK NOS

Gaps in Indian NOS

maintained importance of providing technical and functional information clearly, courteously and professionally

K8 the methods and organisational procedures for establishing positive relations with clients and customers

None

K9 the working requirements and practices of the clients and customers in the working environment where the installation and/or maintenance activity is taking place

None

K10 which situations warrant written technical and functional information

None

K11 the safety implications and operational consequences of supplying inaccurate or incomplete technical and functional information to clients and customers

None

K12 methods of checking the clients’ and customers’ understanding of the technical and functional information provided

None

K13 legislation regarding health and safety, data protection, equal opportunities and regulations that affect the way that technical and functional information is delivered to clients and customers

None

106

Page 108: Transnational Skill Standards Foreman Electrical Works ... · conduit enclosures are in accordance with: P6.1 the electrical system’s ... concealed, exposed, electrical wiring work

TRANSNATIONAL SKILL STANDARDS FOR CONSTRUCTION INDUSTRY

Knowledge & Understanding Indian NOS

Knowledge & Understanding UK NOS

Gaps in Indian NOS

K14 the clients’ and customers’ rights including any contractual agreements

None

General Note: In the Construction SSC NOS, Range statement is not separated out. It is integrated holistically into the PCs and knowledge within the QPs

107

Page 109: Transnational Skill Standards Foreman Electrical Works ... · conduit enclosures are in accordance with: P6.1 the electrical system’s ... concealed, exposed, electrical wiring work

TRANSNATIONAL SKILL STANDARDS FOR CONSTRUCTION INDUSTRY

Section II continued:Compares the competencies in Indian NOS Manage workplace for safe and healthy work environment(CON/N9002) with the UK NOS Establish and maintain relationships in the building services engineering sector(SUMBSE02).

NOS Mapping Descriptions

Indian QP Title Foreman Electrical Works (Construction)

UK Qualification Level 3 NVQ Diploma in Installing Electrotechnical Systems and Equipment (Buildings, Structures and the Environment)

Indian QP Code CON/Q0604 UK Qualification Code NA

Indian NOS Code CON/N9002 UK NOS Code SUMBSE02

Indian NOS Manage workplace for safe and healthy work environment

UK NOS Establish and maintain relationships in the building services engineering sector

Scope

The scope covers the following: Ensure healthy and

safe working environment for subordinates.

Ensure effective implementation of health, safety and environment policies and procedures

Identify and respond to risks / fire and emergencies associated with the work practices, workplace and ensure related

Overview

This standard is for people who are required to develop and maintain positive relationships with clients and customers associated with installation and/or maintenance activities in the building services engineering sector in accordance with appropriate industry standards and regulations, the specification, working practices, the working environment and the natural environment

This standard is

108

Page 110: Transnational Skill Standards Foreman Electrical Works ... · conduit enclosures are in accordance with: P6.1 the electrical system’s ... concealed, exposed, electrical wiring work

TRANSNATIONAL SKILL STANDARDS FOR CONSTRUCTION INDUSTRY

Scope

organizational & statuary requirement as followed

Overview

appropriate to the air conditioning, electrotechnical, consumer electrical and electronic products, heating & ventilating, plumbing, and refrigeration, industries.

The person undertaking the responsibility for establishing and maintaining client and customer relationships must be able to:

• present and provide accurate technical and functional information, advice and guidance

• liaise with clients and customers with respect to their needs and expectations

• respond as appropriate to client and customer needs and expectations

Please note that industry specific terminology is identified by italic text and its explanation and/or meaning can be found in the glossary of this standard.

Competency Mapping: Thefollowingtable, the Indian NOS maps with the UK NOS SUMBSE02 ‘Establish and maintain relationships in the building services engineering sector’ UK NOS.

109

Page 111: Transnational Skill Standards Foreman Electrical Works ... · conduit enclosures are in accordance with: P6.1 the electrical system’s ... concealed, exposed, electrical wiring work

TRANSNATIONAL SKILL STANDARDS FOR CONSTRUCTION INDUSTRY

Performance Criteria - Indian NOS

Performance Criteria - UK NOS Gaps w.r.t to Scope and Range in Indian NOS

To be competent, the user/individual on the job must be able to-

You must be able to-

PC1. ensure proper housekeeping at workplace

P1 identify the clients and customers that need to be supplied with technical and functional information

None

PC2. implement safe handling , stacking methods at workplace / store

P2 obtain the current and relevant technical and functional information that needs to be provided to the clients and customers

None

PC3. ensure that health and safety plan is followed by all subordinates

P3 provide accurate guidance and advice to the clients and customers on technical and functional matters associated with the building services engineering system that has been installed and/or maintained in terms of: P3.1 health and safety issues P3.2 safe and effective operation

None

PC4. identify any hazard in workplace and notify them to appropriate authority

P4 provide information in accordance with organisational procedures

None

PC5. ensure that all safety and protection installation are correctly placed & adequate

P5 demonstrate to the clients and customers, as appropriate, the operation of the building services engineering system that has been installed and/or maintained

None

PC6. ensure safe access is available at work place for movement of workers & materials

P6 confirm in relation to the installation and/or maintenance activity: P6.1 the client and customer expectations and requirements P6.2 the building services engineering system is in a

None

110

Page 112: Transnational Skill Standards Foreman Electrical Works ... · conduit enclosures are in accordance with: P6.1 the electrical system’s ... concealed, exposed, electrical wiring work

TRANSNATIONAL SKILL STANDARDS FOR CONSTRUCTION INDUSTRY

Performance Criteria - Indian NOS

Performance Criteria - UK NOS Gaps w.r.t to Scope and Range in Indian NOS

satisfactory condition P6.3 the hand over process

PC7. ensure safe use of tools and tackles by the workmen as per applicability

P7 establish and maintain productive working relationships with clients and customers, including dealing with disagreements in an amicable and constructive way, so that good relationships are maintained

None

PC8. ensure appropriate use of following Personal Protective Equipment (PPE) as per applicability: —Head Protection (Helmets)——— —Ear Protection —Fall Protection —Foot Protection —Face and Eye Protection, —Hand and Body Protection —Respiratory Protection

P8 respond effectively to requests for technical and functional information from clients and customers

None

PC9. maintain entrances & exit from confined spaces , excavated pits and other location in concurrence with safety parameters or instruction form safety personals

P9 report, record and recommend, in accordance with organisational procedures and as appropriate, any variation to the installation and/or maintenance activity to the clients, customers and other relevant people

None

PC10. ensure organizational policies and procedures are followed for health, safety and welfare, in relation to: methods of receiving or sourcing information dealing with accidents and emergencies associated with the work and environment

P10 comply with organisational standards for appearance and behaviour

None

111

Page 113: Transnational Skill Standards Foreman Electrical Works ... · conduit enclosures are in accordance with: P6.1 the electrical system’s ... concealed, exposed, electrical wiring work

TRANSNATIONAL SKILL STANDARDS FOR CONSTRUCTION INDUSTRY

Performance Criteria - Indian NOS

Performance Criteria - UK NOS Gaps w.r.t to Scope and Range in Indian NOS

reporting stooping work evacuation fire risks and safe exit procedures

PC11. follow procedures for accident recording and reporting as per organizational and statuary requirements

PC12. ensure effective adherence to response to emergency procedures / protocols

PC13. report any case of emergency / risks to the concern people at the construction site

PC14. report any perceived risk hazards to the superiors / concerned EHS

PC15. demonstrate the use of fire protection equipments for different type of fire hazard

PC16. implement control measures to reduce risk & meet legal requirement as per organizational policies

Knowledge & Understanding Indian NOS

Knowledge & Understanding UK NOS

Gaps in Indian NOS

A. Organizational Context KA1. the policies, procedures and protocol set up by the EHS

K1 the importance of customer service in relation to installation and/or maintenance activity

None

112

Page 114: Transnational Skill Standards Foreman Electrical Works ... · conduit enclosures are in accordance with: P6.1 the electrical system’s ... concealed, exposed, electrical wiring work

TRANSNATIONAL SKILL STANDARDS FOR CONSTRUCTION INDUSTRY

Knowledge & Understanding Indian NOS

Knowledge & Understanding UK NOS

Gaps in Indian NOS

Department With respect to Health , Safety and Environment at the respective construction site

KA2. reporting procedures in cases of breaches or hazards in site safety, accidents or emergency situations

K2 how to identify the clients and customers that need to be supplied with technical and functional information

None

KA3. safe working practices for tools, tackles and equipment

K3 sources of technical and functional information such as: K3.1 the specification for the building services engineering system K3.2 the specification for the installation and/or maintenance activity K3.3 the manufacturer’s instructions

None

KA4. workplace policies and health and safety requirements for dealing with potential risks as defined by the EHS department

K4 the responsibilities and limitations of your job role with respect to supplying technical and functional information

None

KA5. importance of creating healthy and cooperative work environment among the gangs of workers

K5 the technical and functional information that you are providing and its implications on the operation of the building services engineering system and/or its equipment, accessories and components that have been installed and/or maintained

None

B. Technical Knowledge KB1. different activities within his work area where an interaction with other workers is required

K6 the organisational procedures and policies regarding the handover and demonstration of an building services engineering system and/or its equipment, accessories and components

None

113

Page 115: Transnational Skill Standards Foreman Electrical Works ... · conduit enclosures are in accordance with: P6.1 the electrical system’s ... concealed, exposed, electrical wiring work

TRANSNATIONAL SKILL STANDARDS FOR CONSTRUCTION INDUSTRY

Knowledge & Understanding Indian NOS

Knowledge & Understanding UK NOS

Gaps in Indian NOS

that have been installed and/or maintained

KB2. applicable techniques of work, properties of materials used, tools and tackles used, safety standards that co- workers might need as per the requirement

K7 the operating principles, controls and settings of the building services engineering system and/or its equipment, accessories and components that have been installed and/or maintained importance of providing technical and functional information clearly, courteously and professionally

None

KB3. importance of proper and effective communication and the expected adverse effects in case of failure relating to quality, timelines, safety, risks at the construction project site

K8 the methods and organisational procedures for establishing positive relations with clients and customers

None

KB4. importance and need of supporting co-workers facing problems for smooth functioning of work

K9 the working requirements and practices of the clients and customers in the working environment where the installation and/or maintenance activity is taking place

None

K10 which situations warrant written technical and functional information

None

K11 the safety implications and operational consequences of supplying inaccurate or incomplete technical and functional information to clients and customers

None

K12 methods of checking the clients’ and customers’ understanding of the technical and functional information

None

114

Page 116: Transnational Skill Standards Foreman Electrical Works ... · conduit enclosures are in accordance with: P6.1 the electrical system’s ... concealed, exposed, electrical wiring work

TRANSNATIONAL SKILL STANDARDS FOR CONSTRUCTION INDUSTRY

Knowledge & Understanding Indian NOS

Knowledge & Understanding UK NOS

Gaps in Indian NOS

provided

K13 legislation regarding health and safety, data protection, equal opportunities and regulations that affect the way that technical and functional information is delivered to clients and customers

None

K14 the clients’ and customers’ rights including any contractual agreements

None

General Note: In the Construction SSC NOS, Range statement is not separated out. It is integrated holistically into the PCs and knowledge within the QPs

115

Page 117: Transnational Skill Standards Foreman Electrical Works ... · conduit enclosures are in accordance with: P6.1 the electrical system’s ... concealed, exposed, electrical wiring work

TRANSNATIONAL SKILL STANDARDS FOR CONSTRUCTION INDUSTRY

Section II continued:Compares the competencies in Indian NOS Supervise, monitor and evaluate performance of subordinates at workplace (CON/N8003) with the UK NOS Coordinate a work site in the building services engineering sector(SUMBSE03).

NOS Mapping Descriptions

Indian QP Title Foreman Electrical Works (Construction)

UK Qualification Level 3 NVQ Diploma in Installing Electrotechnical Systems and Equipment (Buildings, Structures and the Environment)

Indian QP Code CON/Q0604 UK Qualification Code NA

Indian NOS Code CON/N8003 UK NOS Code SUMBSE03

Indian NOS Supervise, monitor and evaluate performance of subordinates at workplace

UK NOS Coordinate a work site in the building services engineering sector

Scope

The scope covers the following:

Monitor all construction work activities performed by subordinates, evaluate their performance and ensure strict adherence to quality instructions and timelines as per organizational policies and procedures

Overview

This standard is for people who are required to coordinate the work site for the installation and/or maintenance activities associated with building services engineering systems and is appropriate to the air conditioning, consumer electrical and electronic products, domestic heating, electrotechnical, heating & ventilation, plumbing and refrigeration industries.

The person undertaking the responsibility for

116

Page 118: Transnational Skill Standards Foreman Electrical Works ... · conduit enclosures are in accordance with: P6.1 the electrical system’s ... concealed, exposed, electrical wiring work

TRANSNATIONAL SKILL STANDARDS FOR CONSTRUCTION INDUSTRY

Scope

Overview

the coordination of the work site must be able to oversee, as relevant, the work of other operatives and/or other contractors, and in accordance with relevant industry standards and regulations, the specification, working practices, the working environment and the natural environment confirm:

• the work to be undertaken

• a programme of work with relevant people

• the organisation of the appropriate resources

• that equipment, accessories and components are fit-for-purpose

• that work is carried out safely

• all relevant documentation is completed accurately

The person carrying out this work should know and understand the extent of their role and responsibilities, including how best to motivate, monitor and

117

Page 119: Transnational Skill Standards Foreman Electrical Works ... · conduit enclosures are in accordance with: P6.1 the electrical system’s ... concealed, exposed, electrical wiring work

TRANSNATIONAL SKILL STANDARDS FOR CONSTRUCTION INDUSTRY

Scope Overview communicate with others in accordance with organisational procedures.

Please note that industry specific terminology is identified by italic text and its explanation and/or definition can be found in the glossary of this standard.

Competency Mapping: Thefollowingtable, the Indian NOS maps with the UK NOS SUMBSE03 ‘Coordinate a work site in the building services engineering sector’ UK NOS.

Performance Criteria - Indian NOS

Performance Criteria - UK NOS Gaps w.r.t to Scope and Range in Indian NOS

To be competent, the user/individual on the job must be able to-

You must be able to-

PC1. fix expected targets for the respective gang as per site requirements and allocate work to subordinates

P1 produce a risk assessment and method statement for the work to be carried out on the identified building services engineering system

None

PC2. establish expected performance standards and expectations for the respective gang of workers to meet the desired outcomes

P2 allocate duties and responsibilities to operatives, when appropriate, to make best use of their competence

None

PC3. inspect assigned work to the respected gang of workers through progressive checking

P3 instruct the operatives, where relevant, about their duties and responsibilities clearly and concisely

None

PC4. observe and verify the work activities performed by the subordinates at the construction

P4 confirm that any instructions given are understood

None

118

Page 120: Transnational Skill Standards Foreman Electrical Works ... · conduit enclosures are in accordance with: P6.1 the electrical system’s ... concealed, exposed, electrical wiring work

TRANSNATIONAL SKILL STANDARDS FOR CONSTRUCTION INDUSTRY

Performance Criteria - Indian NOS

Performance Criteria - UK NOS Gaps w.r.t to Scope and Range in Indian NOS

site

PC5. monitor overall performance of subordinates on the designed measures to ensure quality requirements set by the concerned authority

P5 coordinate effectively, when relevant, the work of other contractors

None

PC6. ensure adherence to the organizational policies and procedures for all relevant construction activities by the workmen subordinations

P6 monitor, as appropriate, that the work of operatives is safe, fit-for-purpose, cost effective and in accordance with: P6.1 industry recognised working practices P6.2 the specification P6.3 the current versions of appropriate industry standards and regulations

None

P7 ensure that safe and appropriate action is taken promptly where a non-compliance is identified during the programme of work

None

P8 ensure that all documentation associated with the installation and/or maintenance work is in accordance with: P8.1 organisational procedures P8.2 the current versions of appropriate industry standards and regulations

None

P9 liaise with the relevant people to resolve issues which are outside the scope of your job role

None

119

Page 121: Transnational Skill Standards Foreman Electrical Works ... · conduit enclosures are in accordance with: P6.1 the electrical system’s ... concealed, exposed, electrical wiring work

TRANSNATIONAL SKILL STANDARDS FOR CONSTRUCTION INDUSTRY

Performance Criteria - Indian NOS

Performance Criteria - UK NOS Gaps w.r.t to Scope and Range in Indian NOS

P10 verify that the equipment, accessories and components are: P10.1 compatible to the working environment P10.2 in accordance with the specification P10.3 of the required and correct type P10.4 delivered on time and undamaged P10.5 suitable and safely stored

None

P11 confirm that the installation and/or maintenance work completed is in accordance with: P11.1 the specification P11.2 the current versions of appropriate industry standards and regulations

120

Page 122: Transnational Skill Standards Foreman Electrical Works ... · conduit enclosures are in accordance with: P6.1 the electrical system’s ... concealed, exposed, electrical wiring work

TRANSNATIONAL SKILL STANDARDS FOR CONSTRUCTION INDUSTRY

Knowledge & Understanding Indian NOS

Knowledge & Understanding UK NOS

Gaps in Indian NOS

A. Organizational Context KA1. policies, procedures and work targets for performance evaluation and appraisals

K1 your role and responsibilities in relation to: K1.1 monitoring and implementing health and safety on the work site K1.2 the work to be undertaken K1.3 allocating roles and responsibilities K1.4 monitoring the work of operatives K1.5 liaising with relevant people

None

KA2. organizational policies, procedures and protocol for smooth completion of work at the respective workplace

K2 how to interpret organisational procedures and monitor changing conditions at the work site

None

B. Technical Knowledge KB1. how to complete work/task accurately by following standard specifications and procedures by optimized and correct used of materials , tools, tackles and equipment

K3 how to coordinate operatives you are responsible for in relation to: K3.1 supervision and motivation K3.2 identification of competence K3.3 planning work allocations, duties and responsibilities

None

K4 how to communicate effectively with relevant people

None

K5 the current versions of appropriate industry standards and regulations relevant to the identified building services engineering system

None

K6 the organisational procedures for: K6.1 completing the necessary documentation

None

121

Page 123: Transnational Skill Standards Foreman Electrical Works ... · conduit enclosures are in accordance with: P6.1 the electrical system’s ... concealed, exposed, electrical wiring work

TRANSNATIONAL SKILL STANDARDS FOR CONSTRUCTION INDUSTRY

Knowledge & Understanding Indian NOS

Knowledge & Understanding UK NOS

Gaps in Indian NOS

K6.2 agreeing a programme of work with relevant people K6.3 confirming that the installation and/or maintenance work is completed K6.4 identification of competence

K7 methods that will verify that the equipment, accessories and components are: K7.1 compatible to the working environment K7.2 in accordance with the specification K7.3 of the required and correct type K7.4 delivered on time and undamaged K7.5 suitable and safely stored

None

K8 how to manage the available storage facility at the work site

None

General Note: In the Construction SSC NOS, Range statement is not separated out. It is integrated holistically into the PCs and knowledge within the QPs

122

Page 124: Transnational Skill Standards Foreman Electrical Works ... · conduit enclosures are in accordance with: P6.1 the electrical system’s ... concealed, exposed, electrical wiring work

TRANSNATIONAL SKILL STANDARDS FOR CONSTRUCTION INDUSTRY

Section II continued:Compares the competencies in Indian NOS Monitor regular electrical works (installation, maintenance and repairing) at a construction site (CON/N0611) with the UK NOS Coordinate a work site in the building services engineering sector(SUMBSE03).

NOS Mapping Descriptions

Indian QP Title Foreman Electrical Works (Construction)

UK Qualification Level 3 NVQ Diploma in Installing Electrotechnical Systems and Equipment (Buildings, Structures and the Environment)

Indian QP Code CON/Q0604 UK Qualification Code NA

Indian NOS Code CON/N0611 UK NOS Code SUMBSE03

Indian NOS Monitor regular electrical works (installation, maintenance and repairing) at a construction site

UK NOS Coordinate a work site in the building services engineering sector

Scope

This scope covers the following: • Monitor and check wiring / connections for LV works at a construction site. • Conduct installation/ maintenance of construction equipment and machineries.

Overview

This standard is for people who are required to coordinate the work site for the installation and/or maintenance activities associated with building services engineering systems and is appropriate to the air conditioning, consumer electrical and electronic products, domestic heating, electrotechnical, heating & ventilation, plumbing and refrigeration industries.

123

Page 125: Transnational Skill Standards Foreman Electrical Works ... · conduit enclosures are in accordance with: P6.1 the electrical system’s ... concealed, exposed, electrical wiring work

TRANSNATIONAL SKILL STANDARDS FOR CONSTRUCTION INDUSTRY

Scope

Overview

The person undertaking the responsibility for the coordination of the work site must be able to oversee, as relevant, the work of other operatives and/or other contractors, and in accordance with relevant industry standards and regulations, the specification, working practices, the working environment and the natural environment confirm:

• the work to be undertaken

• a programme of work with relevant people

• the organisation of the appropriate resources

• that equipment, accessories and components are fit-for-purpose

• that work is carried out safely

• all relevant documentation is completed accurately

The person carrying out this work should know and understand the extent of their role and responsibilities,

124

Page 126: Transnational Skill Standards Foreman Electrical Works ... · conduit enclosures are in accordance with: P6.1 the electrical system’s ... concealed, exposed, electrical wiring work

TRANSNATIONAL SKILL STANDARDS FOR CONSTRUCTION INDUSTRY

Scope

Overview

including how best to motivate, monitor and communicate with others in accordance with organisational procedures.

Please note that industry specific terminology is identified by italic text and its explanation and/or definition can be found in the glossary of this standard.

Competency Mapping: Thefollowingtable, the Indian NOS maps with the UK NOS SUMBSE03 ‘Coordinate a work site in the building services engineering sector’ UK NOS.

Performance Criteria - Indian NOS

Performance Criteria - UK NOS Gaps w.r.t to Scope and Range in Indian NOS

To be competent, the user/individual on the job must be able to-

You must be able to-

PC1. ensure that preventive maintenance of electrical wiring, equipment and fixtures deployed at construction works is being carried out regularly as per requirement

P1 produce a risk assessment and method statement for the work to be carried out on the identified building services engineering system

None

PC2. check and ensure materials, fixtures and devices being used in repairing or maintenance works are ISI certified

P2 allocate duties and responsibilities to operatives, when appropriate, to make best use of their competence

None

PC3. inspect completed LV electrical arrangements for conformance with specifications, requirements and

P3 instruct the operatives, where relevant, about their duties and responsibilities clearly and concisely

None

125

Page 127: Transnational Skill Standards Foreman Electrical Works ... · conduit enclosures are in accordance with: P6.1 the electrical system’s ... concealed, exposed, electrical wiring work

TRANSNATIONAL SKILL STANDARDS FOR CONSTRUCTION INDUSTRY

Performance Criteria - Indian NOS

Performance Criteria - UK NOS Gaps w.r.t to Scope and Range in Indian NOS

compliance with applicable statutory and HSE requirements

PC4. check & ensure that lighting arrangements and its components are in safe condition working properly

P4 confirm that any instructions given are understood

None

PC5. conduct periodical checks/ tests to insulation, joints, physical condition and termination of wires and cables to ensure safe working of wiring systems

P5 coordinate effectively, when relevant, the work of other contractors

None

PC6. check condition and safety of isolation and ensure safe condition for undertaking maintenance/ repairing in wires, cables, lights and fixtures

P6 monitor, as appropriate, that the work of operatives is safe, fit-for-purpose, cost effective and in accordance with: P6.1 industry recognised working practices P6.2 the specification P6.3 the current versions of appropriate industry standards and regulations

None

PC7. diagnose malfunctioning of wiring systems, circuits, temporary panels and its components, using appropriate measuring equipment and hand tools

P7 ensure that safe and appropriate action is taken promptly where a non-compliance is identified during the programme of work

None

PC8. carry out troubleshooting and take immediate actions in case of emergency repairing requirements related to short circuit or malfunction in wiring systems, temporary electrical panels or lighting arrangements

P8 ensure that all documentation associated with the installation and/or maintenance work is in accordance with: P8.1 organisational procedures P8.2 the current versions of appropriate industry standards and regulations

None

126

Page 128: Transnational Skill Standards Foreman Electrical Works ... · conduit enclosures are in accordance with: P6.1 the electrical system’s ... concealed, exposed, electrical wiring work

TRANSNATIONAL SKILL STANDARDS FOR CONSTRUCTION INDUSTRY

Performance Criteria - Indian NOS

Performance Criteria - UK NOS Gaps w.r.t to Scope and Range in Indian NOS

PC9. ensure proper functioning of power tools and diagnostic tools by conducting maintenance as per manufacturer’s guidelines at scheduled intervals

P9 liaise with the relevant people to resolve issues which are outside the scope of your job role

None

PC10. develop hand sketches relevant to electrical circuit diagrams using standard wiring symbols as per work requirements

P10 verify that the equipment, accessories and components are: P10.1 compatible to the working environment P10.2 in accordance with the specification P10.3 of the required and correct type P10.4 delivered on time and undamaged P10.5 suitable and safely stored

None

PC11. supervise electrical works by providing instructions, directions ensuring completion of the same within specified time as per applicable schematics, specification, guidelines and safety norms

P11 confirm that the installation and/or maintenance work completed is in accordance with: P11.1 the specification P11.2 the current versions of appropriate industry standards and regulations

PC12. adhere to schedule of calibration (if any) and conduct calibration periodically to ensure correct working of testing equipment and ensure removal of faulty ones from worksite

PC13. check condition and safety of isolation and ensure safe condition for undertaking maintenance/ repairing in construction equipments

127

Page 129: Transnational Skill Standards Foreman Electrical Works ... · conduit enclosures are in accordance with: P6.1 the electrical system’s ... concealed, exposed, electrical wiring work

TRANSNATIONAL SKILL STANDARDS FOR CONSTRUCTION INDUSTRY

Performance Criteria - Indian NOS

Performance Criteria - UK NOS Gaps w.r.t to Scope and Range in Indian NOS

PC14. conduct installation, electrical maintenance and repair of equipment like electrical distribution panels and its accessories, common construction equipment like bar cutting/bending machine, different types of common pumps used in construction sites, transformers and tower cranes

PC15. ensure proper termination of cables as per applicability at power source and equipment

PC16. prepare schedule of maintenance for common equipment and machineries such as motor, bar cutting/ bending machines, vibratos, tower cranes etc.

PC17. determine potential hazards prior to conduct any maintenance/ repairing work to the equipment or circuits

PC18. take necessary steps or report to concerned authorities on observing any hazardous conditions at work place

PC19. ensure erection of safety signage and barricading, surrounding the faulty or electrically hazardous equipment/ locations to avoid unsafe conditions

128

Page 130: Transnational Skill Standards Foreman Electrical Works ... · conduit enclosures are in accordance with: P6.1 the electrical system’s ... concealed, exposed, electrical wiring work

TRANSNATIONAL SKILL STANDARDS FOR CONSTRUCTION INDUSTRY

Performance Criteria - Indian NOS

Performance Criteria - UK NOS Gaps w.r.t to Scope and Range in Indian NOS

PC20. carry out checks for adverse situation like vicinity of water, fire prior, during and after establishing any electrical system at regular intervals

PC21. ensure proper earthing of electrical circuits as per relevant specifications or manufacturer’s guidelines

PC22. ensure occurrence of trial run and obtain clearance from respective authority relevant to electrical works prior to leave any equipment for working

PC23. ensure upkeep of valuable electrical fixtures and perform checks at electrical stores to ensure safe condition

PC24. prepare data sheet, report and note readings as per applicability according to organizational procedures

PC25. ensure electrical safety to workers, equipment, materials and fixtures by adopting standard safe working procedures as per organizational norms, at workplace

129

Page 131: Transnational Skill Standards Foreman Electrical Works ... · conduit enclosures are in accordance with: P6.1 the electrical system’s ... concealed, exposed, electrical wiring work

TRANSNATIONAL SKILL STANDARDS FOR CONSTRUCTION INDUSTRY

Knowledge & Understanding Indian NOS

Knowledge & Understanding UK NOS

Gaps in Indian NOS

A. Organizational Context KA1. standard practices for monitoring regular electrical works

K1 your role and responsibilities in relation to: K1.1 monitoring and implementing health and safety on the work site K1.2 the work to be undertaken K1.3 allocating roles and responsibilities K1.4 monitoring the work of operatives K1.5 liaising with relevant people

None

KA2. safety rules and regulations for handling and storing required electrical, tools, equipment and materials

K2 how to interpret organisational procedures and monitor changing conditions at the work site

None

KA3. personal protection including the use of related safety gears & equipment

K3 how to coordinate operatives you are responsible for in relation to: K3.1 supervision and motivation K3.2 identification of competence K3.3 planning work allocations, duties and responsibilities

None

KA4. how to request for tools and materials as per set procedures maintenance of tools and equipment

K4 how to communicate effectively with relevant people

None

B. Technical Knowledge KB1. guidelines provided in Indian Standard code of practice applicable for establishing and inspecting electrical wiring works

K5 the current versions of appropriate industry standards and regulations relevant to the identified building services engineering system

None

KB2. statutory guidelines provided by ISI for LV wiring operations

K6 the organisational procedures for: K6.1 completing the necessary

None

130

Page 132: Transnational Skill Standards Foreman Electrical Works ... · conduit enclosures are in accordance with: P6.1 the electrical system’s ... concealed, exposed, electrical wiring work

TRANSNATIONAL SKILL STANDARDS FOR CONSTRUCTION INDUSTRY

Knowledge & Understanding Indian NOS

Knowledge & Understanding UK NOS

Gaps in Indian NOS

documentation K6.2 agreeing a programme of work with relevant people K6.3 confirming that the installation and/or maintenance work is completed K6.4 identification of competence

KB3. electrical safety norms as per standard practice and organizational policy, procedure of providing CPR, first aids, use of regular and job specific PPEs as per requirement

K7 methods that will verify that the equipment, accessories and components are: K7.1 compatible to the working environment K7.2 in accordance with the specification K7.3 of the required and correct type K7.4 delivered on time and undamaged K7.5 suitable and safely stored

None

KB4. classification of fire and use of fire protection devices

K8 how to manage the available storage facility at the work site

None

KB5. read and interpret drawings, SLDs related schematics for single and three phase wiring system

KB6. how to develop electrical drawings using appropriate symbols and abbreviations as per standard practice

KB7. how to estimate required material quantity from electrical drawings

KB8. sequencing of electrical works to be carried out depending upon requirement of

131

Page 133: Transnational Skill Standards Foreman Electrical Works ... · conduit enclosures are in accordance with: P6.1 the electrical system’s ... concealed, exposed, electrical wiring work

TRANSNATIONAL SKILL STANDARDS FOR CONSTRUCTION INDUSTRY

Knowledge & Understanding Indian NOS

Knowledge & Understanding UK NOS

Gaps in Indian NOS

construction works

KB9. acceptance criteria of electrical materials, devices, fixtures and protective arrangements

KB10. how to verify authentication of ISI mark provided with electrical materials, fixtures and devices

KB11. principles of electrical theory as applied to electrical circuits and wiring systems

KB12. understand working principle of complex electrical circuits and manufacturer's guidelines/ specifications of repairing

KB13. concept of electrical isolation procedures and their applications in LV electrical works

KB14. area of application & specification of electrical protective devices

KB15. correct alternative use of electrical parts if required one is unavailable

KB16. detailed concept of 3 phase connections and its distribution at construction sites

KB17. detailed concept of AC and DC circuits, their properties and area of application

132

Page 134: Transnational Skill Standards Foreman Electrical Works ... · conduit enclosures are in accordance with: P6.1 the electrical system’s ... concealed, exposed, electrical wiring work

TRANSNATIONAL SKILL STANDARDS FOR CONSTRUCTION INDUSTRY

Knowledge & Understanding Indian NOS

Knowledge & Understanding UK NOS

Gaps in Indian NOS

KB18. concept about safe procedure of troubleshooting in 3 phase connections

KB19. concept of working principle and components of electrical panels and transformers and generators

KB20. operational characteristics of electrical panels and power distribution through the same

KB21. advance troubleshooting in electrical panels, transformers and generators

KB22. working principle and connection of AC single phase and AC three phase motors, submersible pumps and their maintenance

KB23. selection and use of starters such as DOL, Star Delta, Step down Transformer starter

KB24. line and phase voltage, current and power in a 3 phase circuits with balanced and unbalanced load

KB25. principle of different methods of earthing. i.e. Pipe, Plate, etc.

KB26. measurement of Earth resistance by earth tester, testing of Earth Leakage by ELCB and relay, etc.

KB27. use of electrical power tools and their maintenance

133

Page 135: Transnational Skill Standards Foreman Electrical Works ... · conduit enclosures are in accordance with: P6.1 the electrical system’s ... concealed, exposed, electrical wiring work

TRANSNATIONAL SKILL STANDARDS FOR CONSTRUCTION INDUSTRY

Knowledge & Understanding Indian NOS

Knowledge & Understanding UK NOS

Gaps in Indian NOS

KB28. use of measuring and diagnostic tools in electrical circuits

KB29. standards procedure of storing, stacking electrical tools and equipment

KB30. computer basics – MS Office, Internet, E-mail

KB31. basic arithmetic and use of calculator

KB32. methods and techniques of inspection that are approved by the organization

KB33. calibration of equipment and authorization procedures as per the organization policy

KB34. calibration schedule of equipment and machineries

B35. quality control systems and site documentation procedures for electrical connections

KB2. appropriate personal protective equipment to used based on various working conditions

K16 how maintenance of tools and equipment is carried out

None

SB3. identify safety risks that affect the health, safety and environment for self and others working in the vicinity, tackle it if within limit or report to appropriate authority

K17 what the programme is for the work to be carried out in the estimated, allocated time and why deadlines should be kept

General Note: In the Construction SSC NOS, Range statement is not separated out. It is integrated holistically into the PCs and knowledge within the QPs

134

Page 136: Transnational Skill Standards Foreman Electrical Works ... · conduit enclosures are in accordance with: P6.1 the electrical system’s ... concealed, exposed, electrical wiring work

TRANSNATIONAL SKILL STANDARDS FOR CONSTRUCTION INDUSTRY

Competency Mapping: Thefollowingtable, the Indian NOS maps with the UK NOS COSVR166 ‘Cut and bend reinforcement steel to shape’ UK NOS.

Performance Criteria - Indian NOS

Performance Criteria - UK NOS Gaps in Indian NOS

To be competent, the user/individual on the job must be able to-

You must be able to-

SA2. read in one or more language, preferably the local language at the site read

P1,Intrepet the given information relating to the work and to resources to confirm its relevance

w.r.t Scope /Range of P1: interpretations of specifications, schedules, risk assessment, manufactures information

SA5. read various, sign boards, safety rules and safety tags, instruction related to exit routes during emergency at the workplace

CON/N0204: Read and understand routine drawings / sketches and Bar Bending Schedule

CON/N0206: Prepare, fabricate, place and fix reinforcement for RCC structures

SB1. decide whether his workplace is safe for working and also his work is not creating hazardous conditions for other

P2: comply with the given, relevant legislation and official guidance to carry out your work and maintain safe and healthy work practices

None

SB11. identify violation of any safety norms which may lead to accidents

CON/N9001:Work according to personal health, safety and environment protocol at construction site

PC1. select hand tools/power tools for cutting rebars as per requirement / instruction

P3: select the required quantity and quality of resources for the methods of work

None

PC2. select cutting blade for cutting of rebar as per requirement / instruction

PC8. select hand/power tools for bending rebars with respect to the work

135

Page 137: Transnational Skill Standards Foreman Electrical Works ... · conduit enclosures are in accordance with: P6.1 the electrical system’s ... concealed, exposed, electrical wiring work

TRANSNATIONAL SKILL STANDARDS FOR CONSTRUCTION INDUSTRY

Performance Criteria - Indian NOS

Performance Criteria - UK NOS Gaps in Indian NOS

PC9. select accessories for bending with respect to the diameter of rebar used & machine used

CON/N9001:Work according to personal health, safety and environment protocol at construction site

P4: comply with organisational procedures to minimise the risk of damage to the work and surrounding area

Protection of work

PC3. make use of measurement and marking tool to mark on rebars for cutting as per specified length in the BBS

P5: comply with the given contract information to carry out the work efficiently to the required specification

None

PC4. place rebars properly for cutting, as per requirement and instruction

PC5. ensure adequate number of rods are placed for cutting to avoid damage to machine

PC10. mark on rebar and place & fix rods on correct position for bending

PC11. maintain correct body posture while bending rebars manually or mechanically

PC12. bend rebars as per the shape and dimensions given in the BBS, including hooks

SB3. complete work as per agreed time schedule and quality

P6: complete the work within the allocated time, in accordance with the programme of work

None

136

Page 138: Transnational Skill Standards Foreman Electrical Works ... · conduit enclosures are in accordance with: P6.1 the electrical system’s ... concealed, exposed, electrical wiring work

TRANSNATIONAL SKILL STANDARDS FOR CONSTRUCTION INDUSTRY

Knowledge & Understanding: Knowledge & Understanding: Gaps in Indian NOS

K1 the organisational procedures developed to report and rectify inappropriate information and unsuitable resources, and how they are implemented

KA4. service request procedure for tools, materials and equipments maintenance of tools and equipments

K2 the types of information, their source and how they are interpreted

None

SB10. evaluate the complexity of the tasks and seek assistance and support wherever required

K3 the organisational procedures to solve problems with the information and why it is important they are followed

None

SB11. identify violation of any safety norms which may lead to accidents

K4 the level of understanding operatives must have of information for relevant, current legislation and official guidance and how it is applied

CON/N9001:Work according to personal health, safety and environment protocol at construction site

K5 how emergencies should be responded to and who should respond

None

K6 the organisational security procedures for tools, equipment and personal belongings

CON/N9001:Work according to personal health, safety and environment protocol at construction site

K7 what the accident reporting procedures are and who is responsible for making the report

None

CON/N9001:Work according to personal health, safety and environment protocol at construction site

K8 why, when and how health and safety control equipment should be used

None

137

Page 139: Transnational Skill Standards Foreman Electrical Works ... · conduit enclosures are in accordance with: P6.1 the electrical system’s ... concealed, exposed, electrical wiring work

TRANSNATIONAL SKILL STANDARDS FOR CONSTRUCTION INDUSTRY

Knowledge & Understanding: Knowledge & Understanding: Gaps in Indian NOS

KB2. different types of power tools, accessories for cutting , bending and threading of reinforcement

K9 the characteristics, quality, uses, sustainability, limitations and defects associated with the resources and how defects should be rectified

None

KB9. types of hand tool available for cutting and bending

SB8. minimize wastages

K10 how the resources should be used and how any problems associated with the resources are reported

None

SB9. optimize resources

SB10. evaluate the complexity of the tasks and seek assistance and support wherever required

KA4. service request procedure for tools, materials and equipments

K11 the organisational procedures to select resources, why they have been developed and how they are used

None

KA2. safety rules and regulations for handling and storing required tools, equipment and materials

K12 the hazards associated with the resources and methods of work and how they are overcome

None

K13 how to protect work from damage and the purpose of protection

CON/N9001:Work according to personal health, safety and environment protocol at construction site

K14 why disposal of waste should be carried out safely and how it is achieved

None

KA1. standard practices for reinforcement work

K15 how methods of work, to meet the specification, are carried out and problems reported

None

CON/N0204: Read and understand routine drawings / sketches and Bar Bending Schedule

K16 how maintenance of tools and equipment is carried out

None

138

Page 140: Transnational Skill Standards Foreman Electrical Works ... · conduit enclosures are in accordance with: P6.1 the electrical system’s ... concealed, exposed, electrical wiring work

TRANSNATIONAL SKILL STANDARDS FOR CONSTRUCTION INDUSTRY

Knowledge & Understanding: Knowledge & Understanding: Gaps in Indian NOS

K17 what the programme is for the work to be carried out in the estimated, allocated time and why deadlines should be kept

General Note: In the Construction SSC NOS, Rangestatement is not separated out. It is integrated holistically into the PCs andknowledge within the QPs

139

Page 141: Transnational Skill Standards Foreman Electrical Works ... · conduit enclosures are in accordance with: P6.1 the electrical system’s ... concealed, exposed, electrical wiring work

TRANSNATIONAL SKILL STANDARDS FOR CONSTRUCTION INDUSTRY

Section II continued: Compares the competencies in Indian NOS Read and understand routine drawings / sketches and Bar Bending Schedule (CON/N0204)with the UK NOSFix steel in situ(COSVR534).

NOS Mapping Descriptions

Indian QP Title Bar Bender & Steel Fixer UK Qualification Steel fixer

Indian QP Code CON/Q203 UK Qualification Code QUA844

Indian NOS Read and understand routine drawings / sketches and Bar Bending Schedule

UK Unit Title Fix steel in situ

Indian NOS Code CON/N0204 UK NOS Code COSVR534

Scope This scope covers the following:

• Read and understand routine drawings / sketches

• Read and understand Bar Bending Schedule

Overview This standard is about

1 interpreting information

2 adopting safe and healthy working practices

3 selecting materials, components and equipment

4 preparing, cutting and bending reinforcement steel to standard shapes using recognised codes

140

Page 142: Transnational Skill Standards Foreman Electrical Works ... · conduit enclosures are in accordance with: P6.1 the electrical system’s ... concealed, exposed, electrical wiring work

TRANSNATIONAL SKILL STANDARDS FOR CONSTRUCTION INDUSTRY

Competency Mapping: Thefollowingtable, the Indian NOS maps with the UK NOS COSVR534 ‘Fix steel in situ ’ UK NOS.

Performance Criteria - Indian NOS

Performance Criteria - UK NOS Gaps in Indian NOS

To be competent, the user/individual on the job must be able to-

You must be able to-

PC1. select hand tools/power tools for cutting rebars as per requirement / instruction

P1,Intrepet the given information relating to the work and to resources to confirm its relevance

interpretations of specifications, schedules, risk assessment and manufacturers information

PC8. select hand/power tools for bending rebars with respect to the work

PC10. mark on rebar and place & fix rods on correct position for bending

CON/N0206: Prepare, fabricate, place and fix reinforcement for RCC structures

PC2. select cutting blade for cutting of rebar as per requirement / instruction

P2: comply with the given, relevant legislation and official guidance to carry out your work and maintain safe and healthy work practices

w.r.t Scope /Range of P2: :safe use of health and safety access equipment

CON/N9001:Work according to personal health, safety and environment protocol at construction site

PC4. place rebars properly for cutting, as per requirement and instruction

P3: select the required quantity and quality of resources for the methods of work

None

PC6. maintain correct body posture while cutting rebars manually or mechanically tag and stack rebars after cutting as per standards practices

PC9. select accessories for bending with respect to the diameter of rebar used &machine used

PC11. maintain correct body posture while bending rebars manually or mechanically

CON/N9001:Work according to P4: comply with organisational protection of the work and its

141

Page 143: Transnational Skill Standards Foreman Electrical Works ... · conduit enclosures are in accordance with: P6.1 the electrical system’s ... concealed, exposed, electrical wiring work

TRANSNATIONAL SKILL STANDARDS FOR CONSTRUCTION INDUSTRY

Performance Criteria - Indian NOS

Performance Criteria - UK NOS Gaps in Indian NOS

personal health, safety and environment protocol at construction site

procedures to minimise the risk of damage to the work and surrounding area

surrounding area from damage

CON/N0205: Use hand and power tools for cutting and bending of reinforcement

P5: comply with the given contract information to carry out the work efficiently to the required specification

None

CON/N0206: Prepare, fabricate, place and fix reinforcement for RCC structures

PC7. plan for cutting of rebars as per instructions

P6: complete the work within the allocated time, in accordance with the programme of work

None

PC12. plan for cutting of rebars as per instructions, considering minimum wastage and cutting length

Knowledge & Understanding: Knowledge & Understanding: Gaps in Indian NOS

K1 the organisational procedures developed to report and rectify inappropriate information and unsuitable resources, and how they are implemented

KB1. how to read basic drawing/sketches for bar bending and fixing works

K2 the types of information, their source and how they are interpreted

None

KB5. how to read and understand BBS

CON/N0206: Prepare, fabricate, place and fix reinforcement for RCC structures

K3 the organisational procedures to solve problems with the information and why it is important they are followed

None

142

Page 144: Transnational Skill Standards Foreman Electrical Works ... · conduit enclosures are in accordance with: P6.1 the electrical system’s ... concealed, exposed, electrical wiring work

TRANSNATIONAL SKILL STANDARDS FOR CONSTRUCTION INDUSTRY

Knowledge & Understanding: Knowledge & Understanding: Gaps in Indian NOS

K4 the level of understanding operatives must have of information for relevant, current legislation and official guidance and how it is applied

CON/N9001:Work according to personal health, safety and environment protocol at construction site

K5 how emergencies should be responded to and who should respond

None

K6 the organisational security procedures for tools, equipment and personal belongings

CON/N9001:Work according to personal health, safety and environment protocol at construction site

K7 what the accident reporting procedures are and who is responsible for making the report

None

CON/N9001:Work according to personal health, safety and environment protocol at construction site

K8 why, when and how health and safety control equipment should be used

None

KA5. maintenance of tools and equipments

K9 the characteristics, quality, uses, sustainability, limitations and defects associated with the resources and how defects should be rectified

None

KB8. different types of cover block and their uses

KB9. how to prevent reinforcement from rusting

KB10. different types of steel rods, length and diameter

KB11. different types of binding wire, thickness and uses

KB12. mould forms and their specific requirements along with process / procedure to befollowed for pre cast

143

Page 145: Transnational Skill Standards Foreman Electrical Works ... · conduit enclosures are in accordance with: P6.1 the electrical system’s ... concealed, exposed, electrical wiring work

TRANSNATIONAL SKILL STANDARDS FOR CONSTRUCTION INDUSTRY

Knowledge & Understanding: Knowledge & Understanding: Gaps in Indian NOS

reinforcement

KB13basic material properties of bars like strength

SB8. minimize wastages K10 how the resources should be used and how any problems associated with the resources are reported

None

SB9. optimize resources

KA4. service request procedure for tools, materials and equipments

K11 the organisational procedures to select resources, why they have been developed and how they are used

None

KA2. safety rules and regulations for handling and storing required tools, equipment and materials

K12 the hazards associated with the resources and methods of work and how they are overcome

None

K13 how to protect work from damage and the purpose of protection

CON/N9001:Work according to personal health, safety and environment protocol at construction site

K14 why disposal of waste should be carried out safely and how it is achieved

None

KA1. standard practices for reinforcement work

K15 how methods of work, to meet the specification, are carried out and problems reported

None

KA5. maintenance of tools and equipments

K16 how maintenance of tools and equipment is carried out

None

K17 what the programme is for the work to be carried out in the estimated, allocated time and why deadlines should be kept

General Note: In the Construction SSC NOS, Rangestatement is not separated out. It is integrated holistically into the PCs andknowledge within the QPs

144

Page 146: Transnational Skill Standards Foreman Electrical Works ... · conduit enclosures are in accordance with: P6.1 the electrical system’s ... concealed, exposed, electrical wiring work

TRANSNATIONAL SKILL STANDARDS FOR CONSTRUCTION INDUSTRY

Section II continued: Compares the competencies in Indian Prepare, fabricate, place and fix reinforcement for RCC structures (CON/N0206)with the UK NOSFix steel in situ(COSVR534).

NOS Mapping Descriptions

Indian QP Title Bar Bender & Steel Fixer UK Qualification Steel fixer

Indian QP Code CON/Q203 UK Qualification Code QUA844

Indian NOS Prepare, fabricate, place and fix reinforcement for RCC structures

UK Unit Title Fix steel in situ

Indian NOS Code CON/N0206 UK NOS Code COSVR534

Scope This scope covers the following:

• Fabricate, place and fix reinforcement for R.C.C structures as per Bar Bending Schedule and drawing

Overview This standard is about

1 interpreting information

2 adopting safe and healthy working practices

3 selecting materials, components and equipment

4 preparing, cutting and bending reinforcement steel to standard shapes using recognised codes

Competency Mapping: Thefollowingtable, the Indian NOS maps with the UK NOS COSVR534 ‘Fix steel in situ ’ UK NOS.

Performance Criteria - Indian NOS

Performance Criteria - UK NOS Gaps in Indian NOS

To be competent, the user/individual on the job must be able to-

You must be able to-

PC1. read & understand relevant specification given in the sketches/drawing

P1,Intrepet the given information relating to the work and to resources to confirm its relevance

interpretations of specifications, schedules, risk assessment and manufacturers information

PC12. follow sequence of tying as per method statement

145

Page 147: Transnational Skill Standards Foreman Electrical Works ... · conduit enclosures are in accordance with: P6.1 the electrical system’s ... concealed, exposed, electrical wiring work

TRANSNATIONAL SKILL STANDARDS FOR CONSTRUCTION INDUSTRY

CON/N0204: Read and understand routine drawings / sketches and Bar Bending Schedule PC2. follow correct method for insertion/ fixing of rebars as per the types of structure

P2: comply with the given, relevant legislation and official guidance to carry out your work and maintain safe and healthy work practices

safe use of health and safety access equipment

PC12. follow sequence of tying as per method statement

CON/N9001:Work according to personal health, safety and environment protocol at construction site PC3. select rebars for placement as per the drawing

P3: select the required quantity and quality of resources for the methods of work

None

CON/N0205: Use hand and power tools for cutting and bending of reinforcement

CON/N9001:Work according to personal health, safety and environment protocol at construction site

P4: comply with organisational procedures to minimise the risk of damage to the work and surrounding area

Protection of the work and its surrounding area from damage

PC4. mark and place rebars, fabricate cage and fix on its position as per the drawing

P5: comply with the given contract information to carry out the work efficiently to the required specification

None

PC5. maintain uniform spacing between the bars, stirrups, link rod as per the drawing

PC6. stagger the lap to avoid more than 50% of splicing

PC7. place and fix mechanical coupler in case of higher diameter rebars used

PC8. tie reinforcement with approved binding wires as per drawing with specified spacing

PC9. ensure cover blocks and spacers are placed to maintain appropriate covers & spacing

146

Page 148: Transnational Skill Standards Foreman Electrical Works ... · conduit enclosures are in accordance with: P6.1 the electrical system’s ... concealed, exposed, electrical wiring work

TRANSNATIONAL SKILL STANDARDS FOR CONSTRUCTION INDUSTRY

Knowledge & Understanding: Knowledge & Understanding: Gaps in Indian NOS

K1 the organisational procedures developed to report and rectify inappropriate information and unsuitable resources, and how they are implemented

KB1. basic drawing/sketches related to reinforcement work

K2 the types of information, their source and how they are interpreted

None

SB5. rectify any problem in related to fixing or insertion of reinforcement in congested area

K3 the organisational procedures to solve problems with the information and why it is important they are followed

None

SB11. evaluate the complexity of the task and seek assistance and support

PC10. place and fix chairs at specified spacing to maintain correct thickness

PC11. ensure that location and position of reinforcement and fixing ties to reinforcement are checked for accuracy

PC12. follow sequence of tying as per method statement

PC13. provide suitable stiffeners for lifting in case of prefabricated cage

CON/N0205: Use hand and power tools for cutting and bending of reinforcement

SB4. complete work as per agreed time schedule and quality

P6: complete the work within the allocated time, in accordance with the programme of work

None

147

Page 149: Transnational Skill Standards Foreman Electrical Works ... · conduit enclosures are in accordance with: P6.1 the electrical system’s ... concealed, exposed, electrical wiring work

TRANSNATIONAL SKILL STANDARDS FOR CONSTRUCTION INDUSTRY

Knowledge & Understanding: Knowledge & Understanding: Gaps in Indian NOS

wherever required SB12. bring to the notice of the superiors violation of any safety norms which may lead to accidents

K4 the level of understanding operatives must have of information for relevant, current legislation and official guidance and how it is applied

CON/N9001:Work according to personal health, safety and environment protocol at construction site

K5 how emergencies should be responded to and who should respond

None

K6 the organisational security procedures for tools, equipment and personal belongings

CON/N9001:Work according to personal health, safety and environment protocol at construction site

K7 what the accident reporting procedures are and who is responsible for making the report

None

CON/N9001:Work according to personal health, safety and environment protocol at construction site

K8 why, when and how health and safety control equipment should be used

None

KB6. lapping length and importance of lapping for different diameter of rebars

K9 the characteristics, quality, uses, sustainability, limitations and defects associated with the resources and how defects should be rectified

None

KB13. how to check the quality of cutting blade by visual inspection

KB14. how to check the quality of accessories which are used for

148

Page 150: Transnational Skill Standards Foreman Electrical Works ... · conduit enclosures are in accordance with: P6.1 the electrical system’s ... concealed, exposed, electrical wiring work

TRANSNATIONAL SKILL STANDARDS FOR CONSTRUCTION INDUSTRY

Knowledge & Understanding: Knowledge & Understanding: Gaps in Indian NOS

cutting & bending of rebars

KB17. different types and thickness of binding wire

KB18. different types of cover blocks available

SB8. minimize wastages K10 how the resources should be used and how any problems associated with the resources are reported

None

SB9. optimize resources

SB10. revert to superior for selection/sorting of materials

KA4. service request procedure for tools, materials and equipments

K11 the organisational procedures to select resources, why they have been developed and how they are used

None

KB15. electrical safety of powers tools and equipments used in bar bending works

K12 the hazards associated with the resources and methods of work and how they are overcome

None

K13 how to protect work from damage and the purpose of protection

CON/N9001:Work according to personal health, safety and environment protocol at construction site

K14 why disposal of waste should be carried out safely and how it is achieved

None

KA1. standard practices for reinforcement work

K15 how methods of work, to meet the specification, are carried out and problems reported

None

KA5. maintenance of tools and equipments

K16 how maintenance of tools and equipment is carried out

None

K17 what the programme is for the work to be carried out in the estimated, allocated time and why deadlines

149

Page 151: Transnational Skill Standards Foreman Electrical Works ... · conduit enclosures are in accordance with: P6.1 the electrical system’s ... concealed, exposed, electrical wiring work

TRANSNATIONAL SKILL STANDARDS FOR CONSTRUCTION INDUSTRY

Knowledge & Understanding: Knowledge & Understanding: Gaps in Indian NOS

should be kept

General Note: In the Construction SSC NOS, Rangestatement is not separated out. It is integrated holistically into the PCs andknowledge within the QPs

150

Page 152: Transnational Skill Standards Foreman Electrical Works ... · conduit enclosures are in accordance with: P6.1 the electrical system’s ... concealed, exposed, electrical wiring work

TRANSNATIONAL SKILL STANDARDS FOR CONSTRUCTION INDUSTRY

Section II continued: Compares the competencies in Indian NOS Read and understand routine drawings / sketches and Bar Bending Schedule (CON/N0204)with the UK NOSPrefabricate reinforcement steel sections (COSVR535).

NOS Mapping Descriptions

Indian QP Title Bar Bender & Steel Fixer UK Qualification Steel fixer

Indian QP Code CON/Q203 UK Qualification Code QUA844

Indian NOS Read and understand routine drawings / sketches and Bar Bending Schedule

UK Unit Title Prefabricate reinforcement steel sections

Indian NOS Code CON/N0204 UK NOS Code COSVR535

Scope This scope covers the following:

• Read and understand routine drawings / sketches

• Read and understand Bar Bending Schedule

Overview "This standard is about

1 interpreting information

2 adopting safe and healthy working practices

3 selecting materials, components and equipment

4 prefabricating reinforcing steel for concrete structures

5 bracing and preparing prefabricated sections of reinforcement steel for lifting and movement to installation"

151

Page 153: Transnational Skill Standards Foreman Electrical Works ... · conduit enclosures are in accordance with: P6.1 the electrical system’s ... concealed, exposed, electrical wiring work

TRANSNATIONAL SKILL STANDARDS FOR CONSTRUCTION INDUSTRY

Competency Mapping: Thefollowingtable, the Indian NOS maps with the UK NOS COSVR535 ‘Prefabricate reinforcement steel sections’ UK NOS.

Performance Criteria - Indian NOS

Performance Criteria - UK NOS Gaps in Indian NOS

To be competent, the user/individual on the job must be able to-

You must be able to-

PC1. select hand tools/power tools for cutting rebars as per requirement / instruction

P1:Intrepet the given information relating to the work and to resources to confirm its relevance

interpretations of specifications, schedules, risk assessment and manufacturers information

PC8. select hand/power tools for bending rebars with respect to the work PC10. mark on rebar and place & fix rods on correct position for bending CON/N0206: Prepare, fabricate, place and fix reinforcement for RCC structures PC2. select cutting blade for cutting of rebar as per requirement / instruction

P2: comply with the given, relevant legislation and official guidance to carry out your work and maintain safe and healthy work practices

safe use of health and safety access equipment

CON/N9001:Work according to personal health, safety and environment protocol at construction site PC4. place rebars properly for cutting, as per requirement and instruction

P3: select the required quantity and quality of resources for the methods of work

None

PC6. maintain correct body posture while cutting rebars manually or mechanically tag and stack rebars after cutting as per standards practices

PC9. select accessories for bending with respect to the diameter of rebar used & machine used

152

Page 154: Transnational Skill Standards Foreman Electrical Works ... · conduit enclosures are in accordance with: P6.1 the electrical system’s ... concealed, exposed, electrical wiring work

TRANSNATIONAL SKILL STANDARDS FOR CONSTRUCTION INDUSTRY

Knowledge & Understanding: Knowledge & Understanding: Gaps in Indian NOS

K1 the organisational procedures developed to report and rectify inappropriate information and unsuitable resources, and how they are implemented

KB1. how to read basic drawing/sketches for bar bending and fixing works

K2 the types of information, their source and how they are interpreted

None

KB5. how to read and understand BBS

CON/N0206: Prepare, fabricate, place and fix reinforcement for RCC structures

K3 the organisational procedures to solve problems with the information and why it is important they are followed

None

PC11. maintain correct body posture while bending rebars manually or mechanically

CON/N9001:Work according to personal health, safety and environment protocol at construction site

P4: comply with organisational procedures to minimise the risk of damage to the work and surrounding area

protection of the work and its surrounding area from damage

CON/N0205: Use hand and power tools for cutting and bending of reinforcement

P5: comply with the given contract information to carry out the work efficiently to the required specification

None

CON/N0206: Prepare, fabricate, place and fix reinforcement for RCC structures PC7. plan for cutting of rebars as per instructions

P6: complete the work within the allocated time, in accordance with the programme of work

None

PC12. plan for cutting of rebars as per instructions, considering minimum wastage and cutting length

153

Page 155: Transnational Skill Standards Foreman Electrical Works ... · conduit enclosures are in accordance with: P6.1 the electrical system’s ... concealed, exposed, electrical wiring work

TRANSNATIONAL SKILL STANDARDS FOR CONSTRUCTION INDUSTRY

Knowledge & Understanding: Knowledge & Understanding: Gaps in Indian NOS

K4 the level of understanding operatives must have of information for relevant, current legislation and official guidance and how it is applied

CON/N9001:Work according to personal health, safety and environment protocol at construction site

K5 how emergencies should be responded to and who should respond

None

K6 the organisational security procedures for tools, equipment and personal belongings

CON/N9001:Work according to personal health, safety and environment protocol at construction site

K7 what the accident reporting procedures are and who is responsible for making the report

None

CON/N9001:Work according to personal health, safety and environment protocol at construction site

K8 why, when and how health and safety control equipment should be used

None

KA5. maintenance of tools and equipments

K9 the characteristics, quality, uses, sustainability, limitations and defects associated with the resources and how defects should be rectified

None

KB8. different types of cover block and their uses

KB9. how to prevent reinforcement from rusting

KB10. different types of steel rods, length and diameter

KB11. different types of binding wire, thickness and uses

KB12. mould forms and their specific requirements along with process / procedure to be followed for pre cast reinforcement

154

Page 156: Transnational Skill Standards Foreman Electrical Works ... · conduit enclosures are in accordance with: P6.1 the electrical system’s ... concealed, exposed, electrical wiring work

TRANSNATIONAL SKILL STANDARDS FOR CONSTRUCTION INDUSTRY

Knowledge & Understanding: Knowledge & Understanding: Gaps in Indian NOS

KB13basic material properties of bars like strength

SB8. minimize wastages K10 how the resources should be used and how any problems associated with the resources are reported

None

SB9. optimize resources

KA4. service request procedure for tools, materials and equipments

K11 the organisational procedures to select resources, why they have been developed and how they are used

None

KA2. safety rules and regulations for handling and storing required tools, equipment and materials

K12 the hazards associated with the resources and methods of work and how they are overcome

None

K13 how to protect work from damage and the purpose of protection

CON/N9001:Work according to personal health, safety and environment protocol at construction site

K14 why disposal of waste should be carried out safely and how it is achieved

None

KA1. standard practices for reinforcement work

K15 how methods of work, to meet the specification, are carried out and problems reported

None

KA5. maintenance of tools and equipments

K16 how maintenance of tools and equipment is carried out

None

K17 what the programme is for the work to be carried out in the estimated, allocated time and why deadlines should be kept

General Note: In the Construction SSC NOS, Rangestatement is not separated out. It is integrated holistically into the PCs andknowledge within the QPs

155

Page 157: Transnational Skill Standards Foreman Electrical Works ... · conduit enclosures are in accordance with: P6.1 the electrical system’s ... concealed, exposed, electrical wiring work

TRANSNATIONAL SKILL STANDARDS FOR CONSTRUCTION INDUSTRY

Section II continued: Compares the competencies in Indian NOS Prepare, fabricate, place and fix reinforcement for RCC structures (CON/N0206) with the UK NOS Prefabricate reinforcement steel sections(COSVR535).

NOS Mapping Descriptions

Indian QP Title Bar Bender & Steel Fixer UK Qualification Steel fixer

Indian QP Code CON/Q203 UK Qualification Code QUA844

Indian NOS Prepare, fabricate, place and fix reinforcement for RCC structures

UK Unit Title Prefabricate reinforcement steel sections

Indian NOS Code CON/N0206 UK NOS Code COSVR535

Scope This scope covers the following:

• Fabricate, place and fix reinforcement for R.C.C structures as per Bar Bending Schedule and drawing

Overview This standard is about

1 interpreting information

2 adopting safe and healthy working practices

3 selecting materials, components and equipment

4 preparing, cutting and bending reinforcement steel to standard shapes using recognised codes

156

Page 158: Transnational Skill Standards Foreman Electrical Works ... · conduit enclosures are in accordance with: P6.1 the electrical system’s ... concealed, exposed, electrical wiring work

TRANSNATIONAL SKILL STANDARDS FOR CONSTRUCTION INDUSTRY

Competency Mapping: Thefollowingtable, the Indian NOS maps with the UK NOS COSVR535 ‘Prefabricate reinforcement steel sections’ UK NOS.

Performance Criteria - Indian NOS

Performance Criteria - UK NOS Gaps in Indian NOS

To be competent, the user/individual on the job must be able to-

You must be able to-

PC1. read & understand relevant specification given in the sketches/drawing

P1,Intrepet the given information relating to the work and to resources to confirm its relevance

interpretations of specifications, schedules, risk assessment and manufacturers information

PC12. follow sequence of tying as per method statement

CON/N0204: Read and understand routine drawings / sketches and Bar Bending Schedule PC2. follow correct method for insertion/ fixing of rebars as per the types of structure

P2: comply with the given, relevant legislation and official guidance to carry out your work and maintain safe and healthy work practices

safe use of health and safety access equipment

PC12. follow sequence of tying as per method statement

CON/N9001:Work according to personal health, safety and environment protocol at construction site PC3. select rebars for placement as per the drawing

P3: select the required quantity and quality of resources for the methods of work

None

CON/N0205: Use hand and power tools for cutting and bending of reinforcement

CON/N9001:Work according to personal health, safety and environment protocol at construction site

P4: comply with organisational procedures to minimise the risk of damage to the work and surrounding area

Protection of the work and its surrounding area from damage

PC4. mark and place rebars, fabricate cage and fix on its position as per the drawing

P5: comply with the given contract information to carry out the work efficiently to the required specification

lifting points

PC5. maintain uniform spacing between the bars, stirrups, link

157

Page 159: Transnational Skill Standards Foreman Electrical Works ... · conduit enclosures are in accordance with: P6.1 the electrical system’s ... concealed, exposed, electrical wiring work

TRANSNATIONAL SKILL STANDARDS FOR CONSTRUCTION INDUSTRY

rod as per the drawing

PC6. stagger the lap to avoid more than 50% of splicing

PC7. place and fix mechanical coupler in case of higher diameter rebars used

PC8. tie reinforcement with approved binding wires as per drawing with specified spacing

PC9. ensure cover blocks and spacers are placed to maintain appropriate covers & spacing

PC10. place and fix chairs at specified spacing to maintain correct thickness

PC11. ensure that location and position of reinforcement and fixing ties to reinforcement are checked for accuracy

PC12. follow sequence of tying as per method statement

PC13. provide suitable stiffeners for lifting in case of prefabricated cage

CON/N0205: Use hand and power tools for cutting and bending of reinforcement

SB4. complete work as per agreed time schedule and quality

P6: complete the work within the allocated time, in accordance with the programme of work

None

158

Page 160: Transnational Skill Standards Foreman Electrical Works ... · conduit enclosures are in accordance with: P6.1 the electrical system’s ... concealed, exposed, electrical wiring work

TRANSNATIONAL SKILL STANDARDS FOR CONSTRUCTION INDUSTRY

Knowledge & Understanding: Knowledge & Understanding: Gaps in Indian NOS

K1 the organisational procedures developed to report and rectify inappropriate information and unsuitable resources, and how they are implemented

KB1. basic drawing/sketches related to reinforcement work

K2 the types of information, their source and how they are interpreted

None

SB5. rectify any problem in related to fixing or insertion of reinforcement in congested area

K3 the organisational procedures to solve problems with the information and why it is important they are followed

None

SB11. evaluate the complexity of the task and seek assistance and support wherever required SB12. bring to the notice of the superiors violation of any safety norms which may lead to accidents

K4 the level of understanding operatives must have of information for relevant, current legislation and official guidance and how it is applied

CON/N9001:Work according to personal health, safety and environment protocol at construction site

K5 how emergencies should be responded to and who should respond

None

K6 the organisational security procedures for tools, equipment and personal belongings

159

Page 161: Transnational Skill Standards Foreman Electrical Works ... · conduit enclosures are in accordance with: P6.1 the electrical system’s ... concealed, exposed, electrical wiring work

TRANSNATIONAL SKILL STANDARDS FOR CONSTRUCTION INDUSTRY

Knowledge & Understanding: Knowledge & Understanding: Gaps in Indian NOS

CON/N9001:Work according to personal health, safety and environment protocol at construction site

K7 what the accident reporting procedures are and who is responsible for making the report

None

CON/N9001:Work according to personal health, safety and environment protocol at construction site

K8 why, when and how health and safety control equipment should be used

None

KB6. lapping length and importance of lapping for different diameter of rebars

K9 the characteristics, quality, uses, sustainability, limitations and defects associated with the resources and how defects should be rectified

None

KB13. how to check the quality of cutting blade by visual inspection

KB14. how to check the quality of accessories which are used for cutting & bending of rebars

KB17. different types and thickness of binding wire

KB18. different types of cover blocks available

SB8. minimize wastages K10 how the resources should be used and how any problems associated with the resources are reported

None

SB9. optimize resources

SB10. revert to superior for selection/sorting of materials

KA4. service request procedure for tools, materials and equipments

K11 the organisational procedures to select resources, why they have been developed and how they are used

None

KB15. electrical safety of powers tools and equipments used in bar bending works

K12 the hazards associated with the resources and methods of work and how they are overcome

None

160

Page 162: Transnational Skill Standards Foreman Electrical Works ... · conduit enclosures are in accordance with: P6.1 the electrical system’s ... concealed, exposed, electrical wiring work

TRANSNATIONAL SKILL STANDARDS FOR CONSTRUCTION INDUSTRY

Knowledge & Understanding: Knowledge & Understanding: Gaps in Indian NOS

K13 how to protect work from damage and the purpose of protection

CON/N9001:Work according to personal health, safety and environment protocol at construction site

K14 why disposal of waste should be carried out safely and how it is achieved

None

KA1. standard practices for reinforcement work

K15 how methods of work, to meet the specification, are carried out and problems reported

None

KA5. maintenance of tools and equipments

K16 how maintenance of tools and equipment is carried out

None

K17 what the programme is for the work to be carried out in the estimated, allocated time and why deadlines should be kept

General Note: In the Construction SSC NOS, Rangestatement is not separated out. It is integrated holistically into the PCs andknowledge within the QPs

161