TRANSMISSION CORPORATION OF ANDHRA PRADESH LIMITED Sub: 2 nd circuit stringing on 8 kM of 132kV DC/SC line between location No. 7411 and 75 of . Nidadavolu -Bhimavaram l32kV line to MIs Ravali Spinners Pvt. Ltd., and erection of 132kV DC/SC line from location No. 74/1 of Nidadavolu - Bhimavaram 132kV line to . 132kV Tanuku 132kV substation - Administrative approval accorded. TOO (CE Construction-II) MS. No. 478 Date: 09/03/2012 APTRANSCO had approved scheme for extension of additional load 3.2 MVA to MIs. Ravali Spinners Pvt. Ltd., Khanadavili Post, Tanuku, West Godavari District (Referred to as 'the company' henceforth) in addition to the existing CMD of3.15 MVA total aggregating CMD of 6.35 MVA at 132 kV Potential by erecting 132kV DC/SC line from Tanuku 132 kV SS to the company with 132 kV Bays at either ends on 25102/2010. Accordingly, the works were taken up by the company by paying necessary development and supervision charges to APTRANSCO. After erecting 8 kM of 132kV DC/SC line from the Company end and also 132kV bays at the Tanuku 132kV SS and the Company end, erection of balance 2 kM of line is held up due to severe right of way problems. The company has requested APTRANSCO for permission to avail supply by temporary arrangement. 2. APTRANSCO has accorded approval for executing the following works by collecting applicable scheme cost from the Company: a) Erection of 132kV DC/SC line from between location No. 7411 2 7124000.00 and 75 of Nidadavolu 220 kV SS - Bhimavaram 132 kV SS line kM to Tanuku 132 kV SS b) 2 no circuit stringing of 132kV Dc/SC line from tapping point of 8 6400000.00 132kV line from Nidadavolu 220 kV SS to Bhimavaram 132 kV kM SS to MIs Ravali Spinners Total amount to be paid by MIs Ravali Spinners Pvt. Ltd. For 13524000.00 APTRANSCO to take up the works: 3. The Company has paid an amount of Rs. 1,35,24,0001- vide Demand Draft drawn on State Bank of India, Yellareddiguda, (Hyderabad) branch, bearing No. "488864" on 02/03/2012. 4. After careful consideration, APTRANSCO accords approval for the above Scheme at a total cost of Rs. I, 35,24,0001- (Rupees One Crore, Thirty Five Lakhs and Twenty Four Thousand Only) 5. "In exercise of the powers conferred under section 164 of the Electricity Act,2003 Central Act No.36, the Government of Andhra Pradesh, vide G.O.Ms.No.115 dated 07110/2003, conferred upon the Transmission Corporation of Andhra Pradesh Limited, the Transmission licensee in the State oflAndhra Pradesh, the powers for placing of the electric supply lines or electric plant for the transmission of electricity or for the purpose of telephonic or telegraphic communications necessary for the proper co-ordination of works that a telegraphic authority possessed under the provision of the Indian Telegraph Act, 1885 (Central Act 13 of 1885)." 6. The Chief Engineer/Zone/Visakhapatnam is authorised to take up the works stated at 2 (b) above duly following the departmental procedures in vogue. ----- -- -- -_. ---_ .. _--- ._- -- ----

TRANSMISSION CORPORATION OF ANDHRA ... - aptransco.co.in · APTRANSCO to take up the works: 3. The Company has paid an amount of Rs. 1,35,24,0001-vide Demand Draft drawn on State

  • Upload
    others

  • View
    0

  • Download
    0

Embed Size (px)

Citation preview

Page 1: TRANSMISSION CORPORATION OF ANDHRA ... - aptransco.co.in · APTRANSCO to take up the works: 3. The Company has paid an amount of Rs. 1,35,24,0001-vide Demand Draft drawn on State

TRANSMISSION CORPORATION OF ANDHRA PRADESH LIMITED

Sub: 2nd circuit stringing on 8 kM of 132kV DC/SC line between location No. 7411 and 75 of .Nidadavolu -Bhimavaram l32kV line to MIs Ravali Spinners Pvt. Ltd., and erection of132kV DC/SC line from location No. 74/1 of Nidadavolu - Bhimavaram 132kV line to .132kV Tanuku 132kV substation - Administrative approval accorded.

TOO (CE Construction-II) MS. No. 478 Date: 09/03/2012

APTRANSCO had approved scheme for extension of additional load 3.2 MVA toMIs. Ravali Spinners Pvt. Ltd., Khanadavili Post, Tanuku, West Godavari District (Referred to as'the company' henceforth) in addition to the existing CMD of3.15 MVA total aggregating CMDof 6.35 MVA at 132 kV Potential by erecting 132kV DC/SC line from Tanuku 132 kV SS to thecompany with 132 kV Bays at either ends on 25102/2010. Accordingly, the works were taken upby the company by paying necessary development and supervision charges to APTRANSCO.After erecting 8 kM of 132kV DC/SC line from the Company end and also 132kV bays at theTanuku 132kV SS and the Company end, erection of balance 2 kM of line is held up due tosevere right of way problems. The company has requested APTRANSCO for permission to availsupply by temporary arrangement.

2. APTRANSCO has accorded approval for executing the following works by collecting applicablescheme cost from the Company:

a) Erection of 132kV DC/SC line from between location No. 7411 2 7124000.00and 75 of Nidadavolu 220 kV SS - Bhimavaram 132 kV SS line kMto Tanuku 132 kV SS

b) 2no circuit stringing of 132kV Dc/SC line from tapping point of 8 6400000.00132kV line from Nidadavolu 220 kV SS to Bhimavaram 132 kV kMSS to MIs Ravali SpinnersTotal amount to be paid by MIs Ravali Spinners Pvt. Ltd. For 13524000.00APTRANSCO to take up the works:

3. The Company has paid an amount of Rs. 1,35,24,0001- vide Demand Draft drawn on State Bankof India, Yellareddiguda, (Hyderabad) branch, bearing No. "488864" on 02/03/2012.

4. After careful consideration, APTRANSCO accords approval for the above Scheme at a total costof Rs. I, 35,24,0001- (Rupees One Crore, Thirty Five Lakhs and Twenty Four Thousand Only)

5. "In exercise of the powers conferred under section 164 of the Electricity Act,2003 Central ActNo.36, the Government of Andhra Pradesh, vide G.O.Ms.No.115 dated 07110/2003, conferredupon the Transmission Corporation of Andhra Pradesh Limited, the Transmission licensee in theState oflAndhra Pradesh, the powers for placing of the electric supply lines or electric plant forthe transmission of electricity or for the purpose of telephonic or telegraphic communicationsnecessary for the proper co-ordination of works that a telegraphic authority possessed under theprovision of the Indian Telegraph Act, 1885 (Central Act 13 of 1885)."

6. The Chief Engineer/Zone/Visakhapatnam is authorised to take up the works stated at 2 (b) aboveduly following the departmental procedures in vogue.

----- -- -- -_. ---_ .._--- ._- -- ----

Page 2: TRANSMISSION CORPORATION OF ANDHRA ... - aptransco.co.in · APTRANSCO to take up the works: 3. The Company has paid an amount of Rs. 1,35,24,0001-vide Demand Draft drawn on State

7. The Chief Engineer/ZoneNisakhapatnam is authorised to take up the 8 kM 2nd circuit stringingworks related to L1LO of 132kV line from 220kV Nidadavolu SS to 132kV Bhimavaram SS onnomination basis duly following departmental procedures in vogue.

8. The order is issued with the concurrence of Chairman and Managing Directorl APTRANSCOvide Reg. No. 564 dated 22/02/2012

BY ORDER AND IN THE NAME OFTRANSMISSION CORPORATION OF ANDHRA PRADESH LIMITED

Sd/-B.UMAKAR RAO

DlRECTORIPROJECTSTo,

The Chief Engineer/Zone/Vizag, Visakhapatnam

Copy to:

The Executive Director/Planning, RAC & ReformsNidyut Soudha/Hyderabad,

The Chief Engineer/Construction-n, Vidyut Soudha, Hyderabad.

The Chief Engineer/Civil/Vidyut Soudha/Hyderabad.r

The Chief Engineer/Power SystemsNidyut Soudha/Hyderabad

The FA & CCA (A, E & R)/Vidyut Soudha/Hyderabad.

The FA & CCA (C F)/Vidyut Soudha/Hyderabad

The Superintending Engineer/TLCNisakhapatnam.

Personal Secretary to the Chairman & Managing Director.

Personal Secretary to the Joint Managing Director/(Comml, IPC & IT)

DE (T) to the Joint Managing DirectorNigilance & Security.

Personal Secretary to the Joint Managing Director/(HRD& Distribution) .

. Personal Secretary to the Director/Finance & Revenue.

Personal Secretary to Director/ Projects.

DE (T) to Director/ Transmission.

Personal Secretary to Director/ Grid Operation.

T.O.O Section.I