Transfer production from Chinese to Thai
SAKAE BOEKI CO.,LTD.
February 2015Vol.2
Contents1.Company Outline 4. Manage with Quality Risk and Change
Point
1-1 Company Information 4-1 Process change point
1-2 Company Structure 4-2 Counter-Plan and indicate Quality Risk
1-3 Company address 4-3 Material evaluation
1-4 Equipment 4-4 Each skill
4-5 QC process sheet 4-6 Process change application form
2.Purpose and background of Production Transfer
5.Layout
2-1 Expected production number3.Transfer merit to SAKAE BOEKI 6. Initial control
7.Production,Examination Equipment
1-1 Company InformationCompany’s name SAKAE BOEKI CO.,LTD.
Address No.111/37 Moo2,Phahonyothin Road,Lamsai,Wangnoi, Ayutthaya,THAILAND 13170
Factory Establishment ( Month, Year )
September 2012 January 2015
Capital 10 Million THB
Representative Kurai Shinji
Employee’s number
9 Persons
Business type Manufacuting and sale rubber product for industry.
1-2 Company OrganizationPlant Manager
Plant Manager
Plant Manager
ISO Supervisor
Quality Assurance Group
Group Leader
Manufacturing Group
Group LeaderGroup Leader Group Leader
Supervisor GroupSale technical Group
Sale Manufacturing Quality
Total 9 Persons
1-3 Company addressSAKAE BOEKI.,LTD. Address
Location FAST FAC Industrial Estate front enclose with Highway of Wongnoi, Ayutthaya province.
Access varies as below : From Suwannabhumi Airport 65 Km.From Donmuang Airport 50 Km.Bangkok city 60 Km.
* Floodwall protection Establish finished
Since our company SAKAE BOEKI
From Takata City 90 Km.
From Thai Sanko 25 Km.
2 Purpose and Background and of production transfer
3rd Boom period advance into China in 2002, request low price manpower in order to production cost decrease, has been selected to manufacture base in Shanghai. Quickly decision, we established a Shanghai factory by ownership of capital 100% from it is easy prevent the outflow such as manufacturing know-how etc. At that time the automobile production value in China is 300 million units. Production of Shanghai factory, product export to Japan is main.
After that our company across “Bankruptcy of Lehman Brothers” in 2005, ARS in 2003 also proceed adjustment of China sale structure, Order of China domestic delivery had been growing according to trace of firm market.
Your company's China factory like that located on the distance of about 10 minutes by car from our company, was allowed to Start Dealing in 2005.
Domestic sale of Shanghai factory in 2011 is 69% of overall but “Senkaku Problem” have effect on high-valued yen in 2012 until said as “China risk, China + 1”, 38% of Shanghai factory sale in 2014 was sold for ASEAN.
SAKAE BOEKI sell production goods of Shanghai factory and Thailand local 2 companies of product in 2012. Now our company preformed Local House Production System for according to order increase of ASEAN.
Rubber bush ordered on August 2012 [New] is mass production at Shanghai Factory, has been start shipping to Japan since January 2013, to Thailand since May 2013.
November 2014 in the last year increased, so can predict as the quantity increase from the long-term demand forecast. Beside, [2SV] was opened on November 2015 and [2HX] was opened June 2016 schedule, a result that was done the careful examination in the company, can decide the application of domestic production for the following reasons.
①New equipment introduction by facility load of China factory is necessary. ②Supply support at optimal production location. ③Improve customer satisfaction by localization and manufacturing in Thailand where main delivery destination.
2-1 Production schedule part number
Received order from THAI SANKO November 2014 148,800 December 2014 100,800 January 2015 302,400 February 2015 100,800
announce Mar’ 2015 - May100,800 pcs / Month
1104440− AC 0
Product Mold
Before transfer After transfer Car type Customer
Transfer to Thai1 Time
1 Time2 Time
Shanghai
manufacturing2 Time SANKOJAPAN
THAI SANKO
3. Transfer Merit to SAKAE BOEKI ① Cost Merit
• Transport cost reduction 350 THB/Box→ 100 THB/Box Status : Great reduction cause changed import from china to Thailand domestic. Material price China :175 THB/kg → Thai :160THB/kg To replace drug was developed in Thailand by combine development time. at the time of the formulation.
3 Transfer Merit to SAKAE BOEKI ② Delivery Merit
• Delivery lead time shortage. 50 Days→25 DaysStatus : Marine transport and IMP-EXP Custom Clearance since factory shipping from THAI SANKO 16 Days.
• Delivery frequency improvement Since factory to THAI SANKO 25 km.Status : 2 Times/MonthImprove : 1 Time/Week ( Negotiable : THAI SANKO )
3 Transfer Merit to SAKAE BOEKI ③Quality Merit
• Eliminate Marine transportation damage. Shipping box damage due to sea transport, there is no possibility of packing box was opened by customs inspection so re-inspection as the result of transport trouble will be unnecessary.
• Eliminate product deformation by Long-term storage.
Delivery L / T shortening, Product storage time will be shortened. Don’t have product deformation cause storage time shortage.
4-1 Process change point
To keep the change point a minimum by transfer control standard, jig, mold, molding M/C from china so can stable production and start up times shortening.Technical staff from china was dispatched and receive training
Method
Condition
Method
Jig
Mold
Material changeMaterial
Change worker Have
HaveNo have
Reason(4M) Change item
Active(Oversea Factory)
Transfer(Sakae Beki)
Change point
Yes & No
No have
No have
No have
No have
Local skill certified person Local skill certified personMan
Machine
Molding M/C Same maker Same M/C type
Action according to working control standard of each operation process
Translate English to Thai, preparation complete and action according to working control standard.
Action according to working control standard of each operation process
Have
No have basis change but try time setting condition.
Transfer special jig it using at china.
Manufacturing, transfer mold No.1
Basis mixing same with china material
Manufacturing 2 side of No.1, No.2
Using order made in china
Cambridge 20 injection molding M/C
Thai supplied some chemical.]
Cambridge 20 injection molding M/C
4-2 Counter-Plan and indicate Quality Risk
Factor (4M)
Change item Present( Shanghai factory )
Transfer( SAKAE BOEKI )
change point have or not
( SAKAE BOEKI )
Mat’ Mat’ change
Standard Mixing same with China Mat’
Q’ty Risk
Factor (4M)
Change itemPresent
( Shanghai factory )Transfer
( SAKAE BOEKI )change point have or not
( SAKAE BOEKI )
Q’ty control person
Q’ty control person
Q’ty control person
Q’ty control person
Q’ty control person
Q’ty control person
Q’ty Risk Counter-plan
Counter-plan Check result method
Check result method Confirm person
Confirm person
Local skill confirm personLocal skill confirm personWorker changeMan
Have
Have
Storage method
Climate change
Don’t understand incoming standard
Don’t understand working standard
Don’t understand worker skill
Don’t understand worker ability
Work standard [Chinese ver.] complete.
Worker training plan and practice.
Control by skill acknowledgment.
Incoming standard [Thai Ver.] complete.
Training & renew detailIncoming standard [Chinese ver.] complete.
Working standard [Thai ver.] complete.
Training & renew detail.
Worker training plan and practice.
Control by skill acknowledgment.
Control humidity temp. at Mat’ storage RM. Confirm as within control range.
Storage in specify place and avoid direct sunlight.Storage in specify place and avoid direct sunlight.
Replace the one part chemicals Thailand procurement equivalent device
4-3 Material Evaluation
* Tolerance of measure value is Lot Variability, Don’t have very tolerance from replace in measure error limit.
Mat' inspection item
Drawing standard request
China : Present Mat'
Thai : After
transferGeneral physical
Hs (JIS-A) 33±3 34 35TB (Mpa) 14±4 13.3 15.6EB (%) 600±200 802 906
TR (Kg/cm) Ageing test 7 70H )
AC (Hs) (Indian) 0 Within +10
0 2
AC (TB) % Within -20 -2 -1AC (EB) (%) Within -40 -3 -3Compression
set test 1X 22H
More than 60 25 41
Ozone 20% Extension, 05 pphm, 200h, 4C
N.C (Don't
write drawing)
N.C. N.C.
Thai
Sale GProduction G
Q’ty control Production
Customer
New order
Order
Approve
Japan
Sakae Rubber
Sale Dep.
Sale technical Dep. Q’ty control dep.
Q’ty assurance dep.
Outsourcing factory
Production Dep.
Technical Dep.Model maker
Receive info.
Make model drawing
Manufacturing modelManufacturing model
GO !
ApproveConfirm
Finishing standard inspection
Model standard plan, adjustment
Model standard plan, adjustment
Confirm accuracy
Receive adjustment
Repair modelSpecific repair
Sent mold
No pass
Confirm accuracy
Pass
Pass adjustment
Approve Approve
Receive adjustment
Pass
No Pass
Receiving
Receive adjustmentRepairSpecific repair
Receive adjustmentAdjustment information contract
First product submit
Confirm accuracy
Shipping Inspection !00% Mass production
Receive adjustment
Adjustment meeting after production preparation ( Progress) QCD Safety announcement
SAKAE RUBBER GROUP
New
order mass production first lot
delivery step
Production preparation activity step Thai < -- > China Sale Skill
China
Thai
Sale GProduction G
Q’ty control Production
Customer
Japan
Sakae Rubber
Sale Dep.
Sale technical Dep. Q’ty control dep.
Q’ty assurance dep.
Outsourcing factory
Production Dep.
Technical Dep.Model maker
China
Production preparation activity step
Thai < -- > China Sale Skill
Mass production order
Q’ty confirm
Receive order
Application
Mass production control
Stroge
Shipping
SAKAE RUBBER GROUPSAKAE RUBBER GROUP
SAKAE RUBBER GROUP
Receiving
Finishing
Effect confirm
Inspection 100%
weight packing
Production planning
Mass production molding action
Employee defect measures meeting
Thai
Sale GProduction G
Q’ty control Production
Customer
Japan
Sakae Rubber
Sale Dep.
Sale technical Dep. Q’ty control dep.
Q’ty assurance dep.
Outsourcing factory
Production Dep.
Technical Dep.Model maker
China
Production preparation activity step Thai < -- > China Sale Skill
SAKAE RUBBER GROUP
Receive info.
Report
Report
Report
ReportPermeant measures
preventive measure ( Safety annoucement)
Report
ReportApprove
Approve
Next report
Customer store
Defect info.
Receive info.
Receive info.Receive info.
Defect, M
easure control
Stock product inspection 100%
Defect measures meeting (Reason clearly, Measures progress)
Preventive measures Process verification Preventive measures
activity
Finishing
Middle Inspection
Design
B Mixing material inspection
Ribbon Mat’ Incoming inspection
Inspection
Packing
Shipping
Thai Factory
B Mixing material
5 Layout
* Goods flow is aimed “Simple” for don’t happen complication.
Finishing Inspection Picking Storage Area
ExitEntrance
Test RM.Move : Mat’ Mat test RM.
Mat
’
Molding M/C : Area
Goods flow
FIFO
Control temp’ & HumiditySetting finished
2 M/C on 2Feb’ 2015
6 Initial control
To preform Initial control similar with china factory in the present, early prevent trouble when transfer process.
Size
Appearance
Material Qualification
1 Shot/Month1 Shot
Initial ControlGeneral Control
Follow as inspection standard ( 1 Shot/Year, Repair mold
time )
Process Transfer timeInspection item of
initial inspection
Follow as inspection working control standard
Check at Material inspection sheet
Measure Top Batch Curelasto only
Measure All Batch of Curelasto
Enforcement itemFirst inspection item
7. Manufacturing & Test facilityTitle Maker name M/C Type’s name Numbe
r
200t Injection Moulding M/C
Huatai XZL-1000×2000- BⅡ 2
Mold Cleaning M/C KEPLER INTERNATIONAL SD1010/70TB(M) 1
Curelastometer EMVIRONMENTAL SYSTEM INTEGRATOR
MOVING DIE RHEOMETER1
Durometer EMVIRONMENTAL SYSTEM INTEGRATOR
HYDRAULIC BASE OF HARDNESS TESTER 1
Hydrometer EMVIRONMENTAL SYSTEM INTEGRATOR
ELECTRONIC DENSIMETER1
Image Measurement
OPTICA SK-DSC1501
Final summary
Current:To preform control quality similar with china manufacturing product, purpose “Cost reduction”, transfer to Thailand Factory.
Thank you for your cooperation and consented to production transfer