32
© 2013 The Williams Companies, Inc. All rights reserved. Atlantic Sunrise | August 2013 | NOT AN OFFER OR ACCEPTANCE OF AN OFFER Transco’s Atlantic Sunrise Project August 2013 FOR DISCUSSION PURPOSES ONLY NOT AN OFFER OR ACCEPTANCE OF AN OFFER

Transco’s Atlantic Sunrise Project...The reports, filings, and other public announcements of The Williams Companies, Inc. and Williams Partners L.P. (WPZ) may contain or incorporate

  • Upload
    others

  • View
    4

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Transco’s Atlantic Sunrise Project...The reports, filings, and other public announcements of The Williams Companies, Inc. and Williams Partners L.P. (WPZ) may contain or incorporate

© 2013 The Williams Companies, Inc. All rights reserved. Atlantic Sunrise | August 2013 | NOT AN OFFER OR ACCEPTANCE OF AN OFFER

Transco’s Atlantic Sunrise Project August 2013

FOR DISCUSSION PURPOSES ONLY

NOT AN OFFER OR ACCEPTANCE OF AN OFFER

Page 2: Transco’s Atlantic Sunrise Project...The reports, filings, and other public announcements of The Williams Companies, Inc. and Williams Partners L.P. (WPZ) may contain or incorporate

© 2013 The Williams Companies, Inc. All rights reserved. Atlantic Sunrise | August 2013 | NOT AN OFFER OR ACCEPTANCE OF AN OFFER 2

Forward-Looking Statements The reports, filings, and other public announcements of The Williams Companies, Inc. and Williams Partners L.P. (WPZ) may contain or incorporate by reference

statements that do not directly or exclusively relate to historical facts. Such statements are "forward-looking statements" within the meaning of Section 27A of the

Securities Act of 1933, as amended, and Section 21E of the Securities Exchange Act of 1934, as amended. We make these forward looking statements in reliance

on the safe harbor protections provided under the Private Securities Litigation Reform Act of 1995. You typically can identi fy forward-looking statements by various

forms of words such as "anticipates," "believes," "seeks," "could," "may," "should," "continues," "estimates," "expects,“ “assumes,” "forecasts," "intends," "might,"

"goals," "objectives," "targets," "planned," "potential," "projects," "scheduled," "will,” “guidance,” “ outlook,” “in service date” or other similar expressions. These

forward-looking statements are based on management's beliefs and assumptions and on information currently available to management and include, among others,

statements regarding:

> Amounts and nature of future capital expenditures;

> Expansion and growth of our business and operations;

> Financial condition and liquidity;

> Business strategy;

> Cash flow from operations or results of operations;

> The levels of dividends to Williams stockholders and of cash distributions to WPZ unitholders;

> Seasonality of certain business components; and

> Natural gas, natural gas liquids, and crude oil prices and demand.

Forward-looking statements are based on numerous assumptions, uncertainties and risks that could cause future events or results to be materially different from

those stated or implied in this presentation. Many of the factors that will determine these results are beyond our ability to control or predict. Specific factors that

could cause actual results to differ from results contemplated by the forward-looking statements include, among others, the following:

> Whether Williams has sufficient cash to enable it to pay current and expected levels of dividends;

> Whether WPZ has sufficient cash from operations to enable it to pay current and expected levels of cash distributions following establishment of cash

reserves payment of fees and expenses, including payments to WPZ’s general partner;

> Availability of supplies, market demand, volatility of prices, and the availability and cost of capital;

> Inflation, interest rates, -- and in the case of Williams fluctuation in foreign exchange and general economic conditions (including future disruptions and

volatility in the global credit markets and the impact of these events on our customers and suppliers);

> The strength and financial resources of our competitors;

Page 3: Transco’s Atlantic Sunrise Project...The reports, filings, and other public announcements of The Williams Companies, Inc. and Williams Partners L.P. (WPZ) may contain or incorporate

© 2013 The Williams Companies, Inc. All rights reserved. Atlantic Sunrise | August 2013 | NOT AN OFFER OR ACCEPTANCE OF AN OFFER 3

Forward-Looking Statements continued

> Ability to acquire new businesses and assets and integrate those operations and assets into our existing businesses, as well as expand our facilities;

> Development of alternative energy sources;

> The impact of operational an d development hazards;

> Costs of, changes in, or the results of laws, government regulations (including safety and climate change regulation and changes in natural gas production

from exploration and production areas that we serve), environmental liabilities, litigation, and rate proceedings;

> Williams’ costs and funding obligations for defined benefit pension plans and other postretirement benefit plans sponsored by its affiliates;

> WPZ’s allocated costs for defined benefit pension plans and other post retirement benefit plans sponsored by its affiliates;

> Changes in maintenance and construction costs;

> Changes in the current geopolitical situation;

> Our exposure to the credit risk of our customers and counterparties;

> Risks related to strategy and financing, including restrictions stemming from our debt agreements, future changes in our credit ratings and the availability

and cost of credit;

> Risks associated with future weather conditions;

> Acts of terrorism, including cybersecurity threats and related disruptions; and

> Additional risks described in our filings with the Securities and Exchange Commission (“SEC”).

Given the uncertainties and risk factors that could cause our actual results to differ materially from those contained in any forward-looking statement, we caution

investors not to unduly rely on our forward-looking statements. We disclaim any obligations to and do not intend to update the above list or to announce

publicly the result of any revisions to any of the forward-looking statements to reflect future events or developments.

In addition to causing our actual results to differ, the factors listed above may cause our intentions to change from those s tatements of intention set forth in this

announcement. Such changes in our intentions may also cause our results to differ. We may change our intentions, at any time and without notice, based

upon changes in such factors, our assumptions, or otherwise.

With respect to WPZ, limited partner interests are inherently different from the capital stock of a corporation, although many of the business risks to which we

are subject are similar to those that would be faced by a corporation engaged in a similar business.

Investors are urged to closely consider the disclosures and risk factors in Williams’ annual report on Form 10 -K filed with the SEC on Feb. 28, 2012, WPZ’s

annual report on Form 10-K filed with the SEC on Feb. 28, 2012 and each of our quarterly reports on Form 10-Q available from our offices or from our websites

at www.williams.com and www.williamslp.com

Page 4: Transco’s Atlantic Sunrise Project...The reports, filings, and other public announcements of The Williams Companies, Inc. and Williams Partners L.P. (WPZ) may contain or incorporate

© 2013 The Williams Companies, Inc. All rights reserved. Atlantic Sunrise | August 2013 | NOT AN OFFER OR ACCEPTANCE OF AN OFFER 4

Williams At A Glance

Unique,

large-scale

energy-

infrastructure

assets

strategically

located

to provide

customers

with access

to the best

markets

Page 5: Transco’s Atlantic Sunrise Project...The reports, filings, and other public announcements of The Williams Companies, Inc. and Williams Partners L.P. (WPZ) may contain or incorporate

© 2013 The Williams Companies, Inc. All rights reserved. Atlantic Sunrise | August 2013 | NOT AN OFFER OR ACCEPTANCE OF AN OFFER 5

The Williams Companies > One of the leading energy

infrastructure companies in North

America

> 15,000 miles of interstate gas

pipelines

> 1,000 miles of NGL transportation

pipelines

> 10,000 miles of oil and gas

gathering pipelines

> Daily gas processing capacity of

6.6 billion cubic feet of natural gas

> Natural gas liquids production of

more than 200,000 barrels per day

> 4,100 employees

> NYSE: WMB

> Headquarters in Tulsa, Okla.

> Learn more at williams.com

Page 6: Transco’s Atlantic Sunrise Project...The reports, filings, and other public announcements of The Williams Companies, Inc. and Williams Partners L.P. (WPZ) may contain or incorporate

© 2013 The Williams Companies, Inc. All rights reserved. Atlantic Sunrise | August 2013 | NOT AN OFFER OR ACCEPTANCE OF AN OFFER 6

Williams Operating Areas

> Northeast Gathering & Processing

– Consists of our existing Laurel Mountain, Appalachian Basin and Ohio Valley assets, and also

oversees our investment in Caiman Ohio.

> Atlantic Gulf

– Consists of Transco’s 10,200-mile interstate pipeline that is a major supplier of natural gas to the

Southeast, Mid-Atlantic and Northeast U.S. markets; our Gulfstream joint venture pipeline which

serves growing Florida markets from the Gulf; and Williams gathering, processing, storage and

natural gas liquids assets along the Gulf which include more than 1,000 miles of offshore oil and

gas gathering lines, and plants and facilities from north Padre Island, TX, to Mobile, AL.

> West

– Encompasses a wide geographic area that extends from Sumas, WA, near the Canadian border, to

the Four Corners area near Bloomfield, NM. Assets include Northwest Pipeline and the Midstream

gathering and processing facilities in the Piceance in Colorado, Southwest Wyoming, Wamsutter,

WY, and the Four Corners. The West operating area operates more than 11,000 miles of gathering

and transmission pipeline that have a combined capacity of 8.1 Bcfd as well as several processing

and treating plants with a combined inlet capacity of 5.6 Bcfd.

> NGL & Petchem Services

– Consists of Gulf Olefins, Midstream Canada, NGL & Olefins Sales, NGL Services, Conway and

Overland Pass Pipeline.

Page 7: Transco’s Atlantic Sunrise Project...The reports, filings, and other public announcements of The Williams Companies, Inc. and Williams Partners L.P. (WPZ) may contain or incorporate

© 2013 The Williams Companies, Inc. All rights reserved. Atlantic Sunrise | August 2013 | NOT AN OFFER OR ACCEPTANCE OF AN OFFER 7

Transco: Nation’s largest gas pipeline system

> First gas delivery was made on Dec. 5, 1950 to Danville, VA

> Official operations began on Jan. 16, 1951 with deliveries into NYC

> System design capacity: 9.9 MMDthd

> Seasonal storage: 193 MMDth

> Annual throughput: 2.8 Tcf

> Supply areas: Gulf Coast, Mid-Continent, Appalachia, and imported LNG

> Market areas: Southeast, Mid-Atlantic and Northeast

– Deliveries account for 8% of U.S. natural gas consumption

> Miles of pipeline: ~10,200 miles

> Compressor stations: 52

> Horsepower: 1,552,151

> Rate case filed August 31, 2012 with new rates effective March 1, 2013

Charlotte

Atlanta

Washington D.C.

Baltimore

Philadelphia

New York City Transco Deliveries *

Market Area %

NC 100

NYC 50

NJ 50

GA 30

PA 30

VA 25

MD 15

*% of consumption

Page 8: Transco’s Atlantic Sunrise Project...The reports, filings, and other public announcements of The Williams Companies, Inc. and Williams Partners L.P. (WPZ) may contain or incorporate

© 2013 The Williams Companies, Inc. All rights reserved. Atlantic Sunrise | August 2013 | NOT AN OFFER OR ACCEPTANCE OF AN OFFER 8

7.5

8

8.5

9

9.5

10

10.5

Qu

an

tity

(M

Md

t/d

)

Peak Day

3 Day Peak 9.96

8.99

Transco Peak Day Deliveries*

8.64

8.24

10 - 11 09 - 10 07- 08

9.00

9.25

08 - 09

12/14/10 1/3/10 1/2/08 2/5/09 12/13-15/10 1/2-4/10 2/3-5/09 1/2-4/08

9.52

9.25

8. 91

8.23

*Market area deliveries, which includes Zones 4 through 6.

1/3/12

11 - 12

1/3-5/12 1/22/13 1/22-24/13

12 – 13

10.44

9.90

21% Increase

Page 9: Transco’s Atlantic Sunrise Project...The reports, filings, and other public announcements of The Williams Companies, Inc. and Williams Partners L.P. (WPZ) may contain or incorporate

© 2013 The Williams Companies, Inc. All rights reserved. Atlantic Sunrise | August 2013 | NOT AN OFFER OR ACCEPTANCE OF AN OFFER 9

Transco System Overview

Zone 4

Zone 5

Zone 6

Zone 1

Zone 2

Zone 3

System Facts

> Peak design capacity 9.9 MMDth/d.

> ~ 10,200 miles of pipe – 2,000 mainline miles

> 40 Mainline Compressor Stations – 369 compressor units

– 1.5 MM HP

> Extensive Offshore Gathering System

> ~ 900 Active Metering Points.

> 193 MMDth Storage Capacity.

WASHINGTON

78 MMDth

W/D 817 MDth/d

Inj. 431 MDth/d

EMINENCE

10 MMDth

W/D 1,240 MDth/d

Inj. 150 MDth/d

PINE NEEDLE LNG

4 MMDth

W/D 414 MDth/d

Inj. 21 MDth/d

LEIDY

91 MMDth

W/D 1,328 MDth/d

Inj. 519 MDth/d

S-2

12 MMDth

W/D 137 MDth/d

Inj. 104 MDth/d

STA. 240 LNG

2 MMDth

W/D 399 MDth/d

Inj. 10 MDth/d

Page 10: Transco’s Atlantic Sunrise Project...The reports, filings, and other public announcements of The Williams Companies, Inc. and Williams Partners L.P. (WPZ) may contain or incorporate

© 2013 The Williams Companies, Inc. All rights reserved. Atlantic Sunrise | August 2013 | NOT AN OFFER OR ACCEPTANCE OF AN OFFER 10

Transco System Flows Rivervale

'08-'09 71 MDthd

’12-’13 213 MDthd

Pleasant Valley

'08-'09 30 MDthd

’12-’13 47 MDthd Cascade Creek

'08-'09 235 MDthd

’12-’13 207 MDthd

Leidy

'08-'09 1,171 MDthd

’12-’13 1,893 MDthd

CTGS

‘08-’09 223 MDthd

’12-’13 203 MDthd

SWLA

‘08-’09 390 MDthd

’12-’13 81 MDthd

CENLA

‘08-’09 102 MDthd

’12-’13 107 MDthd

Katy

‘08-’09 209 MDthd

’12-’13 62 MDthd

Holmesville/Walthall

'08-'09 438 MDthd

’12-’13 418 MDthd

Lower Chanceford

'08-'09 0 MDthd

’12-’13 207 MDthd Boswell’s Tavern

'08-'09 118 MDthd

’12-’13 148 MDthd

Destin

'08-'09 63 MDthd

’12-’13 15 MDthd

Scott Mtn./Pineview

'08-'09 499 MDthd

’12-’13 2,056 MDthd

Note: ‘12-’13 volumes through 7/31/13

*Indicates southward flow

Marcellus supplies on the Leidy Line continue to increase TETCO’s TEMAX expansion delivers Rockies/Marcellus supplies

to Lower Chanceford Mobile Bay volumes flow southward on a regular basis Steady volumes from Mid-Continent shales provide supply

reliability at Station 85 Supply from Production Area laterals decline

210

Zone 5

SELA

'08-'09 610 MDthd

’12-’13 337 MDthd

Mobile Bay

'08-'09 122 MDthd

’12-’13 (569) MDthd*

Trunkline Ragley

'08-'09 176 MDthd

’12-’13 130 MDthd

Zone 6

Zone 4

Zone 3

Zone 2

Zone 1

195

85

65 45

30

Page 11: Transco’s Atlantic Sunrise Project...The reports, filings, and other public announcements of The Williams Companies, Inc. and Williams Partners L.P. (WPZ) may contain or incorporate

© 2013 The Williams Companies, Inc. All rights reserved. Atlantic Sunrise | August 2013 | NOT AN OFFER OR ACCEPTANCE OF AN OFFER 11

Marcellus Impact on Transco’s System

> Marcellus supply connected to Leidy Line can fully serve load

downstream of Station 195 during certain shoulder periods

> Situation could be exacerbated once projects are placed into service

– NE Supply Link

– Spectra NJ – NY project

> Limitations on southbound interruptible and secondary FT will be

required

– No physical capability currently in place to limit southbound flow or flow large volumes

south

– Odorization issues

– Station piping changes required

> Future projects include facilities to facilitate southbound flow

– Virginia Southside (2015)

– Leidy SE (2015)

– Dalton (TBD)

Page 12: Transco’s Atlantic Sunrise Project...The reports, filings, and other public announcements of The Williams Companies, Inc. and Williams Partners L.P. (WPZ) may contain or incorporate

© 2013 The Williams Companies, Inc. All rights reserved. Atlantic Sunrise | August 2013 | NOT AN OFFER OR ACCEPTANCE OF AN OFFER 12

Future Projected Supply Usage

85

Florida markets

Mid-Atlantic markets

Southeast markets

Northeast markets

Barnett

Haynesville

Fayetteville

Woodford

Marcellus

Interconnect capacity totals

over 3 MMDthd at Station 85

Current flow approx. 2 MMDthd

65

Eagle Ford

Shale Gas also to supply

Proposed LNG exports in

Texas and Louisiana

• Future Expansion Projects will provide shippers with contractual capacity as far south as Station 85

from Marcellus production receipts

• Mainline becomes bi-directional • Mainline will consist of a null point

• System demands and operations will determine how

far south Marcellus Production will flow and how far north Mid Continent Production will flow

Leidy Line interconnect capacity

totals over 5.4 MMDthd

Current flow approx. 2.8 MMDthd

New York City

Page 13: Transco’s Atlantic Sunrise Project...The reports, filings, and other public announcements of The Williams Companies, Inc. and Williams Partners L.P. (WPZ) may contain or incorporate

© 2013 The Williams Companies, Inc. All rights reserved. Atlantic Sunrise | August 2013 | NOT AN OFFER OR ACCEPTANCE OF AN OFFER 13

Zone 6 Constrained Areas

Page 14: Transco’s Atlantic Sunrise Project...The reports, filings, and other public announcements of The Williams Companies, Inc. and Williams Partners L.P. (WPZ) may contain or incorporate

© 2013 The Williams Companies, Inc. All rights reserved. Atlantic Sunrise | August 2013 | NOT AN OFFER OR ACCEPTANCE OF AN OFFER 14

Zone 4 & 5 Constrained Areas

Page 15: Transco’s Atlantic Sunrise Project...The reports, filings, and other public announcements of The Williams Companies, Inc. and Williams Partners L.P. (WPZ) may contain or incorporate

© 2013 The Williams Companies, Inc. All rights reserved. Atlantic Sunrise | August 2013 | NOT AN OFFER OR ACCEPTANCE OF AN OFFER 15

Why Transco Firm Service? > Firm Transportation (FT) service is provided through a primary path of capacity, as

defined by the receipt and delivery points specified on a shipper’s service agreement, and is not subject to reduction or interruption except under force majeure conditions.

– FT service provides the full contract entitlement from the designated receipt point(s) to the designated delivery point(s).

> FT service offers shippers additional flexibility through the use of flexible receipt and delivery points including secondary rights, segmentation, and capacity release.

– Segmentation on Transco’s system within contract path

– Additional secondary rights in Zones 4 and 6

– Capacity Release Market for primary and secondary rights for zones within contract path.

> Ability to release unused capacity within the gas day, daily, monthly or longer.

> Ability to segment capacity rights within FT contract and via capacity release.

> Flexible and reliable no-notice Firm Transportation services supported by multiple pipes.

– No-notice service allows for deviation between scheduled and measured volumes without daily balancing penalties, subject to a pre-set imbalance allocation methodology, the options for which are provided in Transco’s tariff (Section 18 of the General Terms and Conditions).

> Growing, diverse supply options from liquid supply points, including the Marcellus Shale.

> A long track record of successfully constructing expansion projects sized and timed to meet our customers’ needs.

Page 16: Transco’s Atlantic Sunrise Project...The reports, filings, and other public announcements of The Williams Companies, Inc. and Williams Partners L.P. (WPZ) may contain or incorporate

© 2013 The Williams Companies, Inc. All rights reserved. Atlantic Sunrise | August 2013 | NOT AN OFFER OR ACCEPTANCE OF AN OFFER 16

Transco Zone 6 FT Rates

5-5 6-6 6-5

> Motion Filing Rates (Docket No. RP12-993) (Including Electric Power)

– Reservation $0.20083/dt $0.14752/dt $0.27860/dt

– Commodity $0.01543/dt $0.00901/dt $0.02412/dt

> Electric Power Charge

– Reservation $0.00106/dt $0.00061/dt $0.00167/dt

– Commodity $0.00471/dt $0.00294/dt $0.00765/dt

> Fuel Retention Percentage (Annual Fuel Tracker)

– Fuel 1.13% 0.60% 1.73%

Page 17: Transco’s Atlantic Sunrise Project...The reports, filings, and other public announcements of The Williams Companies, Inc. and Williams Partners L.P. (WPZ) may contain or incorporate

© 2013 The Williams Companies, Inc. All rights reserved. Atlantic Sunrise | August 2013 | NOT AN OFFER OR ACCEPTANCE OF AN OFFER 17

Northern Market Area Projects

195

210

New York City

Philadelphia

PA OH

WV

VA MD DE

NJ

NY

Leidy Hub

Leidy Southeast • 27-42 mi. of 42-inch loop

• Compression

Zone 6

NE Connector • Compression

Northeast Supply Link •12 mi. 42-inch loop

• Compression

• Modifications

Rockaway Lateral • 3.3 mi. 26-inch lateral

Baltimore

Zone 5

Project Name ISD MDth/d

Northeast Supply Link 2013 250

Northeast Connector 2014 100

Rockaway Delivery Lateral 2014 647

Leidy Southeast 2015 525

Page 18: Transco’s Atlantic Sunrise Project...The reports, filings, and other public announcements of The Williams Companies, Inc. and Williams Partners L.P. (WPZ) may contain or incorporate

© 2013 The Williams Companies, Inc. All rights reserved. Atlantic Sunrise | August 2013 | NOT AN OFFER OR ACCEPTANCE OF AN OFFER 18

Southern Market Area Projects

210 Zone 6

Zone 5

Zone 4

85

160

Atlanta

Charlotte

Richmond

Virginia Southside

• 99 mi. of 24-inch pipe

(including lateral)

• Compression

Mid-South

• 22.6 mi. of 42-inch loop

• Compression

Mobile Bay South III

•Compression

Project Name ISD MDth/d

Mid-South 2012/13 225

Mobile Bay South III 2014 325

Virginia Southside 2015 270

Page 19: Transco’s Atlantic Sunrise Project...The reports, filings, and other public announcements of The Williams Companies, Inc. and Williams Partners L.P. (WPZ) may contain or incorporate

© 2013 The Williams Companies, Inc. All rights reserved. Atlantic Sunrise | August 2013 | NOT AN OFFER OR ACCEPTANCE OF AN OFFER 19

Constitution Pipeline LLC

Albany

Williams Transco GPL

NJ

NY

PA

CT

MA

NY

Iroquois Wright

&

TGP Line 200

Williams Springville

Gathering System Williams Midstream

Planned Central

Station

Schoharie

Otsego

Delaware

Chenango

Broome

Susquehanna

Wyoming

Bradford

Lackawanna

Wayne

GreeneConstitution

Pipeline

> A 125-mile, 30-inch pipeline connecting Williams’ Midstream Gathering System in Susquehanna County, PA to Iroquois Gas Transmission and Tennessee Gas Pipeline in Schoharie County, NY

> Capacity: 650 MDth/d

> New FERC-regulated interstate pipeline

> Owned (41%) and operated by WPZ; Cabot Oil and Gas owns 25%, Piedmont Constitution Pipeline Company owns 24% and Capitol Energy Ventures (WGL) owns 10%

> Target in-service date: March 2015

Page 20: Transco’s Atlantic Sunrise Project...The reports, filings, and other public announcements of The Williams Companies, Inc. and Williams Partners L.P. (WPZ) may contain or incorporate

© 2013 The Williams Companies, Inc. All rights reserved. Atlantic Sunrise | August 2013 | NOT AN OFFER OR ACCEPTANCE OF AN OFFER 20

Atlantic Sunrise

Page 21: Transco’s Atlantic Sunrise Project...The reports, filings, and other public announcements of The Williams Companies, Inc. and Williams Partners L.P. (WPZ) may contain or incorporate

© 2013 The Williams Companies, Inc. All rights reserved. Atlantic Sunrise | August 2013 | NOT AN OFFER OR ACCEPTANCE OF AN OFFER 21

Project Path

Alabama

Georgia

South

Carolina

North

Carolina

Virginia

Maryland

Pennsylvania

Zone 4

Zone 5

Zone 6

Access to Sabal Trail Pipeline

Access to Elba Express Pipeline

Access to Cove Point Pipeline 165

85

Page 22: Transco’s Atlantic Sunrise Project...The reports, filings, and other public announcements of The Williams Companies, Inc. and Williams Partners L.P. (WPZ) may contain or incorporate

© 2013 The Williams Companies, Inc. All rights reserved. Atlantic Sunrise | August 2013 | NOT AN OFFER OR ACCEPTANCE OF AN OFFER 22

Open Season – Overview

> Atlantic Sunrise will provide from 450,000 dt/day to in excess of 1,000,000 dt/day of new, year-round firm transportation capacity by a proposed in-service date of July 1, 2017.

> Commences at 10:00 a.m. CST on Thursday, August 8, 2013 and ends at 3:00 p.m. CDT on Friday, September 27, 2013.

> Receipt points on Transco’s Leidy Line located between the existing Grugan Interconnect at MP 190.2 in Clinton County, Pennsylvania and Transco’s existing Station 515 in Luzerne County, Pennsylvania – see map Slide 25.

> Shippers path will terminate at Transco’s Station 85 at the Zone 4 and 4A Pools in Choctaw County, Alabama.

> Rates – Shipper may elect: – a cost of service-based, daily reservation recourse rate.

OR

– a negotiated daily reservation rate.

• As part of any negotiated rate arrangement under the Project, Transco will agree to:

– A five-year extension for all or a portion of their TCQ at either the existing negotiated rate or the applicable recourse rate; and

– if shipper elects under (i) above the existing negotiated rate, then Transco will offer a one-year exension for all or a portion of their TCQ at the applicable recourse rate.

NOTE: The following is intended to be a summary of the Open Season Notice, please reference the actual notice filed

on Transco’s 1Line on August 8, 2013.

Page 23: Transco’s Atlantic Sunrise Project...The reports, filings, and other public announcements of The Williams Companies, Inc. and Williams Partners L.P. (WPZ) may contain or incorporate

© 2013 The Williams Companies, Inc. All rights reserved. Atlantic Sunrise | August 2013 | NOT AN OFFER OR ACCEPTANCE OF AN OFFER 23

Open Season – Overview > Shippers must submit a Open Season Transportation Request form.

> Anchor Shipper: – A shipper requesting at least 420,000 dt/day will qualify as an Anchor Shipper.

– Will receive priority with regard to allocation of the capacity and may be provided preference with regard to negotiated rates.

> Upon receipt of the Transportation Request forms, Transco, in its sole discretion, may: – revise the scope and/or capacity of the Project;

– starting with the shipper with the largest requested TCQ, allow shippers to voluntarily reduce their TCQ;

– allocate the available firm transportation capacity; or

– determine not to pursue the Project.

> If Transco Allocates: – The capacity will be allocated first to those who qualify as Anchor Shippers, with capacity among

Anchor Shippers being allocated first to those selecting the longest term then on a pro rata basis.

– Remaining capacity will be allocated to the other requesting shippers first to those selecting the longest term then on a pro rata basis.

> Requests received after the close of the open season may be accepted or rejected on a not unduly discriminatory basis.

> Shippers are responsible for confirming the availability of their requested receipt and delivery points with the point operators.

> Transco reserves the right to reject any requests for service on a not unduly discriminatory basis.

NOTE: The following is intended to be a summary of the Open Season Notice, please reference the actual notice filed

on Transco’s 1Line on August 8, 2013.

Page 24: Transco’s Atlantic Sunrise Project...The reports, filings, and other public announcements of The Williams Companies, Inc. and Williams Partners L.P. (WPZ) may contain or incorporate

© 2013 The Williams Companies, Inc. All rights reserved. Atlantic Sunrise | August 2013 | NOT AN OFFER OR ACCEPTANCE OF AN OFFER 24

Atlantic Sunrise – Overview

> Atlantic Sunrise provides firm transportation service from various supply

points along Transco’s Leidy Line in Pennsylvania to Dominion’s Cove

Point Pipeline interconnect located in Fairfax County, Virginia and

extends south to the Zone 4 / 4A Pools at Station 85 in Choctaw

County, Alabama.

> The project will provide the necessary transportation for Shippers to

directly access numerous, diversified supply points along Transco’s

Leidy Line and delivery to points along the Mainline at historical delivery

pressures.

> The project will include pipeline looping, compressor additions and

modifications, and modifications to Transco’s mainline to accommodate

southerly flow.

> Transco expects, subject to the outcome of the open season, that its

FERC certificate application will propose rolled-in treatment of the

compressor fuel and electric power charges.

> Target ISD is currently estimated to be Q2/Q3 2017.

Page 25: Transco’s Atlantic Sunrise Project...The reports, filings, and other public announcements of The Williams Companies, Inc. and Williams Partners L.P. (WPZ) may contain or incorporate

© 2013 The Williams Companies, Inc. All rights reserved. Atlantic Sunrise | August 2013 | NOT AN OFFER OR ACCEPTANCE OF AN OFFER 25

Legend

Existing Meter Stations

Marcellus Interconnects

In Service

I/C Agmt. In Place

In Negotiations

Preliminary

535

Station

515

517 520

Wharton Storage

Leidy Storage Anadarko-

Grugan

XTO-Cabot Clinton

NCL-Penn State

PVR-

Tombs Run

PVR-

Canoe Run

PVR-

Barto Anadarko-

Bull Run Vista Pennsylvania

General-

Breon

Anadarko-

Guinter

Anadarko-

Grugan 2

NFG Midstream-

Liberty Drive

Anadarko-

Miller Hill

Williams Field Services-

Puddlefield

Anadarko-

Bull Run Vista 2

Great Plains-

Rattlesnake

CNYOG-

Marc I

PVR-

Chapin

PVR-

Barto II

PVR-

Quaker State

Receipt Point Area (Between Grugan and

Station 515) Mountain Gathering

(XTO) – Dry Run

IC Meter

Design (dt/d)

IC Meter

Design (dt/d)

Proposed

ISD In Service ISD In Progress

NCL – Penn State 10,661 existing PVR NEPA Gas Gathering – Barto II 258,750 02/2013

PVR NEPA Gas Gathering – Canoe Run 155,250 11/25/08 UGI Penn Natural Gas - Carverton 310,500 09/2013

PVR NEPA Gas Gathering – Barto 155,250 03/15/09 569,250

Anadarko – Grugan 119,025 10/28/10

PVR Marcellus Gas Gathering – Tombs Run 258,750 02/15/11

Pennsylvania General – Breon 238,050 07/05/11

Anadarko – Bull Run Vista 72,450 07/06/11

Anadarko – Grugan 2 243,225 10/13/11

Williams Field Services – Puddlefield 724,500 01/09/12

Great Plains Operating – Rattlesnake 12,420 04/17/12

Anadarko – Guinter 637,560 04/26/12

NFG Midstream Trout Run – Liberty Drive 282,245 05/30/12

PVR NEPA Gas Gathering – Chapin 776,250 09/28/12

Anadarko – Miller Hill 637,560 10/25/12

CNYOG – Marc I (Pipeline Interconnect) 571,320 11/29/12

PVR Marcellus Gas Gathering – Quaker State 38,709 01/03/13

Anadarko – Bull Run Vista 2 119,025 01/30/13

5,052,250 Total Interconnect Meter Design 5,621,500

Page 26: Transco’s Atlantic Sunrise Project...The reports, filings, and other public announcements of The Williams Companies, Inc. and Williams Partners L.P. (WPZ) may contain or incorporate

© 2013 The Williams Companies, Inc. All rights reserved. Atlantic Sunrise | August 2013 | NOT AN OFFER OR ACCEPTANCE OF AN OFFER 26

Leidy Line Volumes Ramping Up

0

500

1,000

1,500

2,000

2,500

3,000

3,500

MD

th/d

Marcellus Flow Volumes (MDth/d)

Marcellus Interconnect Capacity:

In Service: 5,446 MDth/d

In Progress: 311 MDth/d

7/31/2013: 3,080 MDth/d

Page 27: Transco’s Atlantic Sunrise Project...The reports, filings, and other public announcements of The Williams Companies, Inc. and Williams Partners L.P. (WPZ) may contain or incorporate

© 2013 The Williams Companies, Inc. All rights reserved. Atlantic Sunrise | August 2013 | NOT AN OFFER OR ACCEPTANCE OF AN OFFER 27

Leidy Line Meter Stations (Grugan East)

Leidy Line Activity (As of August 2013)

Interconnect Party Interconnect Name In-Service Date Interconnect Meter

Design (Dts/Day)

6-month Historical

Avg. Vol. (Dts/Day)

PVR NEPA Gas Gathering Barto 03/15/09 155,250 110,000

Pennsylvania General Energy Company Breon 07/05/11 238,050 150,000

Anadarko Marcellus Midstream, LLC Bull Run Vista 1 & 2 07/06/11 191,475 105,000

PVR NEPA Gas Gathering Canoe Run 11/25/08 155,250 55,000

PVR NEPA Gas Gathering Chapin 09/28/12 776,250 375,000

Anadarko Marcellus Midstream, LLC Grugan 1 & 2 10/28/10 362,250 110,000

Anadarko Marcellus Midstream, LLC Guinter 04/26/12 637,560 70,000

NFG Midstream Trout Run, LLC Liberty Drive 05/30/12 282,245 155,000

Central NY Oil and Gas Company, LLC Marc I 11/29/12 571,320 440,000

Anadarko Marcellus Midstream, LLC Miller Hill 10/25/12 637,560 40,000

NCL Natural Resources, LLC Penn State Existing 10,661 0

Williams Field Services Company, LLC Puddlefield 01/09/12 724,500 540,000

PVR Marcellus Gas Gathering, LLC Quaker State 01/03/13 38,709 15,000

Great Plains Operating LLC Rattlesnake 04/17/12 12,420 2,000

Range Resources - Appalachia, LLC Tombs Run 02/15/11 258,750 340,000

Total 5,052,250 2,507,000

Page 28: Transco’s Atlantic Sunrise Project...The reports, filings, and other public announcements of The Williams Companies, Inc. and Williams Partners L.P. (WPZ) may contain or incorporate

© 2013 The Williams Companies, Inc. All rights reserved. Atlantic Sunrise | August 2013 | NOT AN OFFER OR ACCEPTANCE OF AN OFFER 28

Marcellus Producers

Leidy Line

Interconnects Producers

6-month Historical

Avg. Vol. (Dts/Day)

Barto Chesapeake, Enerplus, Exco 110,000

Breon Anadarko Petroleum, Exxon Mobil, Pennsylvania General Energy 150,000

Bull Run Vista 1 & 2 Anadarko Petroleum, Mitsui, Ultra 105,000

Canoe Run Anadarko Petroleum, Chesapeake, Enerplus, Exco, Mitsui, Range, Statoil 55,000

Chapin Chesapeake, Chief, Enerplus, Statoil 375,000

Grugan 1 & 2 Anadarko Petroleum, Mitsui, Ultra 110,000

Guinter Anadarko Petroleum, Chesapeake, Mitsui, Statoil 70,000

Liberty Drive Seneca Resources Corporation 155,000

Marc I Anadarko Petroleum, Chesapeake, Mitsui, Statoil 440,000

Miller Hill Anadarko Petroleum, Chesapeake, Mitsui, Statoil 40,000

Puddlefield Cabot Oil & Gas 540,000

Quaker State Inflection 15,000

Rattlesnake Great Plains Energy 2,000

Tombs Run Anadarko Petroleum, Chesapeake, Chief, Range, Enerplus, Mitsui, Statoil 340,000

Total 2,507,000

Page 29: Transco’s Atlantic Sunrise Project...The reports, filings, and other public announcements of The Williams Companies, Inc. and Williams Partners L.P. (WPZ) may contain or incorporate

© 2013 The Williams Companies, Inc. All rights reserved. Atlantic Sunrise | August 2013 | NOT AN OFFER OR ACCEPTANCE OF AN OFFER 29

Pipeline Key Delivery Points

Point Name Location Status Zone

Pleasant Valley bi-directional interconnect with Dominion’s Cove Point Pipeline

Milepost 1586.20 on Transco’s mainline in Fairfax County, Virginia.

Existing Zone 5

Boswell’s Tavern bi-directional interconnect with TCO

Milepost 1519.91 on Transco’s mainline in Louisa County, Virginia.

Existing Zone 5

Zone 5 Market Pool at Station 165 Milepost 1412.99 on Transco’s mainline in Pittsylvania County, Virginia.

Existing Zone 5

Cascade Creek bi-directional interconnect with ETNG.

Milepost 1384.80 on Transco’s mainline in Rockingham County, North Carolina.

Existing Zone 5

Cardinal interconnect with Cardinal Pipeline Milepost 1375.45 on Transco’s mainline in Rockingham County, North Carolina.

Existing Zone 5

Carolina Gas interconnect with Carolina Gas Transmission Company

Milepost 1213.17 on Transco’s mainline in Spartanburg County, South Carolina.

Existing Zone 5

Elba – South Carolina Milepost 1149.00 on Transco’s mainline in Anderson County, South Carolina.

Existing Zone 5

Elba – Georgia Milepost 1148.20 on Transco’s mainline in Hart County, Georgia

Existing Zone 4

Sabal Trail Milepost 784.66 on Transco’s mainline in Choctaw County, Alabama.

Proposed by 3rd Party

Zone 4

Zone 4 Pool at the interconnection between Transco’s mainline and Mobile Bay Lateral at Station 85 located at (the Zone 4 Pool.

Milepost 784.66 on Transco’s mainline in Choctaw County, Alabama.

Existing Zone 4

Zone 4A Pool at the interconnection between Transco’s mainline and Mobile Bay

Milepost 0.00 on the Mobile Bay Lateral in Choctaw County, Alabama.

Existing Zone 4A

Page 30: Transco’s Atlantic Sunrise Project...The reports, filings, and other public announcements of The Williams Companies, Inc. and Williams Partners L.P. (WPZ) may contain or incorporate

© 2013 The Williams Companies, Inc. All rights reserved. Atlantic Sunrise | August 2013 | NOT AN OFFER OR ACCEPTANCE OF AN OFFER 30

Project Milestones – Proforma P

roje

ct

Develo

pm

en

t P

roje

ct

Execu

tio

n

Deliverable Timing

• Preliminary Marketing Effort March 2013 – July 2013

• Non-Binding Open Season August – September 2013

• Execute Binding Precedent Agreements October 31, 2013

• WMB / WPZ Board Consideration November 2013

• Initiate FERC Pre-Filing Q1 2014

• File FERC Application January 2015

• Receive FERC Certificate February 2016

• Commence Compression Construction July 2016

• Commence Pipeline Construction July 2016

Start-up (Target ISD) July 1, 2017

Page 31: Transco’s Atlantic Sunrise Project...The reports, filings, and other public announcements of The Williams Companies, Inc. and Williams Partners L.P. (WPZ) may contain or incorporate

© 2013 The Williams Companies, Inc. All rights reserved. Atlantic Sunrise | August 2013 | NOT AN OFFER OR ACCEPTANCE OF AN OFFER 31

Why Transco?

> We are a pipeline owner / operator with significant large project

experience.

– 19 projects completed since 2001 that added 3.2 Bcf of capacity to the Transco

mainline.

– 8 projects in the execution stage adding another 2.5 Bcf of capacity.

> We offer a diversified supply portfolio.

– On the Leidy Line we offer direct access to 15 different producers, at 16 different

receipt meters, representing an average of 2,507,000 Dts/day of flowing supply.

> Our Tariff offers transportation flexibility through segmentation and

secondary rights.

– Significant segmentation rights under Transco’s tariff to segment your contract path for

added-value.

– Secondary rights within Zone 6 (north of the Zone 6 Pool) that provide access to the

New York market and secondary rights within Zone 4 (west of the Zone 4 / 4A Pool)

with storage access in Mississippi.

> Strong Capacity Release Market for primary and secondary rights for

zones within contract path.

Page 32: Transco’s Atlantic Sunrise Project...The reports, filings, and other public announcements of The Williams Companies, Inc. and Williams Partners L.P. (WPZ) may contain or incorporate

© 2013 The Williams Companies, Inc. All rights reserved. Atlantic Sunrise | August 2013 | NOT AN OFFER OR ACCEPTANCE OF AN OFFER 32

Transco Expansions – 12 Year Review > Strong track record of successfully building system expansions to meet the

customers’ needs…when they need it.

Project In-Service MDth/d

MarketLink Phase 1 2001 166

MarketLink Phase 2 2002 130

Leidy East 2002 130

Trenton Woodbury 2003 51

Central New Jersey 2005 105

Leidy to Long Island 2007 100

Sentinel Phase 1 2008 40

Sentinel Phase 2 2009 102

Total Northern Market 824

Sundance 2002 236

Momentum Phase 1 2003 269

Momentum Phase 2 2004 54

Potomac 2007 165

Eminence Enhancement 2009 46

Mobile Bay South 2010 253

Mobile Bay South 2 2011 380

85 North 2010/2011 309

Pascagoula 2011 467

Mid-South Phase 1 2012 95

Mid-Atlantic Connector 2013 142

Mid-South Phase 2 2013 130

Total Southern Market 2,546