23
Training Calendar: Year 2014-15 Mitsubishi FA Products Training Factory Automation Engineering Centre, Factory Automation & Industrial Division Mitsubishi Electric India Private Limited India

Training Calendar: Year 2014-15 · 1. Training Centres Regular training is arranged at following centres: Pune Centre Mitsubishi Electric India Private Limited Factory Automation

  • Upload
    others

  • View
    4

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Training Calendar: Year 2014-15 · 1. Training Centres Regular training is arranged at following centres: Pune Centre Mitsubishi Electric India Private Limited Factory Automation

Training Calendar: Year 2014-15

Mitsubishi FA Products Training

Factory Automation Engineering Centre,

Factory Automation & Industrial Division

Mitsubishi Electric India Private Limited India

Page 2: Training Calendar: Year 2014-15 · 1. Training Centres Regular training is arranged at following centres: Pune Centre Mitsubishi Electric India Private Limited Factory Automation

2

Index

1. TRAINING CENTRES ........................................................................................................................... 3

2. LIST OF REGULAR TRAINING COURSES ............................................................................................... 4

3. MITSUBISHI FA PRODUCT TRAINING CALENDAR: YEAR 2014-15 ......................................................... 5

4. DETAILED AGENDA OF REGULAR TRAINING COURSES: MELCO FA PRODUCTS ..................................... 6

FX PLC TRAINING ..................................................................................................................................................... 6

GOT TRAINING ........................................................................................................................................................ 7

Q PLC & CC-LINK BASIC TRAINING ........................................................................................................................... 8

Q PLC NETWORKING .............................................................................................................................................. 10

POSITIONING TRAINING ........................................................................................................................................... 11

VFD (INVERTER) TRAINING ...................................................................................................................................... 12

Q MOTION TRAINING ............................................................................................................................................. 13

SIMPLE MOTION TRAINING ...................................................................................................................................... 15

5. DETAILED AGENDA OF REGULAR TRAINING COURSES: MEI FA PRODUCTS ........................................ 16

NEXGENIE 1000 PLC TRAINING .............................................................................................................................. 16

NEXGENIE 2000 PLUS PLC TRAINING ...................................................................................................................... 18

MS-HMI TRAINING ................................................................................................................................................ 20

6. CUSTOMIZED TRAINING PROGRAMMES .......................................................................................... 21

7. INSTRUCTIONS FOR REGISTRATION ................................................................................................. 22

8. TRAINING REQUEST FROM .............................................................................................................. 23

Page 3: Training Calendar: Year 2014-15 · 1. Training Centres Regular training is arranged at following centres: Pune Centre Mitsubishi Electric India Private Limited Factory Automation

3

1. Training Centres Regular training is arranged at following centres:

Pune Centre

Mitsubishi Electric India Private Limited

Factory Automation & Industrial Division,

EL-3, J Block, MIDC Bhosari,

Pune, Maharashtra

India – 411 026

Tel.: +91-20-2710 2000

Fax: +91-20-2710 2100

Gurgaon Centre

Mitsubishi Electric India Private Limited

Factory Automation & Industrial Division,

2nd

Floor, Tower A & B, DLF Cyber Greens,

DLF Cyber City, DLF Phase III,

Gurgaon, Haryana,

India -122 002

Tel.: +91-124-4630300

Fax: +91-124-4630399

Bangalore Centre

Mitsubishi Electric India Private Limited

Factory Automation & Industrial Division, Prestige Emerald, 6th Floor, Municipal No. 2,

Madras Bank Road, (Lavelle Road),

Bangalore, Karnataka,

India -560001

Tel: +91-80- 4020-1600

Fax: +91-80- 4020-1699

Chennai Centre

Mitsubishi Electric India Private Limited

Factory Automation & Industrial Division,

No.1 Vivekananda Road, Srinivasa Nagar

Off Spur Tank Road, Chetpet

Chennai, Tamil Nadu

India – 600 031

Tel: +91-44-49232222

Fax: +91-44-49232249

Ahmedabad Centre

Mitsubishi Electric India Private Limited

Factory Automation & Industrial Division,

B/4, 3rd floor, Safal Profitaire,

Corporate Road,

Prahaladnagar, Satellite,

Ahmedabad, Gujrat

India – 380 054

Tel. : +91-79-65120063

Fax : +91-79-65120063

www.MitsubishiElectric.in

Email: [email protected]

Page 4: Training Calendar: Year 2014-15 · 1. Training Centres Regular training is arranged at following centres: Pune Centre Mitsubishi Electric India Private Limited Factory Automation

4

2. List of Regular Training Courses Following training courses are regularly offered from our all training centres mentioned in previous section.

Courses on MELCO FA Products Sr.

No.

Training

Code

Duration

(Days)

Brief Agenda

1 FX PLC 2

Includes FX3U/3G Basic and Advanced Programming, Analog

interfacing using Blocks & ADP, and Interrupt Functions like

Input, Timers and Counter

2 GOT 2

Includes GOT1000 / GT2000 series hardware, GT Designer

programming, Basic & advanced features, Recipes & Alarms,

Ladder Monitoring & Editing, Backup & Restore function.

Different types of connections with PLC / Controllers, etc.

3 Q PLC

(Q PLC & CC-Link Basics) 3

Includes QnH & QnUDEH PLC Hardware, Basic and Advanced

programming, Analog I/O modules, programming using

GxWorks2 and CC-Link Open network basic training.

4 VFD

(Inverter) 2

FR-700 series of Inverters, Parameters, Configurations and

Connections for Signal & Power, V/F control, FR-Configurator,

Error & Warnings, Troubleshooting, Accessories like reactors &

BU, Communication with PLCs though Serial, CC-Link, other

protocols, Advanced Features, Energy Saving Drives, etc.

5 Position 3

Includes positioning basics, FX Positioning using FX3U inbuilt

high speed I/O and Positioning Instructions, Q Positioning using

QD75 /QD77 modules (P/D/M/MH) with pulse type and SSCNET

based servo amplifier.

6 Q Motion 3

Includes Mitsubishi make Q17nD/DS motion CPUs with MR-J4-B

/J3-B type servo amplifiers, MT-Developer-II programming

platform, Real Mode (SV13) and Virtual Mode (SV22), SFC

programming, Mechanical System Editor, CAM configuration and

monitoring and debugging.

7 Simple Motion 2 QD77MSn module range, Simple Motion Function, Configuration

of Mechanical system, CAM design, operation, etc.

8 Q Network

(Advanced Networking) 3

CC-link advanced function like PLC to PLC communication, CC-

Link IE : Field and control, MelsecNet/H : Control and remote I/O

network

Courses on MEI FA Products

1 NG1K 2

Nexgenie 1000 PLC hardware, Base & Expansion Units, Memory

Organization, DI/DO and Analog I/O, Connection &

Configuration, Programming using CoDeSys, Troubleshooting &

Maintenance issues, etc.

2 NG2KP 3

Nexgenie 2000PLUS PLC hardware, Base & Expansion Modules,

Memory Organization, DI/DO and Analog I/O, Connection &

Configuration, Programming using CoDeSys, Modbus Network,

Communication FBs, Interface with MS-HMI, basic programming

of HMI, Troubleshooting & Maintenance issues, etc.

3 MS-HMI 2

Includes MS-HMI series hardware, MS-Designer programming,

Screen Design /Various Objects, Data logging, History trends,

Recipes & Alarms, third party connectivity, etc.

Page 5: Training Calendar: Year 2014-15 · 1. Training Centres Regular training is arranged at following centres: Pune Centre Mitsubishi Electric India Private Limited Factory Automation

5

3. Mitsubishi FA Product Training Calendar: Year 2014-15

Page 6: Training Calendar: Year 2014-15 · 1. Training Centres Regular training is arranged at following centres: Pune Centre Mitsubishi Electric India Private Limited Factory Automation

6

4. Detailed Agenda of Regular Training Courses: MELCO FA Products

FX PLC Training

Prerequisites Participants are expected to know the number systems (Binary, Hex, BCD), basics of

PLC, Basics of Electrical & Electronics etc.

Duration Two days

Training Session Timing

Training Time 09:30 am to 05:00 pm

Tea Time 10:45 am to 11:00 am and 03:30 pm to 03:45 pm

Lunch Time 01:00 pm to 2:00 pm

Duration Activity / Contents

Day 1

09:15 am Registration

09:30 am to 01:00 pm Review of Number Systems, Basics of PLC and PLC SCAN

FX Series Hardware Review

• Range of PLCs like FX3U /FX3G, Different types of blocks/expansion

module

• Discrete I/O, Sourcing & Sinking, Relay & Transistor Type

• PLC Memory, PLC Devices

• Addressing : I/O

PLC Programming : GX Works 2

• Project Creation / Project Editor

• Transfer setup / Upload / Download

• Relay Based Instructions and Timers & Counters

• Monitoring & Editing

Practice

02:00 pm to 05:00 pm PLC Programming

• Grouping of bit devices, indexing registers

• Data transfer instructions & Arithmetic instructions

• Logical / comparison instructions

Practice

Day 2

09:30 am to 01:00 pm Analog Input / Output Blocks

• Range of analog blocks

• FX3U-4AD and FX3U-4DA modules

• Specification, wiring and configuration, interfacing with BFMs

Analog Input / Output Adapters

• Range of Analog Adapters

• FX3U-4AD-ADP and FX3U-4DA-ADP

• Specifications, wiring and Configuration, Special D/M devices

Practice

02:00 pm to 05:00 pm Advanced Programming

• Program control instruction : CJ, For-Next and Call

Interrupts

• Input interrupts

• Timer interrupts

• High speed counter & counter interrupts

Practice

05:00 pm to 5:30 pm Feedback / Interaction / Self evaluation

Page 7: Training Calendar: Year 2014-15 · 1. Training Centres Regular training is arranged at following centres: Pune Centre Mitsubishi Electric India Private Limited Factory Automation

7

GOT Training

Prerequisites Participants are expected to know the number systems (Binary, Hex, BCD), basics of

PLC, Basics of Electrical & Electronics etc.

Duration Two Days

Training Session Timing

Training Time 09:30 am to 05:00 pm

Tea Time 10:45 am to 11:00 am and 03:30 pm to 03:45 pm

Lunch Time 01:00 pm to 2:00 pm

Duration Activity / Contents

Day 1

09:30 am to 05:00 pm GOT Hardware overview

GT Designer software

• New project creation

• Configuration of GOT communication with PLC

• OS selection and installation: Boot OS, Standard monitor OS,

Communication driver,

• Different types of Screen

• Various Objects like switch / lamps / Text and Numerical display, various

graphs; and other objects

• Part Display & Part routes

• Comments / Comment groups / Comment display

• User Alarms: Alarm configuration & Alarm Display

• Objects from Library

Practical Session

Day 2

09:30 am to 04:00 pm GT Designer software

• Recipe,

• Scripts: Project & Screen scripts

• Logging function, Time Action,

• System Alarms & Advanced Alarms

• Document Display, Network Monitoring

• Backup restoration: GOT & PLC programs

• Intelligent Module monitoring

• List Monitor & Editor

• Ladder Monitoring & Editor

• One-touch ladder jump function, PLC Diagnosis on GOT

Different communication options like CC-Link, Ethernet and Q-Bus connection

Practical Session

04:00 pm to 05:00 pm Evaluation

Feedback

Interaction

Page 8: Training Calendar: Year 2014-15 · 1. Training Centres Regular training is arranged at following centres: Pune Centre Mitsubishi Electric India Private Limited Factory Automation

8

Q PLC & CC-Link Basic Training

Prerequisites Participants are expected to know the number systems (Binary, Hex, BCD), basics of PLC,

basics of Networking, RS232 and RS485 protocols, etc.

Duration Three Days

Training Session Timing

Training Time 09:30 am to 05:00 pm

Tea Time 10:45 am to 11:00 am and 03:30 pm to 03:45 pm

Lunch Time 01:00 pm to 02:00 pm

Duration Activity / Contents

Day 1

09:15 am Registration

09:30 am to 01:00 pm Basics of PLC

• Introduction of Q / QnU series PLCs hardware

• Discrete I/O modules, sourcing and sinking connections

• PLC memory drives, device memory, special devices (SM/SD)

• Addressing of I/O PLC Programming : GX Works2

• Simple Project mode

• Transfer setup: RS232/USB/Ethernet

• Project upload & download

• Relay based instructions

• Timers & Counters

• Monitoring & Editing Practical

02:00 pm to 05:00 pm PLC Programming

• Data transfer instructions

• Arithmetic instructions

• Logical and comparison instructions

• In-line ST programming

Practical

Day 2

09:30 am to 01:00 pm Advanced Programming

• Grouping of Bit devices and Indexing

• Program control instruction: Call and Subroutines, Jump, For-Next Loop

instructions

• Multiple programs

• File registers

• Memory Card : file registers & program backup and booting Practical

02:00 pm to 05:00 pm Analog Input / Outputs Module

• Range of Analog Modules

• Connections, buffer memory, configuration

• BFM interface : To/From instructions, Un\Gm addressing

• Intelligent Module Configuration –AD/DA

Practice

Page 9: Training Calendar: Year 2014-15 · 1. Training Centres Regular training is arranged at following centres: Pune Centre Mitsubishi Electric India Private Limited Factory Automation

9

Duration Activity / Contents

Day 3

09:30 am to 10:45 pm Introduction of Structure Programming (IEC-61131-3)

• Different Editors : Structure Ladder, FBD, Ladder and ST

• POU Types: Program, Function and Function Block

• Standard and User Library

11:00 am to 04:30 pm CC-Link Basics

• CC-Link module specification and features

• Wiring of remote I/O module

• Remote I/O stations & remote Device Stations

• Hardware test of QJ61BT11N module

• Troubleshooting and practical session

04:30 pm to 05:00 pm Evaluation / Feedback / Interaction

Page 10: Training Calendar: Year 2014-15 · 1. Training Centres Regular training is arranged at following centres: Pune Centre Mitsubishi Electric India Private Limited Factory Automation

10

Q Networking (Advanced Networking)

Prerequisites Participants are expected to know the number systems (Binary, Hex, BCD), basics of PLC,

basics of Networking, RS232 and RS485 protocols, etc.

Duration Three Days

Training Session Timing

Training Time 09:30 am to 05:00 pm

Tea Time 10:45 am to 11:00 am and 03:30 pm to 03:45 pm

Lunch Time 01:00 pm to 02:00 pm

Duration Activity / Contents

Day 1

09:15 am Registration

09:30 am to 01:00 pm Q PLC Overview

• Hardware overview in brief

• Overview I/O addressing

• GX-Works2 Programming Software overview CC-Link

• Specifications

• Configuration for Remote I/O and Remote Device Stations

• PLC to PLC communication using Local Stations

02:00 pm to 05:00 pm CC-Link IE Field network

• Specifications

• Configuration for Remote I/O stations

• Configuration for Local Station

Practical

Day 2

09:30 am to 01:00 pm CC-Link IE Field network (cont.)

• Configuration for head module (L series I/O)

• I/P packet transfer using CC-Link IE Field network Practical

02:00 pm to 05:00 pm CC-Link IE Control Network

• Specifications

• Configuration of Control stations and normal stations Practice

Day 3

09:30 am to 01:00 pm MelsecNet/H

• MelsecNet modules range, specification and features

• Configuration and wiring

• Optical loop and coaxial connections

• PLC to PLC communication Practice

02:00 pm to 04:00 pm MelsecNet/H

• Remote I/O network

• System configuration

• Remote To/From instructions

• Hardware Test of MelsecNet/H modules

Practice

04:00 pm to 05:00 pm Evaluation / Feedback /Interaction

Page 11: Training Calendar: Year 2014-15 · 1. Training Centres Regular training is arranged at following centres: Pune Centre Mitsubishi Electric India Private Limited Factory Automation

11

Positioning Training

Prerequisites Participants are expected to know the number systems (Binary, Hex, BCD), basics of

PLC, basics of induction Motor, etc. Participant must be well familiar with FX PLC and

QPLC basics.

Duration Three Days

Training Session Timing

Training Time 09:30 am to 05:15 pm

Tea Time 10:45 am to 11:00 am and 03:30 pm to 03:45 pm

Lunch Time 01:00 pm to 02:00 pm

Duration Activity / Contents

Day 1

09:15 am Registration

09:30 am to 01:00 pm Basics of Positioning

Pulse Type Servo Amplifier : MR-E Super /MR-JE / MR-J3/J4-A

• Specification and parameters

• Power connection guideline

• Signal connections with positioning controllers like FX3U / QD75P/D

• Display, monitoring and test operation

• Troubleshooting : Alarms & warnings

MR-Configurator

• Setup software for Testing / Setting / Parameter Backup

02:00 pm to 05:00 pm Positioning using FX3U PLC

• FX3U inbuilt High speed I/O and FX3U High Speed Adapters

• Positioning Instructions & FX3U Table Instructions

• Practical

Day 2

09:30 am to 01:00 pm SSCNET based Servo System : MR-J3 /MR-J4B

• Specification and Parameters

• SSCNET connection with positioning controllers like QD75MH /QD77MS

Product Range : QD75P/D/M/MH /QD77MS

• Specifications

• External Signal Connections : DOG, STOP/Change, FLS and RLS

• I/Os : Positioning status and commands

02:00 pm to 05:00 pm QD77 MS /QD75MH

• Positioning parameters , Monitoring data & Control data

• JOG operations

• Homing operation : Different types of homing

• Errors monitoring & error correction logic

Day 3

09:30 am to 01:00 pm

02:00 pm to 04:00 pm

QD75MH /Q77MS

• Point to point Control : Using buffer memory

• Various positioning functions: INC/ABS, Interpolation, VF / VR etc.

• M-Code

• Current value change function

• Speed override function

• Teaching Instruction

Expansion Function of QD77MS

• Speed –Position-Torque control mode change over function

Practice

04:00 pm to 05:00 pm Evaluation / Feedback /Interaction

Page 12: Training Calendar: Year 2014-15 · 1. Training Centres Regular training is arranged at following centres: Pune Centre Mitsubishi Electric India Private Limited Factory Automation

12

VFD (Inverter) Training

Prerequisites Participants are expected to know the number systems (Binary, Hex, BCD), basics of

PLC, basics of induction Motor, FX Series Basics and Q PLC Basics etc.

Duration 2 Day

Training Session Timing

Training Time 09:30 am to 05:00 pm

Tea Time 10:45 am to 11:00 am and 03:30 pm to 03:45 pm

Lunch Time 01:00 pm to 02:00 pm

Duration Activity / Contents

Day 1

09:30 am to 01:00 pm Mitsubishi Inverter : 700 Series

• Basics of inverter

• Mitsubishi range of inverters

• Inverter Selection

• Power and signal connections

V/F Control

• Operation

• Parameters

• Different types of load patterns

• Different mode of operation: PU, Net, External etc.

• Jog operation

02:00 pm to 05:00 pm FR-Configurator

• Parameters setting

• Backup, Monitoring, trends

Auxiliary Components

Troubleshooting

• Error & Warning Codes

Practical

Day 2

09:30 am to 01:00 pm Networking of VFD

• FX3U & VFD using RS485 /232 BD

• VFD on CC-LINK using F7NC

• Modbus Option

Practical

02:00 pm to 04:30 pm Energy Saving Using VFD : F700 series

Advanced Features of Mitsubishi VFD

4:30 pm to 05:00 pm Interaction / Feedback / Evaluation

Page 13: Training Calendar: Year 2014-15 · 1. Training Centres Regular training is arranged at following centres: Pune Centre Mitsubishi Electric India Private Limited Factory Automation

13

Q Motion Training

Prerequisites Participants are expected to know the number systems (Binary, Hex, BCD), basics of Q

PLC, Addressing of I/O, basics instructions, GX Developer, fundamentals of Positioning,

basics of induction motors and encoder, drive principle, etc.

Participants must have gone through positioning training.

Duration Three Days

Training Session Timing

Training Time 09:30 am to 05:15 pm

Tea Time 10:45 am to 11:00 am and 03:30 pm to 03:45 pm

Lunch Time 01:00 pm to 02:00 pm

Duration Activity / Contents

Day 1

09:15 am Registration

09:30 am to 01:00 pm

02:00 pm to 05:00 pm

Overview of Mitsubishi Range of Servo Controllers

SSCNET Based Servo Systems

• Basics of servo systems

• Servo amplifier MR-J3B /MR-J4B /MR-J4WB

• Connections : SSCNET, external signals and power Connections

• Parameters

Q17nD/DS Q170M/MS Motion CPUs

• Range of motion CPUs: specifications and configurations

• Motion Specific Modules : Q172DEX / Q173DPX / Q172DLX

OS installation procedure

Special relays & registers of motion CPUs

MT Developer - 2

• New project creation

• Basic system setting

• Multiple CPU data sharing setting

• Fixed parameters and parameter blocks

• Servo parameters

Jog Operation Exercise

Day 2

09:30 am to 01:00 pm

02:00 pm to 05:00 pm

SFC Programming

• SFC Specifications

• SFC programming Steps (F /FS/G etc)

• Instructions for F/G Steps

• Servo program (K) and various instruction

Exercise

• Homing using different homing methods like Near point Dog, Data set, etc

• Single axis positioning in real mode

• Interpolation : Linear, Circular

• VF/VR instructions

Page 14: Training Calendar: Year 2014-15 · 1. Training Centres Regular training is arranged at following centres: Pune Centre Mitsubishi Electric India Private Limited Factory Automation

14

Duration Activity / Contents

Day 3

09:00 am to 01:00 pm

02:00 pm to 04:30 pm Motion Control: Virtual Mode

• Special bits and registers for virtual axis

• Servo Program allocation for Virtual Control

• Real to virtual mode transition

• Configuration of virtual axis

• Simultaneously operation of virtual and real axis

Mechanical Editor

• Input Modules : Servo motors (virtual axis) / Synchronous encoders

• Connecting Modules :Different types of gears, Clutches, Differential gears and

speed gears

• Output Modules : Rotary Table, Roller, Ball Screw & CAM

CAM Editor

• CAM Design : Feed CAM & Reciprocating CAM

Exercises

04:30 pm to 05:00 pm Evaluation / Feedback / Interaction

Page 15: Training Calendar: Year 2014-15 · 1. Training Centres Regular training is arranged at following centres: Pune Centre Mitsubishi Electric India Private Limited Factory Automation

15

Simple Motion Training

Prerequisites Participants are expected to know the number systems (Binary, Hex, BCD), basics of Q

PLC, Addressing of I/O, basics instructions, GX Developer, fundamentals of Positioning,

basics of induction motors and encoder, drive principle, etc.

Participants must have gone through positioning training.

Duration Two Days

Training Session Timing

Training Time 09:30 am to 05:00 pm

Tea Time 10:45 am to 11:00 am and 03:30 pm to 03:45 pm

Lunch Time 01:00 pm to 02:00 pm

Duration Activity / Contents

Day 1

09:15 am Registration

09:30 am to 01:00 pm

02:00 pm to 05:00 pm

Overview :

• Mitsubishi Range of Servo Controllers

• SSCNET Based Servo Systems

• Overview of QD77 Specifications overview

QD77MS Configurations

• Parameters

• Servo parameters Settings

• Positioning Parameters

• Input Axis Parameters

• Synchronous Parameters with single virtual axis and linear cam

• Jog, Home and error correction program

• Synchronous operation using Sequence program

CAM Design

• CAM types, Resolutions, Stroke units, and other parameters

• Configuration of different types of CAM

• Selection of CAM for Output axis

Practice

Day 2

09:30 am to 01:00 pm

02:00 pm to 04:30 pm

Synchronous parameters in Details

• Auxiliary Virtual Servo and encoder axis

• Clutches, electronic gears, differential gears, speed change gears

• Exercises using different components of synchronous motion

CAM Auto generation Function

• Control data for Auto generation of CAM

• Execution of Auto CAM for rotary axis

CAM Position Restoration function

Troubleshooting and Monitoring

04:30 pm to 05:00 pm Evaluation / Feedback / Interaction

Page 16: Training Calendar: Year 2014-15 · 1. Training Centres Regular training is arranged at following centres: Pune Centre Mitsubishi Electric India Private Limited Factory Automation

16

5. Detailed Agenda of Regular Training Courses: MEI FA Products

Nexgenie 1000 PLC Training

Prerequisites Participants are expected to know the number systems (Binary, Hex, BCD), basics of

PLC, Basics of Electrical & Electronics etc.

Duration Two Days

Training Session Timing

Training Time 09:30 am to 05:00 pm

Tea Time 10:45 am to 11:00 am and 03:30 pm to 03:45 pm

Lunch Time 01:00 pm to 2:00 pm

Duration Activity / Contents

Day 1

09:15 am Registration

09:30 am to 10:45 am Review of Number Systems, Basics of PLC and PLC SCAN

MEI PLC Product Range Overview

Nexgenie 1000 PLC Hardware Review

Nexgenie 1000 PLC : Base Blocks

• NG16DL / NG16ADL / NG14RL / NG14 RN / NG16DN

• Introduction of Base blocks – serial ports, I/O wiring connector

Different types of digital expansion module

• NE16DX / NE14RX / NE08X / NE06RX / NE08DX

• Discrete I/O, Sourcing & Sinking, Relay & Transistor Type

• Sinking & sourcing wiring Explanation

• Relay & Transistor Type wiring Explanation

PLC Memory & PLC Devices

• Different Types Of Memory & its size

• Marker Memory

• Data Memory

• File Marker Memory

• Application memory

Addressing : I/O ( Symbolic & Absolute Addressing) & Marker Memory

• I / Q / M Memory addressing

• Memory Mapping : Explanation of Memory Mapping – Bit , Byte , Word &

Double Word

• Symbolic Addressing

11:00 am to 01:00pm PLC Programming : CoDeSys

System Requirement & Installation

POU & Main PRG Explanation

• What is mean by POU , what is the advantage of POU

• Main PRG – POU Execution

Programming Languages – LD , IL , ST , FBD, etc

• What are the different programming Languages

• When & where ( which application / project ) to use different

programming languages

• Possibility of Conversion

Configuration of PLC

• Explain difference with respect other Nexgenie Series PLC Configuration

• Explain addressing by referring CoDeSys configuration menu

Page 17: Training Calendar: Year 2014-15 · 1. Training Centres Regular training is arranged at following centres: Pune Centre Mitsubishi Electric India Private Limited Factory Automation

17

• Analog I/O configuration

Project Creation / Project Editor

• How to create / save / open project

• How to add / delete contact ; how to add / delete rung ; how to add /

delete blocks

Transfer setup / Upload / Download

• Communication parameter set up

• USB to serial port

• What happen if source code is not downloaded

• What is mean by Source Code

Relay Based Instructions and Timers & Counters

• LD / ADD / OR / Set / Reset / Store / addition of timer / counter block

Monitoring & Editing - Simulation Mode

• How to monitor current value of timer / counter

• What is Force / Force Release

• How to use Simulation mode

• What is the advantage of Simulation Mode

Visualization

• What is Visualization & Where to use it

• Simple Example & Demo of one Example

Practice

02:00 pm to 05:00 pm PLC Programming

• Data transfer instructions

• Arithmetic instructions

• Logical / Comparison instructions

Practice

Day 2

09:30 am to 01:00 pm

02:00 pm to 04:30 pm

VAW (Visual Access Window) Programming

Analog Modules

Range of analog blocks

• Explanation of Various Analog Block

• NE40UX , NE42UX , NE02AX & NG16ADL

• Specifications & Wiring

Program Configurator

• How to insert Program Configurator in CoDeSys Software

• How to use Program Configurator for Serial port / LCD & Analog IO Block

• Programming

Troubleshooting

• Offline – LED diagnostics & Online - System Variables

Practice

04:30 pm to 05:00 pm Evaluation / Feedback / Interaction

Page 18: Training Calendar: Year 2014-15 · 1. Training Centres Regular training is arranged at following centres: Pune Centre Mitsubishi Electric India Private Limited Factory Automation

18

Nexgenie 2000 Plus PLC Training

Prerequisites Participants are expected to know the number systems (Binary, Hex, BCD), basics of

PLC, Basics of Electrical & Electronics etc.

Duration Three Days

Training Session Timing

Training Time 09:30 am to 05:00 pm

Tea Time 10:45 am to 11:00 am and 03:30 pm to 03:45 pm

Lunch Time 01:00 pm to 2:00 pm

Duration Activity / Contents

Day 1

09:15 am Registration

09:30 am to 11:00 am Review of Number Systems, Basics of PLC and PLC SCAN

MEI PLC Product Range Overview

Nexgenie 2000 Plus PLC Hardware Review

• Range of CPUS, Base racks

• Range of different types of module

DI/DO Modules in Detail

• Specifications / Wiring / Sourcing /Sinking

• Relay & transistor type output modules

PLC Memory, PLC Devices

• Different Types Of Memory & its size

• Marker Memory, Data Memory, File Marker Memory, Application memory

Addressing : I/O ( Symbolic & Absolute Addressing ) & Marker Memory

• I / Q / M Memory addressing, Memory Mapping : Explanation of Memory

Mapping – Bit , Byte , Word & Double Word

• Symbolic Addressing

11:00 am to 01:00 pm PLC Programming : CoDeSys

Brief Explanation about Programming Software – CoDeSys

• System Requirement & Installation

• POU & Main PRG Explanation

• Programming Languages – LD , IL , ST , FBD

• What are the different programming Languages

• When & where ( which application / project ) to use different

programming languages

• Possibility of Conversion

Configuration of PLC

• Explain difference with respect other Nexgenie Series PLC Configuration

• Explain addressing by referring CoDeSys configuration menu

• Analog I/O configuration

Project Creation / Project Editor

• How to create / save / open project

• How to add / delete contact ; how to add / delete rung ; how to add /

delete blocks

Transfer setup / Upload / Download

• Communication parameter set up

• USB to serial port

• What happen if source code is not downloaded

• What is mean by Source Code

Relay Based Instructions and Timers & Counters

• LD / ADD / OR / Set / Reset / Store / addition of timer / counter block

Page 19: Training Calendar: Year 2014-15 · 1. Training Centres Regular training is arranged at following centres: Pune Centre Mitsubishi Electric India Private Limited Factory Automation

19

Monitoring & Editing - Simulation Mode

• How to monitor current value of timer / counter

• What is Force / Force Release

• How to use Simulation mode

• What is the advantage of Simulation Mode

Practice

02:00 pm to 05:00 pm PLC Programming

• Data transfer instructions

• Arithmetic instructions

• Conversion instructions: SCALE /RAD/DEG etc.

Practice

Day 2

09:30 am to 11:00 am PLC Programming (Contd.)

• Logical / comparison instructions

• Export & Import Feature

• Export/Import of POU, FB and Global Variables

• Visualization, Watch & Recipe Manager, Configuration.

• Save / Print POUs

Practice

11:00 am to 05:00 pm Analog Input / Output Modules

• Range of analog modules,

• Specification, wiring and configuration

• Program Configurator

o How to insert Program Configurator in CoDeSys Software

o How to use Program Configurator for different modules

• Programming using IM_Read & IM_Write Function Blocks

Practice

Day 3

09:30 am to 1:00 pm P2111CPU : Modbus Function

• Module Master Configuration

• Remote I/O Module (Rix) Connection & Configuration

• Application Examples: Mitsubishi Inverter / Energy Meters, etc.

• Modbus Slave Function

• Programming : Communication FBs

Practice

02:00 pm to 04:30 pm P2511 CPU & MS HMI

• Brief Introduction of MS series HMI

• Connection of HMI with PLC using Serial Port of P2511

• Basic Programming of HMI : Basics Screens & Various Objects

Practice

04:30 pm to 05:00 pm Evaluation / Feedback /Interaction

Page 20: Training Calendar: Year 2014-15 · 1. Training Centres Regular training is arranged at following centres: Pune Centre Mitsubishi Electric India Private Limited Factory Automation

20

MS-HMI Training

Prerequisites Participants are expected to know the number systems (Binary, Hex, BCD), basics of

PLC, Basics of Electrical & Electronics etc.

Duration Two Days

Training Session Timing

Training Time 09:30 am to 05:00 pm

Tea Time 10:45 am to 11:00 am and 03:30 pm to 03:45 pm

Lunch Time 01:00 pm to 2:00 pm

Duration Activity / Contents

Day 1

09:30 am to 05:00 pm MS Series HMI Features

• Hardware overview

• MS Designer system requirements & Installation Procedure

• New project creation & Configuration of MS Series HMI with PLC

• MS designer program environment (title bar, tool bars, tool boxes, menu

bar) / File Menu / Open and Close, Save and Save as, upload, download

• Screen creation: Screen Menu / View Menu / Draw Menu /Edit Menu.

• Various Objects like Buttons, Character Entry & Numeric Entry, List & Drop

Down List, Indicators, Numeric Display & Character Display, Message

Display Objects, Bar Graph , Pie Graph & Panel Meters, Trend Graph, XY

Chart, Dynamic Graphics ,Historical Display

• User Alarms: Alarm configuration & Alarm Display

• Library Menu : Bitmap Library / Font Library / Message Library / Shape

Library Manager

• Password

• Recipe

Practical Session

Day 2

09:30 am to 04:30 pm MS Designer software

• Screen control & data logging

• Control block / Screen Number Register / Command Flag Register

• Logging buffer control register / Time Block.

• Tool Menu

• System Massages / Offline/online simulation

• Introduction Of Macro

• Macro function / Macro classifications / Application Macros

• Screens Macros / ON/OFF Macros / Sub-Macros / Macro Commands

• 3rd

Party Interface & Communication

• Communication with ASCII Devices Communication with Modbus Devises

(Drives, Energy meters, Temperature controllers) / Printer interface /

Multilink communication

Practical Session

04:30 pm to 05:00 pm Evaluation / Feedback / Interaction

Page 21: Training Calendar: Year 2014-15 · 1. Training Centres Regular training is arranged at following centres: Pune Centre Mitsubishi Electric India Private Limited Factory Automation

21

6. Customized Training Programmes

We also conduct training on following products as per customer’s requirements:

MELCO FA Products Training List

Training Module Brief Agenda

FX Networking

Serial Communication Boards/ Adapters, 1:N & N:N communications,

Inverter Network with FX3U / FX3G PLCs, CC-Link for FX PLC : Master

& Salve Blocks, Ethernet Module : FX3U-ENET

FX Third Party

communications

Modbus communication using FX3U-232 /485 ADP-MB

FX Positioning Blocks FX2N-1PG /FX2N-10PG

FX3U-20SSCH: SSCNET-III based module for MR-J3-B servo amplifier

Q Third Party

Communications

Modbus: Serial & TCP/IP, DeviceNet / Profibus / Others

Redundant CPU Q12PRH / Q25PRH Redundancy CPUs, Programming & Parameter

Setting for redundancy

IQ Platform Integrated Programming Platform for PLC, HMI and Motion. This

includes MELSOFT Navigator, GX Works-2, MT Works-2, GT Works-3

Q170MSCPU 16 Axis Motion & Sequence CPU combined controller, MT-Developer-

2, SSCNET-III based servo amplifier

MR-MQ100 Standalone 1½ Axis Motion Controller, MT-Developer-2, SSCNET-III

based servo amplifier

MR-J3-T CC-link based Servo Amplifier of MR-J3 Series

L series PLC training

L Series PLC hardware, Range of CPUs, I/O modules, Analog Modules,

Networking modules, etc, I/O addressing, Programming using

GxWorks2,

L Basic Positioning

L series Built-in Positioning, High speed inputs/outputs, Encoder

Interfacing, Interfacing with pulse input type servo amplifiers, Homing,

Jogging, and positioning, practice

L Advance Positioning LD75MH and LD77MS modules, SSCNET based Servo controllers,

Simple Motion control, etc.

MEI FA Products Training List

NG5K Training

Nexgenie 5000 PLC, hardware overview, PLC memory, Different types

of I/O modules, Programming using CoDeSys, Analog I/O module

interface, CAN Open communication interface, practice, etc.

Advanced Training PTO/HSC using NG2KP and NG5K PLC, Interfacing with Servo

Amplifiers, Motion Function Library, etc.

Networking Training CAN OPEN, MODBUS and Ethernet Communication feature in NG2KP /

NG5K series PLCs, third party connectivity, GPRS,

SL HMI Training

Different Types of Text HMI: JR HMI, JR Ex HMI, SR Ex HMI, Sr HMI., SL

Designer Programming software, message configuration, key

configuration, etc.

Please contact training department for detailed agenda and schedule for above training programs.

Page 22: Training Calendar: Year 2014-15 · 1. Training Centres Regular training is arranged at following centres: Pune Centre Mitsubishi Electric India Private Limited Factory Automation

22

7. Instructions for Registration

1. Regular training programs are conducted as per the calendar.

2. Contact training department for charges.

3. For the registration, please send duly filled ‘Training Request Form’ as given on following

page to nearby training centre or below centre :

Factory Automation Engineering Centre (FAC)

Factory Automation & Industrial Division,

Mitsubishi Electric India Private Ltd.,

EL-3, J Block, MIDC, Bhosari, Pune-411 026

Email: [email protected]

4. Registration is to be done minimum two weeks in advance with full payment of the training

fees.

5. Accommodation and transportation will be arranged by the participants.

6. Fees once paid will not be refunded. Registration can be transferred to other participants

from the same company with prior intimation to the Training Department.

7. We also offer wide range of training modules for Mitsubishi Factory Automation Products. If

training requirement is other than regular training programs, please contact.

8. Please contact us for customized training required at site.

Page 23: Training Calendar: Year 2014-15 · 1. Training Centres Regular training is arranged at following centres: Pune Centre Mitsubishi Electric India Private Limited Factory Automation

23

8. Training Request From