Upload
nguyenthuy
View
219
Download
6
Embed Size (px)
Citation preview
PROGRAMME CATEGORIES
Technical Engineering
Quality Management System Supply Chain Management
Finance Accounts & Administration Information Technology
Environment Health & Safety General Management & Behavioral
Orientation Programmes Core Development Programmes
Code Programme Name Days Month Venue Participants Contents
T410
TL - Tower Erection & Stringing Methodology
2
April April May May June June July July
August August
Meerut Vijayanagaram
Jabalpur Angul
Bhopal Hospet
Srinagar Coimbatore
Agra Muzaffarpur
Non - Sup , S-Band,
Stringing Engineers &
Store keepers
Tower erection methodology - String-ing methodology - Field Quality Plan Requirements - Erection & stringing tools management - Store manage-
ment - Utilization of Tools and tackles
T547
Project Management (TL)
1
May Delhi
Nagpur GET / DET /
S Band Concepts of quality - Cost - Safety - Working capital - Control measures
T411
TL - Latest Survey Techniques
1
June Delhi
Nagpur Non - Sup &
S Band Use of Satellite Imaginary and soft-ware for survey / latest Techniques
L053 Legal Aspects of Contracts
Management
1
Sept Delhi
Nagpur
Tier 1 Legal Definition - important Clauses -
Arbitration
T412
Introduction of UPD & Project Management
2
June August Sept
Delhi Lucknow Kolkata
O-1 to M1-C
Introduction to UPD - Nature of Work -Activities- Funding Schemes - Pay-ment Terms - Challenges - SC Man-agement - Project Management -
RGGVY XI & XII Plan- Tools & Tech-niques - MPCS - JCR - Execution
Methodology - SOP
E001
Enhancing Project
Planner's Performance
1
June August Sept
Delhi Lucknow Varanasi Kolkata
S-2 to M1-C
Scheduling - JCR - Reconciliation - Pro-gress Reporting - Dash Boards - Con-
tracts Management
T413
Productivity Management in UPD jobs
1 August
Sept Delhi
Kolkata
S-1 to M1-C Productivity Concepts - Tools &
Techniques
A033
Contracts Management
1
August Sept
Delhi Chennai
M1-A to M2-C
Contracts Management - Project Management - Reconciliation -
Working Capital - Payment Terms
Basic Knowledge in
Implementation of 5S 1 June TLT, Pithampur
S-1 to M1-C / GETs / DETs
Basic Knowledge in Implementing 5S
Basics of CNC Machines &
their Operations 1 June TLT, Pondy
S-1 to M1-C / GETs / DETs
Basics of CNC Machines including its construction & working
- CNC Programming Software Funda-mentals- Troubleshooting of CNCs
Process of Furnace
Operation & Maintenance of Galvanizing
1 June TLT, Pondy S-1 to M1-C / GETs / DETs
Components of Furnace in detail incl. types of burners, valves etc.
- Working of furnace - Types of fuel used, ignition method employed - Troubleshooting of fur-nace—Cost Efficient ways of oper-
ating the furnace incl. control of fuel consumption
TECHNICAL
Code Programme Name Days Month Venue Participants Contents
T402 Study of Route and Tower Spotting & Optimization by Modern Techniques
1 April Nagpur S-1 to M1-A Route Study by GIS - Tower Spotting by PLS CADD
T506 Detailing of Transmission
Line Towers 2 June
TLTRS, Kanchi
S-1 to M1-A Tower Loading - Design - Various Accessories - Design Precaution during erection and stringing
Q381 Design Tips for Site
Execution 1 August Chennai S-1 to M1-A
Calculation - Use of prop setting - Understanding the GA drawings
T333 Engineering Concepts of
Substation Design 2 June
Hydera-bad
S-1 to M1-A PGETs / GETs /
DETs
AIS & GIS layout - Bus bar configura-tion- Protection - SCADA - Earthing & Lightning protection - Illumination -EHV/HV cabling -Fundamentals of OFC and related systems -Basic civil for electrical engineers
T414 Engineering Concepts of
Power Distribution at HV/LT level
2 August Lucknow S-1 to M1-A
PGETs / GETs / DETs
Design and component selection of 33/11 kV OH Power distribution - Overview of REC standard - Equipment selection including distribution transformer - RMU - Autorecloser - Sectionaliser - Smart metering - Power distribution SCADA - Precautionary measures while revamping of distribution lines - Earthing and lightning protection - HV and LV cable sizing - Basic civil for electrical Engineers
ENGINEERING
QUALITY MANAGEMENT SYSTEM
J021 QMS awareness Program -
TL BU 1 May HQ
QA/ QC engineers & S1-M1B
Requirements of - ISO 9001:2015 Standard - Under-stand the revisions w.r.t.2008 version - Understand document modification & re certification process
J113 Internal Auditors Training - QMS & Quality Require-ments in TL Construction
2 July Nagpur S-1 to M1-B
Concept - Fundamentals and Evaluation of Quality Manage-ment System - ISO 9001:2008 Requirements - Auditing Process and Case Studies - Stages of Au-diting and Auditing Skills & Qual-ity Requirements in TL
T330 Work Methods for Electri-
cal Installations 1 May Kolkata Site Engineers Concepts - Procedures - Checklist
J021 Quality Management
System – EHV SS & UPD 1 June Chennai HQ / Cluster Site
Awareness on QMS requirements
Code Programme Name Days Month Venue Participants Contents
T418 Safety in UPD Projects 2 April Kolkata S-1 to M1-C
Fundamental EHS Management Sys-tems - Safety During Project Opera-tion -Behaviour Based Safety - Elec-trical Safety - PTW - ERP
B233 Train the Trainers 2 May June
Kolkata Delhi
S-1 to M2-C
Behaviour Based Safety - Effective Trainer Skill - Effective Body Lan-guage - Planning & Preparation for training session - Non-verbal Com-munication
S260 Safety in APDRP Projects 2
May April July
August April
Kolkata Lucknow
Bangalore Delhi
Lucknow
O-1 to M2-C
Safe Work Procedures during Survey - Excavation - Foundation - Tower Erection - Stringing - Material Han-dling - Tools & Tackles Inspection - PTP LC Shut down - Case study
S232 Safety in Transmission
Line 2
June August
June Sept Sept May
Patna Hyderabad
Siliguri Delhi
Nagpur Kurnool
S-1 to M1-C
Fundamental EHS Management - Requirements before stringing activi-ty - Insulator hoisting safety - String-ing PTP procedure - LC shutdown procedure - Rough sag - Final sag procedures - Clipping - Jumpering
S063 First Aid Training 1 July Delhi
Kolkata S-1 to M1-A
Response for a Medical Emergency - Basics of First Aid
T419 Safety in E&I and UPD
Projects 2
Sept June
Kolkata Chennai
S-1 to M1-C
Safety During Project Operation - Behaviour Based Safety - Electrical Safety Requirements - Fundamental EHS Management Systems
S264 Behaviour Based Safety 1 August May
Mumbai Chennai
M1A - Above Positive Safety Culture creation to improve safety implementation
S107 Safety in Construction of EHV SS & UPD projects
2 July Chennai
Delhi Lucknow
S-1 to M1-A
EHS Management - Loss prevention Technique - LOTO - Shut down pro-cedures - Work at height - Excava-tion safety - Electrical safety - Mate-rial handling safety - Accident inves-tigation
T421 Safety in E&I 2 June July
Hyderabad Nagpur
S-1 to M1-A Safety in cable Tray erection - Cable laying - Panel erection
J113 Internal Auditors Training 2 August Chennai S-1 to M1-C
Understanding of Key elements of IMS - Internal auditing procedure - IMS requirements - Interview tech-niques during audit process - Audit Report preparation
B415 Capacity Building Training
for EHS Staff 2 May Delhi S-1 to O-2
L&T IMS system - Project specific work methodology - HIRA - Safety implementation methods
S277 Safety in EHV SS 2 May Mumbai S1 - M1-A Safety in Cable tray Erection - Cable Laying -Transformer Erection
ENVIRONMENT HEALTH & SAFETY
Code Programme Name Days Month Venue Participants Contents
163 Negotiation skills 1 June HQ O-1 to M1-C
Types of Procurement—Negotiation styles— Commercial Terms & Condi-tions - Domestic & Global procure-ment -when & how to negotiate, etc
C340 Logistics Management 1 August HQ O-1 to M1-C Importance of Logistics—Effective inventory control— INCOTERMS—Types of logistics
T416 Vendor Development
skills 1 Sept Chennai O-1 to M1-C
Criteria for vendor selection—Vendor evaluation—Factory assesment Development and partnering with Vendors for long term operations— Vendor Performance assessment.
FINANCE ACCOUNTS & ADMINISTRATION
SUPPLY CHAIN MANAGEMENT
F281
Programme on Indirect Taxes and Compliance Arising out of Recent
Changes in Budget
1
June June
August June
Delhi Varanasi Lucknow Nagpur Chennai
All Site Accountants
Basics of Indirect Taxes - Concept of Sales & Deemed Sales - Scheme of
Central Sales Tax Act & Its Implication - Tax Saving Exercise - Introduction of VAT - An Overview & Its implication -
F325 Basics of Site Accounts & IR & Administration Func-
tions 2 July Sept
Varanasi Lucknow
Lateral Recruit-ers of Site Ac-
countants, Stores Keepers,
Admin Staff
Overview of Accounts - Basics of Ac-counts - Bank Guarantee & Costing –
Insurance - Supply Chain Manage-ment - Stores Management - Client
Invoicing - ARRS – Client Ledger Rec-onciliation - Working Capital - Cash
Flow - Risk Mgmnt - Site Admin & IR
F122 Working Capital Management &
Inventory Management 1 July to Sept
Delhi Varanasi Lucknow Kolkata Chennai
Site Accountants
Importance of Cash Flow - Working Capital Cycle
MM03 Stores Management 1 June
Delhi Varanasi Lucknow Kolkata Chennai
S-1 to M1-A, GCTs
Purpose of Store Management – Store Procedures – Concepts of Stores Layout – Handling of Materials at Site
– Documentation Related to Store
T404 EIP - New Planning
Module 2
May June July
August
LNCL KKRO
Nagpur Delhi
Planning Engi-neer, Billing
Engineer & BU coordinator
Online Job Cost Report (JCR) - Daily Project Report (DPR) - Daily Execution Report (DER) - New Sub-contract module - Material Planning
INFORMATION TECHNOLOGY
Code Programme Name Days Month Venue Participants Contents
B102 Interviewing Skills 2 May Delhi M1-A & Above
Importance Of Skilled Interviewing - Writing An Ad - Behavioral Event Interview (BEI) - Under-standing Body Language - Preparation For Inter-view - Gaining Skills For Interviewing (Practice Video Recording) - Understanding Self Before An Interview - Practice Interviews - Types Of Inter-views - Test, Simulations, Presentations, Assess-ment Tests - Do And Don’ts In Interview - 2 Live Interviews With Candidates (Video Recording ) - Rating Candidates
B257 Lifestyle Modification
and Stress Management
2 May HQ S-1 to M1-C
Self-Awareness - Managing Psychological and Physical Health - Anger Management - Managing Stress - Yoga (Asana, Pranayama and Meditation) - Managing Relationships and Networking - Man-aging Personal Finance and Career
B148 Innovation &
Creativity 2 May HQ O-1 to M1-C
Understanding Creativity - Creative Thinking - Blocks - Creativity Enhancing Techniques
B263 Team Building 1 Aug HQ S-1 to M1-C
Concept of team building - Team vs. Group - Stag-es of team building - Characteristics of a good team leader - Managing conflict in a team - Developing a high performance team
D028 Supervisory
Development Programme
6
May July
Aug Sept
Chennai Mumbai Kolkata
Delhi Varanasi
S-1 & S-2
Overview of L&T - Changing Dynamics of Mgnt - Functional Interdependence - The Role of a Super-visor - Overview of WCM - Interpersonal Effective-ness - Site Admin - EHS - Leadership & Motivation - Finance- QMS - Risk Management - Basics of Costing - Team Building - Negotiation Skills - Time Management - IT / EIP - Contract Management
GENERAL MANAGEMENT & BEHAVIORAL
CORE DEVELOPMENT PROGRAMME
ORIENTATION PROGRAMMES
T017
Technical Orientation
Programme
17 6
July
Mysore Kanchi
GETS
Introduction to IC & BU - itsDepartments & Functioning - Hands on Training
T049 PGET Orientation
Programme 5 August HQ
PGETs /NICMAR
Introduction to IC & BU’s - its Departments & Functioning
ATL is the Learning Management System (LMS) of Larsen & Toubro. ATL offers world class
resources which enables to develop skills in order to compete internally and externally.
ATL can be accessed through http://atl.ltindia.com only by L&T employees while using their
PS Number as their login credentials.
For any queries, write to [email protected]
ATL- ANY TIME LEARNING (Anytime, Anywhere, At your place)