Upload
netatraining
View
214
Download
0
Embed Size (px)
Citation preview
8/9/2019 Train to Gain Brochure
1/24
8/9/2019 Train to Gain Brochure
2/24
06/05/08This information was correct at the time of publication
8/9/2019 Train to Gain Brochure
3/24
CCONTENTSONTENTS
1
Introduction 2
Delivery process 3
RIGGINGSupporting Engineering Activities NVQ - Level 2 4
Moving loads NVQ - Level 3 5
STEEL ERECTING
Constructional Steelwork site operations NVQ - Level 2 6
Constructing Capital Plant Steel Structures: NVQ - Level 3 7
MECHANICAL
Maintaining Plant and Systems - Mechanical NVQ Level 3 8-9
PIPEWORK
Installing Plant and Systems - Pipefitting NVQ - Level 3 10
PLATING
Fabricating of Steel Structures NVQ - Level 3 11
WELDING
Welding (Plate) NVQ Level 3 12-13
SCAFFOLDING
Accessing Operations & Rigging NVQ - Level 2 14
Accessing Operations & Rigging NVQ - Level 3 15
ELECTRICAL
Installing & commissioning electro-technical systems & equipment
(plant) NVQ Level 316
Maintaining plant systems (Electrical) NVQ Level 3 17-18
INSTRUMENTATION
Maintaining Plant and Systems:Instrument and Controls
NVQ Level 319-20
8/9/2019 Train to Gain Brochure
4/24
8/9/2019 Train to Gain Brochure
5/24
CANDIDATE REGISTRATION
ONLINE/ FACE TO FACE TRAINING
AS APPROPRIATE
PORTFOLIO BUILD/ E FOLIO BUILD
EVIDENCE GATHERING
OBSERVATION
WITNESS STATEMENT
INTERNAL VERIFICATION
EXTERNAL VERIFICATION
ISSUE OF CERTIFICATE
NETA
SUPPORT
DDELIVERYELIVERY PPROCESSROCESS
3
8/9/2019 Train to Gain Brochure
6/24
8/9/2019 Train to Gain Brochure
7/24
8/9/2019 Train to Gain Brochure
8/24
6
CONSTRUCTIONAL STEELWORK SITE OPERATIONS
NVQ - LEVEL 2
Candidates must achieve TEN units made up of:
all SEVEN of the Mandatory unitsplus
ONE further units from the Technical Options
MANDATORY UNITS - Candidate must achieve all SEVEN units
Unit SO1: Contribute to effective working relationships
Unit SO2: Work safely, minimise risk and comply with emergency procedures
Unit SO3: Identify and deal with hazards in the work environment
Unit SO4: Carry out slinging and signalling for the movement of loads
Unit SO5: Erect structural steelwork components
Unit SO8: Work safely at height on steel structures
Unit SO12:Assemble bolted joints in structural steelwork
TECHNICAL OPTIONS - Candidates must achieve any ONE unit.
Unit SO9: Set up and utilise powered access equipment
Unit SO10: Operate powered tools and equipment for routine and predictable
requirements
Unit SO11: Operate specialised plant and machinery to peformance
requirements
Unit SO13: Work to the dimensional control of the work programme
Unit SO14: Dismantle structural steelwork components
Unit SO15: Store structural steelwork related resources for further use
SSTEELTEEL EERECTINGRECTING
8/9/2019 Train to Gain Brochure
9/24
7
Candidates must achieve FOURTEEN units made up of:
all TEN of the mandatory units;plus
FOUR further units from the technical options.
CONSTRUCTING CAPITAL PLANT STEEL STRUCTURES:
NVQ - LEVEL 3
MANDATORY UNITS - candidates must achieve all TEN units.
Unit E1: Prepare structural steel loads for moving
Unit E2: Move structural steel loads
Unit E3: Position and erect steel structures
Unit E4: Erect structural steel sections
Unit E5: Dismantle structural steel sections
Unit E6: Reinstate the work area after completing structural steel activities
Unit E7: Store structural steel related resources for further useUnit CO1: Contribute to effective working relationships
Unit CO2: Work safely, minimise risk and comply with emergency
procedures
Unit CO3: Identify and deal with hazards in the work environment
TECHNICAL OPTIONS - candidates must achieve any FOUR units.
Unit E8: Check that the steel structure is installed to specification
Unit E9: Determine technical requirements to achieve steel erecting
objectives
Unit E10: Determine resource requirements to achieve steel erecting
objectives
Unit E11: Prepare work areas for steel erecting activitiesUnit E12: Prepare materials required for steel erecting activities
Unit E13: Prepare equipment required for steel erecting activities
SSTEELTEEL EERECTINGRECTING
8/9/2019 Train to Gain Brochure
10/24
8/9/2019 Train to Gain Brochure
11/24
TECHNICAL OPTIONS - Candidates must achieve any FOUR units of
which THREE must be selected from SET A and ONE from SET B.
SET A: (Select THREE units)
Unit MPS Mech 10:Assemble bolted joints to a specification
Unit MPS Mech 11:Assemble components of mechanical plant and
equipment
Unit MPS Mech 12: Restore components from mechanical plant and
equipment to operational condition by repair
Unit MPS Mech 13: Prepare work areas for the maintenance of mechanical
plant and equipment
Unit MPS Mech 14: Prepare materials for the maintenance of mechanical
plant and equipment
Unit MPS Mech 15: Prepare equipment in support of engineering activities
Unit MPS Mech 16: Reinstate the work area after completing the
maintenance of mechanical plant and equipment
Unit MPS Mech 17: Hand over mechanical plant and equipment
SET B: (Select ONE unit)
Unit MPS Mech 18: Determine the feasibility of repair of components of
mechanical plant and equipment
Unit MPS Mech 19: Test the performance and condition of mechanical
plant and equipment
Unit MPS Mech 20:Analyse test results relating to mechanical plant and
equipment
Unit MPS Mech 21: Establish that a engineering maintenance process has
been completed to specification
MAINTAINING PLANT AND SYSTEMS - MECHANICAL
NVQ LEVEL 3
9
MMECHANICALECHANICAL
8/9/2019 Train to Gain Brochure
12/24
INSTALLING PLANT AND SYSTEMS - PIPEFITTING
NVQ - LEVEL 3
Candidates must achieve TEN units made up of:
all FIVE of the Mandatory unitsplus
EITHER Unit IPS Pipe 3 OR Unit IPS Pipe 12plus
FOUR further units from the Technical Options
MANDATORY UNITS - Candidate must achieve all FIVE units
Unit IPS Pipe 1: Shape pipework components by material removal using
hand tools
Unit IPS Pipe 2:Assemble pipework components to meet specification
Unit CO1: Contribute to effective working relationships
Unit CO2: Work safely and comply with emergency procedures
Unit CO3: Deal with hazards in the work environment
TECHNICAL OPTIONS - Candidates must achieve EITHER Unit IPS Pipe 3
OR Unit IPS Pipe 12 PLUS any FOUR other units.
Unit IPS Pipe 3: Position and install pipework
Unit IPS Pipe 4: Mark out to required specification
Unit IPS Pipe 5: Establish the compliance of an engineering installation with
the specification
Unit IPS Pipe 6: Prepare work areas for the installation of pipework
Unit IPS Pipe 7: Prepare materials required for pipework installation
Unit IPS Pipe 8: Prepare equipment for pipework installation
Unit IPS Pipe 9: Reinstate the work area after completing the installation of
pipework
Unit IPS Pipe 10: Store pipework installation related resources for further use
Unit IPS Pipe 11: Test the performance and condition of installed pipework
Unit IPS Pipe 12: Shape pipework components by manually applied pressure10
PP IPEWORKIPEWORK
8/9/2019 Train to Gain Brochure
13/24
FABRICATING OF STEEL STRUCTURES
NVQ - LEVEL 3
Candidates must achieve TEN units made up of:
all EIGHT of the Mandatory unitsplus
TWO further units from the Technical Options
MANDATORY UNITS - Candidate must achieve all EIGHT units
Unit FSS1: Shape components of fabricated steel structures by removal
using hand and Power tools
Unit FSS2: Prepare work areas for the fabrication of steel structures
Unit FSS3: Prepare materials for the fabrication of steel structures
Unit FSS4: Prepare equipment for the fabrication of steel structures
Unit FSS5: Reinstate the work area after completing the fabrication of
steel structures
Unit CO1: Contribute to effective working relationships
Unit CO2: Work safely and comply with emergency procedure
Unit CO3: Deal with hazards in the work environment
TECHNICAL OPTIONS - Candidates must achieve any TWO units.
Unit FSS6:Assemble components of steel fabrications to meet
specification
Unit FSS7: Store steel structure fabrication related resources for further
use
Unit FSS8: Manually form components to specification
Unit QSE9: Join materials by the arc welding processes
11
PPLATINGLATING
W
8/9/2019 Train to Gain Brochure
14/24
WELDING (PLATE)
NVQ LEVEL 3
Candidates must achieve TWELVE units made up of:
all NINE of the Mandatory unitsplus
THREE units from the Technical Options comprisingGroup A OR 2 units from Group A and One unit from
Group B
MANDATORY UNITS - Candidates must achieve all NINE units
Unit W1: Prepare work areas for welding activities
Unit W2: Prepare materials required for welding activities
Unit W3: Prepare equipment for welding activities
Unit W4: Reinstate the work area after completing welding activities
Unit W5: Store and control resources during welding
Unit W6: Obtain and interpret welding specifications
Unit CO1: Contribute to effective working relationships
Unit CO2: Work safely, minimize risk and comply with emergency
procedures
Unit CO3: Identify and deal with hazards in the work environment
OPTIONAL UNITS -
Candidates must achieve THREE units from
Group A (W26 to W43)
OR
2 units from Group A (W26 to W43) PLUS
ONE unit from Group B (W9 to W25)
12
WWELDINGELDING
8/9/2019 Train to Gain Brochure
15/24
SS
8/9/2019 Train to Gain Brochure
16/24
SSCAFFOLDINGCAFFOLDING
ACCESSING OPERATIONS & RIGGING
NVQ - LEVEL 2
Candidates must achieve all EIGHT mandatory units;
MANDATORY UNITS
Unit VR01 - Conform to General Workplace Safety
Unit VR02 - Conform to Efficient Work Practices
Unit VR03 - Move & Handle Resources
Unit VR247 - Tube & FittingErect & Dismantle Independent & Birdcage
Scaffold Systems Scaffolding
Unit VR248 - Tube & FittingErect & Dismantle Tower Scaffold Systems
Scaffolding
Unit VR249 - Tube & FittingErect & Dismantle Cantilever Scaffold SystemsScaffolding
Unit VR251 - Tube & FittingErect & Dismantle Pavement & Roof Scaffold
Systems Scaffolding
unit VR252 - Utilise Provision for Fall Arrest
14
SSCAFFOLDINGCAFFOLDING
8/9/2019 Train to Gain Brochure
17/24
ACCESSING OPERATIONS & RIGGING
NVQ - LEVEL 3
Candidates must achieve all EIGHT mandatory units;
MANDATORY UNITS
VR01 - Conform to General Workplace Safety
VR209 - Confirm Work Activities and Resources for the Work
VR210 - Develop and Maintain Good Working Relationship
VR211 - Confirm the Occupational Method of Work
VR252 - Utilise Provision for Fall Arrest
VR405 - Scaffolding (Construction) Erect Specialised, Designed Scaffolds
and Rigging
VR406 - Tube & FittingErect and Dismantle Complex Overhead ScaffoldsSystems Scaffolding
VR407 - Tube & FittingErect and Dismantle Complex Falsework Scaffolds
Systems Scaffolding
VR408 - Tube & FittingErect and Dismantle Complex Shoring Scaffolds
Systems Scaffolding
VR409 - Tube & FittingErect and Dismantle Complex Access and Support
Scaffolding Temporary Roof
Systems Scaffolding Structures
15
SSCAFFOLDINGCAFFOLDING
8/9/2019 Train to Gain Brochure
18/24
8/9/2019 Train to Gain Brochure
19/24
EELECTRICALLECTRICAL
8/9/2019 Train to Gain Brochure
20/24
18
TECHNICAL OPTIONS - Candidates must achieve any FOUR units of
which THREE must be selected from SET A and ONE from SET B
SET A
Unit MPS Elec 10:Assemble components of electrical plant and
equipmentUnit MPS Elec 11: Restore components from electrical plant and
equipment to operational condition by repair
Unit MPS Elec 12: Prepare work areas for the maintenance of electrical
plant and equipment
Unit MPS Elec 13: Prepare materials for the maintenance of electrical
plant and equipment
Unit MPS Elec 14: Prepare equipment in support of electrical
engineering activities
Unit MPS Elec 15: Reinstate the work area after completing the
maintenance of electrical plant and equipment
Unit MPS Elec 16: Hand over electrical plant and equipment
SET B
Unit MPS Elec 17: Determine the feasibility of repair of components of
electrical plant and equipment
Unit MPS Elec 18: Test and monitor the performance and condition of
electrical plant and equipment
Unit MPS Elec 19:Analyse the test results relating to the tested
electrical plant and equipment
Unit MPS Elec 20: Establish that an electrical engineering maintenance
process has been completed to specification
EELECTRICALLECTRICAL
MAINTAINING PLANT AND SYSTEMS:
INSTRUMENT AND CONTROLS
NVQ - LEVEL 3 - CONT.
8/9/2019 Train to Gain Brochure
21/24
IINSTRUMENTATIONNSTRUMENTATION
8/9/2019 Train to Gain Brochure
22/24
20
TECHNICAL OPTIONS - candidates must achieve any FOUR units of whichTHREE must be selected from SET A and ONE from SET B.
SET A:
Unit MPS Inst 9: Assemble components of instrument and control systems
Unit MPS Inst 10: Restore components from instrument and control systems
to operational condition by repair
Unit MPS Inst 11: Prepare work areas for maintaining instrument and control
systems
Unit MPS Inst 12: Prepare materials required for maintaining instrument and
control systems
Unit MPS Inst 13: Prepare equipment required for maintaining instrument and
control systems
Unit MPS Inst 14: Reinstate the work area after completing the maintenance
of instrument and control systems
Unit MPS Inst 15: Handover plant and equipment
SET B:Unit MPS Inst 16: Determine the feasibility of repair of components from
instrument and control systems
Unit MPS Inst 17: Test the performance and condition of instrument and
control systems
Unit MPS Inst 18: Analyse the test results relating to the tested instrument and
control systems
Unit MPS Inst 19: Establish that an engineering maintenance process has
been completed to specification
IINSTRUMENTATIONNSTRUMENTATION
MAINTAINING PLANT AND SYSTEMS:
INSTRUMENT AND CONTROLS
8/9/2019 Train to Gain Brochure
23/24
Thi C i f id d b
8/9/2019 Train to Gain Brochure
24/24
This Course is one of many provided by
NETA Training Group.
Other Courses include:
Electrical / InstrumentationHazardous Area Training (COMP'EX')
AM2
Health & Safety
Safety Passport
Abrasive Wheels
CPC (Certificate of Professional Competence)Lifting / Slinging / Rigging
Lorry Loader
Management/Supervisory
Assessor Training A1/ A2/ V1
Mechanical/Fabrication
Pneumatics and HydraulicsCommercial & Domestic Gas Training
Scaffolding
Transport
ADR Hazchem
Fork Lift Truck
Welding/Welder Testing
For information on forthcomingCourses Examination Dates / Times
or a full range of courses contact:
NETA Training Group
Sales Department
Pennine Avenue
North Tees Industrial Estate
StocktonTS18 2RJ
Tel: 01642 616936Fax: 01642 612431
email [email protected] website www.neta.co.uk
Equal Opportunities Statement
It is our aim that there shall be equal opportunities in this organisation. There will be no discrimination on grounds of sex, be ing
married, colour, race or disability which is not permitted by law; or on any grounds, including age, except where this is necessary
to ensure that the job is done effectively. This principle will apply to recru itment, training, promotion, dismissa l, transfer and all other
benefits, terms and conditions of employment.
Meeting the needs and expectations of service users is of the highest priority to our
staff. Therefore if you have any concerns or wish to make a comment about the service
please contact: Barbara Seddon email [email protected]