August 7, 2007August 7, 2007 11
The Study on City Master Plan and Urban Development Program of Ulaanbaatar City (UBMPS)Intensive Learning Session on Urban Planning under Market Economy
Introduction To Traffic ManagementIntroduction To Traffic Management
August 10, 2007August 10, 2007
JICA Study TeamJICA Study Team
22August 7, 2007August 7, 2007
The Study on City Master Plan and Urban Development Program of Ulaanbaatar City (UBMPS)Intensive Learning Session on Urban Planning under Market Economy
ContentsContents
1.1. Overview of traffic managementOverview of traffic management2.2. Data collection and identification of problemsData collection and identification of problems3.3. Data AnalysisData Analysis4.4. Formulation of solutionsFormulation of solutions5.5. Implementation of improvement measuresImplementation of improvement measures6.6. Operation and evaluationOperation and evaluation7.7. Traffic Accident and SafetyTraffic Accident and Safety8.8. SummarySummary
33August 7, 2007August 7, 2007
The Study on City Master Plan and Urban Development Program of Ulaanbaatar City (UBMPS)Intensive Learning Session on Urban Planning under Market Economy
1. Overview of Traffic Management1. Overview of Traffic Management
What is traffic management?What is traffic management?
Rational for traffic management.Rational for traffic management.
Traffic management process.Traffic management process.
44August 7, 2007August 7, 2007
The Study on City Master Plan and Urban Development Program of Ulaanbaatar City (UBMPS)Intensive Learning Session on Urban Planning under Market Economy
What is Traffic Management?What is Traffic Management?
A set of traffic A set of traffic EEngineering, ngineering, EEnforcement nforcement and and EEducational measures to make traffic ducational measures to make traffic more efficient and safer.more efficient and safer.
No acquisition of additional land.No acquisition of additional land.
Far less costly as compared with road Far less costly as compared with road construction or road widening.construction or road widening.
Can be implemented in a short time.Can be implemented in a short time.
Physical and operational measures.Physical and operational measures.
55August 7, 2007August 7, 2007
The Study on City Master Plan and Urban Development Program of Ulaanbaatar City (UBMPS)Intensive Learning Session on Urban Planning under Market Economy
Objectives of Traffic ManagementObjectives of Traffic Management
General objectives:General objectives: Make traffic more efficient.Make traffic more efficient. Enhance traffic safetyEnhance traffic safety Reduce pollutant emissionReduce pollutant emission
Specific objectives:Specific objectives: Promote public transport usePromote public transport use Promote non-motorized transport (NMT)Promote non-motorized transport (NMT) Restrict use of private cars (traffic demand Restrict use of private cars (traffic demand
management)management)
66August 7, 2007August 7, 2007
The Study on City Master Plan and Urban Development Program of Ulaanbaatar City (UBMPS)Intensive Learning Session on Urban Planning under Market Economy
Rationale for Traffic ManagementRationale for Traffic Management
Not enough roads to accommodate Not enough roads to accommodate growing traffic demand.growing traffic demand.
Cannot keep constructing new roads even Cannot keep constructing new roads even if fund is available.if fund is available.
New approach that relies on:New approach that relies on: Improvement of public transport;Improvement of public transport; Intensive management of travel demand; andIntensive management of travel demand; and Traffic management techniques to increase Traffic management techniques to increase
effective capacity of available road space.effective capacity of available road space.
77August 7, 2007August 7, 2007
The Study on City Master Plan and Urban Development Program of Ulaanbaatar City (UBMPS)Intensive Learning Session on Urban Planning under Market Economy
Traffic Management ProcessTraffic Management ProcessIdentify traffic
problems
Collect data
Analyze data & formulate solution
Estimate cost of improvements
Implement measures
Monitor & fine-tune or adjust measures
Consult stakeholders
Secure efficient and safe flow of people and goods through the road network
Conduct information drive
Secure fund
88August 7, 2007August 7, 2007
The Study on City Master Plan and Urban Development Program of Ulaanbaatar City (UBMPS)Intensive Learning Session on Urban Planning under Market Economy
2. Data Collection & Problem Identifications2. Data Collection & Problem Identifications
Identification of problem (traffic congestion) Identification of problem (traffic congestion) and its location.and its location.
Traffic survey.Traffic survey. Various traffic surveys were conducted in this Various traffic surveys were conducted in this
study.study.
Opinion and behavior survey.Opinion and behavior survey.
99August 7, 2007August 7, 2007
The Study on City Master Plan and Urban Development Program of Ulaanbaatar City (UBMPS)Intensive Learning Session on Urban Planning under Market Economy
Traffic CongestionTraffic Congestion
Traffic congestion occurs when:Traffic congestion occurs when:
Demand>CapacityDemand>Capacity
Even small excess demand can cause heavy Even small excess demand can cause heavy congestion.congestion.
Heavy congestion in Bangkok, Thailand
1010August 7, 2007August 7, 2007
The Study on City Master Plan and Urban Development Program of Ulaanbaatar City (UBMPS)Intensive Learning Session on Urban Planning under Market Economy
Bottleneck PointsBottleneck Points
A location where physical or effective A location where physical or effective capacity decreases and congestion starts.capacity decreases and congestion starts. Intersection / roundaboutIntersection / roundabout Narrowed road sectionNarrowed road section Roadside parkingRoadside parking Bus stopBus stop High side frictionHigh side friction
1111August 7, 2007August 7, 2007
The Study on City Master Plan and Urban Development Program of Ulaanbaatar City (UBMPS)Intensive Learning Session on Urban Planning under Market Economy
Traffic SurveyTraffic Survey
Objectives: Obtain quantitative data that is Objectives: Obtain quantitative data that is required to identify traffic problem and required to identify traffic problem and formulate solutions.formulate solutions.
Type of survey:Type of survey: Intersection turning movement countIntersection turning movement count Intersection inventory surveyIntersection inventory survey Traffic signal operation surveyTraffic signal operation survey Traffic accident surveyTraffic accident survey Travel time surveyTravel time survey
1212August 7, 2007August 7, 2007
The Study on City Master Plan and Urban Development Program of Ulaanbaatar City (UBMPS)Intensive Learning Session on Urban Planning under Market Economy
Intersection Turning Movement CountIntersection Turning Movement Count
Essential for intersection capacity analysis.Essential for intersection capacity analysis.
Counted in vehicle and converted to PCU Counted in vehicle and converted to PCU (Passenger Car Unit) for peak hour.(Passenger Car Unit) for peak hour.
Total Out
Total In
RT1 TH1
Total Out
RT2
TH2
Tota
l In
Total Out LT3 TH3
Total In
LT1
RT3
LT2RT4
TH4
Total In
RT4
Total Out
1313August 7, 2007August 7, 2007
The Study on City Master Plan and Urban Development Program of Ulaanbaatar City (UBMPS)Intensive Learning Session on Urban Planning under Market Economy
Travel Time SurveyTravel Time Survey
To identify bottleneck and low speed section To identify bottleneck and low speed section along the survey route. along the survey route.
Test vehicle runs several times along survey Test vehicle runs several times along survey route and records time at waypoints.route and records time at waypoints.
Travel Time Survey
0
140
370
640
940
1140
0
50
100
150
200
250
300
Distance (m)
Tim
e (s
ec)
Travel Time Survey (Speed)
0
140
370
640
940
1140
0.0
5.0
10.0
15.0
20.0
Distance (m)
Sp
eed
(km
/h)
Time-Distance Chart Travel Speed Chart
1414August 7, 2007August 7, 2007
The Study on City Master Plan and Urban Development Program of Ulaanbaatar City (UBMPS)Intensive Learning Session on Urban Planning under Market Economy
3. Data Analysis3. Data Analysis
Intersection capacity analysis.Intersection capacity analysis.
Traffic flow simulation.Traffic flow simulation.
Traffic analysis software for PC.Traffic analysis software for PC.
1515August 7, 2007August 7, 2007
The Study on City Master Plan and Urban Development Program of Ulaanbaatar City (UBMPS)Intensive Learning Session on Urban Planning under Market Economy
Intersection Capacity AnalysisIntersection Capacity Analysis
A procedure to analyze traffic operation at A procedure to analyze traffic operation at intersection.intersection.
Helpful to examine critical movements and Helpful to examine critical movements and overall intersection performance.overall intersection performance.
Applicable for both signalized and non-Applicable for both signalized and non-signalized intersection.signalized intersection.
1616August 7, 2007August 7, 2007
The Study on City Master Plan and Urban Development Program of Ulaanbaatar City (UBMPS)Intensive Learning Session on Urban Planning under Market Economy
Intersection Capacity AnalysisIntersection Capacity Analysis
Input data:Input data: Directional traffic volumeDirectional traffic volume Lane width and movement assignmentLane width and movement assignment Signal timing (for operational analysis of Signal timing (for operational analysis of
signalized intersection only)signalized intersection only)
Analysis output:Analysis output: [Volume] / [Saturation Rate] for each movement [Volume] / [Saturation Rate] for each movement
and overall intersectionand overall intersection A set of critical movementsA set of critical movements
1717August 7, 2007August 7, 2007
The Study on City Master Plan and Urban Development Program of Ulaanbaatar City (UBMPS)Intensive Learning Session on Urban Planning under Market Economy
Example of Intersection Capacity AnalysisExample of Intersection Capacity Analysis
1520
1985
124 1861
1730
31
747
1067
2198 0 1489
1536
0
47
2890
1683
1731
48
871
AMAM PMPM
Max N-S V/SMax N-S V/S 0.320.32 0.330.33
Max E-W V/SMax E-W V/S 0.400.40 0.490.49
Y ValueY Value 0.720.72 0.830.83
PM peak hour traffic volume Lane width & assignment
3.30m 6.60m
6.60m 3.30m
3.30m
5.00m
5.00m
3.30m
1818August 7, 2007August 7, 2007
The Study on City Master Plan and Urban Development Program of Ulaanbaatar City (UBMPS)Intensive Learning Session on Urban Planning under Market Economy
Traffic Flow Simulation SoftwareTraffic Flow Simulation Software
A set of computer programs that constructs A set of computer programs that constructs virtual road network and simulates virtual road network and simulates movements of individual vehicle on it.movements of individual vehicle on it.
Performance of network under various road Performance of network under various road conditions and traffic demands can be conditions and traffic demands can be tested.tested.
1919August 7, 2007August 7, 2007
The Study on City Master Plan and Urban Development Program of Ulaanbaatar City (UBMPS)Intensive Learning Session on Urban Planning under Market Economy
Input Data RequiredInput Data Required
Link, node and network configuration:Link, node and network configuration: Length, grade, lane assignment, connection, Length, grade, lane assignment, connection,
turn pocketturn pocket
Traffic control at intersection:Traffic control at intersection: Signalized and unsignalized, vehicle detectorSignalized and unsignalized, vehicle detector
Traffic volume and vehicle properties:Traffic volume and vehicle properties: Input volume, turning movement at intersection, Input volume, turning movement at intersection,
vehicle performance by type, etc.vehicle performance by type, etc.
2020August 7, 2007August 7, 2007
The Study on City Master Plan and Urban Development Program of Ulaanbaatar City (UBMPS)Intensive Learning Session on Urban Planning under Market Economy
Simulation OutputSimulation Output
Traffic data:Traffic data: Number of trips, traffic volume, delayNumber of trips, traffic volume, delay Congestion data (max and average queue)Congestion data (max and average queue)
Person data:Person data: Person-km, person-trips, delay/personPerson-km, person-trips, delay/person
Vehicle data:Vehicle data: Moving time, delay time, queue timeMoving time, delay time, queue time
Energy and environment:Energy and environment: Fuel consumption, pollutant emissionFuel consumption, pollutant emission
2121August 7, 2007August 7, 2007
The Study on City Master Plan and Urban Development Program of Ulaanbaatar City (UBMPS)Intensive Learning Session on Urban Planning under Market Economy
Traffic Flow AnimationTraffic Flow Animation
2222August 7, 2007August 7, 2007
The Study on City Master Plan and Urban Development Program of Ulaanbaatar City (UBMPS)Intensive Learning Session on Urban Planning under Market Economy
Application of Traffic Flow SimulationApplication of Traffic Flow Simulation
Can be used for comparison and evaluation Can be used for comparison and evaluation of various traffic improvement measures of various traffic improvement measures including:including: Intersection geometric improvementIntersection geometric improvement Signalization / Signal improvementSignalization / Signal improvement Fly-overFly-over Traffic regulation (lane control, turn prohibition, Traffic regulation (lane control, turn prohibition,
parking control, one-way, etc.)parking control, one-way, etc.) Public transport improvementPublic transport improvement HOV (high occupancy vehicle) laneHOV (high occupancy vehicle) lane
2323August 7, 2007August 7, 2007
The Study on City Master Plan and Urban Development Program of Ulaanbaatar City (UBMPS)Intensive Learning Session on Urban Planning under Market Economy
Advantage of Using Simulation SoftwareAdvantage of Using Simulation Software
Several traffic management measures can Several traffic management measures can be tested and compared with minimal time be tested and compared with minimal time and cost.and cost.
Various measures of effectiveness (MoE) Various measures of effectiveness (MoE) can be obtained.can be obtained.
Visual presentation of road network and Visual presentation of road network and traffic operation available.traffic operation available.
2424August 7, 2007August 7, 2007
The Study on City Master Plan and Urban Development Program of Ulaanbaatar City (UBMPS)Intensive Learning Session on Urban Planning under Market Economy
Traffic Analysis Software for PCTraffic Analysis Software for PC
Intersection / arterial streets / network Intersection / arterial streets / network operation analysis software.operation analysis software.
Many package software are available:Many package software are available:
Highway capacity softwareHighway capacity softwarePasser II/III/IVPasser II/III/IVSYNCHROSYNCHROSIMTRAFFICSIMTRAFFICaaSIDRAaaSIDRA
SIG/CINEMASIG/CINEMATRANSYT-TRANSYT-7F7FTSISTSIS
2525August 7, 2007August 7, 2007
The Study on City Master Plan and Urban Development Program of Ulaanbaatar City (UBMPS)Intensive Learning Session on Urban Planning under Market Economy
4. Formulation of Solutions4. Formulation of Solutions
Traffic management instruments:Traffic management instruments: Intersection geometric improvementIntersection geometric improvement Traffic signalTraffic signal Transit signal priorityTransit signal priority Traffic sign & road markingTraffic sign & road marking Traffic demand managementTraffic demand management Parking managementParking management
2626August 7, 2007August 7, 2007
The Study on City Master Plan and Urban Development Program of Ulaanbaatar City (UBMPS)Intensive Learning Session on Urban Planning under Market Economy
Traffic Management InstrumentsTraffic Management Instruments
Various technique is available and Various technique is available and applicable to regulate vehicle and applicable to regulate vehicle and pedestrian flows.pedestrian flows.Basic rules are:Basic rules are: Simplify traffic flow (reduce no. of movements)Simplify traffic flow (reduce no. of movements) Segregate road users in space and timeSegregate road users in space and time Increase capacity in order to accommodate Increase capacity in order to accommodate
more vehicles (supply side measure)more vehicles (supply side measure) Restrain traffic in order to reduce traffic volume Restrain traffic in order to reduce traffic volume
(demand side measure)(demand side measure)
2727August 7, 2007August 7, 2007
The Study on City Master Plan and Urban Development Program of Ulaanbaatar City (UBMPS)Intensive Learning Session on Urban Planning under Market Economy
Traffic Engineering SolutionTraffic Engineering Solution
What is “traffic engineering?”What is “traffic engineering?” Traffic Engineering applies engineering Traffic Engineering applies engineering
principles to help solve transportation problems, principles to help solve transportation problems, and brings into play knowledge of psychology and brings into play knowledge of psychology and habits of users of the transportation and habits of users of the transportation systems, aside from technical foundations.systems, aside from technical foundations.
2828August 7, 2007August 7, 2007
The Study on City Master Plan and Urban Development Program of Ulaanbaatar City (UBMPS)Intensive Learning Session on Urban Planning under Market Economy
Traffic Engineering MeasuresTraffic Engineering Measures
Traffic Engineering Measures
Advanced signal control
Signal timing review
Traffic sign / road marking
Road section
Intersection Geometry improvement
Turn restriction
Reversible lane
Traffic information system
Wide area Area traffic control system
Truck ban
One-way
Traffic sign / road marking
2929August 7, 2007August 7, 2007
The Study on City Master Plan and Urban Development Program of Ulaanbaatar City (UBMPS)Intensive Learning Session on Urban Planning under Market Economy
Intersection Geometric ImprovementIntersection Geometric Improvement
Regulate vehicle and pedestrian Regulate vehicle and pedestrian movements at intersection by modifying movements at intersection by modifying intersection geometry.intersection geometry.
Basic rulesBasic rules Make intersection size as small as possibleMake intersection size as small as possible Keep number of approaches four or lessKeep number of approaches four or less Make approach angle close to 90 degreeMake approach angle close to 90 degree Provide left turn lane if necessaryProvide left turn lane if necessary Provide refugee space for pedestrianProvide refugee space for pedestrian
3030August 7, 2007August 7, 2007
The Study on City Master Plan and Urban Development Program of Ulaanbaatar City (UBMPS)Intensive Learning Session on Urban Planning under Market Economy
Example of Intersection Geometric ImprovementExample of Intersection Geometric Improvement
Before After
3131August 7, 2007August 7, 2007
The Study on City Master Plan and Urban Development Program of Ulaanbaatar City (UBMPS)Intensive Learning Session on Urban Planning under Market Economy
Traffic Signal – Signal WarrantTraffic Signal – Signal Warrant
Signal warrant determines whether a traffic Signal warrant determines whether a traffic signal is required at a particular intersection signal is required at a particular intersection or not.or not.
Factors to be considered:Factors to be considered:Traffic volume
Left turn volume
Pedestrian volume
V/C ratio
Nearby facility
Traffic accident
3232August 7, 2007August 7, 2007
The Study on City Master Plan and Urban Development Program of Ulaanbaatar City (UBMPS)Intensive Learning Session on Urban Planning under Market Economy
Traffic Signal – Basic ParameterTraffic Signal – Basic Parameter
Cycle (duration of 1 cycle, second)Cycle (duration of 1 cycle, second)
Split (ratio of green time against cycle, %)Split (ratio of green time against cycle, %)
Offset (time difference between 2 signals with Offset (time difference between 2 signals with same cycle, second or %)same cycle, second or %)
Green(split)
Red
Cycle
Offset
Intersection 2
Intersection 1
Distance
TimeVehicle movement
3333August 7, 2007August 7, 2007
The Study on City Master Plan and Urban Development Program of Ulaanbaatar City (UBMPS)Intensive Learning Session on Urban Planning under Market Economy
Traffic Signal – Control ModeTraffic Signal – Control Mode
CategoryCategory ModeMode TechnologyTechnology CostCost O/MO/M
IsolatedIsolated Fixed timeFixed time SimpleSimple LowLow EasyEasy
Time-of-dayTime-of-day
ActuatedActuated
ArterialArterial CoordinatedCoordinated
Area Area ResponsiveResponsive
AdaptiveAdaptive SophisticatedSophisticated HighHigh DifficultDifficult
O/M: Operation and maintenance
3434August 7, 2007August 7, 2007
The Study on City Master Plan and Urban Development Program of Ulaanbaatar City (UBMPS)Intensive Learning Session on Urban Planning under Market Economy
Traffic Signal - CoordinationTraffic Signal - Coordination
Signals along arterial street are coordinated to Signals along arterial street are coordinated to maximize throughput and minimize delaymaximize throughput and minimize delay
Distance
Tim
e
Shorter Travel Time
Tim
e
Uncoordinated Signals Coordinated Signals
Distance
Sig
nal
3535August 7, 2007August 7, 2007
The Study on City Master Plan and Urban Development Program of Ulaanbaatar City (UBMPS)Intensive Learning Session on Urban Planning under Market Economy
Traffic Signal – Control ModeTraffic Signal – Control Mode
Signal
Clock Vehicle Detector
Fixed Time Time-of-day (TOD) Actuation
Coordinated Area Traffic Control
Traffic responsive/adaptive
Connection
Traffic Control Center
3636August 7, 2007August 7, 2007
The Study on City Master Plan and Urban Development Program of Ulaanbaatar City (UBMPS)Intensive Learning Session on Urban Planning under Market Economy
Traffic Signal – Manual ControlTraffic Signal – Manual Control
Why manual control is not efficient?Why manual control is not efficient? Control based on wrong perceptionControl based on wrong perception
– Minimizing stops instead of total throughputMinimizing stops instead of total throughput Effective only for light trafficEffective only for light traffic
– Not effective for near- or over-saturated trafficNot effective for near- or over-saturated traffic Local optimization at bestLocal optimization at best
– Coordination not considered, not network-wide Coordination not considered, not network-wide optimizationoptimization
Fatigue and loss of attentionFatigue and loss of attention– Human natureHuman nature
3737August 7, 2007August 7, 2007
The Study on City Master Plan and Urban Development Program of Ulaanbaatar City (UBMPS)Intensive Learning Session on Urban Planning under Market Economy
Traffic Signal – Long Cycle TimeTraffic Signal – Long Cycle Time
If cycle time is doubled, average delay is If cycle time is doubled, average delay is also doubled with same traffic volumealso doubled with same traffic volume
RED RED
GREEN GREEN
SIGNAL
ARRIVALTIME
SHORT CYCLE TIME
RED
GREEN
SIGNAL
ARRIVALTIME
LONG CYCLE TIME
3838August 7, 2007August 7, 2007
The Study on City Master Plan and Urban Development Program of Ulaanbaatar City (UBMPS)Intensive Learning Session on Urban Planning under Market Economy
Platoon – Group of VehiclesPlatoon – Group of Vehicles
In manual control, operator tends to wait for In manual control, operator tends to wait for approaching vehicle - wrong practice!approaching vehicle - wrong practice!
(a) Start of Green (b) Begining of Green (c) End of Green
3939August 7, 2007August 7, 2007
The Study on City Master Plan and Urban Development Program of Ulaanbaatar City (UBMPS)Intensive Learning Session on Urban Planning under Market Economy
Platoon ProfilePlatoon Profile
Green time is wasted as it is not fully utilizedGreen time is wasted as it is not fully utilized
Efficiency decreases with longer cycleEfficiency decreases with longer cycle
Platoon Pattern
Green Time
Veh
icle
s/U
nit
Gre
en
Saturation flow level
Wasted Green Time
Cycle Length and Efficiency
100 120 140 160 180 200
Cycle Length (sec)
Veh
icle
s/U
nit
Gre
en
4040August 7, 2007August 7, 2007
The Study on City Master Plan and Urban Development Program of Ulaanbaatar City (UBMPS)Intensive Learning Session on Urban Planning under Market Economy
Transit Signal PriorityTransit Signal Priority
Red signal is shortened or green signal is Red signal is shortened or green signal is lengthened to minimized delay of buslengthened to minimized delay of bus
Time
Distance
(a) Early Green (b) Green Extension
Red
BusMovement
BusMovement
Green
BUS DET
BUS DET
4141August 7, 2007August 7, 2007
The Study on City Master Plan and Urban Development Program of Ulaanbaatar City (UBMPS)Intensive Learning Session on Urban Planning under Market Economy
Traffic Signs and Road MarkingsTraffic Signs and Road Markings
Effective tool to regulate trafficEffective tool to regulate traffic
Mongolian standards establishedMongolian standards established
4242August 7, 2007August 7, 2007
The Study on City Master Plan and Urban Development Program of Ulaanbaatar City (UBMPS)Intensive Learning Session on Urban Planning under Market Economy
5. Implementation of Improvement Measures 5. Implementation of Improvement Measures
Cost estimate and fundingCost estimate and funding
Consultation with stakeholdersConsultation with stakeholders
Legislation and regulationLegislation and regulation
Public relationsPublic relations
4343August 7, 2007August 7, 2007
The Study on City Master Plan and Urban Development Program of Ulaanbaatar City (UBMPS)Intensive Learning Session on Urban Planning under Market Economy
Cost Estimate and FundingCost Estimate and Funding
Realistic cost must be estimated using Realistic cost must be estimated using prevailing price of materials, cost of similar prevailing price of materials, cost of similar works and inquiry to potential suppliers / works and inquiry to potential suppliers / contractors.contractors.
Fund must be secured from annual budget, Fund must be secured from annual budget, special budget, or other sources.special budget, or other sources.
Long lead time must be considered for Long lead time must be considered for timely implementation. timely implementation.
4444August 7, 2007August 7, 2007
The Study on City Master Plan and Urban Development Program of Ulaanbaatar City (UBMPS)Intensive Learning Session on Urban Planning under Market Economy
Consultation with StakeholderConsultation with Stakeholder
Share knowledge and experience and Share knowledge and experience and collaborate in formulating workable solutioncollaborate in formulating workable solution
Stakeholder Meeting in Jakarta, Indonesia
Participants: Driver Participants: Driver (public, private), (public, private), passenger, pedestrian, passenger, pedestrian, resident, shop owner, resident, shop owner, other government other government agencies (national and agencies (national and local)local)
4545August 7, 2007August 7, 2007
The Study on City Master Plan and Urban Development Program of Ulaanbaatar City (UBMPS)Intensive Learning Session on Urban Planning under Market Economy
Information & Education CampaignInformation & Education Campaign
Disseminate information to foster road Disseminate information to foster road user’s cooperationuser’s cooperation
Traffic rule campaign Traffic rule campaign in Hanoi, Vietnamin Hanoi, Vietnam
4646August 7, 2007August 7, 2007
The Study on City Master Plan and Urban Development Program of Ulaanbaatar City (UBMPS)Intensive Learning Session on Urban Planning under Market Economy
6. Operation and Evaluation6. Operation and Evaluation
Guidance and enforcement.Guidance and enforcement.
Review and evaluation.Review and evaluation.
4747August 7, 2007August 7, 2007
The Study on City Master Plan and Urban Development Program of Ulaanbaatar City (UBMPS)Intensive Learning Session on Urban Planning under Market Economy
Role of Traffic PoliceRole of Traffic Police
Enforcement of traffic rules.Enforcement of traffic rules.
Apprehension of violators.Apprehension of violators. Speeding,Speeding, Drunken drivingDrunken driving Red signal violationRed signal violation
Traffic guidance and control.Traffic guidance and control.
No left turn violationNo left turn violation One-way violationOne-way violation No parking violationNo parking violation
4848August 7, 2007August 7, 2007
The Study on City Master Plan and Urban Development Program of Ulaanbaatar City (UBMPS)Intensive Learning Session on Urban Planning under Market Economy
Traffic Control by Traffic EnforcerTraffic Control by Traffic Enforcer
Get drivers and pedestrians to obey traffic rules Get drivers and pedestrians to obey traffic rules and regulations – main taskand regulations – main task
Human signal controller – secondary taskHuman signal controller – secondary task
Impromptu new traffic scheme not effectiveImpromptu new traffic scheme not effective
Traffic police at work
4949August 7, 2007August 7, 2007
The Study on City Master Plan and Urban Development Program of Ulaanbaatar City (UBMPS)Intensive Learning Session on Urban Planning under Market Economy
Existing Enforcement SystemExisting Enforcement System
Offence is settled on the spot with payment Offence is settled on the spot with payment of fine in cash.of fine in cash.
Fine is the revenue for UB City.Fine is the revenue for UB City.
Total amount of fine: 500 mil. Tg. for 2006Total amount of fine: 500 mil. Tg. for 2006
More amount expected for 2007.More amount expected for 2007.
Suspension or revocation for severe Suspension or revocation for severe offence.offence.
Offence is not recorded.Offence is not recorded.
5050August 7, 2007August 7, 2007
The Study on City Master Plan and Urban Development Program of Ulaanbaatar City (UBMPS)Intensive Learning Session on Urban Planning under Market Economy
Point System for Traffic OffencePoint System for Traffic Offence
Demerit point is given to driver who Demerit point is given to driver who committed traffic offence.committed traffic offence.Number of points depend on type of Number of points depend on type of offence.offence.Driving license is suspended or revoked if Driving license is suspended or revoked if demerit points reach the certain level.demerit points reach the certain level.Training or test is required for suspended or Training or test is required for suspended or revoked drivers.revoked drivers.No offence for certain period will reset or No offence for certain period will reset or reduce demerit points.reduce demerit points.
5151August 7, 2007August 7, 2007
The Study on City Master Plan and Urban Development Program of Ulaanbaatar City (UBMPS)Intensive Learning Session on Urban Planning under Market Economy
7. Traffic Accidents and Safety7. Traffic Accidents and Safety
High accident rate compared with number of High accident rate compared with number of vehicles.vehicles.High rate of pedestrian accidents.High rate of pedestrian accidents.Accident prone locations:Accident prone locations: Intersection, roundabout, high traffic volumeIntersection, roundabout, high traffic volume
Accident prone locations
5252August 7, 2007August 7, 2007
The Study on City Master Plan and Urban Development Program of Ulaanbaatar City (UBMPS)Intensive Learning Session on Urban Planning under Market Economy
Number of AccidentsNumber of Accidents
Accidents
Year Nation UB City UB Share
2000 5,991 5,074 84.7%
2001 5,212 4,394 84.3%
2002 5,553 4,358 78.5%
2003 5,296 3,892 73.5%
2004 4,803 3,557 74.1%
5353August 7, 2007August 7, 2007
The Study on City Master Plan and Urban Development Program of Ulaanbaatar City (UBMPS)Intensive Learning Session on Urban Planning under Market Economy
Accident TypeAccident Type
Fatality (person)
Injured (person)
Property Damage
(mil. Tg.)
Year NationUB
City
Share NationUB
City
Share NationUB
City
Share
2000 338 14141.7
%1,616 940
58.2%
483.2 215.644.6
%
2001 335 9729.0
%1,812 1,078
59.5%
289.7 127.644.0
%
2002 327 12237.3
%1,636 818
50.0%
658.3 384.458.4
%
2003 391 14537.1
%1,224 692
56.5%
729.9 424.458.1
%
2004 385 10226.5
%2,312 1,119
48.4%
354.3 127.436.0
%
5454August 7, 2007August 7, 2007
The Study on City Master Plan and Urban Development Program of Ulaanbaatar City (UBMPS)Intensive Learning Session on Urban Planning under Market Economy
Accident TypeAccident Type
Type Number Share
Car - car 11,864 55.7%
Car - pedestrian 8,477 39.8%
Immovable facilities 376 1.8%
Overturn 335 1.6%
Fallen passenger 104 0.5%
Car - bicycle 81 0.4%
Car - animal 0 0.0%
Others 68 0.3%
Total 21,305
5555August 7, 2007August 7, 2007
The Study on City Master Plan and Urban Development Program of Ulaanbaatar City (UBMPS)Intensive Learning Session on Urban Planning under Market Economy
Traffic Safety Education - PolicyTraffic Safety Education - Policy
Understanding of importance of educationUnderstanding of importance of education
Curriculum suitable for recipient and local Curriculum suitable for recipient and local conditionsconditions
Understanding of traffic rule and mannerUnderstanding of traffic rule and manner
Participatory approach and hand-on trainingParticipatory approach and hand-on training
Evaluation of effect of safety educationEvaluation of effect of safety education
Review of curriculum to cope with changing needs Review of curriculum to cope with changing needs of societyof society
Consideration of privacyConsideration of privacy
Coordination with other organizationsCoordination with other organizations
5656August 7, 2007August 7, 2007
The Study on City Master Plan and Urban Development Program of Ulaanbaatar City (UBMPS)Intensive Learning Session on Urban Planning under Market Economy
Safety Education – Target GroupSafety Education – Target Group
Different curriculum for each target groupDifferent curriculum for each target group Small childrenSmall children Elementary, junior high, high school studentsElementary, junior high, high school students AdultsAdults Elderly personsElderly persons
5757August 7, 2007August 7, 2007
The Study on City Master Plan and Urban Development Program of Ulaanbaatar City (UBMPS)Intensive Learning Session on Urban Planning under Market Economy
Education MenuEducation Menu
Text bookText book
Traffic safety parkTraffic safety park
Campaign and paradeCampaign and parade
TV programsTV programs
Training for Traffic PoliceTraining for Traffic Police
5858August 7, 2007August 7, 2007
The Study on City Master Plan and Urban Development Program of Ulaanbaatar City (UBMPS)Intensive Learning Session on Urban Planning under Market Economy
Monitoring and EvaluationMonitoring and Evaluation
Essential for sustainability.Essential for sustainability.
IndicatorsIndicators Comparison of “before” and “after” data (traffic Comparison of “before” and “after” data (traffic
volume, travel time, delay, etc.)volume, travel time, delay, etc.) Number and severity of accidentsNumber and severity of accidents Number of traffic offencesNumber of traffic offences Pedestrian environment (space, waiting time Pedestrian environment (space, waiting time
and path to cross intersection)and path to cross intersection) ComplaintsComplaints
5959August 7, 2007August 7, 2007
The Study on City Master Plan and Urban Development Program of Ulaanbaatar City (UBMPS)Intensive Learning Session on Urban Planning under Market Economy
8. Summary8. Summary
Effectiveness and limitations of traffic Effectiveness and limitations of traffic management measures must be properly management measures must be properly understood (no almighty solution).understood (no almighty solution).
Scientific approach must be taken (think Scientific approach must be taken (think before you tinker). before you tinker).
Concerted and sustained efforts by all Concerted and sustained efforts by all parties concerned is required (never ending parties concerned is required (never ending task but do your best).task but do your best).