87
Project No.: 2017-0675 [ Month Year ] 3257 Mainway, City of Burlington STRATEGY 4 INC. TRAFFIC IMPACT AND PARKING STUDY APRIL 2018

TRAFFIC IMPACT AND PARKING STUDY 3257 …...April 17, 2018 Reference No. 2017-0675 Mr. Jeff Kenny Strategy 4 Inc. 2620 Bristol Circle, Suite 100 Oakville, ON L6H 6Z7 Attention: Mr

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: TRAFFIC IMPACT AND PARKING STUDY 3257 …...April 17, 2018 Reference No. 2017-0675 Mr. Jeff Kenny Strategy 4 Inc. 2620 Bristol Circle, Suite 100 Oakville, ON L6H 6Z7 Attention: Mr

Project No.: 2017-0675

[ Month Year ]

3257 Mainway, City of Burlington

STRATEGY 4 INC.

TRAFFIC IMPACT AND PARKING STUDY

APRIL 2018

Page 2: TRAFFIC IMPACT AND PARKING STUDY 3257 …...April 17, 2018 Reference No. 2017-0675 Mr. Jeff Kenny Strategy 4 Inc. 2620 Bristol Circle, Suite 100 Oakville, ON L6H 6Z7 Attention: Mr

April 17, 2018 Reference No. 2017-0675 Mr. Jeff Kenny Strategy 4 Inc. 2620 Bristol Circle, Suite 100 Oakville, ON L6H 6Z7

Attention: Mr. Kenny Traffic Impact and Parking Study 3257 Mainway City of Burlington

Cole Engineering Group Ltd. (“COLE”) is pleased to submit the revised Traffic Impact and Parking Study (TIPS) for the above noted subject property, in support of a new U-Haul facility with three full moves accesses on Mainway. The site located at 3257 Mainway on the north side of Mainway directly across from Pioneer Road in the City of Burlington (the “City”).

This study concludes that during the peak periods, all key intersections and site accesses can operate at satisfactory levels of service and below capacity with no road improvements required. In addition, the proposed parking supply is sufficient to serve the site.

Should you have any questions, please do not hesitate to contact the undersigned.

Best Regards,

COLE ENGINEERING GROUP LTD.

Mustafa Ersin Sarier, E.I.T., M. Eng. Rao Marthi, C.E.T. Traffic Analyst Project Manager Traffic Traffic Urban Development (ICI) Urban Development (ICI) MS/RM

Page 3: TRAFFIC IMPACT AND PARKING STUDY 3257 …...April 17, 2018 Reference No. 2017-0675 Mr. Jeff Kenny Strategy 4 Inc. 2620 Bristol Circle, Suite 100 Oakville, ON L6H 6Z7 Attention: Mr

Strategy 4 Inc. 357 Mainway Traffic Impact and Parking Study

2017-0675 April 2018 i

PREPARED BY:

COLE ENGINEERING GROUP LTD.

Mustafa Ersin Sarier, E.I.T., M. Eng. Traffic Analyst Traffic Urban Development (ICI)

Issues and Revisions Registry

Identification Date Description of issued and/or revision

Draft Report April 2018 For Client review

Final Report April 2018 For submission

CHECKED BY:

COLE ENGINEERING GROUP LTD.

Rao Marthi, C.E.T., MITE Project Manager Traffic Urban Development (ICI)

Page 4: TRAFFIC IMPACT AND PARKING STUDY 3257 …...April 17, 2018 Reference No. 2017-0675 Mr. Jeff Kenny Strategy 4 Inc. 2620 Bristol Circle, Suite 100 Oakville, ON L6H 6Z7 Attention: Mr

Strategy 4 Inc. 357 Mainway Traffic Impact and Parking Study

2017-0675 April 2018 ii

Statement of Conditions

This Report / Study (the “Work”) has been prepared at the request of, and for the exclusive use of, the Owner / Client, City of Burlington and its affiliates (the “Intended User”). No one other than the Intended User has the right to use and rely on the Work without first obtaining the written authorization of Cole Engineering Group Ltd. and its Owner. Cole Engineering Group Ltd. expressly excludes liability to any party except the Intended User for any use of, and/or reliance upon, the work.

Neither possession of the Work, nor a copy of it, carries the right of publication. All copyright in the Work is reserved to Cole Engineering Group Ltd. The Work shall not be disclosed, produced or reproduced, quoted from, or referred to, in whole or in part, or published in any manner, without the express written consent of Cole Engineering Group Ltd., City of Burlington, or the Owner.

Page 5: TRAFFIC IMPACT AND PARKING STUDY 3257 …...April 17, 2018 Reference No. 2017-0675 Mr. Jeff Kenny Strategy 4 Inc. 2620 Bristol Circle, Suite 100 Oakville, ON L6H 6Z7 Attention: Mr

Strategy 4 Inc. 357 Mainway Traffic Impact and Parking Study

2017-0675 April 2018 iii

Table of Contents

1 Introduction ............................................................................................................................. 1

2 Study Approach ........................................................................................................................ 1

3 Existing Traffic Conditions......................................................................................................... 2

3.1 Existing Road Network ............................................................................................................. 2

3.2 Existing Traffic Analysis ........................................................................................................... 2

4 Future Background Traffic ........................................................................................................ 3

4.1 Background Traffic Growth ...................................................................................................... 3

4.2 Background Developments ...................................................................................................... 3

4.3 Future (2023) Background Traffic Analysis ............................................................................. 3

5 Site Traffic ................................................................................................................................ 4

5.1 Trip Generation ........................................................................................................................ 4

5.2 Site Traffic Volumes ................................................................................................................. 5

6 Future Total Traffic ................................................................................................................... 5

6.1 Future (2023) Total Traffic Analysis ......................................................................................... 5

7 Parking .................................................................................................................................... 7

7.1 City of Burlington By-law Parking Requirements ..................................................................... 7

7.2 ITE Parking Generation ............................................................................................................ 7

7.3 Parking Rationalization ............................................................................................................ 7 7.3.1 Office Parking Review ............................................................................................................... 7 7.3.2 Proxy Parking Survey ................................................................................................................ 8

7.3.2.1 Oakville Proxy Parking Utilization Survey ................................................................. 8 7.3.2.2 Burlington Proxy Parking Utilization Survey ........................................................... 10

7.4 Parking Comparison ............................................................................................................... 11

8 Conclusions and Recommendations ....................................................................................... 12

Page 6: TRAFFIC IMPACT AND PARKING STUDY 3257 …...April 17, 2018 Reference No. 2017-0675 Mr. Jeff Kenny Strategy 4 Inc. 2620 Bristol Circle, Suite 100 Oakville, ON L6H 6Z7 Attention: Mr

Strategy 4 Inc. 357 Mainway Traffic Impact and Parking Study

2017-0675 April 2018 iv

LIST OF TABLES

Table 3.1 Level of Service – Existing Traffic Assessment .................................................................... 3 Table 4.1 Level of Service-Future (2023) Background Traffic Assessment ......................................... 4 Table 5.1 Trip Generation – Subject Site ............................................................................................ 5 Table 5.2 Trip Distribution .................................................................................................................. 5 Table 6.1 Level of Service – Future (2023) Total Traffic Assessment ................................................. 6 Table 7.1 Parking Requirement as per City of Burlington Zoning By-law 2020 .................................. 7 Table 7.2 ITE Parking Generation 4th Edition – Future Parking Demand ............................................ 7 Table 7.3 Total Observed Parking Survey Results (Oakville) .............................................................. 8 Table 7.4 Warehouse Parking Survey Estimation (Oakville) ............................................................... 9 Table 7.5 Total Observed Parking Survey Results (Burlington) ........................................................ 10 Table 7.6 Warehouse Parking Survey Estimation (Burlington) ........................................................ 10 Table 7.7 Parking Comparison Table ................................................................................................ 11

LIST OF FIGURES

Figure 1-1 Site Location ............................................................................................... Following Report Figure 1-2 Site Plan ..................................................................................................... Following Report Figure 3-1 Existing Lane Configuration ....................................................................... Following Report Figure 3-2 Existing Traffic Volumes ............................................................................. Following Report Figure 4-1 Future (2023) Background Traffic Volumes ............................................... Following Report Figure 5-1 Site Traffic Volumes ................................................................................... Following Report Figure 6-1 Future (2023) Total Traffic Volumes .......................................................... Following Report

APPENDICES

Appendix A Existing Traffic Data

Appendix B Existing Traffic Level of Service Calculations

Appendix C Future (2023) Background Traffic Level of Service Calculations

Appendix D Future (2023) Total Traffic Level of Service Calculations

Appendix E Parking Demand Surveys

Page 7: TRAFFIC IMPACT AND PARKING STUDY 3257 …...April 17, 2018 Reference No. 2017-0675 Mr. Jeff Kenny Strategy 4 Inc. 2620 Bristol Circle, Suite 100 Oakville, ON L6H 6Z7 Attention: Mr

Strategy 4 Inc. 357 Mainway Traffic Impact and Parking Study

2017-0675 April 2018 1

1 Introduction

Cole Engineering Group Ltd. (COLE) was retained by Strategy 4 Inc. to undertake a Traffic Impact and Parking Study (TIPS) in support of a new U-Haul facility (the “subject site”). The subject lands are located on the north side of Mainway across from Pioneer Road, municipally known as 3257 Mainway, in the City of Burlington (the “City”). The site location is illustrated in Figure 1-1.

The property is currently occupied by a vacant industrial development. The current proposal is to convert the existing 124,302ft2 building plus 31,704ft2 addition into a U-Haul rental facility that will include an automotive repair shop, dispatch and receiving area (“DnR”), showroom, office; and a self-storage warehouse. The site will use the three existing full moves accesses onto Mainway Road. The Site Plan is illustrated in Figure 1-2.

The purpose of this TIS includes:

Assessment of the existing traffic volumes and background growth within the study area;

Estimation of the future background traffic volumes based on a 5-year traffic horizon (2023);

Forecasting of traffic associated with the proposed development;

Documentation of the traffic impacts associated with the subject lands;

Identification of any traffic operational concerns;

Identification of any mitigation measures for the adjacent road network (if necessary); and,

Comment on the adequacy of the parking spaces supplied for the proposed development and review of on-site circulation.

2 Study Approach

Weekday morning and afternoon peak period traffic counts were obtained from the City for the following study area intersections:

Mainway Road / Dillon Road (Signalized);

Mainway Road / Pioneer Road (Unsignalized); and,

Mainway Road / Northside Road (Signalized).

The traffic data and signal timing plans are provided in Appendix A. An annual growth factor of 1% a year has been applied to forecast the existing (2018) traffic conditions with the weekday morning and afternoon peak periods analyzed as a result of the traffic peaks on Mainway, as discussed with City staff.

In order to forecast the future background (2023) traffic conditions, an annual background growth rate of 1% was used. No background developments in this area were identified by City staff for inclusion in this study.

Site traffic was derived using information contained in the Trip Generation Manual, 9th Edition, published by the Institute of Transportation Engineers (ITE). To be conservative, a non-auto modal split was not applied to trip generation and trips were distributed based on the existing traffic patterns.

Page 8: TRAFFIC IMPACT AND PARKING STUDY 3257 …...April 17, 2018 Reference No. 2017-0675 Mr. Jeff Kenny Strategy 4 Inc. 2620 Bristol Circle, Suite 100 Oakville, ON L6H 6Z7 Attention: Mr

Strategy 4 Inc. 357 Mainway Traffic Impact and Parking Study

2017-0675 April 2018 2

Future total traffic conditions are determined by the summation of the estimated traffic volumes generated by the site and the background traffic volumes for the 2023 horizon.

The study area intersections were analyzed using Synchro 9.0 software which utilizes the U.S. Transportation Research Board Highway Capacity Manual 2000 methodology.

3 Existing Traffic Conditions

The existing lane configuration for the study area road network is illustrated in Figure 3-1.

3.1 Existing Road Network

The road network within the study area is outlined below:

Mainway Road is an east-west arterial road consisting of a four (4) lane cross section under the jurisdiction of the City. Mainway Road maintains a speed limit of 60 km/h from Guelph Line to Burloak Drive. The road has urban cross section and sidewalks on the both side of the road in the vicinity of the subject site;

Pioneer Road is a local municipal road consisting of two (2) lane cross section under the jurisdiction of the City and maintains 50 km/h in the vicinity of the subject site. The road has urban cross section with no sidewalks. It is under un-signalized control at Mainway intersection;

Northside Road is a collector road consisting of two (2) lane cross section under the jurisdiction of the City and maintains 40 km/h in the vicinity of the subject site. The road has urban cross section with a sidewalk on the west side. It is under signalized control at Mainway intersection; and,

Dillon Road is a collector road consisting of two (2) lane cross section under the jurisdiction of the City and maintains 50 km/h in the vicinity of the subject site. The road has urban cross section with sidewalks on the both side of the road. It is under signalized control at Mainway intersection.

3.2 Existing Traffic Analysis

The existing traffic volumes are illustrated in Figure 3-2 and were analyzed using Synchro 9.0 software. Existing signal timings were incorporated in the analysis. The results of the existing intersection operations are summarized in Table 3.1, with the volume to capacity (v/c) ratios for overall and individual movements. Volume / Capacity (v/c) ratios for overall intersection operations, through movements, or shared through / turning movements equal to 0.85 or above; and v/c ratios for exclusive movements equal to 0.95 or above have been shown in bold. For unsignalized intersections, level of service (LOS), based on average delay per vehicle, on individual movements exceeding LOS “D” have also been shown in bold. The detailed calculations are shown in Appendix B.

Page 9: TRAFFIC IMPACT AND PARKING STUDY 3257 …...April 17, 2018 Reference No. 2017-0675 Mr. Jeff Kenny Strategy 4 Inc. 2620 Bristol Circle, Suite 100 Oakville, ON L6H 6Z7 Attention: Mr

Strategy 4 Inc. 357 Mainway Traffic Impact and Parking Study

2017-0675 April 2018 3

Table 3.1 Level of Service – Existing Traffic Assessment

Intersection Key Movement AM Peak LOS (v/c) PM Peak LOS (v/c)

Mainway Road / Dillon Road

(Signalized)

Overall

EB through-left

WB through-right

SB left

SB right

B (0.62)

C (0.79)

B (0.39)

B (0.43)

B (0.05)

B (0.47)

B (0.53)

B (0.78)

B (0.03)

B (0.01)

Mainway Road / Northside Road

(Signalized)

Overall

EB through-left

WB through-right

SB left

SB right

B (0.41)

B (0.49)

A (0.25)

C (0.21)

C (0.06)

B (0.37)

A (0.41)

A (0.47)

C (0.11)

C (0.06)

Mainway Road / Pioneer Road

(Un-Signalized)

EB through

EB right

WB left

WB through

NB left

A (0.34)

A (0.21)

A (0.09)

A (0.18)

D (0.30)

A (0.22)

A (0.13)

A (0.02)

A (0.37)

D (0.42)

The analysis shows that in the existing condition, the study area intersections all operate at good levels of service (LOS) and below capacity.

4 Future Background Traffic

4.1 Background Traffic Growth

Estimates of growth in background traffic volumes from existing conditions to future horizon year (2023) conditions were developed by applying a rate of growth of 1% per year, as provided by City staff.

4.2 Background Developments

Based on correspondence with City staff, there are no proposed developments in the vicinity of the subject site that need to be taken into account in this study.

4.3 Future (2023) Background Traffic Analysis

Future (2023) background traffic volumes are provided in Figure 4-1, following the report. The results of the future (2023) background traffic operations are summarized in Table 4.1, with the volume to capacity (v/c) ratios for overall and individual movements. Volume / Capacity (v/c) ratios for overall intersection operations, through movements, or shared through / turning movements equal to 0.85 or above; and v/c ratios for exclusive movements equal to 0.95 or above have been shown in bold. For unsignalized intersections, level of service (LOS), based on average delay per vehicle, on individual movements exceeding LOS “D” have also been shown in bold. The detailed calculations are shown in Appendix C.

Page 10: TRAFFIC IMPACT AND PARKING STUDY 3257 …...April 17, 2018 Reference No. 2017-0675 Mr. Jeff Kenny Strategy 4 Inc. 2620 Bristol Circle, Suite 100 Oakville, ON L6H 6Z7 Attention: Mr

Strategy 4 Inc. 357 Mainway Traffic Impact and Parking Study

2017-0675 April 2018 4

Table 4.1 Level of Service-Future (2023) Background Traffic Assessment

Intersection Key Movement AM Peak LOS (v/c) PM Peak LOS (v/c)

Mainway Road / Dillon Road

(Signalized)

Overall

EB through-left

WB through-right

SB left

SB right

B (0.64)

C (0.79)

B (0.39)

B (0.44)

B (0.05)

B (0.48)

B (0.54)

B (0.79)

B (0.03)

B (0.01)

Mainway Road / Northside Road

(Signalized)

Overall

EB through-left

WB through-right

SB left

SB right

B (0.43)

B (0.51)

A (0.26)

C (0.21)

C (0.06)

B (0.39)

A (0.43)

B (0.49)

C (0.11)

C (0.06)

Mainway Road / Pioneer Road

(Un-Signalized)

EB through

EB right

WB left

WB through

NB left

A (0.36)

A (0.22)

A (0.10)

A (0.19)

D (0.31)

A (0.23)

A (0.14)

A (0.02)

A (0.39)

D (0.45)

The results of the future background (2023) traffic analysis indicate that all intersections will function with acceptable LOS and below capacity in both the Weekday AM and PM peak periods.

5 Site Traffic

5.1 Trip Generation

Trip generation is estimated using information contained in the Trip Generation Manual, 9th Edition published by the Institute of Transportation Engineers (ITE). The total site is to have a gross floor area (GFA) of 14,493.40 m2 (156,006 ft2) which includes 168.7 m2 of Dispatch and Receiving space (DnR), 632.22 m2 of office and showroom space, 11,601.48 m2 of storage space, and 2091 m2 of automotive repair shop space. Since the automotive repair shop will be used for repairing the existing U-Haul vehicles, it will not be generating any additional trips to / from the site. Therefore, the GFA of the automotive repair shop does not need to be considered for the trip generation and site traffic analysis.

The office component is assessed using land use 710 (General Office) and the self-storage warehouse with associated motor vehicle modifications is assessed using land use 151 (Mini-Warehouse). According to the Trip Generation Manual, 15% of the trips generated by the mini-warehouse are to be truck traffic. The weekday trip generation is summarized in Table 5.1.

Page 11: TRAFFIC IMPACT AND PARKING STUDY 3257 …...April 17, 2018 Reference No. 2017-0675 Mr. Jeff Kenny Strategy 4 Inc. 2620 Bristol Circle, Suite 100 Oakville, ON L6H 6Z7 Attention: Mr

Strategy 4 Inc. 357 Mainway Traffic Impact and Parking Study

2017-0675 April 2018 5

Table 5.1 Trip Generation – Subject Site

Land Use Parameter AM Peak Hour PM Peak Hour

In Out Total In Out Total

Office (8,621 ft2)

Gross Trips 11 2 13 2 11 13

Gross Trips Rate (trips/1000 ft2) 1.28 0.23 1.51 0.23 1.28 1.51

Self-Storage Warehouse (124,877 ft2)

Gross Trips 17 18 35 19 17 36

Gross Trips Rate (trips/1000 ft2) 0.14 0.14 0.28 0.15 0.14 0.29

Total 28 20 48 21 28 49

The proposed development is expected to generate a total of 48 two (2)-way trips during the weekday AM peak hour and 49 two (2)-way trips during the weekday PM peak hour.

5.2 Site Traffic Volumes

The trip distribution for the proposed development is based on existing traffic patterns and is summarized in Table 5.2 below.

Table 5.2 Trip Distribution

Direction Via AM Peak Hour PM Peak Hour

Inbound Outbound Inbound Outbound

North Dillon Road 15% 5% 5% 10%

Northside Road 10% 5% 5% 5%

South Pioneer Road 5% 5% 5% 5%

East Mainway Road 30% 60% 55% 30%

West Mainway Road 40% 25% 30% 50%

Total 100% 100% 100% 100%

The assigned site traffic volumes are shown in Figure 5-1.

6 Future Total Traffic

The future total traffic operations for the study area intersections were assessed using Synchro 9.0 software.

6.1 Future (2023) Total Traffic Analysis

The future (2023) total traffic volumes are illustrated in Figure 6-1. The results of the future (2023) total traffic intersection operations are summarized in Table 6.1, with the volume to capacity (v/c) ratios for overall and individual movements. Volume / Capacity (v/c) ratios for overall intersection operations, through movements, or shared through / turning movements equal to 0.85 or above; and v/c ratios for exclusive movements equal to 0.95 or above have been shown in bold. For unsignalized intersections, level of service (LOS), based on average delay per vehicle, on individual movements exceeding LOS “D” have also been shown in bold. The detailed calculations are shown in Appendix D.

Page 12: TRAFFIC IMPACT AND PARKING STUDY 3257 …...April 17, 2018 Reference No. 2017-0675 Mr. Jeff Kenny Strategy 4 Inc. 2620 Bristol Circle, Suite 100 Oakville, ON L6H 6Z7 Attention: Mr

Strategy 4 Inc. 357 Mainway Traffic Impact and Parking Study

2017-0675 April 2018 6

Table 6.1 Level of Service – Future (2023) Total Traffic Assessment

Intersection Key Movement AM Peak LOS (v/c) PM Peak LOS (v/c)

Mainway Road / Dillon Road

(Signalized)

Overall

EB left- through

WB through-right

SB left

SB right

B (0.64)

C (0.79)

B (0.41)

C (0.45)

B (0.05)

B (0.49)

B (0.57)

B (0.79)

B (0.03)

B (0.01)

Mainway Road / Northside Road

(Signalized)

Overall

EB through-left

WB through-right

SB left

SB right

B (0.43)

B (0.52)

A (0.26)

C (0.21)

C (0.06)

B (0.42)

B (0.50)

B (0.53)

C (0.12)

C (0.06)

Mainway Road / Pioneer Road

(Un-Signalized)

EB through

EB-right

WB-left

WB through

NB left-right

- (0.36)

- (0.22)

A (0.10)

- (0.20)

D (0.32)

- (0.24)

- (0.14)

A (0.02)

- (0.39)

D (0.46)

Mainway Road / Middle Site Access

(Un-Signalized)

EB-left

EB through

WB through

WB- right

SB left-right

A (0.00)

- (0.38)

- (0.22)

- (0.11)

C (0.01)

A (0.00)

- (0.26)

- (0.41)

- (0.20)

C (0.02)

Mainway Road / Easterly Site Access

(Un-Signalized)

EB-left

EB through

WB through

WB- right

SB left-right

A (0.00)

- (0.38)

- (0.23)

- (0.11)

C (0.01)

A (0.00)

- (0.26)

- (0.41)

- (0.20)

C (0.02)

Mainway Road / Westerly Site Access

(Un-Signalized)

EB left

EB through

WB through

WB-right

SB left-right

A (0.01)

- (0.41)

- (0.22)

- (0.12)

C (0.06)

A (0.01)

- (0.26)

- (0.45)

- (0.23)

E (0.18)

Under future (2023) total traffic conditions, the intersections at the study area operate under capacity and no other improvements are needed.

Page 13: TRAFFIC IMPACT AND PARKING STUDY 3257 …...April 17, 2018 Reference No. 2017-0675 Mr. Jeff Kenny Strategy 4 Inc. 2620 Bristol Circle, Suite 100 Oakville, ON L6H 6Z7 Attention: Mr

Strategy 4 Inc. 357 Mainway Traffic Impact and Parking Study

2017-0675 April 2018 7

7 Parking

7.1 City of Burlington By-law Parking Requirements

Based on the City Zoning By-law 2020, this site would require 3.5 parking spaces per 100 m2 GFA for the office and one (1) parking space per 100 m2 GFA for the self-storage warehouse and shop area. Table 7.1 summarizes the required parking spaces as per the City’s By-law.

Table 7.1 Parking Requirement as per City of Burlington Zoning By-law 2020

Use Total GFA Parking Rate Parking Requirement

Office: Other 800.92 m2 3.5 Spaces / 100 m2 28 Spaces

Industrial Uses 11,601.48 m2 1 Space / 100 m2 116 Spaces

Total 144 Spaces

The City of Burlington By-law parking requirements states 144 parking spaces are required. Since the shop area will not be generating trips to and from the site, as stated in Section 5.1; this area does not require additional site parking.

7.2 ITE Parking Generation

Future parking demand was also analyzed using ITE’s Parking Generation Manual, 4th Edition. The results are summarized in Table 7.2.

Table 7.2 ITE Parking Generation 4th Edition – Future Parking Demand

Land Use (LUC) Maximum 85th Percentile Parking Demand / 1000ft2 1000 ft2 GFA Total

Office Building – Urban (LUC701) 2.98 vehicles per 1000 ft2 GFA 8.621 26

Mini-Warehouse (LUC151) 0.17 vehicles per 1000 ft2 GFA 124.877 21

Total Future Parking Demand 47

As observed from the ITE’s Parking Generation 4th Edition, the site is anticipated to require a parking demand of 47 parking spaces in total.

7.3 Parking Rationalization

7.3.1 Office Parking Review

In review of the City’s By-law, parking for the ancillary office use will be supplied at the rate of 3.5 spaces / 100 m2. Therefore, with a GFA of 632.22 m2 for office space, 22 parking spaces are required for office use. This has been found to better reflect the intended use of the site’s office space for warehouse, truck rental, and ancillary retail.

Page 14: TRAFFIC IMPACT AND PARKING STUDY 3257 …...April 17, 2018 Reference No. 2017-0675 Mr. Jeff Kenny Strategy 4 Inc. 2620 Bristol Circle, Suite 100 Oakville, ON L6H 6Z7 Attention: Mr

Strategy 4 Inc. 357 Mainway Traffic Impact and Parking Study

2017-0675 April 2018 8

7.3.2 Proxy Parking Survey

To determine the parking requirements for the self-storage warehouse use, parking demand studies were conducted at two (2) U-Haul proxy site locations:

U-Haul Moving and Storage of Oakville (478 Woody Road, Oakville); and,

U-Haul Moving and Storage of Burlington (3476 Mainway, Burlington).

The parking demand surveys were performed by Accu-Traffic on Saturday, September 10, 2016 from 8:00 AM to 4:00 PM and can be found in Appendix E.

As it is expected that these sites would also be subject to the office parking By-law rate of 3.5 spaces / 100 m2, the office GFA’s were used to calculate the amount of parking spaces required for office use at these sites. The parking required for office use was discounted from the observed parking surveys in order to determine the warehouse parking demand.

The majority of business and parking for the proxy sites was found to be generated from truck rental service, therefore transaction data provided by the U-Haul sites were utilized to discount half of the customers who would choose to leave their vehicles on site.

In order to better understand the parking requirement of the warehouse use, U-Haul rental data was acquired and taken into account with the surveys.

It is important to understand that there are no parking spaces on these proxy sites which are dedicated to a single use. As such, different discounting factors were applied to the proxy data to better approximate exclusive warehouse use. These include the vehicles of employees to the office as well as those that leave their vehicles on site while renting a truck for the day. Based on the rental data received, approximately 81% of rentals are same day rentals for Burlington and 64% of rentals are same day rentals for Oakville.

7.3.2.1 Oakville Proxy Parking Utilization Survey

The U-Haul site located at 478 Woody Road in the City of Oakville was observed for parking utilization on Saturday, September 10, 2016. The warehouse consists of an approximate GFA of 5501 m2 and an office GFA of 98 m2. There are eight (8) parking spaces provided in the main parking area and 150 parking spaces in the rear for a total of 158 spaces. Note that the parking usage can be used interchangeably. The total observed results are provided in Table 7.3.

Table 7.3 Total Observed Parking Survey Results (Oakville)

Time Observed Parked Vehicles Parking Utilization Rate

8:00 – 8:30 9 6%

8:30 – 9:00 12 8%

9:00 – 9:30 14 9%

9:30 – 10:00 11 7%

10:00 – 10:30 13 8%

10:30 – 11:00 13 8%

11:00 – 11:30 15 9%

11:30 – 12:00 14 9%

Page 15: TRAFFIC IMPACT AND PARKING STUDY 3257 …...April 17, 2018 Reference No. 2017-0675 Mr. Jeff Kenny Strategy 4 Inc. 2620 Bristol Circle, Suite 100 Oakville, ON L6H 6Z7 Attention: Mr

Strategy 4 Inc. 357 Mainway Traffic Impact and Parking Study

2017-0675 April 2018 9

Time Observed Parked Vehicles Parking Utilization Rate

12:00 – 12:30 18 11%

12:30 – 1:00 15 9%

1:00 – 1:30 14 9%

1:30 – 2:00 16 10%

2:00 – 2:30 17 11%

2:30 – 3:00 16 10%

3:00 – 3:30 16 10%

3:30 – 4:00 15 9%

As shown in Table 7.3, a maximum parking utilization rate of 11% was found during the peak period of 12:00 - 12:30 PM. Based on the observed parked vehicles, assumed office parking, and rental data provided, an estimated warehouse parking rate was found and summarized in Table 7.4.

Table 7.4 Warehouse Parking Survey Estimation (Oakville)

Time Observed Vehicles

Parking Utilization

Office Parking

Rental Data Rental Parking

Warehouse Parking Rental

Out Rental

Returned

8:00 – 8:30 9 6% 3 11 0 5 1

8:30 – 9:00 12 8% 3 2 0 6 3

9:00 – 9:30 14 9% 3 1 1 6 5

9:30 – 10:00 11 7% 3 2 0 7 1

10:00 – 10:30 13 8% 3 2 0 8 2

10:30 – 11:00 13 8% 3 1 0 9 1

11:00 – 11:30 15 9% 3 1 2 8 4

11:30 – 12:00 14 9% 3 0 0 8 3

12:00 – 12:30 18 11% 3 3 2 9 6

12:30 – 1:00 15 9% 3 2 0 10 2

1:00 – 1:30 14 9% 3 1 0 10 1

1:30 – 2:00 16 10% 3 0 0 10 3

2:00 – 2:30 17 11% 3 0 2 9 5

2:30 – 3:00 16 10% 3 3 1 10 3

3:00 – 3:30 16 10% 3 1 5 8 5

3:30 – 4:00 15 9% 3 0 1 8 4

As a result, a maximum of six (6) vehicles are estimated to have been parked for warehouse usage. This would result in a peak warehouse parking demand rate of one (1) space / 917 m2 GFA.

Page 16: TRAFFIC IMPACT AND PARKING STUDY 3257 …...April 17, 2018 Reference No. 2017-0675 Mr. Jeff Kenny Strategy 4 Inc. 2620 Bristol Circle, Suite 100 Oakville, ON L6H 6Z7 Attention: Mr

Strategy 4 Inc. 357 Mainway Traffic Impact and Parking Study

2017-0675 April 2018 10

7.3.2.2 Burlington Proxy Parking Utilization Survey

The U-Haul site located at 3476 Mainway, Burlington was observed for parking utilization on Saturday, September 10, 2016. The warehouse consists of an approximate GFA of 4782.7 m2 and an office GFA of 90.9 m2. There are four (4) parking spaces provided in the main parking area and 45 parking spaces in the rear for a total of 49 spaces. Note that the parking usage can be used interchangeably. The total observed results are provided in Table 7.5.

Table 7.5 Total Observed Parking Survey Results (Burlington)

Time Observed Vehicles Parking Utilization

8:00 – 8:30 21 43%

8:30 – 9:00 19 39%

9:00 – 9:30 19 39%

9:30 – 10:00 21 43%

10:00 – 10:30 21 43%

10:30 – 11:00 20 41%

11:00 – 11:30 20 41%

11:30 – 12:00 22 45%

12:00 – 12:30 22 45%

12:30 – 1:00 23 47%

1:00 – 1:30 26 53%

1:30 – 2:00 21 43%

2:00 – 2:30 23 47%

2:30 – 3:00 24 49%

3:00 – 3:30 24 49%

3:30 – 4:00 22 45%

Shown in Table 7.5, a maximum parking utilization rate of 53% was found during the peak period of 1:00 - 1:30 PM. Based on the observed parked vehicles, assumed office parking, and rental data provided, an estimated warehouse parking rate was found and summarized in Table 7.6.

Table 7.6 Warehouse Parking Survey Estimation (Burlington)

Time Observed Vehicles

Parking Utilization

Office Parking

Rental Data Rental Parking

Warehouse Parking Rental

Out Rental

Returned

8:00 – 8:30 21 43% 3 10 0 5 13

8:30 – 9:00 19 39% 3 2 0 6 10

9:00 – 9:30 19 39% 3 0 1 5 11

9:30 – 10:00 21 43% 3 2 0 6 12

10:00 – 10:30 21 43% 3 1 0 7 11

Page 17: TRAFFIC IMPACT AND PARKING STUDY 3257 …...April 17, 2018 Reference No. 2017-0675 Mr. Jeff Kenny Strategy 4 Inc. 2620 Bristol Circle, Suite 100 Oakville, ON L6H 6Z7 Attention: Mr

Strategy 4 Inc. 357 Mainway Traffic Impact and Parking Study

2017-0675 April 2018 11

Time Observed Vehicles

Parking Utilization

Office Parking

Rental Data Rental Parking

Warehouse Parking Rental

Out Rental

Returned

10:30 – 11:00 20 41% 3 1 1 7 10

11:00 – 11:30 20 41% 3 1 2 6 11

11:30 – 12:00 22 45% 3 3 1 7 12

12:00 – 12:30 22 45% 3 0 1 7 12

12:30 – 1:00 23 47% 3 1 4 5 15

1:00 – 1:30 26 53% 3 5 1 7 16

1:30 – 2:00 21 43% 3 1 0 8 10

2:00 – 2:30 23 47% 3 0 1 7 13

2:30 – 3:00 24 49% 3 1 2 7 14

3:00 – 3:30 24 49% 3 0 2 6 15

3:30 – 4:00 22 45% 3 0 0 6 13

Based on the proxy survey results, the Burlington U-Haul site experienced a peak parking demand for the warehouse use at 1:00 PM of 16 vehicles, or a peak demand rate of approximately one (1) space / 300 m2 of GFA.

7.4 Parking Comparison

In summary, the proxy sites located at 478 Woody Road and 3476 Mainway were used to determine a parking rate for the proposed site. The proposed parking rate is 3.5 spaces per 100 m2 for office GFA, as per the City’s Zoning By-law, and one (1) space per 300 m2 for self-storage warehouse GFA based on the proxy site data. A comparison of all related parking rates in addition to the proposed parking supply rates are summarized in Table 7.7.

Table 7.7 Parking Comparison Table

Parking Rates Use Total GFA Parking Rate Parking Requirement

City Zoning By-law Parking Rate

Office 800.92 m2 3.5 Spaces / 100 m2 28 Spaces

Warehouse 11,601.48 m2 1 Space / 100 m2 116 Spaces

Total 12,402.48 m2 - 144 Spaces

ITE Parking Rate

Office 800.92 m2 1 Space / 32 m2 26 Spaces

Warehouse 11,601.48 m2 1 Space / 547 m2 21 Spaces

Total 12,402.48 m2 - 47 Spaces

Maximum Proxy Site Parking Rate

Office 800.92 m2 3.5 Spaces / 100 m2 28 Spaces

Warehouse 11,601.48 m2 1 Space / 300 m2 39 Spaces

Total 12,402.48 m2 - 67 Spaces

Page 18: TRAFFIC IMPACT AND PARKING STUDY 3257 …...April 17, 2018 Reference No. 2017-0675 Mr. Jeff Kenny Strategy 4 Inc. 2620 Bristol Circle, Suite 100 Oakville, ON L6H 6Z7 Attention: Mr

Strategy 4 Inc. 357 Mainway Traffic Impact and Parking Study

2017-0675 April 2018 12

Parking Rates Use Total GFA Parking Rate Parking Requirement

Proposed Parking Rate

Office 800.92 m2 3.5 Spaces / 100 m2 28 Spaces

Warehouse 11,601.48 m2 1 Space / 300 m2 39 Spaces

Total 12,402.48 m2 - 67 Spaces

Based on the above parking comparison the 75 proposed parking spaces exceed the proposed parking by 8 parking spaces when compared to the ITE’s Parking Generation, 4th Edition.

8 Conclusions and Recommendations

The assumptions, findings and conclusions of our analysis are presented as follows:

Under existing traffic conditions, the study area intersections along Mainway currently operate with acceptable LOS and volume to capacity (v/c) ratios;

Based on the future (2023) background traffic analysis all intersections within the study area generally operate with acceptable LOS and volume to capacity (v/c) ratios;

The subject site is expected to generate 48 new vehicular two-way trips during the weekday morning peak hour (28 trips inbound and 20 trips outbound), and 49 new vehicular two (2)-way trips during the weekday afternoon peak hour (21 trips inbound and 28 trips outbound);

The future (2023) total traffic is expected to exhibit similar results as the future (2023) background traffic;

The three existing accesses are expected to operate with acceptable LOS and volume to capacity (v/c) ratios; and,

The proposed parking supply of 75 parking spaces is supported by the ITE’s Parking Generation 4th Edition and two (2) proxy parking utilization surveys and is therefore sufficient to service the site.

Page 19: TRAFFIC IMPACT AND PARKING STUDY 3257 …...April 17, 2018 Reference No. 2017-0675 Mr. Jeff Kenny Strategy 4 Inc. 2620 Bristol Circle, Suite 100 Oakville, ON L6H 6Z7 Attention: Mr

City of Burlington

Figure 1-1 - Site Location

3257 Mainway - A New U-Haul FacilityStrategy 4 Inc.

Ref.# 2017-0675 (April 2018)

Traffic Impact and Parking Study

SITE LOCATIONSITE LOCATION

Page 20: TRAFFIC IMPACT AND PARKING STUDY 3257 …...April 17, 2018 Reference No. 2017-0675 Mr. Jeff Kenny Strategy 4 Inc. 2620 Bristol Circle, Suite 100 Oakville, ON L6H 6Z7 Attention: Mr

Figure 1-2 - Proposed Site Plan

Ref.# 2017-0675 (April 2018)

City of Burlington

3257 Mainway - A New U-Haul FacilityStrategy 4 Inc.

Traffic Impact and Parking Study

Page 21: TRAFFIC IMPACT AND PARKING STUDY 3257 …...April 17, 2018 Reference No. 2017-0675 Mr. Jeff Kenny Strategy 4 Inc. 2620 Bristol Circle, Suite 100 Oakville, ON L6H 6Z7 Attention: Mr

Mainway Road

Figure 3-1 - Existing Lane Configurations

Westerly Access

Legend

Existing Lane Configuration

Existing Traffic Control Signal

Existing Stop Control

Ref.# 2017-0675 (April 2018)

City of Burlington

3257 Mainway - A New U-Haul FacilityStrategy 4 Inc.

Traffic Impact and Parking Study

Northside Road Middle Access

Pioneer Road

Easterly Access Dillon Road

Mainway Road

Page 22: TRAFFIC IMPACT AND PARKING STUDY 3257 …...April 17, 2018 Reference No. 2017-0675 Mr. Jeff Kenny Strategy 4 Inc. 2620 Bristol Circle, Suite 100 Oakville, ON L6H 6Z7 Attention: Mr

Figure 3-2 - Existing (2018) Traffic Volumes

Legendxx AM Peak Hour Volume(xx) PM Peak Hour Volume

Ref.# 2017-0675 (April 2018)

City of Burlington

3257 Mainway - A New U-Haul FacilityStrategy 4 Inc.

Traffic Impact and Parking Study

Mainway Road

Westerly AccessNorthside Road Middle Access

Pioneer Road

Easterly Access Dillon Road

Mainway Road

(69) 39(509) 792

(0) 0(549) 864

(518) 803(31) 61

(0) 0(566) 841

(0) 0(566) 841

(29) 51(537) 790

Page 23: TRAFFIC IMPACT AND PARKING STUDY 3257 …...April 17, 2018 Reference No. 2017-0675 Mr. Jeff Kenny Strategy 4 Inc. 2620 Bristol Circle, Suite 100 Oakville, ON L6H 6Z7 Attention: Mr

Figure 4-1 Future (2023) Background Traffic Volumes

Legendxx AM Peak Hour Volume(xx) PM Peak Hour Volume

Mainway Road

Westerly AccessNorthside Road Middle Access

Pioneer Road

Easterly Access Dillon Road

Mainway Road

(69) 39(535) 832

(0) 0(577) 908

(544) 844(31) 61

(0) 0(595) 884

(0) 0(595) 884

(29) 51(564) 830

Ref.# 2017-0675 (April 2018)

City of Burlington

3257 Mainway - A New U-Haul FacilityStrategy 4 Inc.

Traffic Impact and Parking Study

Page 24: TRAFFIC IMPACT AND PARKING STUDY 3257 …...April 17, 2018 Reference No. 2017-0675 Mr. Jeff Kenny Strategy 4 Inc. 2620 Bristol Circle, Suite 100 Oakville, ON L6H 6Z7 Attention: Mr

Figure 5-1 Site Traffic Volumes

Legendxx AM Peak Hour Volume(xx) PM Peak Hour Volume

Ref.# 2017-0675 (April 2018)

City of Burlington

3257 Mainway - A New U-Haul FacilityStrategy 4 Inc.

Traffic Impact and Parking Study

Mainway Road

Westerly AccessNorthside Road Middle Access

Pioneer Road

Easterly Access Dillon Road

Mainway Road

(0) 0(7) 14

(6) 8(4) 3

(17) 12(2) 1

(2) 2(15) 10

(2) 1(15) 10

(2) 1(15) 10

Page 25: TRAFFIC IMPACT AND PARKING STUDY 3257 …...April 17, 2018 Reference No. 2017-0675 Mr. Jeff Kenny Strategy 4 Inc. 2620 Bristol Circle, Suite 100 Oakville, ON L6H 6Z7 Attention: Mr

Figure 6-1 Future (2023) Total Traffic Volumes

Legendxx AM Peak Hour Volume(xx) PM Peak Hour Volume

Mainway Road

Westerly AccessNorthside Road Middle Access

Pioneer Road

Easterly Access Dillon Road

Mainway Road

(69) 39(542) 846

(6) 8(581) 911

(561) 856(33) 62

(2) 2(610) 894

(2) 1(610) 894

(31) 52(579) 840

Ref.# 2017-0675 (April 2018)

City of Burlington

3257 Mainway - A New U-Haul FacilityStrategy 4 Inc.

Traffic Impact and Parking Study

Page 26: TRAFFIC IMPACT AND PARKING STUDY 3257 …...April 17, 2018 Reference No. 2017-0675 Mr. Jeff Kenny Strategy 4 Inc. 2620 Bristol Circle, Suite 100 Oakville, ON L6H 6Z7 Attention: Mr

APPENDIX A

Existing Traffic Data

Page 27: TRAFFIC IMPACT AND PARKING STUDY 3257 …...April 17, 2018 Reference No. 2017-0675 Mr. Jeff Kenny Strategy 4 Inc. 2620 Bristol Circle, Suite 100 Oakville, ON L6H 6Z7 Attention: Mr

Mainway @ Dillon Rd

Morning Peak Diagram Specified Period

From:

To:

7:00:00

9:00:00

One Hour Peak

From:

To:

7:30:00

8:30:00

Municipality:

Site #:

Intersection:

TFR File #:

Count date:

Burlington

0000200634

Mainway & Dillon Rd

1

29-Mar-2016

Weather conditions:Clear/Dry

Person(s) who counted:Adriana

** Signalized Intersection ** Major Road: Mainway runs W/E

North Leg Total:

North Entering:

North Peds:

Peds Cross:

379

291

4

Cyclists

Trucks

Cars

Totals

0

5

67

72

0

17

202

219

0

22

269

Cyclists

Trucks

Cars

Totals

0

9

79

88

CyclistsTrucks Cars Totals

0 37 443 480

CyclistsTrucks Cars Totals

0 3 32 35

0 43 505 548

0 46 537

Peds Cross:

West Peds:

West Entering:

West Leg Total:

0

583

1063

Dillon Rd

Mainway

W

N

E

S

Mainway

East Leg Total:

East Entering:

East Peds:

Peds Cross:

1228

461

0

Cars Trucks CyclistsTotals

47 6 0 53

376 32 0 408

423 38 0

Cars Trucks CyclistsTotals

707 60 0 767

Comments

Page 28: TRAFFIC IMPACT AND PARKING STUDY 3257 …...April 17, 2018 Reference No. 2017-0675 Mr. Jeff Kenny Strategy 4 Inc. 2620 Bristol Circle, Suite 100 Oakville, ON L6H 6Z7 Attention: Mr

Mainway @ Dillon Rd

Mid-day Peak Diagram Specified Period

From:

To:

11:00:00

14:00:00

One Hour Peak

From:

To:

12:00:00

13:00:00

Municipality:

Site #:

Intersection:

TFR File #:

Count date:

Burlington

0000200634

Mainway & Dillon Rd

1

29-Mar-2016

Weather conditions:Clear/Dry

Person(s) who counted:Adriana

** Signalized Intersection ** Major Road: Mainway runs W/E

North Leg Total:

North Entering:

North Peds:

Peds Cross:

86

58

2

Cyclists

Trucks

Cars

Totals

0

3

18

21

0

5

32

37

0

8

50

Cyclists

Trucks

Cars

Totals

0

2

26

28

CyclistsTrucks Cars Totals

0 36 221 257

CyclistsTrucks Cars Totals

0 0 13 13

0 48 222 270

0 48 235

Peds Cross:

West Peds:

West Entering:

West Leg Total:

0

283

540

Dillon Rd

Mainway

W

N

E

S

Mainway

East Leg Total:

East Entering:

East Peds:

Peds Cross:

558

251

0

Cars Trucks CyclistsTotals

13 2 0 15

203 33 0 236

216 35 0

Cars Trucks CyclistsTotals

254 53 0 307

Comments

Page 29: TRAFFIC IMPACT AND PARKING STUDY 3257 …...April 17, 2018 Reference No. 2017-0675 Mr. Jeff Kenny Strategy 4 Inc. 2620 Bristol Circle, Suite 100 Oakville, ON L6H 6Z7 Attention: Mr

Mainway @ Dillon Rd

Afternoon Peak Diagram Specified Period

From:

To:

15:00:00

18:00:00

One Hour Peak

From:

To:

16:30:00

17:30:00

Municipality:

Site #:

Intersection:

TFR File #:

Count date:

Burlington

0000200634

Mainway & Dillon Rd

1

29-Mar-2016

Weather conditions:Clear/Dry

Person(s) who counted:Adriana

** Signalized Intersection ** Major Road: Mainway runs W/E

North Leg Total:

North Entering:

North Peds:

Peds Cross:

226

27

1

Cyclists

Trucks

Cars

Totals

0

0

11

11

0

0

16

16

0

0

27

Cyclists

Trucks

Cars

Totals

0

17

182

199

CyclistsTrucks Cars Totals

0 51 671 722

CyclistsTrucks Cars Totals

0 1 26 27

0 72 411 483

0 73 437

Peds Cross:

West Peds:

West Entering:

West Leg Total:

0

510

1232

Dillon Rd

Mainway

W

N

E

S

Mainway

East Leg Total:

East Entering:

East Peds:

Peds Cross:

1382

883

0

Cars Trucks CyclistsTotals

156 16 0 172

660 51 0 711

816 67 0

Cars Trucks CyclistsTotals

427 72 0 499

Comments

Page 30: TRAFFIC IMPACT AND PARKING STUDY 3257 …...April 17, 2018 Reference No. 2017-0675 Mr. Jeff Kenny Strategy 4 Inc. 2620 Bristol Circle, Suite 100 Oakville, ON L6H 6Z7 Attention: Mr

Mainway @ Dillon Rd

Total Count Diagram

Municipality:

Site #:

Intersection:

TFR File #:

Count date:

Burlington

0000200634

Mainway & Dillon Rd

1

29-Mar-2016

Weather conditions:Clear/Dry

Person(s) who counted:Adriana

** Signalized Intersection ** Major Road: Mainway runs W/E

North Leg Total:

North Entering:

North Peds:

Peds Cross:

1428

699

18

Cyclists

Trucks

Cars

Totals

0

14

173

187

0

43

469

512

0

57

642

Cyclists

Trucks

Cars

Totals

0

56

673

729

CyclistsTrucks Cars Totals

0 291 2798 3089

CyclistsTrucks Cars Totals

0 10 193 203

0 379 2480 2859

0 389 2673

Peds Cross:

West Peds:

West Entering:

West Leg Total:

0

3062

6151

Dillon Rd

Mainway

W

N

E

S

Mainway

East Leg Total:

East Entering:

East Peds:

Peds Cross:

6799

3428

0

Cars Trucks CyclistsTotals

480 46 0 526

2625 277 0 2902

3105 323 0

Cars Trucks CyclistsTotals

2949 422 0 3371

Comments

Page 31: TRAFFIC IMPACT AND PARKING STUDY 3257 …...April 17, 2018 Reference No. 2017-0675 Mr. Jeff Kenny Strategy 4 Inc. 2620 Bristol Circle, Suite 100 Oakville, ON L6H 6Z7 Attention: Mr

Mainway @ Dillon Rd

Annual Average Daily Traffic Diagram

Total Factor = Monthly Factor(1.04) x Daily Factor(0.93) x 24 Hour Factor(1.85) = 1.789320

Municipality:

Site #:

Intersection:

TFR File #:

Count date:

Burlington

0000200634

Mainway & Dillon Rd

1

29-Mar-2016

Weather conditions:Clear/Dry

Person(s) who counted:Adriana

** Signalized Intersection ** Major Road: Mainway runs W/E

North Leg Total:

North Entering:

North Peds:

Peds Cross:

2555

1251

32

Cyclists

Trucks

Cars

Totals

0

25

310

335

0

77

839

916

0

102

1149

Cyclists

Trucks

Cars

Totals

0

100

1204

1304

CyclistsTrucks Cars Totals

0 521 5007 5527

CyclistsTrucks Cars Totals

0 18 345 363

0 678 4438 5116

0 696 4783

Peds Cross:

West Peds:

West Entering:

West Leg Total:

0

5479

11006

Dillon Rd

Mainway

W

N

E

S

Mainway

East Leg Total:

East Entering:

East Peds:

Peds Cross:

12166

6134

0

Cars Trucks CyclistsTotals

859 82 0 941

4697 496 0 5193

5556 578 0

Cars Trucks CyclistsTotals

5277 755 0 6032

Comments

Page 32: TRAFFIC IMPACT AND PARKING STUDY 3257 …...April 17, 2018 Reference No. 2017-0675 Mr. Jeff Kenny Strategy 4 Inc. 2620 Bristol Circle, Suite 100 Oakville, ON L6H 6Z7 Attention: Mr

Mainway @ Pioneer Rd

Morning Peak Diagram Specified Period

From:

To:

7:00:00

9:00:00

One Hour Peak

From:

To:

7:30:00

8:30:00

Municipality:

Site #:

Intersection:

TFR File #:

Count date:

Burlington

0000201255

Mainway & Pioneer Rd

3

3-Nov-2015

Weather conditions:Sunny/Dry

Person(s) who counted:Dominik

** Non-Signalized Intersection ** Major Road: Mainway runs W/E

CyclistsTrucks Cars Totals

1 35 255 291

CyclistsTrucks Cars Totals

3 66 718 787

0 10 51 61

3 76 769

Peds Cross:

West Peds:

West Entering:

West Leg Total:

4

848

1139

Mainway

W

N

E

S

Mainway

Pioneer Rd

East Leg Total:

East Entering:

East Peds:

Peds Cross:

1124

299

2

Cars Trucks CyclistsTotals

235 26 1 262

25 12 0 37

260 38 1

Cars Trucks CyclistsTotals

736 85 4 825

Cars

Trucks

Cyclists

Totals

76

22

0

98

Cars

Trucks

Cyclists

Totals

20

9

0

29

18

19

1

38

38

28

1

Peds Cross:

South Peds:

South Entering:

South Leg Total:

1

67

165

Comments

Page 33: TRAFFIC IMPACT AND PARKING STUDY 3257 …...April 17, 2018 Reference No. 2017-0675 Mr. Jeff Kenny Strategy 4 Inc. 2620 Bristol Circle, Suite 100 Oakville, ON L6H 6Z7 Attention: Mr

Mainway @ Pioneer Rd

Mid-day Peak Diagram Specified Period

From:

To:

11:00:00

14:00:00

One Hour Peak

From:

To:

12:15:00

13:15:00

Municipality:

Site #:

Intersection:

TFR File #:

Count date:

Burlington

0000201255

Mainway & Pioneer Rd

3

3-Nov-2015

Weather conditions:Sunny/Dry

Person(s) who counted:Dominik

** Non-Signalized Intersection ** Major Road: Mainway runs W/E

CyclistsTrucks Cars Totals

0 55 321 376

CyclistsTrucks Cars Totals

0 53 333 386

0 13 41 54

0 66 374

Peds Cross:

West Peds:

West Entering:

West Leg Total:

1

440

816

Mainway

W

N

E

S

Mainway

Pioneer Rd

East Leg Total:

East Entering:

East Peds:

Peds Cross:

822

394

2

Cars Trucks CyclistsTotals

302 48 0 350

27 17 0 44

329 65 0

Cars Trucks CyclistsTotals

359 68 1 428

Cars

Trucks

Cyclists

Totals

68

30

0

98

Cars

Trucks

Cyclists

Totals

19

7

0

26

26

15

1

42

45

22

1

Peds Cross:

South Peds:

South Entering:

South Leg Total:

0

68

166

Comments

Page 34: TRAFFIC IMPACT AND PARKING STUDY 3257 …...April 17, 2018 Reference No. 2017-0675 Mr. Jeff Kenny Strategy 4 Inc. 2620 Bristol Circle, Suite 100 Oakville, ON L6H 6Z7 Attention: Mr

Mainway @ Pioneer Rd

Afternoon Peak Diagram Specified Period

From:

To:

15:00:00

18:00:00

One Hour Peak

From:

To:

16:45:00

17:45:00

Municipality:

Site #:

Intersection:

TFR File #:

Count date:

Burlington

0000201255

Mainway & Pioneer Rd

3

3-Nov-2015

Weather conditions:Sunny/Dry

Person(s) who counted:Dominik

** Non-Signalized Intersection ** Major Road: Mainway runs W/E

CyclistsTrucks Cars Totals

2 147 774 923

CyclistsTrucks Cars Totals

2 51 455 508

0 7 24 31

2 58 479

Peds Cross:

West Peds:

West Entering:

West Leg Total:

0

539

1462

Mainway

W

N

E

S

Mainway

Pioneer Rd

East Leg Total:

East Entering:

East Peds:

Peds Cross:

1435

879

1

Cars Trucks CyclistsTotals

717 143 2 862

12 5 0 17

729 148 2

Cars Trucks CyclistsTotals

498 56 2 556

Cars

Trucks

Cyclists

Totals

36

12

0

48

Cars

Trucks

Cyclists

Totals

57

4

0

61

43

5

0

48

100

9

0

Peds Cross:

South Peds:

South Entering:

South Leg Total:

2

109

157

Comments

Page 35: TRAFFIC IMPACT AND PARKING STUDY 3257 …...April 17, 2018 Reference No. 2017-0675 Mr. Jeff Kenny Strategy 4 Inc. 2620 Bristol Circle, Suite 100 Oakville, ON L6H 6Z7 Attention: Mr

Mainway @ Pioneer Rd

Total Count Diagram

Municipality:

Site #:

Intersection:

TFR File #:

Count date:

Burlington

0000201255

Mainway & Pioneer Rd

3

3-Nov-2015

Weather conditions:Sunny/Dry

Person(s) who counted:Dominik

** Non-Signalized Intersection ** Major Road: Mainway runs W/E

CyclistsTrucks Cars Totals

8 568 3364 3940

CyclistsTrucks Cars Totals

14 382 3218 3614

0 86 234 320

14 468 3452

Peds Cross:

West Peds:

West Entering:

West Leg Total:

17

3934

7874

Mainway

W

N

E

S

Mainway

Pioneer Rd

East Leg Total:

East Entering:

East Peds:

Peds Cross:

7816

3899

15

Cars Trucks CyclistsTotals

3153 496 8 3657

159 83 0 242

3312 579 8

Cars Trucks CyclistsTotals

3422 479 16 3917

Cars

Trucks

Cyclists

Totals

393

169

0

562

Cars

Trucks

Cyclists

Totals

211

72

0

283

204

97

2

303

415

169

2

Peds Cross:

South Peds:

South Entering:

South Leg Total:

10

586

1148

Comments

Page 36: TRAFFIC IMPACT AND PARKING STUDY 3257 …...April 17, 2018 Reference No. 2017-0675 Mr. Jeff Kenny Strategy 4 Inc. 2620 Bristol Circle, Suite 100 Oakville, ON L6H 6Z7 Attention: Mr

Mainway @ Pioneer Rd

Annual Average Daily Traffic Diagram

Total Factor = Monthly Factor(0.99) x Daily Factor(0.93) x 24 Hour Factor(1.85) = 1.703295

Municipality:

Site #:

Intersection:

TFR File #:

Count date:

Burlington

0000201255

Mainway & Pioneer Rd

3

3-Nov-2015

Weather conditions:Sunny/Dry

Person(s) who counted:Dominik

** Non-Signalized Intersection ** Major Road: Mainway runs W/E

CyclistsTrucks Cars Totals

14 967 5730 6711

CyclistsTrucks Cars Totals

24 651 5481 6156

0 146 399 545

24 797 5880

Peds Cross:

West Peds:

West Entering:

West Leg Total:

29

6701

13412

Mainway

W

N

E

S

Mainway

Pioneer Rd

East Leg Total:

East Entering:

East Peds:

Peds Cross:

13313

6641

26

Cars Trucks CyclistsTotals

5370 845 14 6229

271 141 0 412

5641 986 14

Cars Trucks CyclistsTotals

5829 816 27 6672

Cars

Trucks

Cyclists

Totals

669

288

0

957

Cars

Trucks

Cyclists

Totals

359

123

0

482

347

165

3

516

707

288

3

Peds Cross:

South Peds:

South Entering:

South Leg Total:

17

998

1955

Comments

Page 37: TRAFFIC IMPACT AND PARKING STUDY 3257 …...April 17, 2018 Reference No. 2017-0675 Mr. Jeff Kenny Strategy 4 Inc. 2620 Bristol Circle, Suite 100 Oakville, ON L6H 6Z7 Attention: Mr

Mainway @ Northside Rd

Morning Peak Diagram Specified Period

From:

To:

7:00:00

9:00:00

One Hour Peak

From:

To:

8:00:00

9:00:00

Municipality:

Site #:

Intersection:

TFR File #:

Count date:

Burlington

0000202293

Mainway & Northside Rd

3

18-May-2016

Weather conditions:Clear/Dry

Person(s) who counted:Rick W

** Signalized Intersection ** Major Road: Mainway runs W/E

North Leg Total:

North Entering:

North Peds:

Peds Cross:

196

141

2

Cyclists

Trucks

Cars

Totals

2

6

75

83

0

0

0

0

2

4

52

58

4

10

127

Cyclists

Trucks

Cars

Totals

1

4

50

55

CyclistsTrucks Cars Totals

4 32 267 303

CyclistsTrucks Cars Totals

0 1 38 39

2 33 600 635

0 0 1 1

2 34 639

Peds Cross:

West Peds:

West Entering:

West Leg Total:

0

675

978

Northside Rd

Mainway

W

N

E

S

Mainway

Driveway

East Leg Total:

East Entering:

East Peds:

Peds Cross:

929

236

0

Cars Trucks CyclistsTotals

12 3 1 16

192 26 2 220

0 0 0 0

204 29 3

Cars Trucks CyclistsTotals

652 37 4 693

Cars

Trucks

Cyclists

Totals

1

0

0

1

Cars

Trucks

Cyclists

Totals

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

Peds Cross:

South Peds:

South Entering:

South Leg Total:

1

0

1

Comments

Page 38: TRAFFIC IMPACT AND PARKING STUDY 3257 …...April 17, 2018 Reference No. 2017-0675 Mr. Jeff Kenny Strategy 4 Inc. 2620 Bristol Circle, Suite 100 Oakville, ON L6H 6Z7 Attention: Mr

Mainway @ Northside Rd

Mid-day Peak Diagram Specified Period

From:

To:

11:00:00

14:00:00

One Hour Peak

From:

To:

12:00:00

13:00:00

Municipality:

Site #:

Intersection:

TFR File #:

Count date:

Burlington

0000202293

Mainway & Northside Rd

3

18-May-2016

Weather conditions:Clear/Dry

Person(s) who counted:Rick W

** Signalized Intersection ** Major Road: Mainway runs W/E

North Leg Total:

North Entering:

North Peds:

Peds Cross:

194

102

7

Cyclists

Trucks

Cars

Totals

0

2

70

72

0

0

0

0

0

0

30

30

0

2

100

Cyclists

Trucks

Cars

Totals

0

1

91

92

CyclistsTrucks Cars Totals

0 41 482 523

CyclistsTrucks Cars Totals

0 0 58 58

1 37 399 437

0 0 0 0

1 37 457

Peds Cross:

West Peds:

West Entering:

West Leg Total:

12

495

1018

Northside Rd

Mainway

W

N

E

S

Mainway

Driveway

East Leg Total:

East Entering:

East Peds:

Peds Cross:

953

486

1

Cars Trucks CyclistsTotals

33 1 0 34

412 39 0 451

1 0 0 1

446 40 0

Cars Trucks CyclistsTotals

429 37 1 467

Cars

Trucks

Cyclists

Totals

1

0

0

1

Cars

Trucks

Cyclists

Totals

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

Peds Cross:

South Peds:

South Entering:

South Leg Total:

1

0

1

Comments

Page 39: TRAFFIC IMPACT AND PARKING STUDY 3257 …...April 17, 2018 Reference No. 2017-0675 Mr. Jeff Kenny Strategy 4 Inc. 2620 Bristol Circle, Suite 100 Oakville, ON L6H 6Z7 Attention: Mr

Mainway @ Northside Rd

Afternoon Peak Diagram Specified Period

From:

To:

15:00:00

18:00:00

One Hour Peak

From:

To:

16:15:00

17:15:00

Municipality:

Site #:

Intersection:

TFR File #:

Count date:

Burlington

0000202293

Mainway & Northside Rd

3

18-May-2016

Weather conditions:Clear/Dry

Person(s) who counted:Rick W

** Signalized Intersection ** Major Road: Mainway runs W/E

North Leg Total:

North Entering:

North Peds:

Peds Cross:

245

113

3

Cyclists

Trucks

Cars

Totals

0

4

74

78

0

0

0

0

1

4

30

35

1

8

104

Cyclists

Trucks

Cars

Totals

0

11

121

132

CyclistsTrucks Cars Totals

2 51 764 817

CyclistsTrucks Cars Totals

0 4 65 69

3 46 382 431

0 0 0 0

3 50 447

Peds Cross:

West Peds:

West Entering:

West Leg Total:

13

500

1317

Northside Rd

Mainway

W

N

E

S

Mainway

Driveway

East Leg Total:

East Entering:

East Peds:

Peds Cross:

1268

802

2

Cars Trucks CyclistsTotals

56 7 0 63

690 47 2 739

0 0 0 0

746 54 2

Cars Trucks CyclistsTotals

412 50 4 466

Cars

Trucks

Cyclists

Totals

0

0

0

0

Cars

Trucks

Cyclists

Totals

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

Peds Cross:

South Peds:

South Entering:

South Leg Total:

1

0

0

Comments

Page 40: TRAFFIC IMPACT AND PARKING STUDY 3257 …...April 17, 2018 Reference No. 2017-0675 Mr. Jeff Kenny Strategy 4 Inc. 2620 Bristol Circle, Suite 100 Oakville, ON L6H 6Z7 Attention: Mr

Mainway @ Northside Rd

Total Count Diagram

Municipality:

Site #:

Intersection:

TFR File #:

Count date:

Burlington

0000202293

Mainway & Northside Rd

3

18-May-2016

Weather conditions:Clear/Dry

Person(s) who counted:Rick W

** Signalized Intersection ** Major Road: Mainway runs W/E

North Leg Total:

North Entering:

North Peds:

Peds Cross:

1416

771

22

Cyclists

Trucks

Cars

Totals

3

25

484

512

0

0

0

0

5

22

232

259

8

47

716

Cyclists

Trucks

Cars

Totals

1

33

611

645

CyclistsTrucks Cars Totals

10 268 3491 3769

CyclistsTrucks Cars Totals

0 15 359 374

9 249 3024 3282

0 0 1 1

9 264 3384

Peds Cross:

West Peds:

West Entering:

West Leg Total:

42

3657

7426

Northside Rd

Mainway

W

N

E

S

Mainway

Driveway

East Leg Total:

East Entering:

East Peds:

Peds Cross:

7071

3529

12

Cars Trucks CyclistsTotals

252 18 1 271

3006 243 7 3256

2 0 0 2

3260 261 8

Cars Trucks CyclistsTotals

3257 271 14 3542

Cars

Trucks

Cyclists

Totals

3

0

0

3

Cars

Trucks

Cyclists

Totals

1

0

0

1

0

0

0

0

1

0

0

1

2

0

0

Peds Cross:

South Peds:

South Entering:

South Leg Total:

9

2

5

Comments

Page 41: TRAFFIC IMPACT AND PARKING STUDY 3257 …...April 17, 2018 Reference No. 2017-0675 Mr. Jeff Kenny Strategy 4 Inc. 2620 Bristol Circle, Suite 100 Oakville, ON L6H 6Z7 Attention: Mr

Mainway @ Northside Rd

Annual Average Daily Traffic Diagram

Total Factor = Monthly Factor(0.93) x Daily Factor(0.94) x 24 Hour Factor(1.85) = 1.617270

Municipality:

Site #:

Intersection:

TFR File #:

Count date:

Burlington

0000202293

Mainway & Northside Rd

3

18-May-2016

Weather conditions:Clear/Dry

Person(s) who counted:Rick W

** Signalized Intersection ** Major Road: Mainway runs W/E

North Leg Total:

North Entering:

North Peds:

Peds Cross:

2290

1247

36

Cyclists

Trucks

Cars

Totals

5

40

783

828

0

0

0

0

8

36

375

419

13

76

1158

Cyclists

Trucks

Cars

Totals

2

53

988

1043

CyclistsTrucks Cars Totals

16 433 5646 6095

CyclistsTrucks Cars Totals

0 24 581 605

15 403 4891 5308

0 0 2 2

15 427 5473

Peds Cross:

West Peds:

West Entering:

West Leg Total:

68

5914

12010

Northside Rd

Mainway

W

N

E

S

Mainway

Driveway

East Leg Total:

East Entering:

East Peds:

Peds Cross:

11436

5707

19

Cars Trucks CyclistsTotals

408 29 2 438

4862 393 11 5266

3 0 0 3

5272 422 13

Cars Trucks CyclistsTotals

5267 438 23 5728

Cars

Trucks

Cyclists

Totals

5

0

0

5

Cars

Trucks

Cyclists

Totals

2

0

0

2

0

0

0

0

2

0

0

2

3

0

0

Peds Cross:

South Peds:

South Entering:

South Leg Total:

15

3

8

Comments

Page 42: TRAFFIC IMPACT AND PARKING STUDY 3257 …...April 17, 2018 Reference No. 2017-0675 Mr. Jeff Kenny Strategy 4 Inc. 2620 Bristol Circle, Suite 100 Oakville, ON L6H 6Z7 Attention: Mr

TS ID: Line No: Model: IP address: Controller Make:

Econolite

Type of Operation: 8 Phase Semi-Actuated

*‐Start from Main Menu

Date Description Prepared by

Y M D

2 2016 5 16

Ph1 Ph5

Ph2 Ph6

Ph3 Ph7

Ph4 Ph8

PHASE IN USE/EXCLUSIVE PED (MM) *- 1 - 2

Phase: 1 2 3 4 5 6 7 8

Phase in Use X X X

Exclusive PED

Phase:

Timing Plan: 1 1 2 3 4 5 6 7 8

Minimum Green 15 15 8

Walk 20 20 8

ACS/3 172.22.201.2902

* - 2 - 1CONTROLLER TIMING DATA - VEHICLE TIMING

WB - Mainway

SB - Dillion Road

PHASE DESCRIPTION

MA

Intersection Name:

No

EB - Mainway

8Mainway @ Dillion Rd

Walk 20 20 8

Ped. Clearance 15 15 10

Pedestrian Carry Over

Vehicle Extension 3 3 3

MAX 1 40 40 15

MAX 2 40 40 15

Yellow Change 4 4 4

Red Clearance 2 2 3

Phase Minimum: 42 42 26

PHASE DATA - VEHICLE AND PEDESTRIAN RECALLS * - 2 - 8

1 2 3 4 5 6 7 8

Lock Detector

Vehicle Recall

Pedestrian Recall X X

MAX Recall X X

Min Recall

COORDINATION: COORDINATOR PATTERN, SPLIT PATTERN * - 3 - 2, - 3 - 3

Phase:

Page 43: TRAFFIC IMPACT AND PARKING STUDY 3257 …...April 17, 2018 Reference No. 2017-0675 Mr. Jeff Kenny Strategy 4 Inc. 2620 Bristol Circle, Suite 100 Oakville, ON L6H 6Z7 Attention: Mr

Phases (sec)

1 2 3 4 5 6 7 8

60 0 60 30

50 0 50 30

60 0 60 30

0 0

TIME BASE: ACTION PLAN, DAY PLAN * - 5 - 2, - 5 - 3, -5 - 4

Day Plan Sched. # Action PlanTime 

PeriodPattern Timing Plan

Schedule 1 = Day Plan 1

Schedule 2 = Day Plan 2

Schedule 3 = Day Plan 3

Day Plan 1 (Weekday)

Day Plan 2 (Saturday)

Day Plan 3 (Sunday, Holidays)

Coordinator Pattern (CP)

Cycle Length

Offset (sec)Timing Plan

Split Pattern

3

1

1

1

1

2

3

1

1

1

1

1

1

1

2

06:00

09:00

15:30

1

1

10:00

19:00

0:00

254

1

2

3

254

25410

10

1

2

3

10

1

2

3

10

1

1

1

1

0

0

0

0

90

80

90

0

1

2

3

10

Action Plan 10 = free (254)

Special Programming:

TIME BASE DATA ‐ TIME OF YEAR EVENTS * - 5 - 5

Events Exception DayMON/ 

MON

DOW/ 

DOW

WOM/ 

YearDay Plan

New Year's Day 1 Fixed 1 1 0 3

Family Day  2 Float 2 2 3 3

Good Friday 3 Float 4 6 1 3

Victoria Day 4 Float 5 2 3 3

Canada Day 5 Fixed 7 1 0 3

Civic Day 6 Float 8 2 1 3

Labour Day 7 Float 9 2 1 3

Thanksgiving 8 Float 10 2 2 3

Christmas Day 9 Fixed 12 25 0 3

Page 44: TRAFFIC IMPACT AND PARKING STUDY 3257 …...April 17, 2018 Reference No. 2017-0675 Mr. Jeff Kenny Strategy 4 Inc. 2620 Bristol Circle, Suite 100 Oakville, ON L6H 6Z7 Attention: Mr

TS ID: Line No: Model: IP address: Controller Make:

Econolite

Type of Operation: 4 Phase Semi-Actuated

*‐Start from Main Menu

Date Description Prepared by

Y M D

2 2016 5 16

Ph1 Ph5

Ph2 Ph6

Ph3 Ph7

Ph4 Ph8

PHASE IN USE/EXCLUSIVE PED (MM) *- 1 - 2

Phase: 1 2 3 4 5 6 7 8

Phase in Use X X

Exclusive PED

Phase:

Timing Plan: 1 1 2 3 4 5 6 7 8

Minimum Green 8 8

Walk 25 10

Ped. Clearance 14 8

Pedestrian Carry Over

Vehicle Extension 3 3

MAX 1 35 25

MAX 2 35 25

Yellow Change 4 4

Red Clearance 3 2

Phase Minimum: 47 25

PHASE DATA - VEHICLE AND PEDESTRIAN RECALLS * - 2 - 8

1 2 3 4 5 6 7 8

Lock Detector

Vehicle Recall

Pedestrian Recall X X

MAX Recall X X

Min Recall

COORDINATION: COORDINATOR PATTERN, SPLIT PATTERN * - 3 - 2, - 3 - 3

ACS/3 172.22.200.2194

* - 2 - 1CONTROLLER TIMING DATA - VEHICLE TIMING

Phase:

PHASE DESCRIPTION

MA

Intersection Name:

No

EB/WB - Mainway

SB - Northside

5Mainway @ Northside

Page 45: TRAFFIC IMPACT AND PARKING STUDY 3257 …...April 17, 2018 Reference No. 2017-0675 Mr. Jeff Kenny Strategy 4 Inc. 2620 Bristol Circle, Suite 100 Oakville, ON L6H 6Z7 Attention: Mr

Phases (sec)

1 2 3 4 5 6 7 8

63 27

53 27

63 27

0 0

TIME BASE: ACTION PLAN, DAY PLAN * - 5 - 2, - 5 - 3, -5 - 4

Day Plan Sched. # Action PlanTime 

PeriodPattern Timing Plan

Schedule 1 = Day Plan 1

Schedule 2 = Day Plan 2

Schedule 3 = Day Plan 3

Day Plan 1 (Weekday)

Day Plan 2 (Saturday)

Day Plan 3 (Sunday, Holidays)

Action Plan 10 = free (254)

Special Programming:

TIME BASE DATA ‐ TIME OF YEAR EVENTS * - 5 - 5

Events Exception DayMON/ 

MON

DOW/ 

DOW

WOM/ 

YearDay Plan

New Year's Day 1 Fixed 1 1 0 3

Family Day  2 Float 2 2 3 3

Good Friday 3 Float 4 6 1 3

Victoria Day 4 Float 5 2 3 3

Canada Day 5 Fixed 7 1 0 3

Civic Day 6 Float 8 2 1 3

Labour Day 7 Float 9 2 1 3

Thanksgiving 8 Float 10 2 2 3

Christmas Day 9 Fixed 12 25 0 3

Coordinator Pattern (CP)

Cycle Length

Offset (sec)Timing Plan

Split Pattern

3

3

1

1

1

1

2

2

3

3

1

1

1

1

1

1

1

2

2

06:00

09:00

15:30

1

1

1

1

118:00

19:00

09:00

18:00

09:00 2

254

1

2

3

254

2

25410

2

10

1

2

3

10

2

1

2

3

10

1

1

1

1

0

0

0

0

90

80

90

0

1

2

3

10

Page 46: TRAFFIC IMPACT AND PARKING STUDY 3257 …...April 17, 2018 Reference No. 2017-0675 Mr. Jeff Kenny Strategy 4 Inc. 2620 Bristol Circle, Suite 100 Oakville, ON L6H 6Z7 Attention: Mr

APPENDIX B

Intersection Capacity Analysis Reports Existing (2018) Traffic Conditions

Page 47: TRAFFIC IMPACT AND PARKING STUDY 3257 …...April 17, 2018 Reference No. 2017-0675 Mr. Jeff Kenny Strategy 4 Inc. 2620 Bristol Circle, Suite 100 Oakville, ON L6H 6Z7 Attention: Mr

HCM Signalized Intersection Capacity Analysis 3257 Mainway TIPS1: Mainway & Northside Road EX AM

04/08/2018 Synchro 9 ReportEx AM.syn Page 1

Movement EBL EBT WBT WBR SBL SBR

Lane ConfigurationsTraffic Volume (vph) 39 792 426 31 72 83Future Volume (vph) 39 792 426 31 72 83Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900Total Lost time (s) 7.0 7.0 6.0 6.0Lane Util. Factor 0.95 0.95 1.00 1.00Frpb, ped/bikes 1.00 1.00 1.00 1.00Flpb, ped/bikes 1.00 1.00 1.00 1.00Frt 1.00 0.99 1.00 0.85Flt Protected 1.00 1.00 0.95 1.00Satd. Flow (prot) 3471 3394 1722 1526Flt Permitted 0.90 1.00 0.95 1.00Satd. Flow (perm) 3133 3394 1722 1526

Peak-hour factor, PHF 0.87 0.87 0.87 0.87 0.87 0.87Adj. Flow (vph) 45 910 490 36 83 95RTOR Reduction (vph) 0 0 6 0 0 73Lane Group Flow (vph) 0 955 520 0 83 22Confl. Peds. (#/hr) 2 2Heavy Vehicles (%) 3% 5% 6% 10% 6% 7%

Turn Type Perm NA NA Prot PermProtected Phases 4 8 6Permitted Phases 4 6Actuated Green, G (s) 56.0 56.0 21.0 21.0Effective Green, g (s) 56.0 56.0 21.0 21.0Actuated g/C Ratio 0.62 0.62 0.23 0.23Clearance Time (s) 7.0 7.0 6.0 6.0Vehicle Extension (s) 3.0 3.0 3.0 3.0

Lane Grp Cap (vph) 1949 2111 401 356v/s Ratio Prot 0.15 c0.05v/s Ratio Perm c0.30 0.01v/c Ratio 0.49 0.25 0.21 0.06Uniform Delay, d1 9.2 7.6 27.8 26.8Progression Factor 1.00 1.00 1.00 1.00Incremental Delay, d2 0.9 0.3 1.2 0.3Delay (s) 10.1 7.9 29.0 27.2Level of Service B A C CApproach Delay (s) 10.1 7.9 28.0Approach LOS B A C

Intersection Summary

HCM 2000 Control Delay 11.3 HCM 2000 Level of Service BHCM 2000 Volume to Capacity ratio 0.41Actuated Cycle Length (s) 90.0 Sum of lost time (s) 13.0Intersection Capacity Utilization 68.2% ICU Level of Service CAnalysis Period (min) 15c Critical Lane Group

Page 48: TRAFFIC IMPACT AND PARKING STUDY 3257 …...April 17, 2018 Reference No. 2017-0675 Mr. Jeff Kenny Strategy 4 Inc. 2620 Bristol Circle, Suite 100 Oakville, ON L6H 6Z7 Attention: Mr

HCM Unsignalized Intersection Capacity Analysis 3257 Mainway TIPS2: Mainway & Site Access 3 EX AM

04/08/2018 Synchro 9 ReportEx AM.syn Page 2

Movement EBL EBT WBT WBR SBL SBR

Lane ConfigurationsTraffic Volume (veh/h) 0 864 457 0 0 0Future Volume (Veh/h) 0 864 457 0 0 0Sign Control Free Free StopGrade 0% 0% 0%Peak Hour Factor 0.87 0.87 0.87 0.87 0.87 0.87Hourly flow rate (vph) 0 993 525 0 0 0PedestriansLane Width (m)Walking Speed (m/s)Percent BlockageRight turn flare (veh)Median type None NoneMedian storage veh)Upstream signal (m) 332pX, platoon unblocked 0.88vC, conflicting volume 525 1022 262vC1, stage 1 conf volvC2, stage 2 conf volvCu, unblocked vol 525 761 262tC, single (s) 4.1 6.8 6.9tC, 2 stage (s)tF (s) 2.2 3.5 3.3p0 queue free % 100 100 100cM capacity (veh/h) 1052 306 742

Direction, Lane # EB 1 EB 2 WB 1 WB 2 SB 1

Volume Total 331 662 350 175 0Volume Left 0 0 0 0 0Volume Right 0 0 0 0 0cSH 1052 1700 1700 1700 1700Volume to Capacity 0.00 0.39 0.21 0.10 0.00Queue Length 95th (m) 0.0 0.0 0.0 0.0 0.0Control Delay (s) 0.0 0.0 0.0 0.0 0.0Lane LOS AApproach Delay (s) 0.0 0.0 0.0Approach LOS A

Intersection Summary

Average Delay 0.0Intersection Capacity Utilization 27.2% ICU Level of Service AAnalysis Period (min) 15

Page 49: TRAFFIC IMPACT AND PARKING STUDY 3257 …...April 17, 2018 Reference No. 2017-0675 Mr. Jeff Kenny Strategy 4 Inc. 2620 Bristol Circle, Suite 100 Oakville, ON L6H 6Z7 Attention: Mr

HCM Unsignalized Intersection Capacity Analysis 3257 Mainway TIPS3: Pioneer Road & Mainway EX AM

04/08/2018 Synchro 9 ReportEx AM.syn Page 3

Movement EBT EBR WBL WBT NBL NBR

Lane ConfigurationsTraffic Volume (veh/h) 803 61 60 428 29 38Future Volume (Veh/h) 803 61 60 428 29 38Sign Control Free Free StopGrade 0% 0% 0%Peak Hour Factor 0.93 0.93 0.93 0.93 0.93 0.93Hourly flow rate (vph) 863 66 65 460 31 41Pedestrians 4 2 1Lane Width (m) 3.7 3.7 3.7Walking Speed (m/s) 1.1 1.1 1.1Percent Blockage 0 0 0Right turn flare (veh)Median type None NoneMedian storage veh)Upstream signal (m) 394pX, platoon unblocked 0.92 0.92 0.92vC, conflicting volume 930 1261 468vC1, stage 1 conf volvC2, stage 2 conf volvCu, unblocked vol 740 1101 235tC, single (s) 4.5 7.4 7.9tC, 2 stage (s)tF (s) 2.4 3.8 3.8p0 queue free % 91 77 93cM capacity (veh/h) 689 136 583

Direction, Lane # EB 1 EB 2 WB 1 WB 2 NB 1

Volume Total 575 354 218 307 72Volume Left 0 0 65 0 31Volume Right 0 66 0 0 41cSH 1700 1700 689 1700 242Volume to Capacity 0.34 0.21 0.09 0.18 0.30Queue Length 95th (m) 0.0 0.0 2.4 0.0 9.1Control Delay (s) 0.0 0.0 4.0 0.0 26.0Lane LOS A DApproach Delay (s) 0.0 1.7 26.0Approach LOS D

Intersection Summary

Average Delay 1.8Intersection Capacity Utilization 52.4% ICU Level of Service AAnalysis Period (min) 15

Page 50: TRAFFIC IMPACT AND PARKING STUDY 3257 …...April 17, 2018 Reference No. 2017-0675 Mr. Jeff Kenny Strategy 4 Inc. 2620 Bristol Circle, Suite 100 Oakville, ON L6H 6Z7 Attention: Mr

HCM Unsignalized Intersection Capacity Analysis 3257 Mainway TIPS4: Mainway & Site Access 2 EX AM

04/08/2018 Synchro 9 ReportEx AM.syn Page 4

Movement EBL EBT WBT WBR SBL SBR

Lane ConfigurationsTraffic Volume (veh/h) 0 841 488 0 0 0Future Volume (Veh/h) 0 841 488 0 0 0Sign Control Free Free StopGrade 0% 0% 0%Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Hourly flow rate (vph) 0 914 530 0 0 0PedestriansLane Width (m)Walking Speed (m/s)Percent BlockageRight turn flare (veh)Median type None NoneMedian storage veh)Upstream signal (m)pX, platoon unblockedvC, conflicting volume 530 987 265vC1, stage 1 conf volvC2, stage 2 conf volvCu, unblocked vol 530 987 265tC, single (s) 4.1 6.8 6.9tC, 2 stage (s)tF (s) 2.2 3.5 3.3p0 queue free % 100 100 100cM capacity (veh/h) 1048 248 739

Direction, Lane # EB 1 EB 2 WB 1 WB 2 SB 1

Volume Total 305 609 353 177 0Volume Left 0 0 0 0 0Volume Right 0 0 0 0 0cSH 1048 1700 1700 1700 1700Volume to Capacity 0.00 0.36 0.21 0.10 0.00Queue Length 95th (m) 0.0 0.0 0.0 0.0 0.0Control Delay (s) 0.0 0.0 0.0 0.0 0.0Lane LOS AApproach Delay (s) 0.0 0.0 0.0Approach LOS A

Intersection Summary

Average Delay 0.0Intersection Capacity Utilization 26.6% ICU Level of Service AAnalysis Period (min) 15

Page 51: TRAFFIC IMPACT AND PARKING STUDY 3257 …...April 17, 2018 Reference No. 2017-0675 Mr. Jeff Kenny Strategy 4 Inc. 2620 Bristol Circle, Suite 100 Oakville, ON L6H 6Z7 Attention: Mr

HCM Unsignalized Intersection Capacity Analysis 3257 Mainway TIPS5: Mainway & Site Access 1 EX AM

04/08/2018 Synchro 9 ReportEx AM.syn Page 5

Movement EBL EBT WBT WBR SBL SBR

Lane ConfigurationsTraffic Volume (veh/h) 0 841 488 0 0 0Future Volume (Veh/h) 0 841 488 0 0 0Sign Control Free Free StopGrade 0% 0% 0%Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Hourly flow rate (vph) 0 914 530 0 0 0PedestriansLane Width (m)Walking Speed (m/s)Percent BlockageRight turn flare (veh)Median type None NoneMedian storage veh)Upstream signal (m)pX, platoon unblockedvC, conflicting volume 530 987 265vC1, stage 1 conf volvC2, stage 2 conf volvCu, unblocked vol 530 987 265tC, single (s) 4.1 6.8 6.9tC, 2 stage (s)tF (s) 2.2 3.5 3.3p0 queue free % 100 100 100cM capacity (veh/h) 1048 248 739

Direction, Lane # EB 1 EB 2 WB 1 WB 2 SB 1

Volume Total 305 609 353 177 0Volume Left 0 0 0 0 0Volume Right 0 0 0 0 0cSH 1048 1700 1700 1700 1700Volume to Capacity 0.00 0.36 0.21 0.10 0.00Queue Length 95th (m) 0.0 0.0 0.0 0.0 0.0Control Delay (s) 0.0 0.0 0.0 0.0 0.0Lane LOS AApproach Delay (s) 0.0 0.0 0.0Approach LOS A

Intersection Summary

Average Delay 0.0Intersection Capacity Utilization 26.6% ICU Level of Service AAnalysis Period (min) 15

Page 52: TRAFFIC IMPACT AND PARKING STUDY 3257 …...April 17, 2018 Reference No. 2017-0675 Mr. Jeff Kenny Strategy 4 Inc. 2620 Bristol Circle, Suite 100 Oakville, ON L6H 6Z7 Attention: Mr

HCM Signalized Intersection Capacity Analysis 3257 Mainway TIPS6: Mainway & Dillon Road EX AM

04/08/2018 Synchro 9 ReportEx AM.syn Page 6

Movement EBL EBT WBT WBR SBL SBR

Lane ConfigurationsTraffic Volume (vph) 51 790 416 53 219 72Future Volume (vph) 51 790 416 53 219 72Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900Total Lost time (s) 8.0 8.0 10.0 10.0Lane Util. Factor 0.95 0.95 1.00 1.00Frpb, ped/bikes 1.00 1.00 1.00 1.00Flpb, ped/bikes 1.00 1.00 1.00 1.00Frt 1.00 0.98 1.00 0.85Flt Protected 1.00 1.00 0.95 1.00Satd. Flow (prot) 3433 3303 1690 1526Flt Permitted 0.88 1.00 0.95 1.00Satd. Flow (perm) 3030 3303 1690 1526

Peak-hour factor, PHF 0.92 0.92 0.92 0.92 0.92 0.92Adj. Flow (vph) 55 859 452 58 238 78RTOR Reduction (vph) 0 0 16 0 0 53Lane Group Flow (vph) 0 914 494 0 238 25Confl. Peds. (#/hr) 4 4Heavy Vehicles (%) 6% 6% 8% 11% 8% 7%

Turn Type Perm NA NA Prot PermProtected Phases 4 8 6Permitted Phases 4 6Actuated Green, G (s) 25.8 25.8 23.2 23.2Effective Green, g (s) 23.8 23.8 20.2 20.2Actuated g/C Ratio 0.38 0.38 0.33 0.33Clearance Time (s) 6.0 6.0 7.0 7.0Vehicle Extension (s) 3.0 3.0 3.0 3.0

Lane Grp Cap (vph) 1163 1267 550 497v/s Ratio Prot 0.15 c0.14v/s Ratio Perm c0.30 0.02v/c Ratio 0.79 0.39 0.43 0.05Uniform Delay, d1 16.9 13.8 16.4 14.3Progression Factor 1.00 1.00 1.00 1.00Incremental Delay, d2 3.6 0.2 2.5 0.2Delay (s) 20.4 14.0 18.9 14.5Level of Service C B B BApproach Delay (s) 20.4 14.0 17.8Approach LOS C B B

Intersection Summary

HCM 2000 Control Delay 18.1 HCM 2000 Level of Service BHCM 2000 Volume to Capacity ratio 0.62Actuated Cycle Length (s) 62.0 Sum of lost time (s) 18.0Intersection Capacity Utilization 72.3% ICU Level of Service CAnalysis Period (min) 15c Critical Lane Group

Page 53: TRAFFIC IMPACT AND PARKING STUDY 3257 …...April 17, 2018 Reference No. 2017-0675 Mr. Jeff Kenny Strategy 4 Inc. 2620 Bristol Circle, Suite 100 Oakville, ON L6H 6Z7 Attention: Mr

HCM Signalized Intersection Capacity Analysis 3257 Mainway TIPS1: Mainway & Northside Road Ex PM

04/08/2018 Synchro 9 ReportEx PM.syn Page 1

Movement EBL EBT WBT WBR SBL SBR

Lane ConfigurationsTraffic Volume (vph) 69 509 866 74 40 78Future Volume (vph) 69 509 866 74 40 78Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900Total Lost time (s) 7.0 7.0 6.0 6.0Lane Util. Factor 0.95 0.95 1.00 1.00Frpb, ped/bikes 1.00 1.00 1.00 0.97Flpb, ped/bikes 1.00 1.00 1.00 1.00Frt 1.00 0.99 1.00 0.85Flt Protected 0.99 1.00 0.95 1.00Satd. Flow (prot) 3340 3416 1659 1507Flt Permitted 0.72 1.00 0.95 1.00Satd. Flow (perm) 2426 3416 1659 1507

Peak-hour factor, PHF 0.94 0.94 0.94 0.94 0.94 0.94Adj. Flow (vph) 73 541 921 79 43 83RTOR Reduction (vph) 0 0 7 0 0 64Lane Group Flow (vph) 0 614 993 0 43 19Confl. Peds. (#/hr) 3 3 2 13Heavy Vehicles (%) 6% 9% 5% 10% 10% 5%

Turn Type Perm NA NA Prot PermProtected Phases 4 8 6Permitted Phases 4 6Actuated Green, G (s) 56.0 56.0 21.0 21.0Effective Green, g (s) 56.0 56.0 21.0 21.0Actuated g/C Ratio 0.62 0.62 0.23 0.23Clearance Time (s) 7.0 7.0 6.0 6.0Vehicle Extension (s) 3.0 3.0 3.0 3.0

Lane Grp Cap (vph) 1509 2125 387 351v/s Ratio Prot c0.29 c0.03v/s Ratio Perm 0.25 0.01v/c Ratio 0.41 0.47 0.11 0.06Uniform Delay, d1 8.6 9.1 27.2 26.8Progression Factor 1.00 1.00 1.00 1.00Incremental Delay, d2 0.8 0.7 0.6 0.3Delay (s) 9.4 9.8 27.7 27.1Level of Service A A C CApproach Delay (s) 9.4 9.8 27.3Approach LOS A A C

Intersection Summary

HCM 2000 Control Delay 10.9 HCM 2000 Level of Service BHCM 2000 Volume to Capacity ratio 0.37Actuated Cycle Length (s) 90.0 Sum of lost time (s) 13.0Intersection Capacity Utilization 80.2% ICU Level of Service DAnalysis Period (min) 15c Critical Lane Group

Page 54: TRAFFIC IMPACT AND PARKING STUDY 3257 …...April 17, 2018 Reference No. 2017-0675 Mr. Jeff Kenny Strategy 4 Inc. 2620 Bristol Circle, Suite 100 Oakville, ON L6H 6Z7 Attention: Mr

HCM Unsignalized Intersection Capacity Analysis 3257 Mainway TIPS2: Mainway & Site Access 3 Ex PM

04/08/2018 Synchro 9 ReportEx PM.syn Page 2

Movement EBL EBT WBT WBR SBL SBR

Lane ConfigurationsTraffic Volume (veh/h) 0 549 940 0 0 0Future Volume (Veh/h) 0 549 940 0 0 0Sign Control Free Free StopGrade 0% 0% 0%Peak Hour Factor 0.94 0.94 0.94 0.94 0.94 0.94Hourly flow rate (vph) 0 584 1000 0 0 0PedestriansLane Width (m)Walking Speed (m/s)Percent BlockageRight turn flare (veh)Median type None NoneMedian storage veh)Upstream signal (m) 332pX, platoon unblocked 1.00vC, conflicting volume 1000 1292 500vC1, stage 1 conf volvC2, stage 2 conf volvCu, unblocked vol 1000 1290 500tC, single (s) 4.1 6.8 6.9tC, 2 stage (s)tF (s) 2.2 3.5 3.3p0 queue free % 100 100 100cM capacity (veh/h) 700 158 522

Direction, Lane # EB 1 EB 2 WB 1 WB 2 SB 1

Volume Total 195 389 667 333 0Volume Left 0 0 0 0 0Volume Right 0 0 0 0 0cSH 700 1700 1700 1700 1700Volume to Capacity 0.00 0.23 0.39 0.20 0.00Queue Length 95th (m) 0.0 0.0 0.0 0.0 0.0Control Delay (s) 0.0 0.0 0.0 0.0 0.0Lane LOS AApproach Delay (s) 0.0 0.0 0.0Approach LOS A

Intersection Summary

Average Delay 0.0Intersection Capacity Utilization 29.3% ICU Level of Service AAnalysis Period (min) 15

Page 55: TRAFFIC IMPACT AND PARKING STUDY 3257 …...April 17, 2018 Reference No. 2017-0675 Mr. Jeff Kenny Strategy 4 Inc. 2620 Bristol Circle, Suite 100 Oakville, ON L6H 6Z7 Attention: Mr

HCM Unsignalized Intersection Capacity Analysis 3257 Mainway TIPS3: Pioneer Road & Mainway Ex PM

04/08/2018 Synchro 9 ReportEx PM.syn Page 3

Movement EBT EBR WBL WBT NBL NBR

Lane ConfigurationsTraffic Volume (veh/h) 518 31 17 879 61 48Future Volume (Veh/h) 518 31 17 879 61 48Sign Control Free Free StopGrade 0% 0% 0%Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Hourly flow rate (vph) 563 34 18 955 66 52Pedestrians 1 2Lane Width (m) 3.7 3.7Walking Speed (m/s) 1.1 1.1Percent Blockage 0 0Right turn flare (veh)Median type None NoneMedian storage veh)Upstream signal (m) 394pX, platoon unblockedvC, conflicting volume 599 1096 302vC1, stage 1 conf volvC2, stage 2 conf volvCu, unblocked vol 599 1096 302tC, single (s) 4.7 6.9 7.1tC, 2 stage (s)tF (s) 2.5 3.6 3.4p0 queue free % 98 66 92cM capacity (veh/h) 809 195 669

Direction, Lane # EB 1 EB 2 WB 1 WB 2 NB 1

Volume Total 375 222 336 637 118Volume Left 0 0 18 0 66Volume Right 0 34 0 0 52cSH 1700 1700 809 1700 284Volume to Capacity 0.22 0.13 0.02 0.37 0.42Queue Length 95th (m) 0.0 0.0 0.5 0.0 14.8Control Delay (s) 0.0 0.0 0.8 0.0 26.4Lane LOS A DApproach Delay (s) 0.0 0.3 26.4Approach LOS D

Intersection Summary

Average Delay 2.0Intersection Capacity Utilization 49.7% ICU Level of Service AAnalysis Period (min) 15

Page 56: TRAFFIC IMPACT AND PARKING STUDY 3257 …...April 17, 2018 Reference No. 2017-0675 Mr. Jeff Kenny Strategy 4 Inc. 2620 Bristol Circle, Suite 100 Oakville, ON L6H 6Z7 Attention: Mr

HCM Unsignalized Intersection Capacity Analysis 3257 Mainway TIPS4: Mainway & Site Access 2 Ex PM

04/08/2018 Synchro 9 ReportEx PM.syn Page 4

Movement EBL EBT WBT WBR SBL SBR

Lane ConfigurationsTraffic Volume (veh/h) 0 566 896 0 0 0Future Volume (Veh/h) 0 566 896 0 0 0Sign Control Free Free StopGrade 0% 0% 0%Peak Hour Factor 0.93 0.93 0.93 0.93 0.93 0.93Hourly flow rate (vph) 0 609 963 0 0 0PedestriansLane Width (m)Walking Speed (m/s)Percent BlockageRight turn flare (veh)Median type None NoneMedian storage veh)Upstream signal (m)pX, platoon unblockedvC, conflicting volume 963 1268 482vC1, stage 1 conf volvC2, stage 2 conf volvCu, unblocked vol 963 1268 482tC, single (s) 4.1 6.8 6.9tC, 2 stage (s)tF (s) 2.2 3.5 3.3p0 queue free % 100 100 100cM capacity (veh/h) 723 163 536

Direction, Lane # EB 1 EB 2 WB 1 WB 2 SB 1

Volume Total 203 406 642 321 0Volume Left 0 0 0 0 0Volume Right 0 0 0 0 0cSH 723 1700 1700 1700 1700Volume to Capacity 0.00 0.24 0.38 0.19 0.00Queue Length 95th (m) 0.0 0.0 0.0 0.0 0.0Control Delay (s) 0.0 0.0 0.0 0.0 0.0Lane LOS AApproach Delay (s) 0.0 0.0 0.0Approach LOS A

Intersection Summary

Average Delay 0.0Intersection Capacity Utilization 28.1% ICU Level of Service AAnalysis Period (min) 15

Page 57: TRAFFIC IMPACT AND PARKING STUDY 3257 …...April 17, 2018 Reference No. 2017-0675 Mr. Jeff Kenny Strategy 4 Inc. 2620 Bristol Circle, Suite 100 Oakville, ON L6H 6Z7 Attention: Mr

HCM Unsignalized Intersection Capacity Analysis 3257 Mainway TIPS5: Mainway & Site Access 1 Ex PM

04/08/2018 Synchro 9 ReportEx PM.syn Page 5

Movement EBL EBT WBT WBR SBL SBR

Lane ConfigurationsTraffic Volume (veh/h) 0 566 896 0 0 0Future Volume (Veh/h) 0 566 896 0 0 0Sign Control Free Free StopGrade 0% 0% 0%Peak Hour Factor 0.93 0.93 0.93 0.93 0.93 0.93Hourly flow rate (vph) 0 609 963 0 0 0PedestriansLane Width (m)Walking Speed (m/s)Percent BlockageRight turn flare (veh)Median type None NoneMedian storage veh)Upstream signal (m)pX, platoon unblockedvC, conflicting volume 963 1268 482vC1, stage 1 conf volvC2, stage 2 conf volvCu, unblocked vol 963 1268 482tC, single (s) 4.1 6.8 6.9tC, 2 stage (s)tF (s) 2.2 3.5 3.3p0 queue free % 100 100 100cM capacity (veh/h) 723 163 536

Direction, Lane # EB 1 EB 2 WB 1 WB 2 SB 1

Volume Total 203 406 642 321 0Volume Left 0 0 0 0 0Volume Right 0 0 0 0 0cSH 723 1700 1700 1700 1700Volume to Capacity 0.00 0.24 0.38 0.19 0.00Queue Length 95th (m) 0.0 0.0 0.0 0.0 0.0Control Delay (s) 0.0 0.0 0.0 0.0 0.0Lane LOS AApproach Delay (s) 0.0 0.0 0.0Approach LOS A

Intersection Summary

Average Delay 0.0Intersection Capacity Utilization 28.1% ICU Level of Service AAnalysis Period (min) 15

Page 58: TRAFFIC IMPACT AND PARKING STUDY 3257 …...April 17, 2018 Reference No. 2017-0675 Mr. Jeff Kenny Strategy 4 Inc. 2620 Bristol Circle, Suite 100 Oakville, ON L6H 6Z7 Attention: Mr

HCM Signalized Intersection Capacity Analysis 3257 Mainway TIPS6: Mainway & Dillon Road Ex PM

04/08/2018 Synchro 9 ReportEx PM.syn Page 6

Movement EBL EBT WBT WBR SBL SBR

Lane ConfigurationsTraffic Volume (vph) 29 537 882 172 16 14Future Volume (vph) 29 537 882 172 16 14Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900Total Lost time (s) 8.0 8.0 10.0 10.0Lane Util. Factor 0.95 0.95 1.00 1.00Frpb, ped/bikes 1.00 1.00 1.00 1.00Flpb, ped/bikes 1.00 1.00 1.00 1.00Frt 1.00 0.98 1.00 0.85Flt Protected 1.00 1.00 0.95 1.00Satd. Flow (prot) 3237 3332 1825 1633Flt Permitted 0.82 1.00 0.95 1.00Satd. Flow (perm) 2661 3332 1825 1633

Peak-hour factor, PHF 0.93 0.93 0.93 0.93 0.93 0.93Adj. Flow (vph) 31 577 948 185 17 15RTOR Reduction (vph) 0 0 25 0 0 10Lane Group Flow (vph) 0 608 1108 0 17 5Confl. Peds. (#/hr) 1 1Heavy Vehicles (%) 3% 13% 6% 9% 0% 0%

Turn Type Perm NA NA Prot PermProtected Phases 4 8 6Permitted Phases 4 6Actuated Green, G (s) 30.7 30.7 23.3 23.3Effective Green, g (s) 28.7 28.7 20.3 20.3Actuated g/C Ratio 0.43 0.43 0.30 0.30Clearance Time (s) 6.0 6.0 7.0 7.0Vehicle Extension (s) 3.0 3.0 3.0 3.0

Lane Grp Cap (vph) 1139 1427 552 494v/s Ratio Prot c0.33 c0.01v/s Ratio Perm 0.23 0.00v/c Ratio 0.53 0.78 0.03 0.01Uniform Delay, d1 14.2 16.4 16.4 16.3Progression Factor 1.00 1.00 1.00 1.00Incremental Delay, d2 0.5 2.7 0.1 0.0Delay (s) 14.7 19.1 16.5 16.4Level of Service B B B BApproach Delay (s) 14.7 19.1 16.4Approach LOS B B B

Intersection Summary

HCM 2000 Control Delay 17.6 HCM 2000 Level of Service BHCM 2000 Volume to Capacity ratio 0.47Actuated Cycle Length (s) 67.0 Sum of lost time (s) 18.0Intersection Capacity Utilization 58.1% ICU Level of Service BAnalysis Period (min) 15c Critical Lane Group

Page 59: TRAFFIC IMPACT AND PARKING STUDY 3257 …...April 17, 2018 Reference No. 2017-0675 Mr. Jeff Kenny Strategy 4 Inc. 2620 Bristol Circle, Suite 100 Oakville, ON L6H 6Z7 Attention: Mr

APPENDIX C

Intersection Capacity Analysis Reports Future (2023) Background Traffic Conditions

Page 60: TRAFFIC IMPACT AND PARKING STUDY 3257 …...April 17, 2018 Reference No. 2017-0675 Mr. Jeff Kenny Strategy 4 Inc. 2620 Bristol Circle, Suite 100 Oakville, ON L6H 6Z7 Attention: Mr

HCM Signalized Intersection Capacity Analysis 3257 Mainway TIPS1: Mainway & Northside Road FB2023 AM

04/08/2018 Synchro 9 ReportFB2023 AM.syn Page 1

Movement EBL EBT WBT WBR SBL SBR

Lane ConfigurationsTraffic Volume (vph) 39 832 448 31 72 83Future Volume (vph) 39 832 448 31 72 83Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900Total Lost time (s) 7.0 7.0 6.0 6.0Lane Util. Factor 0.95 0.95 1.00 1.00Frpb, ped/bikes 1.00 1.00 1.00 1.00Flpb, ped/bikes 1.00 1.00 1.00 1.00Frt 1.00 0.99 1.00 0.85Flt Protected 1.00 1.00 0.95 1.00Satd. Flow (prot) 3503 3396 1722 1526Flt Permitted 0.90 1.00 0.95 1.00Satd. Flow (perm) 3161 3396 1722 1526

Peak-hour factor, PHF 0.87 0.87 0.87 0.87 0.87 0.87Adj. Flow (vph) 45 956 515 36 83 95RTOR Reduction (vph) 0 0 6 0 0 73Lane Group Flow (vph) 0 1001 545 0 83 22Confl. Peds. (#/hr) 2 2Heavy Vehicles (%) 3% 4% 6% 10% 6% 7%

Turn Type Perm NA NA Prot PermProtected Phases 4 8 6Permitted Phases 4 6Actuated Green, G (s) 56.0 56.0 21.0 21.0Effective Green, g (s) 56.0 56.0 21.0 21.0Actuated g/C Ratio 0.62 0.62 0.23 0.23Clearance Time (s) 7.0 7.0 6.0 6.0Vehicle Extension (s) 3.0 3.0 3.0 3.0

Lane Grp Cap (vph) 1966 2113 401 356v/s Ratio Prot 0.16 c0.05v/s Ratio Perm c0.32 0.01v/c Ratio 0.51 0.26 0.21 0.06Uniform Delay, d1 9.4 7.7 27.8 26.8Progression Factor 1.00 1.00 1.00 1.00Incremental Delay, d2 0.9 0.3 1.2 0.3Delay (s) 10.3 7.9 29.0 27.2Level of Service B A C CApproach Delay (s) 10.3 7.9 28.0Approach LOS B A C

Intersection Summary

HCM 2000 Control Delay 11.4 HCM 2000 Level of Service BHCM 2000 Volume to Capacity ratio 0.43Actuated Cycle Length (s) 90.0 Sum of lost time (s) 13.0Intersection Capacity Utilization 69.3% ICU Level of Service CAnalysis Period (min) 15c Critical Lane Group

Page 61: TRAFFIC IMPACT AND PARKING STUDY 3257 …...April 17, 2018 Reference No. 2017-0675 Mr. Jeff Kenny Strategy 4 Inc. 2620 Bristol Circle, Suite 100 Oakville, ON L6H 6Z7 Attention: Mr

HCM Unsignalized Intersection Capacity Analysis 3257 Mainway TIPS2: Mainway & Site Access 3 FB2023 AM

04/08/2018 Synchro 9 ReportFB2023 AM.syn Page 2

Movement EBL EBT WBT WBR SBL SBR

Lane ConfigurationsTraffic Volume (veh/h) 0 908 480 0 0 0Future Volume (Veh/h) 0 908 480 0 0 0Sign Control Free Free StopGrade 0% 0% 0%Peak Hour Factor 0.87 0.87 0.87 0.87 0.87 0.87Hourly flow rate (vph) 0 1044 552 0 0 0PedestriansLane Width (m)Walking Speed (m/s)Percent BlockageRight turn flare (veh)Median type None NoneMedian storage veh)Upstream signal (m) 332pX, platoon unblocked 0.87vC, conflicting volume 552 1074 276vC1, stage 1 conf volvC2, stage 2 conf volvCu, unblocked vol 552 786 276tC, single (s) 4.1 6.8 6.9tC, 2 stage (s)tF (s) 2.2 3.5 3.3p0 queue free % 100 100 100cM capacity (veh/h) 1028 290 727

Direction, Lane # EB 1 EB 2 WB 1 WB 2 SB 1

Volume Total 348 696 368 184 0Volume Left 0 0 0 0 0Volume Right 0 0 0 0 0cSH 1028 1700 1700 1700 1700Volume to Capacity 0.00 0.41 0.22 0.11 0.00Queue Length 95th (m) 0.0 0.0 0.0 0.0 0.0Control Delay (s) 0.0 0.0 0.0 0.0 0.0Lane LOS AApproach Delay (s) 0.0 0.0 0.0Approach LOS A

Intersection Summary

Average Delay 0.0Intersection Capacity Utilization 28.4% ICU Level of Service AAnalysis Period (min) 15

Page 62: TRAFFIC IMPACT AND PARKING STUDY 3257 …...April 17, 2018 Reference No. 2017-0675 Mr. Jeff Kenny Strategy 4 Inc. 2620 Bristol Circle, Suite 100 Oakville, ON L6H 6Z7 Attention: Mr

HCM Unsignalized Intersection Capacity Analysis 3257 Mainway TIPS3: Pioneer Road & Mainway FB2023 AM

04/08/2018 Synchro 9 ReportFB2023 AM.syn Page 3

Movement EBT EBR WBL WBT NBL NBR

Lane ConfigurationsTraffic Volume (veh/h) 844 61 60 450 29 38Future Volume (Veh/h) 844 61 60 450 29 38Sign Control Free Free StopGrade 0% 0% 0%Peak Hour Factor 0.93 0.93 0.93 0.93 0.93 0.93Hourly flow rate (vph) 908 66 65 484 31 41Pedestrians 4 2 1Lane Width (m) 3.7 3.7 3.7Walking Speed (m/s) 1.1 1.1 1.1Percent Blockage 0 0 0Right turn flare (veh)Median type None NoneMedian storage veh)Upstream signal (m) 394pX, platoon unblocked 0.90 0.90 0.90vC, conflicting volume 975 1318 490vC1, stage 1 conf volvC2, stage 2 conf volvCu, unblocked vol 755 1135 217tC, single (s) 4.5 7.4 7.9tC, 2 stage (s)tF (s) 2.4 3.8 3.8p0 queue free % 90 76 93cM capacity (veh/h) 669 127 592

Direction, Lane # EB 1 EB 2 WB 1 WB 2 NB 1

Volume Total 605 369 226 323 72Volume Left 0 0 65 0 31Volume Right 0 66 0 0 41cSH 1700 1700 669 1700 229Volume to Capacity 0.36 0.22 0.10 0.19 0.31Queue Length 95th (m) 0.0 0.0 2.4 0.0 9.8Control Delay (s) 0.0 0.0 4.0 0.0 27.7Lane LOS A DApproach Delay (s) 0.0 1.6 27.7Approach LOS D

Intersection Summary

Average Delay 1.8Intersection Capacity Utilization 54.1% ICU Level of Service AAnalysis Period (min) 15

Page 63: TRAFFIC IMPACT AND PARKING STUDY 3257 …...April 17, 2018 Reference No. 2017-0675 Mr. Jeff Kenny Strategy 4 Inc. 2620 Bristol Circle, Suite 100 Oakville, ON L6H 6Z7 Attention: Mr

HCM Unsignalized Intersection Capacity Analysis 3257 Mainway TIPS4: Mainway & Site Access 2 FB2023 AM

04/08/2018 Synchro 9 ReportFB2023 AM.syn Page 4

Movement EBL EBT WBT WBR SBL SBR

Lane ConfigurationsTraffic Volume (veh/h) 0 884 513 0 0 0Future Volume (Veh/h) 0 884 513 0 0 0Sign Control Free Free StopGrade 0% 0% 0%Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Hourly flow rate (vph) 0 961 558 0 0 0PedestriansLane Width (m)Walking Speed (m/s)Percent BlockageRight turn flare (veh)Median type None NoneMedian storage veh)Upstream signal (m)pX, platoon unblockedvC, conflicting volume 558 1038 279vC1, stage 1 conf volvC2, stage 2 conf volvCu, unblocked vol 558 1038 279tC, single (s) 4.1 6.8 6.9tC, 2 stage (s)tF (s) 2.2 3.5 3.3p0 queue free % 100 100 100cM capacity (veh/h) 1023 230 724

Direction, Lane # EB 1 EB 2 WB 1 WB 2 SB 1

Volume Total 320 641 372 186 0Volume Left 0 0 0 0 0Volume Right 0 0 0 0 0cSH 1023 1700 1700 1700 1700Volume to Capacity 0.00 0.38 0.22 0.11 0.00Queue Length 95th (m) 0.0 0.0 0.0 0.0 0.0Control Delay (s) 0.0 0.0 0.0 0.0 0.0Lane LOS AApproach Delay (s) 0.0 0.0 0.0Approach LOS A

Intersection Summary

Average Delay 0.0Intersection Capacity Utilization 27.8% ICU Level of Service AAnalysis Period (min) 15

Page 64: TRAFFIC IMPACT AND PARKING STUDY 3257 …...April 17, 2018 Reference No. 2017-0675 Mr. Jeff Kenny Strategy 4 Inc. 2620 Bristol Circle, Suite 100 Oakville, ON L6H 6Z7 Attention: Mr

HCM Unsignalized Intersection Capacity Analysis 3257 Mainway TIPS5: Mainway & Site Access 1 FB2023 AM

04/08/2018 Synchro 9 ReportFB2023 AM.syn Page 5

Movement EBL EBT WBT WBR SBL SBR

Lane ConfigurationsTraffic Volume (veh/h) 0 884 513 0 0 0Future Volume (Veh/h) 0 884 513 0 0 0Sign Control Free Free StopGrade 0% 0% 0%Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Hourly flow rate (vph) 0 961 558 0 0 0PedestriansLane Width (m)Walking Speed (m/s)Percent BlockageRight turn flare (veh)Median type None NoneMedian storage veh)Upstream signal (m)pX, platoon unblockedvC, conflicting volume 558 1038 279vC1, stage 1 conf volvC2, stage 2 conf volvCu, unblocked vol 558 1038 279tC, single (s) 4.1 6.8 6.9tC, 2 stage (s)tF (s) 2.2 3.5 3.3p0 queue free % 100 100 100cM capacity (veh/h) 1023 230 724

Direction, Lane # EB 1 EB 2 WB 1 WB 2 SB 1

Volume Total 320 641 372 186 0Volume Left 0 0 0 0 0Volume Right 0 0 0 0 0cSH 1023 1700 1700 1700 1700Volume to Capacity 0.00 0.38 0.22 0.11 0.00Queue Length 95th (m) 0.0 0.0 0.0 0.0 0.0Control Delay (s) 0.0 0.0 0.0 0.0 0.0Lane LOS AApproach Delay (s) 0.0 0.0 0.0Approach LOS A

Intersection Summary

Average Delay 0.0Intersection Capacity Utilization 27.8% ICU Level of Service AAnalysis Period (min) 15

Page 65: TRAFFIC IMPACT AND PARKING STUDY 3257 …...April 17, 2018 Reference No. 2017-0675 Mr. Jeff Kenny Strategy 4 Inc. 2620 Bristol Circle, Suite 100 Oakville, ON L6H 6Z7 Attention: Mr

HCM Signalized Intersection Capacity Analysis 3257 Mainway TIPS6: Mainway & Dillon Road FB2023 AM

04/08/2018 Synchro 9 ReportFB2023 AM.syn Page 6

Movement EBL EBT WBT WBR SBL SBR

Lane ConfigurationsTraffic Volume (vph) 51 830 437 53 219 72Future Volume (vph) 51 830 437 53 219 72Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900Total Lost time (s) 8.0 8.0 10.0 10.0Lane Util. Factor 0.95 0.95 1.00 1.00Frpb, ped/bikes 1.00 1.00 1.00 1.00Flpb, ped/bikes 1.00 1.00 1.00 1.00Frt 1.00 0.98 1.00 0.85Flt Protected 1.00 1.00 0.95 1.00Satd. Flow (prot) 3433 3306 1690 1526Flt Permitted 0.88 1.00 0.95 1.00Satd. Flow (perm) 3033 3306 1690 1526

Peak-hour factor, PHF 0.92 0.92 0.92 0.92 0.92 0.92Adj. Flow (vph) 55 902 475 58 238 78RTOR Reduction (vph) 0 0 15 0 0 53Lane Group Flow (vph) 0 957 518 0 238 25Confl. Peds. (#/hr) 4 4Heavy Vehicles (%) 6% 6% 8% 11% 8% 7%

Turn Type Perm NA NA Prot PermProtected Phases 4 8 6Permitted Phases 4 6Actuated Green, G (s) 27.4 27.4 23.2 23.2Effective Green, g (s) 25.4 25.4 20.2 20.2Actuated g/C Ratio 0.40 0.40 0.32 0.32Clearance Time (s) 6.0 6.0 7.0 7.0Vehicle Extension (s) 3.0 3.0 3.0 3.0

Lane Grp Cap (vph) 1211 1320 536 484v/s Ratio Prot 0.16 c0.14v/s Ratio Perm c0.32 0.02v/c Ratio 0.79 0.39 0.44 0.05Uniform Delay, d1 16.8 13.6 17.2 15.1Progression Factor 1.00 1.00 1.00 1.00Incremental Delay, d2 3.6 0.2 2.7 0.2Delay (s) 20.4 13.8 19.9 15.3Level of Service C B B BApproach Delay (s) 20.4 13.8 18.7Approach LOS C B B

Intersection Summary

HCM 2000 Control Delay 18.1 HCM 2000 Level of Service BHCM 2000 Volume to Capacity ratio 0.64Actuated Cycle Length (s) 63.6 Sum of lost time (s) 18.0Intersection Capacity Utilization 74.0% ICU Level of Service DAnalysis Period (min) 15c Critical Lane Group

Page 66: TRAFFIC IMPACT AND PARKING STUDY 3257 …...April 17, 2018 Reference No. 2017-0675 Mr. Jeff Kenny Strategy 4 Inc. 2620 Bristol Circle, Suite 100 Oakville, ON L6H 6Z7 Attention: Mr

HCM Signalized Intersection Capacity Analysis 3257 Mainway TIPS1: Mainway & Northside Road FB2023 PM

04/08/2018 Synchro 9 ReportFB2023 PM.syn Page 1

Movement EBL EBT WBT WBR SBL SBR

Lane ConfigurationsTraffic Volume (vph) 69 535 910 74 40 78Future Volume (vph) 69 535 910 74 40 78Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900Total Lost time (s) 7.0 7.0 6.0 6.0Lane Util. Factor 0.95 0.95 1.00 1.00Frpb, ped/bikes 1.00 1.00 1.00 0.97Flpb, ped/bikes 1.00 1.00 1.00 1.00Frt 1.00 0.99 1.00 0.85Flt Protected 0.99 1.00 0.95 1.00Satd. Flow (prot) 3340 3389 1659 1507Flt Permitted 0.72 1.00 0.95 1.00Satd. Flow (perm) 2404 3389 1659 1507

Peak-hour factor, PHF 0.94 0.94 0.94 0.94 0.94 0.94Adj. Flow (vph) 73 569 968 79 43 83RTOR Reduction (vph) 0 0 7 0 0 64Lane Group Flow (vph) 0 642 1040 0 43 19Confl. Peds. (#/hr) 3 3 2 13Heavy Vehicles (%) 6% 9% 6% 10% 10% 5%

Turn Type Perm NA NA Prot PermProtected Phases 4 8 6Permitted Phases 4 6Actuated Green, G (s) 56.0 56.0 21.0 21.0Effective Green, g (s) 56.0 56.0 21.0 21.0Actuated g/C Ratio 0.62 0.62 0.23 0.23Clearance Time (s) 7.0 7.0 6.0 6.0Vehicle Extension (s) 3.0 3.0 3.0 3.0

Lane Grp Cap (vph) 1495 2108 387 351v/s Ratio Prot c0.31 c0.03v/s Ratio Perm 0.27 0.01v/c Ratio 0.43 0.49 0.11 0.06Uniform Delay, d1 8.8 9.3 27.2 26.8Progression Factor 1.00 1.00 1.00 1.00Incremental Delay, d2 0.9 0.8 0.6 0.3Delay (s) 9.7 10.1 27.7 27.1Level of Service A B C CApproach Delay (s) 9.7 10.1 27.3Approach LOS A B C

Intersection Summary

HCM 2000 Control Delay 11.1 HCM 2000 Level of Service BHCM 2000 Volume to Capacity ratio 0.39Actuated Cycle Length (s) 90.0 Sum of lost time (s) 13.0Intersection Capacity Utilization 81.0% ICU Level of Service DAnalysis Period (min) 15c Critical Lane Group

Page 67: TRAFFIC IMPACT AND PARKING STUDY 3257 …...April 17, 2018 Reference No. 2017-0675 Mr. Jeff Kenny Strategy 4 Inc. 2620 Bristol Circle, Suite 100 Oakville, ON L6H 6Z7 Attention: Mr

HCM Unsignalized Intersection Capacity Analysis 3257 Mainway TIPS2: Mainway & Site Access 3 FB2023 PM

04/08/2018 Synchro 9 ReportFB2023 PM.syn Page 2

Movement EBL EBT WBT WBR SBL SBR

Lane ConfigurationsTraffic Volume (veh/h) 0 577 988 0 0 0Future Volume (Veh/h) 0 577 988 0 0 0Sign Control Free Free StopGrade 0% 0% 0%Peak Hour Factor 0.94 0.94 0.94 0.94 0.94 0.94Hourly flow rate (vph) 0 614 1051 0 0 0PedestriansLane Width (m)Walking Speed (m/s)Percent BlockageRight turn flare (veh)Median type None NoneMedian storage veh)Upstream signal (m) 332pX, platoon unblocked 0.99vC, conflicting volume 1051 1358 526vC1, stage 1 conf volvC2, stage 2 conf volvCu, unblocked vol 1051 1341 526tC, single (s) 4.1 6.8 6.9tC, 2 stage (s)tF (s) 2.2 3.5 3.3p0 queue free % 100 100 100cM capacity (veh/h) 670 145 502

Direction, Lane # EB 1 EB 2 WB 1 WB 2 SB 1

Volume Total 205 409 701 350 0Volume Left 0 0 0 0 0Volume Right 0 0 0 0 0cSH 670 1700 1700 1700 1700Volume to Capacity 0.00 0.24 0.41 0.21 0.00Queue Length 95th (m) 0.0 0.0 0.0 0.0 0.0Control Delay (s) 0.0 0.0 0.0 0.0 0.0Lane LOS AApproach Delay (s) 0.0 0.0 0.0Approach LOS A

Intersection Summary

Average Delay 0.0Intersection Capacity Utilization 30.6% ICU Level of Service AAnalysis Period (min) 15

Page 68: TRAFFIC IMPACT AND PARKING STUDY 3257 …...April 17, 2018 Reference No. 2017-0675 Mr. Jeff Kenny Strategy 4 Inc. 2620 Bristol Circle, Suite 100 Oakville, ON L6H 6Z7 Attention: Mr

HCM Unsignalized Intersection Capacity Analysis 3257 Mainway TIPS3: Pioneer Road & Mainway FB2023 PM

04/08/2018 Synchro 9 ReportFB2023 PM.syn Page 3

Movement EBT EBR WBL WBT NBL NBR

Lane ConfigurationsTraffic Volume (veh/h) 544 31 17 924 61 48Future Volume (Veh/h) 544 31 17 924 61 48Sign Control Free Free StopGrade 0% 0% 0%Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Hourly flow rate (vph) 591 34 18 1004 66 52Pedestrians 1 2Lane Width (m) 3.7 3.7Walking Speed (m/s) 1.1 1.1Percent Blockage 0 0Right turn flare (veh)Median type None NoneMedian storage veh)Upstream signal (m) 394pX, platoon unblockedvC, conflicting volume 627 1148 316vC1, stage 1 conf volvC2, stage 2 conf volvCu, unblocked vol 627 1148 316tC, single (s) 4.7 6.9 7.1tC, 2 stage (s)tF (s) 2.5 3.6 3.4p0 queue free % 98 63 92cM capacity (veh/h) 787 180 655

Direction, Lane # EB 1 EB 2 WB 1 WB 2 NB 1

Volume Total 394 231 353 669 118Volume Left 0 0 18 0 66Volume Right 0 34 0 0 52cSH 1700 1700 787 1700 265Volume to Capacity 0.23 0.14 0.02 0.39 0.45Queue Length 95th (m) 0.0 0.0 0.5 0.0 16.4Control Delay (s) 0.0 0.0 0.8 0.0 29.1Lane LOS A DApproach Delay (s) 0.0 0.3 29.1Approach LOS D

Intersection Summary

Average Delay 2.1Intersection Capacity Utilization 50.9% ICU Level of Service AAnalysis Period (min) 15

Page 69: TRAFFIC IMPACT AND PARKING STUDY 3257 …...April 17, 2018 Reference No. 2017-0675 Mr. Jeff Kenny Strategy 4 Inc. 2620 Bristol Circle, Suite 100 Oakville, ON L6H 6Z7 Attention: Mr

HCM Unsignalized Intersection Capacity Analysis 3257 Mainway TIPS4: Mainway & Site Access 2 FB2023 PM

04/08/2018 Synchro 9 ReportFB2023 PM.syn Page 4

Movement EBL EBT WBT WBR SBL SBR

Lane ConfigurationsTraffic Volume (veh/h) 0 595 942 0 0 0Future Volume (Veh/h) 0 595 942 0 0 0Sign Control Free Free StopGrade 0% 0% 0%Peak Hour Factor 0.93 0.93 0.93 0.93 0.93 0.93Hourly flow rate (vph) 0 640 1013 0 0 0PedestriansLane Width (m)Walking Speed (m/s)Percent BlockageRight turn flare (veh)Median type None NoneMedian storage veh)Upstream signal (m)pX, platoon unblockedvC, conflicting volume 1013 1333 506vC1, stage 1 conf volvC2, stage 2 conf volvCu, unblocked vol 1013 1333 506tC, single (s) 4.1 6.8 6.9tC, 2 stage (s)tF (s) 2.2 3.5 3.3p0 queue free % 100 100 100cM capacity (veh/h) 692 148 517

Direction, Lane # EB 1 EB 2 WB 1 WB 2 SB 1

Volume Total 213 427 675 338 0Volume Left 0 0 0 0 0Volume Right 0 0 0 0 0cSH 692 1700 1700 1700 1700Volume to Capacity 0.00 0.25 0.40 0.20 0.00Queue Length 95th (m) 0.0 0.0 0.0 0.0 0.0Control Delay (s) 0.0 0.0 0.0 0.0 0.0Lane LOS AApproach Delay (s) 0.0 0.0 0.0Approach LOS A

Intersection Summary

Average Delay 0.0Intersection Capacity Utilization 29.4% ICU Level of Service AAnalysis Period (min) 15

Page 70: TRAFFIC IMPACT AND PARKING STUDY 3257 …...April 17, 2018 Reference No. 2017-0675 Mr. Jeff Kenny Strategy 4 Inc. 2620 Bristol Circle, Suite 100 Oakville, ON L6H 6Z7 Attention: Mr

HCM Unsignalized Intersection Capacity Analysis 3257 Mainway TIPS5: Mainway & Site Access 1 FB2023 PM

04/08/2018 Synchro 9 ReportFB2023 PM.syn Page 5

Movement EBL EBT WBT WBR SBL SBR

Lane ConfigurationsTraffic Volume (veh/h) 0 595 942 0 0 0Future Volume (Veh/h) 0 595 942 0 0 0Sign Control Free Free StopGrade 0% 0% 0%Peak Hour Factor 0.93 0.93 0.93 0.93 0.93 0.93Hourly flow rate (vph) 0 640 1013 0 0 0PedestriansLane Width (m)Walking Speed (m/s)Percent BlockageRight turn flare (veh)Median type None NoneMedian storage veh)Upstream signal (m)pX, platoon unblockedvC, conflicting volume 1013 1333 506vC1, stage 1 conf volvC2, stage 2 conf volvCu, unblocked vol 1013 1333 506tC, single (s) 4.1 6.8 6.9tC, 2 stage (s)tF (s) 2.2 3.5 3.3p0 queue free % 100 100 100cM capacity (veh/h) 692 148 517

Direction, Lane # EB 1 EB 2 WB 1 WB 2 SB 1

Volume Total 213 427 675 338 0Volume Left 0 0 0 0 0Volume Right 0 0 0 0 0cSH 692 1700 1700 1700 1700Volume to Capacity 0.00 0.25 0.40 0.20 0.00Queue Length 95th (m) 0.0 0.0 0.0 0.0 0.0Control Delay (s) 0.0 0.0 0.0 0.0 0.0Lane LOS AApproach Delay (s) 0.0 0.0 0.0Approach LOS A

Intersection Summary

Average Delay 0.0Intersection Capacity Utilization 29.4% ICU Level of Service AAnalysis Period (min) 15

Page 71: TRAFFIC IMPACT AND PARKING STUDY 3257 …...April 17, 2018 Reference No. 2017-0675 Mr. Jeff Kenny Strategy 4 Inc. 2620 Bristol Circle, Suite 100 Oakville, ON L6H 6Z7 Attention: Mr

HCM Signalized Intersection Capacity Analysis 3257 Mainway TIPS6: Mainway & Dillon Road FB2023 PM

04/08/2018 Synchro 9 ReportFB2023 PM.syn Page 6

Movement EBL EBT WBT WBR SBL SBR

Lane ConfigurationsTraffic Volume (vph) 29 564 927 172 16 14Future Volume (vph) 29 564 927 172 16 14Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900Total Lost time (s) 8.0 8.0 10.0 10.0Lane Util. Factor 0.95 0.95 1.00 1.00Frpb, ped/bikes 1.00 1.00 1.00 1.00Flpb, ped/bikes 1.00 1.00 1.00 1.00Frt 1.00 0.98 1.00 0.85Flt Protected 1.00 1.00 0.95 1.00Satd. Flow (prot) 3235 3332 1825 1633Flt Permitted 0.82 1.00 0.95 1.00Satd. Flow (perm) 2645 3332 1825 1633

Peak-hour factor, PHF 0.93 0.93 0.93 0.93 0.93 0.93Adj. Flow (vph) 31 606 997 185 17 15RTOR Reduction (vph) 0 0 22 0 0 11Lane Group Flow (vph) 0 637 1160 0 17 4Confl. Peds. (#/hr) 1 1Heavy Vehicles (%) 4% 13% 6% 10% 0% 0%

Turn Type Perm NA NA Prot PermProtected Phases 4 8 6Permitted Phases 4 6Actuated Green, G (s) 32.5 32.5 23.3 23.3Effective Green, g (s) 30.5 30.5 20.3 20.3Actuated g/C Ratio 0.44 0.44 0.30 0.30Clearance Time (s) 6.0 6.0 7.0 7.0Vehicle Extension (s) 3.0 3.0 3.0 3.0

Lane Grp Cap (vph) 1172 1477 538 481v/s Ratio Prot c0.35 c0.01v/s Ratio Perm 0.24 0.00v/c Ratio 0.54 0.79 0.03 0.01Uniform Delay, d1 14.0 16.4 17.3 17.1Progression Factor 1.00 1.00 1.00 1.00Incremental Delay, d2 0.5 2.8 0.1 0.0Delay (s) 14.6 19.2 17.4 17.2Level of Service B B B BApproach Delay (s) 14.6 19.2 17.3Approach LOS B B B

Intersection Summary

HCM 2000 Control Delay 17.6 HCM 2000 Level of Service BHCM 2000 Volume to Capacity ratio 0.48Actuated Cycle Length (s) 68.8 Sum of lost time (s) 18.0Intersection Capacity Utilization 58.8% ICU Level of Service BAnalysis Period (min) 15c Critical Lane Group

Page 72: TRAFFIC IMPACT AND PARKING STUDY 3257 …...April 17, 2018 Reference No. 2017-0675 Mr. Jeff Kenny Strategy 4 Inc. 2620 Bristol Circle, Suite 100 Oakville, ON L6H 6Z7 Attention: Mr

APPENDIX D

Intersection Capacity Analysis Reports Future (2023) Total Traffic Conditions

Page 73: TRAFFIC IMPACT AND PARKING STUDY 3257 …...April 17, 2018 Reference No. 2017-0675 Mr. Jeff Kenny Strategy 4 Inc. 2620 Bristol Circle, Suite 100 Oakville, ON L6H 6Z7 Attention: Mr

HCM Signalized Intersection Capacity Analysis 3257 Mainway TIPS1: Mainway & Northside Road FT2023AM

04/16/2018 Synchro 9 ReportFT2023 AM.syn Page 1

Movement EBL EBT WBT WBR SBL SBR

Lane ConfigurationsTraffic Volume (vph) 39 846 455 32 74 83Future Volume (vph) 39 846 455 32 74 83Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900Total Lost time (s) 7.0 7.0 6.0 6.0Lane Util. Factor 0.95 0.95 1.00 1.00Frpb, ped/bikes 1.00 1.00 1.00 1.00Flpb, ped/bikes 1.00 1.00 1.00 1.00Frt 1.00 0.99 1.00 0.85Flt Protected 1.00 1.00 0.95 1.00Satd. Flow (prot) 3503 3398 1722 1526Flt Permitted 0.90 1.00 0.95 1.00Satd. Flow (perm) 3161 3398 1722 1526

Peak-hour factor, PHF 0.87 0.87 0.87 0.87 0.87 0.87Adj. Flow (vph) 45 972 523 37 85 95RTOR Reduction (vph) 0 0 6 0 0 73Lane Group Flow (vph) 0 1017 554 0 85 22Confl. Peds. (#/hr) 2 2Heavy Vehicles (%) 3% 4% 6% 9% 6% 7%

Turn Type Perm NA NA Prot PermProtected Phases 4 8 6Permitted Phases 4 6Actuated Green, G (s) 56.0 56.0 21.0 21.0Effective Green, g (s) 56.0 56.0 21.0 21.0Actuated g/C Ratio 0.62 0.62 0.23 0.23Clearance Time (s) 7.0 7.0 6.0 6.0Vehicle Extension (s) 3.0 3.0 3.0 3.0

Lane Grp Cap (vph) 1966 2114 401 356v/s Ratio Prot 0.16 c0.05v/s Ratio Perm c0.32 0.01v/c Ratio 0.52 0.26 0.21 0.06Uniform Delay, d1 9.5 7.7 27.8 26.8Progression Factor 1.00 1.00 1.00 1.00Incremental Delay, d2 1.0 0.3 1.2 0.3Delay (s) 10.4 8.0 29.0 27.2Level of Service B A C CApproach Delay (s) 10.4 8.0 28.1Approach LOS B A C

Intersection Summary

HCM 2000 Control Delay 11.5 HCM 2000 Level of Service BHCM 2000 Volume to Capacity ratio 0.43Actuated Cycle Length (s) 90.0 Sum of lost time (s) 13.0Intersection Capacity Utilization 69.6% ICU Level of Service CAnalysis Period (min) 15c Critical Lane Group

Page 74: TRAFFIC IMPACT AND PARKING STUDY 3257 …...April 17, 2018 Reference No. 2017-0675 Mr. Jeff Kenny Strategy 4 Inc. 2620 Bristol Circle, Suite 100 Oakville, ON L6H 6Z7 Attention: Mr

HCM Unsignalized Intersection Capacity Analysis 3257 Mainway TIPS2: Mainway & Site Access 3 FT2023AM

04/16/2018 Synchro 9 ReportFT2023 AM.syn Page 2

Movement EBL EBT WBT WBR SBL SBR

Lane ConfigurationsTraffic Volume (veh/h) 8 911 482 12 10 6Future Volume (Veh/h) 8 911 482 12 10 6Sign Control Free Free StopGrade 0% 0% 0%Peak Hour Factor 0.87 0.87 0.87 0.87 0.87 0.87Hourly flow rate (vph) 9 1047 554 14 11 7PedestriansLane Width (m)Walking Speed (m/s)Percent BlockageRight turn flare (veh)Median type None NoneMedian storage veh)Upstream signal (m) 332pX, platoon unblocked 0.87vC, conflicting volume 568 1102 284vC1, stage 1 conf volvC2, stage 2 conf volvCu, unblocked vol 568 807 284tC, single (s) 4.4 7.2 7.2tC, 2 stage (s)tF (s) 2.3 3.7 3.5p0 queue free % 99 95 99cM capacity (veh/h) 928 244 670

Direction, Lane # EB 1 EB 2 WB 1 WB 2 SB 1

Volume Total 358 698 369 199 18Volume Left 9 0 0 0 11Volume Right 0 0 0 14 7cSH 928 1700 1700 1700 324Volume to Capacity 0.01 0.41 0.22 0.12 0.06Queue Length 95th (m) 0.2 0.0 0.0 0.0 1.3Control Delay (s) 0.3 0.0 0.0 0.0 16.8Lane LOS A CApproach Delay (s) 0.1 0.0 16.8Approach LOS C

Intersection Summary

Average Delay 0.3Intersection Capacity Utilization 40.8% ICU Level of Service AAnalysis Period (min) 15

Page 75: TRAFFIC IMPACT AND PARKING STUDY 3257 …...April 17, 2018 Reference No. 2017-0675 Mr. Jeff Kenny Strategy 4 Inc. 2620 Bristol Circle, Suite 100 Oakville, ON L6H 6Z7 Attention: Mr

HCM Unsignalized Intersection Capacity Analysis 3257 Mainway TIPS3: Pioneer Road & Mainway FT2023AM

04/16/2018 Synchro 9 ReportFT2023 AM.syn Page 3

Movement EBT EBR WBL WBT NBL NBR

Lane ConfigurationsTraffic Volume (veh/h) 856 62 60 464 29 38Future Volume (Veh/h) 856 62 60 464 29 38Sign Control Free Free StopGrade 0% 0% 0%Peak Hour Factor 0.93 0.93 0.93 0.93 0.93 0.93Hourly flow rate (vph) 920 67 65 499 31 41Pedestrians 4 2 1Lane Width (m) 3.7 3.7 3.7Walking Speed (m/s) 1.1 1.1 1.1Percent Blockage 0 0 0Right turn flare (veh)Median type None NoneMedian storage veh)Upstream signal (m) 394pX, platoon unblocked 0.90 0.90 0.90vC, conflicting volume 988 1338 496vC1, stage 1 conf volvC2, stage 2 conf volvCu, unblocked vol 764 1153 218tC, single (s) 4.5 7.4 7.9tC, 2 stage (s)tF (s) 2.4 3.8 3.8p0 queue free % 90 75 93cM capacity (veh/h) 662 123 590

Direction, Lane # EB 1 EB 2 WB 1 WB 2 NB 1

Volume Total 613 374 231 333 72Volume Left 0 0 65 0 31Volume Right 0 67 0 0 41cSH 1700 1700 662 1700 223Volume to Capacity 0.36 0.22 0.10 0.20 0.32Queue Length 95th (m) 0.0 0.0 2.5 0.0 10.1Control Delay (s) 0.0 0.0 4.0 0.0 28.6Lane LOS A DApproach Delay (s) 0.0 1.6 28.6Approach LOS D

Intersection Summary

Average Delay 1.8Intersection Capacity Utilization 54.9% ICU Level of Service AAnalysis Period (min) 15

Page 76: TRAFFIC IMPACT AND PARKING STUDY 3257 …...April 17, 2018 Reference No. 2017-0675 Mr. Jeff Kenny Strategy 4 Inc. 2620 Bristol Circle, Suite 100 Oakville, ON L6H 6Z7 Attention: Mr

HCM Unsignalized Intersection Capacity Analysis 3257 Mainway TIPS4: Mainway & Site Access 2 FT2023AM

04/16/2018 Synchro 9 ReportFT2023 AM.syn Page 4

Movement EBL EBT WBT WBR SBL SBR

Lane ConfigurationsTraffic Volume (veh/h) 2 894 526 3 1 1Future Volume (Veh/h) 2 894 526 3 1 1Sign Control Free Free StopGrade 0% 0% 0%Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Hourly flow rate (vph) 2 972 572 3 1 1PedestriansLane Width (m)Walking Speed (m/s)Percent BlockageRight turn flare (veh)Median type None NoneMedian storage veh)Upstream signal (m)pX, platoon unblockedvC, conflicting volume 575 1064 288vC1, stage 1 conf volvC2, stage 2 conf volvCu, unblocked vol 575 1064 288tC, single (s) 4.1 6.8 6.9tC, 2 stage (s)tF (s) 2.2 3.5 3.3p0 queue free % 100 100 100cM capacity (veh/h) 1008 221 715

Direction, Lane # EB 1 EB 2 WB 1 WB 2 SB 1

Volume Total 326 648 381 194 2Volume Left 2 0 0 0 1Volume Right 0 0 0 3 1cSH 1008 1700 1700 1700 338Volume to Capacity 0.00 0.38 0.22 0.11 0.01Queue Length 95th (m) 0.0 0.0 0.0 0.0 0.1Control Delay (s) 0.1 0.0 0.0 0.0 15.7Lane LOS A CApproach Delay (s) 0.0 0.0 15.7Approach LOS C

Intersection Summary

Average Delay 0.0Intersection Capacity Utilization 36.1% ICU Level of Service AAnalysis Period (min) 15

Page 77: TRAFFIC IMPACT AND PARKING STUDY 3257 …...April 17, 2018 Reference No. 2017-0675 Mr. Jeff Kenny Strategy 4 Inc. 2620 Bristol Circle, Suite 100 Oakville, ON L6H 6Z7 Attention: Mr

HCM Unsignalized Intersection Capacity Analysis 3257 Mainway TIPS5: Mainway & Site Access 1 FT2023AM

04/16/2018 Synchro 9 ReportFT2023 AM.syn Page 5

Movement EBL EBT WBT WBR SBL SBR

Lane ConfigurationsTraffic Volume (veh/h) 1 894 528 2 1 1Future Volume (Veh/h) 1 894 528 2 1 1Sign Control Free Free StopGrade 0% 0% 0%Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Hourly flow rate (vph) 1 972 574 2 1 1PedestriansLane Width (m)Walking Speed (m/s)Percent BlockageRight turn flare (veh)Median type None NoneMedian storage veh)Upstream signal (m)pX, platoon unblockedvC, conflicting volume 576 1063 288vC1, stage 1 conf volvC2, stage 2 conf volvCu, unblocked vol 576 1063 288tC, single (s) 4.1 6.8 6.9tC, 2 stage (s)tF (s) 2.2 3.5 3.3p0 queue free % 100 100 100cM capacity (veh/h) 1007 221 715

Direction, Lane # EB 1 EB 2 WB 1 WB 2 SB 1

Volume Total 325 648 383 193 2Volume Left 1 0 0 0 1Volume Right 0 0 0 2 1cSH 1007 1700 1700 1700 338Volume to Capacity 0.00 0.38 0.23 0.11 0.01Queue Length 95th (m) 0.0 0.0 0.0 0.0 0.1Control Delay (s) 0.0 0.0 0.0 0.0 15.7Lane LOS A CApproach Delay (s) 0.0 0.0 15.7Approach LOS C

Intersection Summary

Average Delay 0.0Intersection Capacity Utilization 35.4% ICU Level of Service AAnalysis Period (min) 15

Page 78: TRAFFIC IMPACT AND PARKING STUDY 3257 …...April 17, 2018 Reference No. 2017-0675 Mr. Jeff Kenny Strategy 4 Inc. 2620 Bristol Circle, Suite 100 Oakville, ON L6H 6Z7 Attention: Mr

HCM Signalized Intersection Capacity Analysis 3257 Mainway TIPS6: Mainway & Dillon Road FT2023AM

04/16/2018 Synchro 9 ReportFT2023 AM.syn Page 6

Movement EBL EBT WBT WBR SBL SBR

Lane ConfigurationsTraffic Volume (vph) 52 840 458 53 219 74Future Volume (vph) 52 840 458 53 219 74Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900Total Lost time (s) 8.0 8.0 10.0 10.0Lane Util. Factor 0.95 0.95 1.00 1.00Frpb, ped/bikes 1.00 1.00 1.00 1.00Flpb, ped/bikes 1.00 1.00 1.00 1.00Frt 1.00 0.98 1.00 0.85Flt Protected 1.00 1.00 0.95 1.00Satd. Flow (prot) 3464 3309 1690 1526Flt Permitted 0.88 1.00 0.95 1.00Satd. Flow (perm) 3040 3309 1690 1526

Peak-hour factor, PHF 0.92 0.92 0.92 0.92 0.92 0.92Adj. Flow (vph) 57 913 498 58 238 80RTOR Reduction (vph) 0 0 14 0 0 55Lane Group Flow (vph) 0 970 542 0 238 25Confl. Peds. (#/hr) 4 4Heavy Vehicles (%) 6% 5% 8% 11% 8% 7%

Turn Type Perm NA NA Prot PermProtected Phases 4 8 6Permitted Phases 4 6Actuated Green, G (s) 27.7 27.7 23.2 23.2Effective Green, g (s) 25.7 25.7 20.2 20.2Actuated g/C Ratio 0.40 0.40 0.32 0.32Clearance Time (s) 6.0 6.0 7.0 7.0Vehicle Extension (s) 3.0 3.0 3.0 3.0

Lane Grp Cap (vph) 1222 1330 534 482v/s Ratio Prot 0.16 c0.14v/s Ratio Perm c0.32 0.02v/c Ratio 0.79 0.41 0.45 0.05Uniform Delay, d1 16.8 13.7 17.4 15.2Progression Factor 1.00 1.00 1.00 1.00Incremental Delay, d2 3.6 0.2 2.7 0.2Delay (s) 20.4 13.9 20.1 15.4Level of Service C B C BApproach Delay (s) 20.4 13.9 18.9Approach LOS C B B

Intersection Summary

HCM 2000 Control Delay 18.2 HCM 2000 Level of Service BHCM 2000 Volume to Capacity ratio 0.64Actuated Cycle Length (s) 63.9 Sum of lost time (s) 18.0Intersection Capacity Utilization 74.8% ICU Level of Service DAnalysis Period (min) 15c Critical Lane Group

Page 79: TRAFFIC IMPACT AND PARKING STUDY 3257 …...April 17, 2018 Reference No. 2017-0675 Mr. Jeff Kenny Strategy 4 Inc. 2620 Bristol Circle, Suite 100 Oakville, ON L6H 6Z7 Attention: Mr

HCM Signalized Intersection Capacity Analysis 3257 Mainway TIPS1: Mainway & Northside Road FT2023 PM

04/16/2018 Synchro 9 ReportFT2023 PM.syn Page 1

Movement EBL EBT WBT WBR SBL SBR

Lane ConfigurationsTraffic Volume (vph) 69 542 917 76 42 78Future Volume (vph) 69 542 917 76 42 78Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900Total Lost time (s) 7.0 7.0 6.0 6.0Lane Util. Factor 0.95 0.95 1.00 1.00Frpb, ped/bikes 1.00 1.00 1.00 1.00Flpb, ped/bikes 1.00 1.00 1.00 1.00Frt 1.00 0.99 1.00 0.85Flt Protected 0.99 1.00 0.95 1.00Satd. Flow (prot) 3340 3421 1659 1555Flt Permitted 0.68 1.00 0.95 1.00Satd. Flow (perm) 2277 3421 1659 1555

Peak-hour factor, PHF 0.87 0.87 0.87 0.87 0.87 0.87Adj. Flow (vph) 79 623 1054 87 48 90RTOR Reduction (vph) 0 0 7 0 0 69Lane Group Flow (vph) 0 702 1134 0 48 21Confl. Peds. (#/hr) 2 2Heavy Vehicles (%) 6% 9% 5% 9% 10% 5%

Turn Type Perm NA NA Prot PermProtected Phases 4 8 6Permitted Phases 4 6Actuated Green, G (s) 56.0 56.0 21.0 21.0Effective Green, g (s) 56.0 56.0 21.0 21.0Actuated g/C Ratio 0.62 0.62 0.23 0.23Clearance Time (s) 7.0 7.0 6.0 6.0Vehicle Extension (s) 3.0 3.0 3.0 3.0

Lane Grp Cap (vph) 1416 2128 387 362v/s Ratio Prot c0.33 c0.03v/s Ratio Perm 0.31 0.01v/c Ratio 0.50 0.53 0.12 0.06Uniform Delay, d1 9.3 9.6 27.2 26.8Progression Factor 1.00 1.00 1.00 1.00Incremental Delay, d2 1.2 1.0 0.7 0.3Delay (s) 10.5 10.6 27.9 27.1Level of Service B B C CApproach Delay (s) 10.5 10.6 27.4Approach LOS B B C

Intersection Summary

HCM 2000 Control Delay 11.7 HCM 2000 Level of Service BHCM 2000 Volume to Capacity ratio 0.42Actuated Cycle Length (s) 90.0 Sum of lost time (s) 13.0Intersection Capacity Utilization 72.8% ICU Level of Service CAnalysis Period (min) 15c Critical Lane Group

Page 80: TRAFFIC IMPACT AND PARKING STUDY 3257 …...April 17, 2018 Reference No. 2017-0675 Mr. Jeff Kenny Strategy 4 Inc. 2620 Bristol Circle, Suite 100 Oakville, ON L6H 6Z7 Attention: Mr

HCM Unsignalized Intersection Capacity Analysis 3257 Mainway TIPS2: Mainway & Site Access 3 FT2023 PM

04/16/2018 Synchro 9 ReportFT2023 PM.syn Page 2

Movement EBL EBT WBT WBR SBL SBR

Lane ConfigurationsTraffic Volume (veh/h) 6 581 991 9 15 6Future Volume (Veh/h) 6 581 991 9 15 6Sign Control Free Free StopGrade 0% 0% 0%Peak Hour Factor 0.87 0.87 0.87 0.87 0.87 0.87Hourly flow rate (vph) 7 668 1139 10 17 7PedestriansLane Width (m)Walking Speed (m/s)Percent BlockageRight turn flare (veh)Median type None NoneMedian storage veh)Upstream signal (m) 332pX, platoon unblocked 0.97vC, conflicting volume 1149 1492 574vC1, stage 1 conf volvC2, stage 2 conf volvCu, unblocked vol 1149 1450 574tC, single (s) 4.4 7.1 7.2tC, 2 stage (s)tF (s) 2.4 3.6 3.5p0 queue free % 99 84 98cM capacity (veh/h) 525 105 426

Direction, Lane # EB 1 EB 2 WB 1 WB 2 SB 1

Volume Total 230 445 759 390 24Volume Left 7 0 0 0 17Volume Right 0 0 0 10 7cSH 525 1700 1700 1700 135Volume to Capacity 0.01 0.26 0.45 0.23 0.18Queue Length 95th (m) 0.3 0.0 0.0 0.0 4.7Control Delay (s) 0.5 0.0 0.0 0.0 37.3Lane LOS A EApproach Delay (s) 0.2 0.0 37.3Approach LOS E

Intersection Summary

Average Delay 0.6Intersection Capacity Utilization 37.7% ICU Level of Service AAnalysis Period (min) 15

Page 81: TRAFFIC IMPACT AND PARKING STUDY 3257 …...April 17, 2018 Reference No. 2017-0675 Mr. Jeff Kenny Strategy 4 Inc. 2620 Bristol Circle, Suite 100 Oakville, ON L6H 6Z7 Attention: Mr

HCM Unsignalized Intersection Capacity Analysis 3257 Mainway TIPS3: Pioneer Road & Mainway FT2023 PM

04/16/2018 Synchro 9 ReportFT2023 PM.syn Page 3

Movement EBT EBR WBL WBT NBL NBR

Lane ConfigurationsTraffic Volume (veh/h) 561 33 17 936 61 48Future Volume (Veh/h) 561 33 17 936 61 48Sign Control Free Free StopGrade 0% 0% 0%Peak Hour Factor 0.93 0.93 0.93 0.93 0.93 0.93Hourly flow rate (vph) 603 35 18 1006 66 52Pedestrians 4 2 1Lane Width (m) 3.7 3.7 3.7Walking Speed (m/s) 1.1 1.1 1.1Percent Blockage 0 0 0Right turn flare (veh)Median type None NoneMedian storage veh)Upstream signal (m) 394pX, platoon unblockedvC, conflicting volume 639 1164 322vC1, stage 1 conf volvC2, stage 2 conf volvCu, unblocked vol 639 1164 322tC, single (s) 4.7 6.9 7.1tC, 2 stage (s)tF (s) 2.5 3.6 3.4p0 queue free % 98 62 92cM capacity (veh/h) 779 175 649

Direction, Lane # EB 1 EB 2 WB 1 WB 2 NB 1

Volume Total 402 236 353 671 118Volume Left 0 0 18 0 66Volume Right 0 35 0 0 52cSH 1700 1700 779 1700 258Volume to Capacity 0.24 0.14 0.02 0.39 0.46Queue Length 95th (m) 0.0 0.0 0.5 0.0 17.0Control Delay (s) 0.0 0.0 0.8 0.0 30.2Lane LOS A DApproach Delay (s) 0.0 0.3 30.2Approach LOS D

Intersection Summary

Average Delay 2.2Intersection Capacity Utilization 51.5% ICU Level of Service AAnalysis Period (min) 15

Page 82: TRAFFIC IMPACT AND PARKING STUDY 3257 …...April 17, 2018 Reference No. 2017-0675 Mr. Jeff Kenny Strategy 4 Inc. 2620 Bristol Circle, Suite 100 Oakville, ON L6H 6Z7 Attention: Mr

HCM Unsignalized Intersection Capacity Analysis 3257 Mainway TIPS4: Mainway & Site Access 2 FT2023 PM

04/16/2018 Synchro 9 ReportFT2023 PM.syn Page 4

Movement EBL EBT WBT WBR SBL SBR

Lane ConfigurationsTraffic Volume (veh/h) 2 610 952 1 2 2Future Volume (Veh/h) 2 610 952 1 2 2Sign Control Free Free StopGrade 0% 0% 0%Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Hourly flow rate (vph) 2 663 1035 1 2 2PedestriansLane Width (m)Walking Speed (m/s)Percent BlockageRight turn flare (veh)Median type None NoneMedian storage veh)Upstream signal (m)pX, platoon unblockedvC, conflicting volume 1036 1371 518vC1, stage 1 conf volvC2, stage 2 conf volvCu, unblocked vol 1036 1371 518tC, single (s) 4.1 6.8 6.9tC, 2 stage (s)tF (s) 2.2 3.5 3.3p0 queue free % 100 99 100cM capacity (veh/h) 679 139 508

Direction, Lane # EB 1 EB 2 WB 1 WB 2 SB 1

Volume Total 223 442 690 346 4Volume Left 2 0 0 0 2Volume Right 0 0 0 1 2cSH 679 1700 1700 1700 219Volume to Capacity 0.00 0.26 0.41 0.20 0.02Queue Length 95th (m) 0.1 0.0 0.0 0.0 0.4Control Delay (s) 0.1 0.0 0.0 0.0 21.8Lane LOS A CApproach Delay (s) 0.0 0.0 21.8Approach LOS C

Intersection Summary

Average Delay 0.1Intersection Capacity Utilization 36.3% ICU Level of Service AAnalysis Period (min) 15

Page 83: TRAFFIC IMPACT AND PARKING STUDY 3257 …...April 17, 2018 Reference No. 2017-0675 Mr. Jeff Kenny Strategy 4 Inc. 2620 Bristol Circle, Suite 100 Oakville, ON L6H 6Z7 Attention: Mr

HCM Unsignalized Intersection Capacity Analysis 3257 Mainway TIPS5: Mainway & Site Access 1 FT2023 PM

04/16/2018 Synchro 9 ReportFT2023 PM.syn Page 5

Movement EBL EBT WBT WBR SBL SBR

Lane ConfigurationsTraffic Volume (veh/h) 2 610 952 1 2 1Future Volume (Veh/h) 2 610 952 1 2 1Sign Control Free Free StopGrade 0% 0% 0%Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Hourly flow rate (vph) 2 663 1035 1 2 1PedestriansLane Width (m)Walking Speed (m/s)Percent BlockageRight turn flare (veh)Median type None NoneMedian storage veh)Upstream signal (m)pX, platoon unblockedvC, conflicting volume 1036 1371 518vC1, stage 1 conf volvC2, stage 2 conf volvCu, unblocked vol 1036 1371 518tC, single (s) 4.1 6.8 6.9tC, 2 stage (s)tF (s) 2.2 3.5 3.3p0 queue free % 100 99 100cM capacity (veh/h) 679 139 508

Direction, Lane # EB 1 EB 2 WB 1 WB 2 SB 1

Volume Total 223 442 690 346 3Volume Left 2 0 0 0 2Volume Right 0 0 0 1 1cSH 679 1700 1700 1700 184Volume to Capacity 0.00 0.26 0.41 0.20 0.02Queue Length 95th (m) 0.1 0.0 0.0 0.0 0.4Control Delay (s) 0.1 0.0 0.0 0.0 24.9Lane LOS A CApproach Delay (s) 0.0 0.0 24.9Approach LOS C

Intersection Summary

Average Delay 0.1Intersection Capacity Utilization 36.3% ICU Level of Service AAnalysis Period (min) 15

Page 84: TRAFFIC IMPACT AND PARKING STUDY 3257 …...April 17, 2018 Reference No. 2017-0675 Mr. Jeff Kenny Strategy 4 Inc. 2620 Bristol Circle, Suite 100 Oakville, ON L6H 6Z7 Attention: Mr

HCM Signalized Intersection Capacity Analysis 3257 Mainway TIPS6: Mainway & Dillon Road FT2023 PM

04/16/2018 Synchro 9 ReportFT2023 PM.syn Page 6

Movement EBL EBT WBT WBR SBL SBR

Lane ConfigurationsTraffic Volume (vph) 31 579 937 172 16 15Future Volume (vph) 31 579 937 172 16 15Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900Total Lost time (s) 8.0 8.0 10.0 10.0Lane Util. Factor 0.95 0.95 1.00 1.00Frpb, ped/bikes 1.00 1.00 1.00 1.00Flpb, ped/bikes 1.00 1.00 1.00 1.00Frt 1.00 0.98 1.00 0.85Flt Protected 1.00 1.00 0.95 1.00Satd. Flow (prot) 3237 3336 1825 1633Flt Permitted 0.80 1.00 0.95 1.00Satd. Flow (perm) 2583 3336 1825 1633

Peak-hour factor, PHF 0.92 0.92 0.92 0.92 0.92 0.92Adj. Flow (vph) 34 629 1018 187 17 16RTOR Reduction (vph) 0 0 22 0 0 11Lane Group Flow (vph) 0 663 1183 0 17 5Confl. Peds. (#/hr) 4 4Heavy Vehicles (%) 3% 13% 6% 9% 0% 0%

Turn Type Perm NA NA Prot PermProtected Phases 4 8 6Permitted Phases 4 6Actuated Green, G (s) 33.5 33.5 23.3 23.3Effective Green, g (s) 31.5 31.5 20.3 20.3Actuated g/C Ratio 0.45 0.45 0.29 0.29Clearance Time (s) 6.0 6.0 7.0 7.0Vehicle Extension (s) 3.0 3.0 3.0 3.0

Lane Grp Cap (vph) 1165 1505 530 474v/s Ratio Prot c0.35 c0.01v/s Ratio Perm 0.26 0.00v/c Ratio 0.57 0.79 0.03 0.01Uniform Delay, d1 14.1 16.3 17.7 17.6Progression Factor 1.00 1.00 1.00 1.00Incremental Delay, d2 0.6 2.8 0.1 0.0Delay (s) 14.8 19.1 17.8 17.6Level of Service B B B BApproach Delay (s) 14.8 19.1 17.7Approach LOS B B B

Intersection Summary

HCM 2000 Control Delay 17.6 HCM 2000 Level of Service BHCM 2000 Volume to Capacity ratio 0.49Actuated Cycle Length (s) 69.8 Sum of lost time (s) 18.0Intersection Capacity Utilization 60.7% ICU Level of Service BAnalysis Period (min) 15c Critical Lane Group

Page 85: TRAFFIC IMPACT AND PARKING STUDY 3257 …...April 17, 2018 Reference No. 2017-0675 Mr. Jeff Kenny Strategy 4 Inc. 2620 Bristol Circle, Suite 100 Oakville, ON L6H 6Z7 Attention: Mr

APPENDIX E

Parking Demand Surveys

Page 86: TRAFFIC IMPACT AND PARKING STUDY 3257 …...April 17, 2018 Reference No. 2017-0675 Mr. Jeff Kenny Strategy 4 Inc. 2620 Bristol Circle, Suite 100 Oakville, ON L6H 6Z7 Attention: Mr

Parking Utilization Survey

Location: Burlington

Date: 10-Sep-16

PARKING DEMAND DATA

4 marked parking spaces at main entrance but can fit about 10 cars in front; there

are no marked spaces around storage rooms/garages at the back - can have

around 45 cars be parked along the fence at the storage area on unmarked spaces.

regular U-Haul Illegal regular U-Haul Illegal

8:00 - 8:30 5 1 16 12 6 trailers

8:30 - 9:00 5 1 14 10 6 trailers

9:00 - 9:30 2 1 17 9 6 trailers

9:30 - 10:00 4 1 17 8 5 trailers

10:00 - 10:30 2 0 19 8 5 trailers

10:30 - 11:00 1 0 19 7 4 trailers

11:00 - 11:30 2 0 18 7 4 trailers

11:30 - 12:00 2 0 20 6 5 trailers

12:00 - 12:30 1 0 21 7 5 trailers

12:30 - 13:00 2 0 21 8 5 trailers

13:00 - 13:30 4 0 22 8 5 trailers

13:30 - 14:00 3 0 18 8 5 trailers

14:00 - 14:30 3 0 20 7 5 trailers

14:30 - 15:00 4 0 20 6 6 trailers

15:00 - 15:30 3 0 21 6 6 trailers

15:30 - 16:001 0 21 7 7 trailers

Saturday

Main Parking

4

Note

SUPPLY

Day Time

45

Rear Parking

Page 87: TRAFFIC IMPACT AND PARKING STUDY 3257 …...April 17, 2018 Reference No. 2017-0675 Mr. Jeff Kenny Strategy 4 Inc. 2620 Bristol Circle, Suite 100 Oakville, ON L6H 6Z7 Attention: Mr

Parking Utilization Survey

Location: 478 Woody Rd. Oakville

Date: Sept.10,2016

PARKING DEMAND DATA

regular handicap Illegal

U-haul

trucks

Cargo

trailers cars Rear parking approximately 150 parking spaces

8:00 - 8:306 3 18 17 0 Designated parking (8) only at the front

8:30 - 9:008 4 15 17 0

9:00 - 9:307 5 13 16 2

9:30 - 10:006 2 13 17 3

10:00 - 10:306 2 11 17 5

10:30 - 11:008 2 9 16 3

11:00 - 11:308 3 8 18 4

11:30 - 12:006 3 11 16 5

12:00 - 12:308 5 11 16 5

12:30 - 13:006 3 9 14 6

13:00 - 13:306 1 9 13 7

13:30 - 14:007 1 8 12 8

14:00 - 14:307 2 9 12 8

14:30 - 15:006 1 10 11 9

15:00 - 15:306 3 7 12 7

15:30 - 16:00 6 2 10 12 7

Saturday

Day Time NoteMain Parking Rear Parking

SUPPLY 8 150