TRACK RECORD OFLOAD-OUT PROJECTS

BY

CONTENTS1 INTRODUCTION

LOAD-OUT PROJECTS

LOR BARGELANDING CRAFT LOADOUT AND FLOATOFFLEIGHTON STEALTHTURKMENISTANSUDANLOADOUTS OF CONTAINER CRANESBETWEEN TWO BRIDGESMAQTA BRIDGE

INTRODUCTION

Green Palm Marine Consultancy Joint Ventures withTTS to bring together resources to offer engineeringsolutions, support and project management to theoperators in the offshore sector. The combined efforthas made it possible to provide clients with costeffective solutions in a timely manner.

LOAD-OUT PROJECTS

Client: NDSQ

Project: LOR BargeDimensions cargo: 6,500 TYear of Operation: 2012

Notes : New-built LOR barge was loaded onto barge using hydraulic skids

and a push-pull system.

Upon completion of load-out, the LOR was floated off after submerging of

load-out barge.

Client: Al Fattan Shipyard

Project: Landing craft loadout and floatoffDimensions cargo: 1,500 TYear of Operation: 2011

Notes : New-built landing craft was loaded out onto barge utilising

hydraulic skids.

In Mina Zayed Free Port the landing craft was floated off.

Client: Leighton Offshore

Project: Leighton StealthDimensions cargo: 650 TYear of Operation: 2009

Notes : Skidding of accommodation unit onto the Leighton Stealth.

Client: SBM

Project: TurkmenistanDimensions cargo: 2,900 TYear of Operation: 2007

Notes : Load-out of an FSO and two more floating units onto barge via

SPMT’s.

Float-off in Mina Khalid and Jebel Ali Port

Client: Jan de Nul

Project: SudanDimensions cargo: 1,750 TYear of Operation: 2006

Notes : Loading by means of float-over of dredger Jerommeke and

associated tugboat. Sail to Sudan and offload by means of submerging

barge.

Upon completion of the jog, reverse the operation.

Client: Various

Project: Loadouts of container cranesDimensions cargo: VariousYear of Operation: 1986 - 2014

Notes : Load-out, sea transport and load-ins of various STS cranes and

RTG’s from the UAE to various destinations

Client: Noell Imac

Project: Between Two BridgesDimensions cargo: 800 TYear of Operation: 2003

Notes : Load-out of bridge onto barge at Musafah via skid system. Sail

to bridge location.

Bridge lowered onto bearings via ballasting of barge

Client: Noell Imac

Project: Maqta BridgeDimensions cargo: 2,300 TYear of Operation: 1998

Notes : New Maqta Bridge assembled on barge. Barge maneouvered

into position utilising 8-point mooring / positioning winches.

Bridge lowered onto bearings via ballasting of barge