We shape a safe, high quality, sustainable and friendly built environment.
7/28/2019 Track 2 - 1_Productive Technologies Enhancing Construction Safety
2/43
Firms
7/28/2019 Track 2 - 1_Productive Technologies Enhancing Construction Safety
3/43
Construction ManpowerDevelopment
Regulate foreign workers demandEnhance quality of workforce
CONSTRUCTION PRODUCTIVITY
Tightening RegulatoryRequirements & Standards
Incentives to Adopt Technology& Build Capability
7/28/2019 Track 2 - 1_Productive Technologies Enhancing Construction Safety
4/43
CONSTRUCTION PRODUCTIVITY & CAPABILITY FUND
(CPCF)
WORKFORCEWORKFORCEDEVELOPMENTDEVELOPMENT
Workforce Training& Upgrading (WTU)
TECHNOLOGY ADOPTION &TECHNOLOGY ADOPTION &CAPABILITY DEVELOPMENTCAPABILITY DEVELOPMENT
Mechanisation Credit(MechC)
We shape a safe, high quality, sustainable and friendly built environment.
EnhancedBCA-Industry
Built EnvironmentScholarship
ProductivityImprovement Projects
(PIP)
Building InformationModelling (BIM) Fund
7/28/2019 Track 2 - 1_Productive Technologies Enhancing Construction Safety
5/43
MECH CMechanisation Credit
Scheme
What is it?
Provide assistance for companies to reduce cost
incurred in technology adoption such as purchase or
780 applications received from260 companies.
The equipment must achieve
20% improvement in thespecific process
We shape a safe, high quality, sustainable and friendly built environment.
leasing of equipment.
7/28/2019 Track 2 - 1_Productive Technologies Enhancing Construction Safety
6/43
MECH C
Equipment Cost Funding Cap*
(whichever is lower)
Purchase< $100,000 50% $20,000
> $100,000 20% $100,000
Mechanisation Credit
Scheme
Cap on funding of $250,000 per firm
We shape a safe, high quality, sustainable and friendly built environment.
Leasing< $30,000 50% $6,000
> $30,000 20% $30,000
* per application
7/28/2019 Track 2 - 1_Productive Technologies Enhancing Construction Safety
7/43
Skid Steer Loader
Screed Leveler
MECH C
Automatic wheel washer
Concrete Placing Boom
Telescopic HandlerB
oomL
ift
Scissor Lift
Spider LiftPersonnel Lift
7/28/2019 Track 2 - 1_Productive Technologies Enhancing Construction Safety
8/43
PIPProductivity Improvement Project
Scheme
What is it?
Encourage process improvement through- technologies adoption; or
- simplification of work procedures
We shape a safe, high quality, sustainable and friendly built environment.
to achieve higher site productivity by at least 20%
7/28/2019 Track 2 - 1_Productive Technologies Enhancing Construction Safety
9/43
7/28/2019 Track 2 - 1_Productive Technologies Enhancing Construction Safety
10/43
Productivity Improvement Project
Scheme
PIP
a. Manpower-Related Costs Salary of project members Airfare (economy) & Cost ofLiving Allowance
c. Professional Services Consultancy Subcontracting
Supportable Costs include:
We shape a safe, high quality, sustainable and friendly built environment.
b. Equipment & Materials Equipment Materials/Consumables
Software
d. Intellectual Property Rights Licensing/Royalties Technology Acquisition
* GST is not a supportable cost
7/28/2019 Track 2 - 1_Productive Technologies Enhancing Construction Safety
11/43
PIP
Support level for key systems and materials
Key System and Material Support levelSelected
Equipment
System formworkUp to 50%
Climbing scaffold
Productivity Improvement Project
Scheme
We shape a safe, high quality, sustainable and friendly built environment.
SelectedMaterial
concrete Up to 80%
(for extra cost overconventional material)
Prefab bathroom
Drywall
Only gypsum boards, cement boards and similar drywall systems used in residentialprojects are supportable.
If the material is specified in tender documents, the grant to defray extra material costwill be given to the developer.
7/28/2019 Track 2 - 1_Productive Technologies Enhancing Construction Safety
12/43
Common WSH risks in
construction sites
1. Safety of demolition works
2. Falling from height3. Injury due to carrying heavy items
4. Working in confined space
We shape a safe, high quality, sustainable and friendly built environment.
5. Safety of excavation works
6. Environmental health
7. Fire and explosion
7/28/2019 Track 2 - 1_Productive Technologies Enhancing Construction Safety
13/43
1. Demolition works WSHRisks
ROBOTICROBOTICDEMOLITIONDEMOLITION
MACHINEMACHINE
Operate the machine at a distance from thedemolition area
Able to reach high work area without the need
for worker access
Conventional method
We shape a safe, high quality, sustainable and friendly built environment.
Hand-held concrete breakerProductivity 60% MECH C
7/28/2019 Track 2 - 1_Productive Technologies Enhancing Construction Safety
14/43
7/28/2019 Track 2 - 1_Productive Technologies Enhancing Construction Safety
15/43
Sound proof panel
Auto
2. Falling from height WSHRisks
External Net
Climbing
System
SECTION 1
(Planter Box area)
SECTION 2
(Bay window area)
SECTION 3
(Normal wall area)
7/28/2019 Track 2 - 1_Productive Technologies Enhancing Construction Safety
16/43
-Wide and clean
2. Falling from height WSHRisks
Examples (South Korea projects)
external access-100% covered
7/28/2019 Track 2 - 1_Productive Technologies Enhancing Construction Safety
17/43
2. Falling from height WSHRisksMODULAR SCAFFOLDMODULAR SCAFFOLD
SYSTEMSYSTEM able to take 6 tons per leg
modular system reduces the need for additional
bracing
wider spacing than conventional scaffold frames=> more working space
Productivity 22% PIPPIPPIPPIP
7/28/2019 Track 2 - 1_Productive Technologies Enhancing Construction Safety
18/43
Current Prevailing Technology / method used in the industry
ConventionalScaffolding
Elevator use Gondola
Manual Operated
Lifting Platform
Rope Assist Platform
Machine Assisted
Lifting Platform
Metal Frame Scaffolding
2. Falling from height WSH
Risks
Chain Assist Platform Moving Platform
7/28/2019 Track 2 - 1_Productive Technologies Enhancing Construction Safety
19/43
Proposed Technology / methodMoving Platform Lift Installation Method using Temp System.
Moving Platformwith the use ofTemp Access
Frame
2. Falling from height WSH
Risks
19
Lift Installation usingMoving Platform Method
Lift Installation by Moving Platform Methodwith the use of Temp System
7/28/2019 Track 2 - 1_Productive Technologies Enhancing Construction Safety
20/43
MethodologyMoving Platform Lift Installation Method using Temp Cantilever System.
Machine Room1. Set up Temp System
2. Set up template and plumb lift shaft
3. Install motor room & pit equipment
4.Install 1st & 2nd set of guide rail & brackets
Governor Machine
Traction Machine
Machine Beam
Counterweight & Frame
Controller
2. Falling from height WSH
Risks
20
Lift Shaft
5. Install Car Platform & Frame, Counterweight,Temp Access Frame & Rope
Buffers
TeMP Access
Frame
PermanentCab Frame
Components
a n re
Ropes
Work Platform with ToeGuard to be provided
Guide Rail
6. Move the moving platform & removethe Temp System
7/28/2019 Track 2 - 1_Productive Technologies Enhancing Construction Safety
21/43
Area ofImprovement
Projected Outcomes
Moving Platformwith Temp
System
ScaffoldingMethod
GondolaMethod
ImprovementExpected (%) on
using MovingPlatform with TempS stem over other
Productivity Impacts
2. Falling from height WSH
Risks
PIPPIPPIPPIP
21
methods
Manpower (numberof workers)
2 workers/lift 4 workers/lift 3 workers/lift
100% savings overscaffold
50% savings overgondola
Productivity (manhours) 903 man hours/lift
2512 manhours/lift
1374 manhours/lift
64% savings overscaffold
35% savings overgondola
7/28/2019 Track 2 - 1_Productive Technologies Enhancing Construction Safety
22/43
3. Injury due to carrying heavy items WSHRisks
LADDER HOISTLADDER HOIST
Conventional methodHoisting LadderHoisting Ladder
Productivity 65% MECH C
7/28/2019 Track 2 - 1_Productive Technologies Enhancing Construction Safety
23/43
MINI CRANESMINI CRANES
3. Injury due to carrying heavy items WSHRisks
Small enough to be transported in elevator L:2000W:590H:1300mmProductivity 60%
MECH C
7/28/2019 Track 2 - 1_Productive Technologies Enhancing Construction Safety
24/43
3. Injury due to carrying heavy items WSHRisks
Brickwall
Drywall
Drywall much lighter and faster to install
Productivity 150% PIPPIPPIPPIP
7/28/2019 Track 2 - 1_Productive Technologies Enhancing Construction Safety
25/43
3. Injury due to carrying heavy items WSHRisks
CUSTOMISED FORKLIFT ATTACHMENT TO INSTALLCUSTOMISED FORKLIFT ATTACHMENT TO INSTALLCONCRETE PANELS AT HEIGHTCONCRETE PANELS AT HEIGHT
Productivity 80% PIPPIPPIPPIP
7/28/2019 Track 2 - 1_Productive Technologies Enhancing Construction Safety
26/43
7/28/2019 Track 2 - 1_Productive Technologies Enhancing Construction Safety
27/43
Project Objectives- To study the project level productivity on MRT
projects- To track manpower movement in confined space
-
4. Working in confined space WSHRisks
7/28/2019 Track 2 - 1_Productive Technologies Enhancing Construction Safety
28/43
Present Situation
Manual registration
Manual tagging on tally board
Access Control Point (Top view)
4. Working in confined space WSHRisks
Confined
Space
Registration Point Tally Board
7/28/2019 Track 2 - 1_Productive Technologies Enhancing Construction Safety
29/43
Ultra High Frequency RFID system
4. Working in confined space WSHRisks
UHF RFIDTag
GantryReaders Processor
DisplayTerminal
7/28/2019 Track 2 - 1_Productive Technologies Enhancing Construction Safety
30/43
7/28/2019 Track 2 - 1_Productive Technologies Enhancing Construction Safety
31/43
5. Safety of excavation works WSHRisks
Strut-free excavation provides more space forconstruction equipments and workers
Avoid accidental hitting of steel struts by excavators
PIPPIPPIPPIP
7/28/2019 Track 2 - 1_Productive Technologies Enhancing Construction Safety
32/43
6. Environmental health WSHRisks
Traditional Timber Formwork
System Formwork
Easy to install, less noise,tidier working environment
Productivity 50% PIPPIPPIPPIP
7/28/2019 Track 2 - 1_Productive Technologies Enhancing Construction Safety
33/43
7. Fire and explosion WSHRisks
Flexible Piping with
Compression Sleeve Joint
1. Expand
3. Compress
2. Insert
Inexpensive and easy to store Bends easily in the most confined space
No hot works needed
7/28/2019 Track 2 - 1_Productive Technologies Enhancing Construction Safety
34/43
7. Fire and explosion WSHRisks
7/28/2019 Track 2 - 1_Productive Technologies Enhancing Construction Safety
35/43
7/28/2019 Track 2 - 1_Productive Technologies Enhancing Construction Safety
36/43
Other incentives schemes
We shape a safe, high quality, sustainable and friendly built environment.
Construction Industry
7/28/2019 Track 2 - 1_Productive Technologies Enhancing Construction Safety
37/43
INVESTMENT ALLOWANCE SCHEME (IAS)
Tax incentive for equipment purchases
Approved equipment would be supported with aninvestment allowance of 50% of the capital
expenditure, to be off-set against taxable income
Equipment must
be new and owned by the applicant
be purchased only after date of application and within1st year of qualifying period
be at least $10,000 for construction equipment and$2,000 for IT related equipment
We shape a safe, high quality, sustainable and friendly built environment.
Productivity and InnovationProductivity and Innovation Credit (PIC)Credit (PIC)
7/28/2019 Track 2 - 1_Productive Technologies Enhancing Construction Safety
38/43
Productivity and InnovationProductivity and Innovation Credit (PIC)Credit (PIC)
We shape a safe, high quality, sustainable and friendly built environment.
Pls refer to www.iras.gov.sgfor more information
$100 $400 $68Example:
Expenditure Tax Deduction
400% deduction on $100 = $400 CreditTax savings = 17% x $400 = $68
Tax Savings
Supportable automation equipment/Supportable automation equipment/
system:system:
a.a. Concreting pumpConcreting pump
b.b. RideRide--on concrete trowelon concrete trowel
c.c. AutoAuto--climb scaffold systemclimb scaffold system
d.d. CNC machineryCNC machinery
e.e. ComputerComputer--aided design/ drafting softwareaided design/ drafting software
Increase SME Productivity with Infocomm
7/28/2019 Track 2 - 1_Productive Technologies Enhancing Construction Safety
39/43
Increase SME Productivity with Infocomm
Adoption and Transformation (iSPRINT)Types of Project Grant Cap Qualifying Costs
Packaged solutions, pre-qualifiedby IDA, for basic business
functions:
Finance/ AccountingPayrollPoint-of-SalesSoftware-as-a-Service
Up to 50% of qualifying costs
For Finance & Accounting, Payrolland Point-of-Sales, capped atS$1,500 per packaged solution For Software-as-a-Servicemax.12 months subscription,ca ed S 10 000
Software/ subscription cost Consultancy services
Training cost
We shape a safe, high quality, sustainable and friendly built environment.
Customised solutions(eg. customer relationshipmanagement, enterprise resourceplanning)
Up to 50% of qualifying costs,capped at S$10,000 per SME
Consultancy servicesTraining cost
Customised solutions that requireextensive development efforts and
business re-engineering(eg. supply chain management)
Up to 50% of qualifying costs
(Grant amount is determined on acase-by-case basis)
Manpower-related costs Consultancy services
Hardware/ software costs(amortised) Training cost
Definition of SME: At least 30% of your shareholding is local ANDYour company's group annual sales turnover is less than S$100 million ORYour company's group employment size not more than 200 workers
For more info, visithttp://www.ida.gov.sg/Sector%20Development/20060929142757.aspx
Productivity Management Programme (PMP)
7/28/2019 Track 2 - 1_Productive Technologies Enhancing Construction Safety
40/43
Productivity Management Programme (PMP)
What: Get recommendations on relevant Government schemes that you can tapon for productivity improvements.
Attend productivity clinics to perform a diagnosis of your organisations
productivity using the Integrated Management of Productivity Activities (IMPACT)Assessment tool. The diagnosis can be used to identify areas to focus on anddevelop your productivity
Get referrals to certified consultants for your productivity projects
We shape a safe, high quality, sustainable and friendly built environment.
When and where: Available at 5 Enterprise Development Centres (EDCs) - Chinese, Indian andMalay business chambers, the Association of Small and Medium Enterprises(ASME) and the Singapore Manufacturers' Federation (SMa).
Until Nov 2013
For more info:http://productivity.business.gov.sg/en/performance_management_programme.aspx
Inclusive Growth Programme (IGP)
7/28/2019 Track 2 - 1_Productive Technologies Enhancing Construction Safety
41/43
Inclusive Growth Programme (IGP)
What:
$40 million, 2 year programme administered by NTUC/e2i (Employment andEmployability Institute)
50% funding for projects that improve work processes
Company has to share productivity gains through raising the wages of local
We shape a safe, high quality, sustainable and friendly built environment.
low-wage workers
When: The IGP was launched in August last year and will run until Aug 2012
More info: http://www.e2i.com.sg/services/employers/inclusive-growth-programme
7/28/2019 Track 2 - 1_Productive Technologies Enhancing Construction Safety
42/43
Workforce Training & Upgrading (WTU) SchemeMs Sharon Tan DID: 6325 2096 Email: [email protected]
Ms Cherlyn Lee DID: 6325 5034 Email: [email protected]
Building Information Model (BIM) FundMs Cindy Liew DID: 6325 1107 E-mail: [email protected]
Mechanisation Credit (MechC)SchemeMs Ezrin Raof DID: 6325 5093 E-mail: [email protected]
Productivity Improvement Project (PIP)SchemeMs Phang Li Bin DID: 6325 5071 E-mail: [email protected]
Mr Martin Ho DID: 6325 5101 E-mail: [email protected]
For more info, visit: http://www.bca.gov.sg/CPCF/cpcf.html
For any enquires, pleases call the CPCF Hotline: 18001800--325 5050325 5050
7/28/2019 Track 2 - 1_Productive Technologies Enhancing Construction Safety
43/43
Thank you
We shape a safe, high quality, sustainable and friendly built environment.