Page 1: TPM-new
Page 2: TPM-new

• Laura Dietrich: Maintenance Manger

• Antoinette Lockett: Plant Manger• Waseem Manzoor: Quality Manger• Xiaoyan Liu: Production Manger

Page 3: TPM-new

Meeting AgendaI. Understanding Downtime -GroupII. Major Losses of TPM -Antoinette Lockett

I. Planned Downtime Losses -Xiaoyan LiuII. Unplanned Downtime Losses -Laura DietrichIII. Reduce Speed Losses-IV. Poor Quality Losses -Waseem Manzoor

III. Total Productive MaintenanceI. What is TPM -Antoinette LockettII. Breakdown of TPM -Laura DietrichIII. TPM History -Laura DietrichIV. TPM EvolutionV. Goal of TPM -Antoinette LockettVI. Three Principles of Prevention

Page 4: TPM-new

Meeting Agenda Cont.I. TPM-8 Pillars-Laura DietrichII. Kick off TPM

I. Launching TPM- Preparatory Stage-Antoinette LockettII. Autonomous Maintenance- Xiaoyan LiuIII. Equipment Management Life Cycle- Xiaoyan LiuIV. TPM Implementation-Waseem ManzoorV. Launching TPM- Stabilization-Waseen ManzoorVI. Eliminating Equipment Losses-Laura DietrichVII. Improvement Goals for Chronic Losses-Laura Dietrich

III. Overall Equipment EfficiencyI. What is OEE-Xiaoyan LiuII. OEE Factors-Xiayon LiuIII. Calculating OEE-Waseem Manzoor

IV. TPM Benefits-Xiaoyan Liu

Page 5: TPM-new

Understanding Downtime

Page 6: TPM-new

MAJOR LOSSES

Page 7: TPM-new

Planned Downtime losses

• Start-ups• shift changes• coffee and lunch breaks• planned maintenance shutdowns

Page 8: TPM-new

Unplanned Downtime Losses

• Equipment breakdown

• Changeovers• Lack of material

Page 9: TPM-new

Reduced Speed Losses

• Idling and minor stoppages• Slow-downs

Page 10: TPM-new

Poor Quality Losses

• Process non-conformities

• Scrap

Page 11: TPM-new

TPM

Page 12: TPM-new

What is Total Productive Maintenance?

• TPM is a plant improvement methodology which enables continuous and rapid improvement of the manufacturing process through use of employee involvement, employee empowerment, and closed-loop measurement of results

Page 13: TPM-new

• TOTAL = All encompassing by maintenance and production individuals working together

• PRODUCTIVE = Production goods and services that meet or exceed customers’ expectations

• MAINTENANCE = Keeping equipment and plant in as good as or better than the original conditions at all times

Breakdown of TPM

Page 14: TPM-new

TPM - History

• Productive maintenance (PM) originated in the U.S. in late 1940’s & early 1950’s

• Japanese companies modified and enhanced it to fit the Japanese industrial environment

• The first use the term TPM was in 1961 by Nippondenso, a Japanese auto components manufacturer

• Seiichi Nakajima – head of JIPM, one of the earliest proponents, known as the Father of TPM

Page 15: TPM-new

TPM - Evolution

• Breakdown maintenance• Preventive maintenance (PM)• Productive maintenance• Total productive maintenance

Page 16: TPM-new
Page 17: TPM-new

Goals of TPM1. Aims at getting the most effective use of

equipment2. Builds a comprehensive PM system3. Brings together people from all departments

concerned with equipment4. Requires the support and cooperation of

everyone from top managers down5. Promotes and implements PM activities

based on autonomous small group activities.

6. Maintaining Equipment for life7. Encouraging input from all employees8. Using teams for continuous improvement

Page 18: TPM-new

Three Principles of Prevention

• Maintenance of normal conditions• Early discovery of abnormalities• Prompt response

Page 19: TPM-new

TPM 8 PILLARS

Page 20: TPM-new

PILLARS OF TPM

Kobe

tsu

Kaiz

en

Plan

ned

Mai

nten

ance

Qua

lity

Mai

nten

ance

Trai

ning

Offi

ce T

PM

Safe

ty, h

ealt

h an

d En

viro

nmen

t

5s

Auto

nom

ous

Mai

nten

ance

Page 21: TPM-new

Kick off TPM

Page 22: TPM-new

Launching TPM- Preparatory Stage

• Announce top management’s decision to introduce TPM

• Launch an educational campaign to introduce TPM

• Create an organizational structure to promote TPM

• Establish basic policies• Form a master plan for

implementing TPM

Page 23: TPM-new
Page 24: TPM-new
Page 25: TPM-new
Page 26: TPM-new
Page 27: TPM-new

Launching TPM- Preliminary Implementation

Page 28: TPM-new

• Improve the effectiveness of each critical piece of equipment

• Set up and implement autonomous maintenance

• Establish a planned maintenance system in the maintenance department

• Provide training to improve operator and maintenance skills

• Develop an early equipment management program

Launching TPM- TPM Implementation

Page 29: TPM-new

• Perfect TPM implementation and raise TPM levels

Launching TPM- Stabilization

Page 30: TPM-new

Eliminating Equipment Losses

Page 31: TPM-new

Improvement Goals for Chronic Losses

Page 32: TPM-new

OEE

Page 33: TPM-new

What is OEE

• OEE (overall equipment efficiency) is a “best practices” way to monitor and improve the efficiency of your manufacturing processes – machines– manufacturing cells– assembly lines

Page 34: TPM-new

OEE Factors• Plant Operating Time• Planned production time

– planned downtime ie. breaks• Availability

– downtime losses• Performance

– Speed losses• Quality

– Quality losses

Page 35: TPM-new

World Class OEE

OEE Factor World ClassAvailability 90.0%

Performance 95.0%Quality 99.9 %

OEE 85.0%

Page 36: TPM-new

Calculating OEE

• Availability = Operating time/planned production

• Performance = Ideal Cycle Time / Total Pieces or(total pieces / Operating time)/Ideal Run time

• Quality = Good Pieces / Total Pieces• OEE = Availability X Performance X

Quality

Page 37: TPM-new

Example OEE CalculationI tem Data

Shif t length 8 hrs = 480 min.Short Breaks 2@ 15 min. = 30 minMeal Break 1 @ 30 min = 30 minDown Time 47 min

I deal Run Time 60 pieces per minTotal Pieces 19,271 pieces

Reject Pieces 423 pieces

Page 38: TPM-new

Availability = Operating time Planned production time• = 373 minutes / 420 minutes• = 0.8881 (88.81%)

Page 39: TPM-new

Performance =

(Total pieces /Operating time) Ideal Run Time• = (19,271 pieces/373 minutes)/60

pieces per minute• = 0.8611 (86.11%)

Page 40: TPM-new

Quality =

Good PiecesTotal Pieces

• = 18,848 / 19,271 pieces• = 0.9780 (97.80 %)

Page 41: TPM-new

OEE =

Availability X Performance X Quality • = 0.8881 X 0.8611 X 0.9780• = 0.7479 (74.79%)

Page 42: TPM-new

TPM BENIFITS

Page 43: TPM-new

TPM - Benefits• Improved equipment eliminates the root cause

of defects• Defects are prevented through planned

maintenance• Preventive maintenance costs are reduced as

equipment operators conduct autonomous maintenance

• Improved equipment designs ensure that new equipment naturally produces fewer defects

• Simplified products designs and a redesigned process produce with few defects

• Engineers, technicians and managers are trained in maintenance and quality

Page 44: TPM-new

TPM - Benefits

(Japanese TPM Prize winners during 1982-1984)

• Equipment failures reduced from 1,000/month to 20/month

• Quality defects reduced from 1.0% to 0.1%• Warranty claims reduced by 25%• Maintenance costs reduced by 30%• WIP decreased by 50%• Productivity improved by 50%. (Patterson &

Fredendall, 1995)

Page 45: TPM-new

TPM – Success stories

• USPS Albany, New York: annual save of $86,000; could save $4.5 million if applied nationwide

• Yamato Kogyo Corp., Japan: - productivity up by 130%, - accidents cut by 90%, - defects reduced by 95%, - employee suggestion rate increased

by over 300%