TPC Very High Voltage Control
Status report
Marco Boccioli
20/04/2006
Summary
PLC control and communication routines implemented and tested
PVSS interface implemented Safety features tested System being installed at P2 Draft technical note:
\\pcaitdc21\share\TPC
Implementation: devices
RS 232
Ether net
“DCS”
ELMB PS
TPC cage
Water Pump Gas CO2
100m
2m
2m
L3
VHVPS Emergency Stop
1
2
4
5
6
7 8
2m
9
3
2m
Digital I/O PLC
100m
CR4
Out
ELMB ELMB
In LVPS
100m
AUL (UPS Emergency Stop)
10
11
12
13
16
14 18
15
17
CAN
0.5m
0.5m
2m
0.5m
0.5m
19
20 Rack CR4-Z08
100m
7
240V power line
Low V power line
Signal line and direction
Cable length
Cable number
CR4 Place
VH
V lin
e
10m
10m
2m
0.5m
AUL (UPS Emergency Stop)
2m
100m
Patch
15P
X9
Heinzinger VHVPS
UPS
Implementation: State Diagram OFF
STANDBY
RAMPING_UP
RAMPING_UP
ON
DOWNLOADING
GO_STANDBY
GO_STANDBY GO_INTERMEDIATE CONFIGURE
GO_OFF GO_CONFIGURE
CONFIGURE STOP GO_ON
GO_INTERMEDIATE CONFIGURE STOP
ERROR_LOCAL
RECOVER
INTERLOCK_WENT
RECOVER
TRIPPED
RECOVER
RAMPING_DOWN
RAMPING_DOWN
INTERMEDIATE
STBY_CONFIGURED
DOWNLOADING
DOWNLOADING
Implementation
0
5000
10000
15000
20000
25000
30000
53:57.1 54:40.3 55:23.5 56:06.7 56:49.9 57:33.1
mm:ss
nV
PVSS user interface
Safety
Error Reaction Reaction time [s]
Any interlock is bad Software ramp down Interlock dependent
Voltage trip Software ramp down <4
ELMB is not active Hardware ramp down <7
RS232 communication Hardware ramp down <14
Current trip Hardware ramp down <1
HV Output is off Hardware ramp down <15
Enable Set Value is off Hardware ramp down <1
PLC not running Hardware ramp down <1
Electrical safety checked PLC safety routines tested
Installing the system
RS232
CAN
ELMB
ELMB
Ethernet
“DCS”Rack CR4-Z08Rack CR4-Z08
Power S.
PLCPLC
TPC cageTPC cage
interlocksinterlocks
100m
2m
1m
Installing the system
RS232
CAN
ELMB
ELMB
Ethernet
“DCS”Rack CR4-Z08
Power S.
PLC
TPC cage
interlocks
100m
2m
1m
RS232
CAN
ELMB
ELMB
Ethernet
“DCS”Rack CR4-Z08Rack CR4-Z08
Power S.
PLCPLC
TPC cageTPC cage
interlocksinterlocks
100m
2m
1m
PVSS with FSM Schneider OPC server
Supervisory
Installing the system
RS232
CAN
ELMB
ELMB
Ethernet
“DCS”Rack CR4-Z08
Power S.
PLC
TPC cage
interlocks
100m
2m
1m
RS232
CAN
ELMB
ELMB
Ethernet
“DCS”Rack CR4-Z08Rack CR4-Z08
Power S.
PLCPLC
TPC cageTPC cage
interlocksinterlocks
100m
2m
1m
Schneider Electric Premium P57 5634M
PLC
Installing the system
RS232
CAN
ELMB
ELMB
Ethernet
“DCS”Rack CR4-Z08
Power S.
PLC
TPC cage
interlocks
100m
2m
1m
RS232
CAN
ELMB
ELMB
Ethernet
“DCS”Rack CR4-Z08Rack CR4-Z08
Power S.
PLCPLC
TPC cageTPC cage
interlocksinterlocks
100m
2m
1m
Heinzinger PNC 150000Power Supply
Installing the system
RS232
CAN
ELMB
ELMB
Ethernet
“DCS”Rack CR4-Z08
Power S.
PLC
TPC cage
interlocks
100m
2m
1m
RS232
CAN
ELMB
ELMB
Ethernet
“DCS”Rack CR4-Z08Rack CR4-Z08
Power S.
PLCPLC
TPC cageTPC cage
interlocksinterlocks
100m
2m
1m
ELMB One for each side
Installing the system
RS232
CAN
ELMB
ELMB
Ethernet
“DCS”Rack CR4-Z08
Power S.
PLC
TPC cage
interlocks
100m
2m
1m
RS232
CAN
ELMB
ELMB
Ethernet
“DCS”Rack CR4-Z08Rack CR4-Z08
Power S.
PLCPLC
TPC cageTPC cage
interlocksinterlocks
100m
2m
1m
Cabling Seven points for each side
What next…
End the cabling Test the installed system Integrate the FSM with DCS Release the technical note (