TPC-Meeting : Københaven 2.9.02
• Ne-CO2 Gas System : Status
• CO2 - Gas System : Insulating Gap • Resistor Rod :
– Contacts– Cooling --> Liquid– Cooling --> Gas
Ne-CO2 - Gas System :
• Mixing Unit ok• Compressor Rack ok• Cleaning Cartridges ok• Pressure Tank ok• CO2 - Remover prep
• Hardware ready --> Jan 2003
• Slow control --> mid 2003
Ne-CO2 - Gas Quality Controls
• CO2 - Monitor (0.1%) --> permanent
• 2(O2 & H2O) -Monitor’s --> permanent
• 2 Goofie - Drift-Monitors --> permanent– Drift vel : < 1 %o – Gas (in & out; mounting: near TPC-vessel)
• Gas Chromatograph --> if needed– N2; impurities(CHn; SF6 ; ect.);
CO2 - Insulation Gap Gas System
• CO2 - Recovery :– Closed System– Design Meeting --> Alice week:
sept.02
TPC_Resistor Rod
• Promised :– Weight Watching & Contacts :
• *1/4 & 100 cm Model
– Cooling Tests :• 100 cm Model
– HV & Security Tests :• 200 cm Model
Contacts
Water flow
Alternating Gradient
Cooling
20.25 Co20.20 Co20.1 Co20.05 Co20.0 Co19.75 Co19.8 Co19.9 Co19.95 Co20.0 CoAlternating Gradient
Cooling
Cooling Efficiency :--> Cooling Efficiency :-->
T.M --> BTC !T.M --> BTC !
Rod - Cooling Systems• Leakless Water Cooling
– Control System : like FEC’s– 10 mm Pipes – Cost : 25 kSFR
• CO2 - Gas Cooling– 60 mm Pipes & 50 m– Leaks into Ne_CO2 Volume ???– Cost : (30 components + 30 labor (?) + – 20 heat exchanger ) --> 80 kSFR (?)
Rod-HV- Tests
• 300 kV HI-Injector @ GSI
• 30 Years of HV-Operation
• With :
•Distilled Water-Resistor Chain
300 kV GSI Ion Source : • Uses since 30 years :• Destilled Water Channel as 300kV Divider
– Interlock : Water Quality• < 2 µ Siemens / cm
Resistor Rod HV test : – Rod-Cooling Water Channel --> – Connected to HV with Copper-Return Bridge
• Additonal parallel resistor : --> f(water quality)
Are’s test setup:
HV-Test @ GSI HI - source
• Rod in Nitrogen Atmosphere• Rod filled with :
– Nitrogen– Distilled Water ( < 0.1 & <1 µ Siemens)– Circulation Pump OFF– Tap - Water
• ∂V_last Resistor • & Total Rod Current
Conclusions : I• Removable Resistor Rod :
– Possible --> go_to --> 250 cm
• AGC --> – very efficient -> results soon– Price & Space
• Liquid Cooled Rod : internally save :– HV & Leak – Ceramic Bridge --> Security Factor: * 1015
– Rod Resistivity = f (water quality) --> adjust !
Conclusions : II
• Remaining Heat Sources in TPC
– G_Ohm Resistor Chain -> up to 4 Watt
Let’s Cool them !!!
4W - Distilled Water Resistor Chain
• Adjust Water Quality : • --> (0.05 and 2) µ_Siemens• ( 18 --> 0.5 ) M_Ohm / cm