Upload
others
View
5
Download
0
Embed Size (px)
Citation preview
TOWN PANCHAYATH, NAGAMANGALA
Public Disclosure Schedule
Manual on Public Disclosure Schedules
TP Nagamangala | 2
Content
Sl.no Particulars Page. no 1 Urban planning including town planning 5-6 2 Regulation of Land- use and Construction of Buildings 7-8 3 Planning for Economic and Social development 9 4 Roads and Bridges 10-11 5 Water Supply- Domestic, Industrial and Commercial 12-14 6 Public Health, Sanitation, Conservancy and SWM 15-23 8 Urban forestry, protection of environment and ecology 24-25 10 Slum Improvement & Up-gradation 26-27 11 Urban Poverty Alleviation 28
12 Provision of urban amenities and facilities- parks, gardens and playgrounds
29-30
13 Promotion of cultural, educational, and aesthetic aspects 31
14 Burials and burial grounds, cremations, cremation grounds and electric crematoriums
32
15 Cattle pounds, prevention of cruelty to animals 33 16 Vital Statistics including registration of births and deaths 34-35
17 Public amenities including street lighting, parking lots, bus stops and public conveniences
36-37
18 Regulation of slaughter houses and tanneries 38
Manual on Public Disclosure Schedules
TP Nagamangala | 3
TOWN PANCHAYATH, NAGAMANGALA
Formats for Disclosure
Manual on Public Disclosure Schedules
TP Nagamangala | 4
Functions under 12th Schedule 1. URBAN PLANNING INCLUDING TOWN PLANNING
Sl.No
Functions as per 12th Schedule
Agency Responsible with in their jurisdiction
Data to be Disclosed Period for which information has to be disclosed
Level of Disclosure (ULB/Ward)
Frequency of Disclosure
Reference Remarks
1 Urban Planning including town Planning
1. Town Planning Authority 2. Urban Development Authority (UDA) 3. Municipal Planning Authority
(i) Report and Maps of Master Plans including Zoning Regulations
Plan in force now ULB 1. Annually 2. To be notified as and when changes done
Table 1.1
(ii) Maps of Planning Districts
Plan in force now ULB 1. Annually 2. To be notified as and when changes done
(iii) Details of provisional and finally approved layouts (Survey No, name of owner, Site details)
Previous three financial years including current year
ULB Half Yearly Table.1.2
4. ULB (iv) Report and maps of Comprehensive Development Plan (CDP)
Current plan ULB 1. Annually 2. To be notified as and when changes done
Manual on Public Disclosure Schedules
TP Nagamangala | 5
Table 1.1: Report and Maps of Master Plans including Zoning Regulations (Please fill in following information) Sl. No
Name of the reports related to Master Plan, Zoning Regulation and CDP
Enclosure in PDF
Maps related to Master Plan, Zoning Regulations, Planning District and CDP
Enclosure in PDF
No Layouts
Table 1.2: Number of provisional and final approved layouts (Please fill in following information) Years Number of provisional layouts Number of approved layouts Details of layout as enclosure
Current year No Layouts Found Current year -1 Current year-2 Current year-3 Format: Details of Provisional and final approved layouts Sl. No Name of
Layout Whether provisional/approved Number of sites in the approved layout Name of the
owner/developer of the layout 30*40 40*60 Odd sites
No Layouts Found
Manual on Public Disclosure Schedules
TP Nagamangala | 6
2. REGULATION OF LAND-USE AND CONSTRUCTION OF BUILDINGS
Sl.No
Functions as per 12th Schedule
Agency Responsible with in their jurisdiction
Data to be Disclosed Period for which information has to be disclosed
Level of Disclosure (ULB/Ward)
Frequency of Disclosure
Reference Remarks
2 Regulation of Land- use and Construction of Buildings
UDA/ULB (i) Details of Building Commencement & Completion Certificate (Total application received, total permission granted, location details)
Previous three years including current year
ULB Annually Table 2.1 (a) & Table.2.1 (b)
(ii) Details of Industries and commercial complexes approved (Survey No., Type, Name of the owner)
Previous three Financial years including current year
ULB Annually Table 2.2
Table 2.1 (a): Details of Building Commencement & Completion Certificate Total number of application received for building plan approval from past three years
Total number of License granted from past three years
Current Fy Current FY – 1
Current FY – 2 Current FY – 3 Current Fy Current FY – 1 Current FY – 2
Current FY – 3
2013-14 2012-13 2011-12 2010-11 2013-14 2012-13 2011-12 2010-11
72 83 62 64 72 83 62 64
Manual on Public Disclosure Schedules
TP Nagamangala | 7
Table 2.1 (b): Details of the building plan approval for three years
Format for enclosure Ref Table 2.1.b Table 2.2: Details of approved Industries/Commercial Areas
2013-14 Enclosure
2012-13 Enclosure
2013-14 Enclosure
2012-13 Enclosure
2011-12 Enclosure
2010-11 Enclosure
Mention year
Site area(Sq/feet) Built-up area(Sq/feet)
Location details
Ward Street name Property Number/ Survey Number
Manual on Public Disclosure Schedules
TP Nagamangala | 8
2011-12 Enclosure
2010-11 Enclosure
Format reference to table 2.2
Details Ward Number Street Name Survey Number Site Area(Sq/feet)
Built-up area (Sq/feet)
Owner name
Cur
rent
FY
1
Cur
rent
FY
-1
Cur
rent
FY
-2
Cur
rent
FY
1
Cur
rent
FY
-1
Cur
rent
FY
-2
Cur
rent
FY
1
Cur
rent
FY
-1
Cur
rent
FY
-2
Cur
rent
FY
1
Cur
rent
FY
-1
Cur
rent
FY
-2
Cur
rent
FY
1
Cur
rent
FY
-1
Cur
rent
FY
-2
Cur
rent
FY
1
Cur
rent
FY
-1
Cur
rent
FY
-2
Details in enclosure
- - - - - - - - - - - - - - - - - -
Manual on Public Disclosure Schedules
TP Nagamangala | 9
3. PLANNING FOR ECONOMIC AND SOCIAL DEVELOPMENT Sl.No
Functions as per 12th Schedule
Agency Responsible with in their jurisdiction
Data to be Disclosed Period for which information has to be disclosed
Level of Disclosure (ULB/Ward)
Frequency of Disclosure
Reference
Remarks
3 Planning for Economic and Social development
ULB List and brief of the Social and Economic Development Schemes.-eg; 18% scheme, Ashraya and such other Govt. programs Details of budget allocation and expenditure of these schemes Details of Beneficiaries
Previous three financial years including current year
ULB Annually Table 3.1
Table 3.1
List and brief of the social and economic Development Schemes for three years
Current FY 2013-14 (half year)
Sl. No Name of the Scheme Budget allocated Expenditure List of beneficiaries to be enclosed
1 22.75% 36.60 10.17
2 7.25% 14.46 9.55
3 3% 2.70 0.06
4 SJSRY 19.90 17.21
Current FY 2012-13
Sl. No Name of the Scheme Budget allocated Expenditure List of beneficiaries to be enclosed
1 22.75% 32.2 8.35 Enclosure
2 7.25% 28.30 13.43 Enclosure
Manual on Public Disclosure Schedules
TP Nagamangala | 10
3 3% 6.45 2.04 Enclosure
4 SJSRY 3.88 4.49 Enclosure
Current FY 2011-12
Sl. No Name of the Scheme Budget allocated Expenditure List of beneficiaries to be enclosed
1 22.75% 44.62 16.45 Enclosure 2 7.25% 11.93 3.84 Enclosure 3 3% 6.37 3.86 Enclosure 4 SJSRY 11.00 5.83 Enclosure Current FY-2010-11
Sl. No Name of the Scheme Budget allocated Expenditure List of beneficiaries to be enclosed 1 22.75% 33.85 32.60 Enclosure 2 7.25% 13.20 1.85 Enclosure
3 3% - -
4 SJSRY 5.62 3.79 4. ROADS & BRIDGES
Sl.No
Functions as per 12th Schedule
Agency Responsible with in their jurisdiction
Data to be Disclosed Period for which information has to be disclosed
Level of Disclosure (ULB/Ward)
Frequency of Disclosure
Reference Remarks
4 Roads and Bridges
ULBs & UDA (i) Total Road Length (type of road, its length and width)
Current status ULB/Ward Annually Table 4.1 MIS
(ii) Details of Roads proposed & executed for carpeting/ re-carpeting.
Current year ULB Annually Table 4.2 (a) and 4.2 (b)
Manual on Public Disclosure Schedules
TP Nagamangala | 11
(iii) Percentage of footpath to the total road length of main roads
current status ULB Annually Table 4.3
Table 4.1: Road types
Total existing road length in kms Water bound macadam
(WBM) Bituminous Cement Concrete (CC) Mud road Total
6.098 8.963 1.044 15.664 31.769 Table 4.2.a: Abstract of roads approved for carpeting and re-carpeting in current Financial year (year to be
mentioned numeric like 2010-11)
Type of road Total Road length approved and
tendered for carpeting in kms
Total Road length
approved and tendered for
re-carpeting in km
Water bound macadam (WBM) 2.992
Bituminous 7.992
Cement Concrete (CC) 0.335
Mud road -
Total 11.319
Table 4.2.b: Details of roads approved and tendered for carpeting and recarpeting in current financial year (year to
be mentioned numeric like 2010-11)
Manual on Public Disclosure Schedules
TP Nagamangala | 12
Format for enclosure reference table 4.2.b
Road length Approved and tendered for carpeting, WBM, Bituminous
and CC road (newly surfacing of the roads)
Road length Approved and Tendered for re-
carpeting, WBM, Bituminous and CC road
Type of road Ward
Number
Street Name Length of
road in Kms
Type of
Road
Ward
Number
Street Name Length of road
in Kms
WBM 1 Left side of Mulakatte road 2nd cross 0.150
Bitumin 4 Infront of Badagudamma Temple Road 0.350
Bitumin 6 Kolada Beedi 0.600
Bitumin 6 Old Post Office Road 0.300
Bitumin 8 Banajiga Street 0.300
Type of road Total Road length
approved and tendered for
carpeting in kms
Total Road length approved and
tendered for re-carpeting in km
Water bound macadam (WBM) Enclosure as per the format given below
Enclosure as per the format given below
Bituminous Enclosure as per the format given below
Enclosure as per the format given below
Cement Concrete (CC) Enclosure as per the format given below
Enclosure as per the format given below
Mud road Enclosure as per the format given below
Enclosure as per the format given below
Manual on Public Disclosure Schedules
TP Nagamangala | 13
WBM 13 Kannika Parameshwari Road 0.200
Bitumin 13 Kannika Parameshwari Road 0.200
WBM 10 Kumbara Street 0.275
Bitumin 10 Kumbara Street 0.275
WBM 10 Avige Road 0.300
Bitumin 10 Avige Road 0.300
Bitumin 11 SC Colony Road 0.325
Bitumin 5 Ganiga Street 0.150
Bitumin 6&8 Behind KST Road 0.300
Bitumin 7&8 Badagudamma Temple Road 0.175
Bitumin 8 Banjantri Road 0.75
Bitumin 8 Tank Field Road 0.225
Bitumin 12 A.D. Colony 0.300
Bitumin 14 Right Side of Mandya Road 0.400
WBM 4 Shanidevara Temple Road 0.306
Bitumin 4 Shanidevara Temple Road 0.306
WBM 2 C. Kumar house Road 0.063
Bitumin 2 C. Kumar house Road 0.063
WBM 2 Behind TAPCMS Godown Road 0.368
Bitumin 2 Behind TAPCMS Godown Road 0.368
Bitumin 3 Badrikoppalu Main Road 0.456
Manual on Public Disclosure Schedules
TP Nagamangala | 14
Bitumin 3 Badrikoppalu Cross Roads 0.525
WBM 2 KRS house Road 0.235
Bitumin 2 KRS house Road 0.235
WBM 6 Reading Room Road 0.510
Bitumin 6 Reading Room Road 0.510
WBM 10 Darga Road 0.425
Bitumin 10 Darga Road 0.425
CC Road 5 Pvt. Bus stand Road 0.135
CC Road 15 Haniff Mohalla Cross Roads 0.200
WBM 16 Behind Minividhana Soudha Road 0.160
Bitumin 16 Behind Minividhana Soudha Road 0.160
Table 4.3: Footpath coverage to main roads
Total length of the main roads in ULB Jurisdiction: 31.769 kms
Total length of the footpath built against main road: 9 kms
Manual on Public Disclosure Schedules
TP Nagamangala | 15
5. WATER SUPPLY DOMESTIC, COMMERCIAL & INDUSTRIAL Sl.No
Functions as per 12th Schedule
Agency Responsible with in their jurisdiction
Data to be Disclosed Period for which information has to be disclosed
Level of Disclosure (ULB/Ward)
Frequency of Disclosure
Reference Remarks
5 Water Supply- Domestic, Industrial and Commercial
Water Board/ ULB
(i) Percentage of total water supply (Surfaced, Underground and external source)
current status ULB Level Half yearly Table 5.1 SLB1
(ii)Total number of connection & percentage of Coverage (Household/ public stand posts/ Commercial and Industrial Connection), quantity of w/s
current status ULB Level Half yearly Table 5.2 SLB
(iii) Frequency and Timing for Water Supply.
current status ULB Level Half yearly Table 5.3 SLB
(iv) Quality of Water Supply (percentage of samples complied with the Water Act norms)
current status ULB Level Half yearly Table 5.4 SLB
(v) Cost Recovery in Water Supply Services (Revenue Generated per KL of water/Cost incurred per KL of Water Supplied)
Previous three financial years including current year
ULB Level Annually Table 5.5 SLB
1 Service Level benchmarking by DMA, GoK
Manual on Public Disclosure Schedules
TP Nagamangala | 16
(vi) Water tariff Current status ULB Level Annually Table 5.6
Format 5.1 -Per capita production of water
Water supplied through Surface Source 1.80 in MLD Water Supplied through Underground Source 0.35 in MLD
Water supplied through external source 0 in MLD Format 5.2- Water Supply Coverage Total Number of Households 4810 in numbers Number of house holds with direct water supply connections 2086 in numbers Total Number of Commercial Connection 17 in numbers
Total number of Public Stand Posts 55 in numbers Total number of industrial connections 0 in numbers Format 5.3- frequency & Timings of water supply
Frequency and Timing for Water Supply
Number of days of water supply per week in
Normal season
Number of hours of water supply on any supplied day
(Normal season)
Day by day 1 ½ hour
Manual on Public Disclosure Schedules
TP Nagamangala | 17
Format 5.4- Quality of water supply Total number of water samples collected at the consumer end 2 in Numbers/6 months Number of water samples that meet potable water standards 2 in Numbers/6 months Format 5.5- Cost recovery in water supply (same as in SLB)
Expenditure 1 Total contractual (if outsourced) cost for Bore wells, O & M of
piped network, O & M of vented dam/ Impounding structure/ Jack well/ Intake well, valves, replacement of distribution network, supplying of spare materials, salaries of Contract labours, vehicles etc)
Current Year 2013-
14
9.66
Current Year FY-1
2012-13
Current FY-2
2011-12
Current FY-3
2010-11
2 Total expenditure borne by ULB on Bore wells, O & M of piped network, O & M of vented dam/ Impounding structure/ Jack well/ Intake well, valves, replacement of distribution network, supplying of spare materials, vehicles etc
6.97 21.70 15.33 2.61
3 Salaries of employees under water supply (P ermanent and Daily wages
7.95 18.38 (14.85+
3.53)
7.97 3.40
4 Purchase of items (for water treatment, for pumping machinery and spare parts if any
1.62 7.67 2.89 18.18
5 Electricity Bill for water supply (Surface source and Ground water)
11.65 19.12 9.89 9.96
Revenue 1 Amount collected out of current year demand 17.74 18.23 12.31 10.05 2
Amount collected for providing new connection 1.34 0.33 0.22 1.10
Manual on Public Disclosure Schedules
TP Nagamangala | 18
Format 5.6- Water Tariff
Water Tariff
Present water charges (which ever is applicable)
Flat rate ( mention the rate)
slab Rate (Mention the slab)
Rs.80/- per month for Residential Rs.320/- per month for Commercial
6. PUBLIC HEALTH, SANITATION, CONSERVANCY and SOLID WASTE MANAGEMENT
Sl.No
Functions as per 12th Schedule
Agency Responsible with in their jurisdiction
Data to be Disclosed Period for which information has to be disclosed
Level of Disclosure (ULB/Ward)
Frequency of Disclosure
Reference Remarks
6 Public Health, Sanitation, Conservancy and SWM
ULBs/ Water Board/ UDA
(i) Street Sweeping (road wise street sweeping schedule)
Current status as per action plan
ULB/Ward Half Yearly
Table 6.(a).1 & 6.(a).2
SWM Action Plan
(ii) General statistics on Solid Waste Management (Generation quantity, Details of the Secondary Collection Points, landfill location, user fee)
current status ULB Annually Table 6.(a).3.1& 6.(a).3.2
SWM MIB
(iii) Percentage of HH covered under Door-to-Door Collection
current status ULB Half Yearly
Table 6.(a).4
SLB and MIB
(iv) Percentage of households participating in segregation
current status ULB Half Yearly
Table 6.(a).5
Manual on Public Disclosure Schedules
TP Nagamangala | 19
(v) Extent of Scientific treated and Disposal of MSW (%)
current status ULB Annually Table 6.(a).5
SLB and MIB
(vi) Cost recovery under SWM (Revenue generated per ton of SW/ Expenditure per ton of SWM (in Rs.))
Previous three financial years including current year
ULB Annually Table 6.(a).6
SLB
Sewerage & Drainage:
(vii) Percentage of coverage of UGD
current status ULB Annually Table 6.(b).1
SLB
(viii) Percentage of Waste Water Treated
current status ULB Annually Table 6.(b).2
SLB
(ix) Percentage of extent of reuse and recycle of treated waste water
current status ULB Annually Table 6.(b).3
SLB
(x) Cost recovery under UGD (Revenue generated under UGD/ Expenditure under UGD (in Rs.))
previous three financial years including current year
ULB Annually Table 6.(b).4
SLB
Storm Water Drains
(xi) Statistics of storm Water Drains ( location, length and its cleaning frequency)
current status ULB Annually Table 6.(c).1
(xii) % age roadside drains to road length ( Paved and unpaved)
current status ULB Annually Table 6.(c).2
SLB
Manual on Public Disclosure Schedules
TP Nagamangala | 20
(xiii) Incidences of Water Logging and Flooding (No.s of cases per year/ total number of identified points)
current status ULB Annually Table 6.(c).3
SLB
Public Health (if applicable) (xiv) No of Municipal Hospitals and its location details
Current Status ULB Annually Table 6.(d).1.1 And 1.2
(xv) Facilities available & OPD Timings
Current Status ULB Annually
(xvi) Number of cases of vector Born Diseases per 1000 population
ULB Annually Table 6.(d).2
(xvii) Number of cases of Water Born Diseases per 1000 population
Annually
Manual on Public Disclosure Schedules
TP Nagamangala | 21
Table 6(a).1 Private sector participation details for SWM
Package Number Scope of work Name of the contractor Contract period (dd/mm/yyyy to
dd/mm/yyyy)
Contract value in Rs. In lakhs
01 Road
Sweeping Arkeshwara Enterprises,
Shivapura, Maddur Taluk 02/12/2012 to 01/12/2013 16.41
Table 6(a).2 Street Sweeping Schedule
Package number
ward number
Road ID if avaliable
Road name Road length in Kms
Sun Mon Tue Wed Thu Fri Sat
A* type .. … A type 10 KM All Day .. … B type 17 - - - Wed - - Sat .. … C type 21.2 - - - - Thu - - .. … D type .. …
Source: SWM Action Plan
Manual on Public Disclosure Schedules
TP Nagamangala | 22
Table 6(a).3.1 Details Handled by SHG
(No.s) Handled by Service Provider, if applicable (No.s)
Handled by ULB (No.s)
Handled by RWA/NGO (No.s)
Non slum Household‟s 3539
Slum Household‟s 894
commercial establishments 1086
Bulk generators 35
Expected User fee generation (demand) Table.6 (a) 3.2
General statistics on Solid Waste Management Total Quantity of waste generated in the city per day(TPD)
Total Quantity of waste Collected (TPD)
User fee Slab details enclosed
Resolution date passed from Council
Land fill location Number of secondary transportation vehicles under SWM
5-6 tons 5 tons - -
Sy No. 366/84,88 &64 at
Karadahally, Mandya Road
2 Tractors
Secondary storage containers Location Map
Enclosure
Source: SWM Action Plan
Manual on Public Disclosure Schedules
TP Nagamangala | 23
Table 6(a).4 Number of Households participating in segregation 2200
Table 6(a).5 Scientific Disposal of MSW
Total waste collected & transported to disposal sites 5 in tones/day
Total waste processed in scientific manner……0……in tones/day Table 6(a).6 Cost recovery under SWM in Rs Lakhs
2012-13 Expenditure
2013-14 Expenditure
1. Salary of the employees under SWM
40.77 40.32
2 Total Contractual cost if outsourced under
MSWM for hiring services, vehicles or
equipments, O& M of vehicles, fuel cost, labour
cost etc.
1.55 1.33
3 Total expenditure borne by ULB on SWM for O
&M of vehicles, purchase of tools and
equipments, insurance cost for vehicles, landfill
management cost like tipping fee etc.
0.52 0.59
Revenue 1 Total Revenue generated under SWM
0.00 0.00
Manual on Public Disclosure Schedules
TP Nagamangala | 24
Sewerage
Table.6 (b) 1. UGD Coverage
Total Number of households with direct UGD Connections 484 in Numbers Table.6 (b) 2 Percentage Waste Water treated
Total waste water collected at sewage treatment plant 0 in MLD
Quantity of waste water treated 0 in MLD
Table.6 (b) 3 extent of reuse and recycle of waste water
Quantity of waste water recycled & reused out of treated waste water…0…..in MLD (when mouse is moved on MLD then it
should show “million Liters per day”)
Table.6 (b) 4 Cost recovery under UGD (Input screen)
Expenditure 1. Electricity bill for sewage treatment plant 0.00
2 Total salaries of ULB employees working in STP & UGD system 0.00
3 Total O& M Contractual cost (if Outsourced) under UGD and STP (purchase of items, repair and replacement of spares, labour cost etc.)
0.00
Manual on Public Disclosure Schedules
TP Nagamangala | 25
Total O& M cost born by ULB under UGD and STP (purchase of items, repair and replacement of spares etc.)
0.00
Revenue 1 Total revenue collected from UGD 0.00
Storm Water Drains Table.6(c).1 Statistics of storm water drains
Name of major storm water drains Length in kms Cleaning frequency per annum
Behind TAPCMS Petrol Bank 1 Km 4 times
Behind Canara Bank 0.50 Km 4 times Table.6 (c) 2 Length of road side drains 44.81km
Table.6 (c) 3 Number of water logging and flooding cases per year……in numbers 3 in number
Total number of identified points….in Numbers 3 in number
Public Health to be filled by the ULBs if they are managing this function
Manual on Public Disclosure Schedules
TP Nagamangala | 26
Table 6 (d).1.1 Public Health Name of the Municipal hospitals
Location details Detail of facilities Number of beds
Number of staff
OPD2 Timings of the OPD
Lab Facility (yes/No)
Others if any
No Municipal Hospital Found
Table 6(d). 1.2 Number of vector borne disease cases per 1000 population Number of water borne disease cases per 1000
population
0
0
Function 7 is not managed by ULB in Karnataka State hence the details are not mentioned
2 Out Patient department
Manual on Public Disclosure Schedules
TP Nagamangala | 27
8. URBAN FORESTRY, PROTECTION OF ENVIRONMENT AND ECOLOGY Sl.No
Functions as per 12th Schedule
Agency Responsible with in their jurisdiction
Data to be Disclosed Period for which information has to be disclosed
Level of Disclosure (ULB/Ward)
Frequency of Disclosure
Reference Remarks
8 Urban forestry, protection of environment and ecology
ULB Trees (if applicable)
(i) Number of tree cut/uprooted to the number of existing trees
current status
ULB Half Yearly Table 8.1
(ii) Number of sapling planted to the number of trees cut/uprooted to the number of existing trees
Current year ULB Half Yearly
Water bodies (if applicable)
(iii) Existing number, New Proposals for Revival of water bodies, budget and expenditure
current status
ULB Annual Table 8.2
Table.8.1 (To be filled by the ULBs if they are managing this function) Urban forestry Total Number of existing trees Total Number of trees cut/uprooted Total Number of new saplings planted
Not Maintained by the ULB
Manual on Public Disclosure Schedules
TP Nagamangala | 28
Table.8.2 Protection of Environment and Ecology Sl. No Name existing water bodies
like lake, tanks, pond etc. Proposed for revival in Yes/No Amount budgeted for revival in Rs.
in lakhs Expenditure met in Rs. in Lakhs
1 Hirikere Tank, Yes 85.00 0.00
2 Soolekere Tank No 0.00 0.00
3 Humperasana lake No 0.00 0.00
4 Humperasana upp lake No 0.00 0.00
Function 9 is not managed by ULB in Karnataka State hence the details are not mentioned 10. SLUM IMPROVEMENT & UP-GRADATION
Sl.No
Functions as per 12th Schedule
Agency Responsible with in their jurisdiction
Data to be Disclosed Period for which information has to be disclosed
Level of Disclosure (ULB/Ward)
Frequency of Disclosure
Reference Remarks
10 Slum Improvement & Up-gradation
ULB/UDA (i) Details on declared and undeclared slums (numbers, location, number of households, population, area)
current status ULB/Ward Half yearly Table 10.1
(ii) Details of slum improvement schemes (schemes, slums benefited, budget and
Previous three financial years including current year
ULB/Ward Half yearly Table 10.2.
Manual on Public Disclosure Schedules
TP Nagamangala | 29
expenditure)
(iii) Beneficiary list under each scheme
current status ULB/Ward Half yearly Table 10.2
(iv) Status of Basic Services in Slums (a) No of connections - Water Supply & sanitation (% coverage) (b) Length of Roads and drains (paved and unpaved) (c) No and % of houses (pacca and katcha houses)
current status ULB/Ward Half yearly Table 10.3
Table 10.1 Details on declared and undeclared slums (Input Screen & Output screen are same) Details of declared slums Enclosure as per the format given Below Details of un declared slums Enclosure as per the format given Below Format for enclosure as mentioned in table 10.1
Details of declared and undeclared slums
Name of the slum Declared/ Undeclared Extent in Sq. mt Population Number of Households
Subhash Nagar
Declared
0.0243 605 135
Bubuduke Colony 0.00405 198 33 Narigudde 0.0081 210 69
Manual on Public Disclosure Schedules
TP Nagamangala | 30
Halesanthe Maidana 0.01215 210 50
AD Colony 0.01215 396 110
AK Colony 0.01012 360 70
Aavige Raod 0.0081 235 45
Sweeper Colony 0.01012 215 40
Koladabeedi Undelcalred 0.00607 150 35
Moolehatti Undelcalred 0.01113 207 85
Table.10.2 Details of slum improvement Schemes (Input & Output Screen are same)
Current Year No Scheme are implemented Name of the slum
Improvement Schemes Total Number of Budget and under
each Scheme (in Rs Lakhs)
Expenditure met under each scheme( in Rs Lakhs)
Beneficiary list as enclosure Slums Beneficiaries
enclosure Current Year - 1
Name of the slum Improvement Schemes
Total Number of Budget and under each Scheme (in Rs Lakhs)
Expenditure met under each scheme( in Rs Lakhs)
Beneficiary list as enclosure
Slums Beneficiaries enclosure Current Year - 2
Name of the slum Improvement Schemes
Total Number of Budget and under each Scheme (in Rs Lakhs)
Expenditure met under each scheme( in Rs Lakhs)
Beneficiary list as enclosure
Slums Beneficiaries enclosure
Manual on Public Disclosure Schedules
TP Nagamangala | 31
Table 10.3 Basic Service status in Slums
Status of Basic services in Slums
Total number of households with
direct water supply
connections (numeric)
Total number of public taps/mini
water cisterns (numeric)
Total length of roads
paved and unpaved in
Kms
Total households
connected to UGD
(numeric)
Total length of
road side
drains in Kms
Total number of HH with
individual toilets
(numeric)
Number of Functional Community
Toilets (numeric)
Total number of pacca/kaccha
houses (numeric)
456 367 - 368 - 564 - 473
Note: ULBs needs to disclose information under table 10.2, 10.3 and 10.4 with a note that “All the information in this table are the works undertaken by ULB” (plz Insert this without fail)
Manual on Public Disclosure Schedules
TP Nagamangala | 32
11. URBAN POVERTY ALLEVIATION Sl.No
Functions as per 12th Schedule
Agency Responsible with in their jurisdiction
Data to be Disclosed Period for which information has to be disclosed
Level of Disclosure (ULB/Ward)
Frequency of Disclosure
Reference Remarks
11 Urban Poverty Alleviation
ULBs /DMA/UDA
(i) Details of the Urban Poverty Alleviation Schemes (eg. Components of SJSRY )
Current status ULB Annually Table 11.1
Table 11.1 Details of Urban Poverty Alleviation
Name of Schemes under urban poverty alleviation (multiple
entries)
Budget for the schemes
Expenditure met for the scheme
Number of beneficiaries under the scheme
list of the beneficiaries to be enclosed
USEP(Loan & Subsidy) 3.00 7.25 26 Enclosure
UWSP(Loan & Subsidy) 3.00 7.35 35 Enclosure
UWSP(Revolving fund) 0.80 0.60 3 Enclosure
STEP-UP 1.20 0.2860 20
UCDN 0.50 0.74 350
UWEP - - -
Manual on Public Disclosure Schedules
TP Nagamangala | 33
All the information in this table are the works undertaken by ULB” (plz Insert this without fail) 12. PROVISION OF URBAN AMENITIES AND FACILITIES-PARKS, GARDENS & PLAY GROUNDS
Sl.No
Functions as per 12th Schedule
Agency Responsible with in their jurisdiction
Data to be Disclosed Period for which information has to be disclosed
Level of Disclosure (ULB/Ward)
Frequency of Disclosure
Reference Remarks
12 Provision of urban amenities and facilities- parks, gardens and playgrounds
ULBs/UDAs Playground/ Parks/Gardens
(i) Percentage of area under parks and gardens to the total ULB area
Current status ULB Annually Table 12.1
(ii) Percentage of developed parks and gardens (%)
Current status ULB Annually Table 12.1
(iii) Number, Location, Area, Amenities, details of the maintaining agency
Current Status ULB Annually Table 12.2 (a) and 12.2 (b)
Table.12.1. Area reserved under Parks & Gardens
1. Total ULB area…2.50…in Sq.kms
2. Area reserved under Parks & Gardens…14097.. in Sq.meters
3. Area of developed parks and gardens …1665…in sq. mts
Manual on Public Disclosure Schedules
TP Nagamangala | 34
Table.12.2 (a) Amenities under parks & Gardens
Locations of the park
Park Area in sq. mt
Amenities available under each park (yes/no) Contact details of the Maintaining Agency
Children play area
Seating facility
Track for walking/jogging
Facility for exercise
Name Contact number(numeric)
(multiple entries)
Infront of KST
Temple 1665 Sq.mt No Yes Yes No Chief
Officer TP Nagamangala
286022
Table 12.3.(b) Play ground details
Locations of the playgrounds
playground Area in sq. mt
Contact details of the Maintaining Agency
Name Contact
number(numeric)
Behind Junior College 16000 sq.mt AEE, Pwd 08234-286169
Manual on Public Disclosure Schedules
TP Nagamangala | 35
13. PROMOTION OF CULTURAL, EDUCATIONAL AND AESTHETIC ASPECTS
Sl.No
Functions as per 12th Schedule
Agency Responsible with in their jurisdiction
Data to be Disclosed Period for which information has to be disclosed
Level of Disclosure (ULB/Ward)
Frequency of Disclosure
Reference Remarks
13 Promotion of cultural, educational, and aesthetic aspects
ULBs (i) Details of Community halls, Cultural Centers, marriage halls, municipal educational institutes
Current Status ULB Annually Table 13.1 (a) and 13.1. (b)
(ii) Details of advertisement hoardings, rates, revenue generated
Current Status ULB Annually Table 13.2.1 and 13.2.2
Table 13.1.a Details of cultural Centers
Table 13.1 (b) Details of educational institutes (only if applicable)
Community halls/Auditorium Details Name Address Booking office
address and contact details
Ambedkar Bhavan T.B extension
Nagamangala TPO Nagamangala
Ph 286022, 286919
Name of the Municipal Educational Institutes Number of teachers in each municipal Educational Institutes(in
numbers) Name Address Numbers
No Municipal Educational Institutes Found
Manual on Public Disclosure Schedules
TP Nagamangala | 36
Table13.2.1 Details of Advertisement Hoardings (Input & Output screens are same)
Details of Advertisement hoardings
Number of Hoardings Slab rates for advertisement (As Enclosure)
Advertisement tax demand for the current year in Rs. in lakhs
Advertisement tax collected in the current year in Rs. in lakhs
101 250/ slab 0.25 0.25 14. BURIALS AND BURIAL GROUNDS, CREMATIONS, CREMATION GROUNDS AND ELECTRIC CREMATORIUMS
Sl.No
Functions as per 12th Schedule
Agency Responsible with in their jurisdiction
Data to be Disclosed Period for which information has to be disclosed
Level of Disclosure (ULB/Ward)
Frequency of Disclosure
Reference Remarks
14 Burials and burial grounds, cremations, cremation grounds and electric crematoriums
ULBs (i) Numbers, type, Location of burial grounds and cremation facilities available, fee charged if any
Current Status ULB
Annually Table 14.1 (a). and 14.1(b)
(ii) Details of facility of “Herse/ Corpse
Vehicles”(number and
contact details)
Current Status ULB Annually Table 14.2
Manual on Public Disclosure Schedules
TP Nagamangala | 37
Table.14.1 (a) Details of Burial grounds, cremation grounds & electric crematoriums Details of Burial grounds, cremation grounds & electric crematoriums
Name of the Community
burial ground with
locations
Name and location of the
Crematoriums/Burial ground
Facilities available in the Crematoriums ( Yes / No)
Electric Burning
Burial Availability
of wood
Water facility
Cleaning facility
Others if any
Maintaining agency
Name Contact details
Multiple (entries)
Brahmin Burial ground, B.M. Road
No Yes No Yes Yes Yes No Community
(venkataramu)
9448643944
Ganigas Burial ground, Mysore Road
No No Yes Yes Yes No No Community
Veerashiva Burial ground, Mysore Road
No No Yes Yes Yes No No Community
Muslims Burial ground K.Mallenhalli, Mysore Road
No No Yes Yes Yes No No Community(venkataramu)
9448643944
Muslim Jalmatt Burial ground, Darga Road
No No Yes Yes Yes No No Community(Md. Kalilula)
9448914263
Bajanthri Burial ground, Behind Hirikere Pump House
No Yes Yes Yes Yes No No Community
Manual on Public Disclosure Schedules
TP Nagamangala | 38
Muslims Burial ground, Paduvalapatna Road, Betta
No No Yes Yes Yes No No Community(Md. Kalilula)
9448914263
Kumbara Burial ground, Muneshwara Temple Raod
No No Yes Yes No No No Community
Madivala Burial ground, Paduvala Patna Road
No Yes Yes Yes No No No Community
Banajiga Burial Ground, Mysore Road
No Yes No No No No No Community
Table 14.1 (b) Fee slab for each crematorium (Input and Out put screens are same)
Fee slab for each crematoriums and burial grounds Enclosure
0 0
Table 14.2: Details of Hearse Vehicles
Hearse/Corpse vehicle details
Number of hearse vehicles available
Fee details for the vehicle( in Rs)
Contact details to hire the vehicle
Maintaining agency
Contact Number Name Contact Number
No No No No No
Manual on Public Disclosure Schedules
TP Nagamangala | 39
15. CATTLE PONDS, PREVENTION OF CRUELTY TO ANIMALS Sl.No
Functions as per 12th Schedule
Agency Responsible with in their jurisdiction
Data to be Disclosed Period for which information has to be disclosed
Level of Disclosure (ULB/Ward)
Frequency of Disclosure
Reference Remarks
15 Cattle ponds, prevention of cruelty to animals
ULBs (i) Numbers of stray animals, vaccinated
Current Status ULB Annually Table 15.1 (a) and 15.1 (b)
(ii) List of „Kanji House‟
(care centers for stray animals).
Current Status ULB Annually Table 15.1 (a)
Table.15.1.1 Details of stray animals (input & output screen are same)
Number of stray animals Number of stray dogs vaccinated
Location of Kanji House (care centers for Stray animals) if applicable Dogs Cows Pig Others if applicable
210 2 80 - - -
Table 15.1.2 Details of Veterinary & Animal Welfare Centers (input & output screen are same)
List of location of Veterinary hospitals 1. Veterinary hospital Nagamangala
List of Animal Welfare Association (if available) No Animal Welfare Association
Name and location of NGOs working for animal
welfare( if available)
No NGO’s working
Manual on Public Disclosure Schedules
TP Nagamangala | 40
16. VITAL STATISTICS INCLUDING REGISTRATION OF BIRTHS AND DEATHS Sl.No
Functions as per 12th Schedule
Agency Responsible with in their jurisdiction
Data to be Disclosed Period for which information has to be disclosed
Level of Disclosure (ULB/Ward)
Frequency of Disclosure
Reference Remarks
16 Vital Statistics including registration of births and deaths
ULBs (i) General information pertaining to city (population, area, households etc.)
Current Status and recent census details
ULB Annually Table 16.1 City website
(ii) List of citizen service centers with location
Current status ULB Annually Table 16.2
(iii) Total Births and Deaths recorded along with Birth and Death rates.
Current status ULB Half Yearly
Table 16.3
(iv) Citizen Charter to be published
Current status ULB Annually Table 16.4
Table 16.1: City General information as per recent census details (should be added in their respective ULB website
City General information Present population
Present area in sq.km
Total number of households
Population density
Total male population
Total female population
Total SC/ST Population
Total Slum population
Literacy rate
17763 2.52 4810 7681 8948 8915 1560 2765 80.2
Manual on Public Disclosure Schedules
TP Nagamangala | 41
Table 16.2: List of Citizen Service centers Sl. No Address of the Citizen Service centers if applicable 1 Public Grievance Redressal Cell(PGR), TP Nagamangala
Table 16.3: Details of Birth & Death(jan-2013 to Dec-2013)
Total births recorded Total deaths recorded
851 145 Table 16.4 Citizen Charter (ULBs who have already maintaining the Charter can enclose the same, other ULBs can follow the below format Service Details Period of catering the
service
Procedure to Apply Officer incharge
Designation Contact Number
Birth Certificate
Enclosure Death certificate
Property Tax Application
Khatha Certificate
others
Enclosure if already citizen
charter being maintained
Manual on Public Disclosure Schedules
TP Nagamangala | 42
17. PUBLIC AMENITIES INCLUDING STREETLIGHTING, PARKING LOTS, BUS STOPS AND PUBLIC CONVENIENCES
Sl.No
Functions as per 12th Schedule
Agency Responsible with in their jurisdiction
Data to be Disclosed Period for which information has to be disclosed
Level of Disclosure (ULB/Ward)
Frequency of Disclosure
Reference Remarks
17 Public amenities including street lighting, parking lots, bus stops and public conveniences
ULBs (i) number of street lights Current status ULB Annually Table 17.1 SLB
(ii) No. of Street Lights/ Km of Road Length (No.s)
Current status ULB Annually Table 17.1 SLB
(iv) Details of agency maintaining street lights (name and contact details)
Current status ULB Annually Table 17.2
(v) List of Authorized Parking Areas along with parking capacities and fee
Current status ULB Annually Table 17.3
(vi) Number and locations of bus stops and public toilets (Community and commercial) with its user charge.
Current status ULB Annually Table 17.4
Table.17.1: Details of streetlights
Total number of streetlights Types of streetlights with number
Tube light High Mast Center Media lights
Mercury vapor Sodium vapor
633 251 04 89 0 289
Manual on Public Disclosure Schedules
TP Nagamangala | 43
Table 17.2: Details of Agency Maintaining Streetlight Package Number Wards Covered details of the agency Maintaining the streetlights
Name Phone Number - Total 16 ward ULB 286022 Table.17.3: Details of Parking Lots Details of parking lots
No Parking Lots
Format Parking lot location Parking Capacity Fee Slab
Two wheeler
Four wheeler
Two wheeler
Four wheeler
No Parking Lots Table.17.4 Details of toilets
Public toilets Community Toilets Location Fee slab Location Fee slab
1. Front of Taluk panchayth 0 Savakahlli Mohlalla 0 2.Behind Mini Vidhana Soudha 0 A.K.Colony 0
3. T.B. Circle 0 Sweeper Colony 0
Manual on Public Disclosure Schedules
TP Nagamangala | 44
Table17.5: Details of Bus stop
18. REGULATION OF SLAUGHTER HOUSES AND TANNERIES
Location of Bus stop( As Enclosure)
Area Address
KST Road Private
Bus stand W. No.-05 KST Road,
Nagamangala, D.B., Pura
New KSRTC Bus Stand
W. No.-05 BM Road, Nagamangala,
Location of Public toilets User charges for Pay and Use toilets in Rs.
Pay and use toilets Community based Toilets
Pay and use toilets Community based Toilets
1 0 2 Rs. per use 0
Sl.No
Functions as per 12th Schedule
Agency Responsible with in their jurisdiction
Data to be Disclosed Period for which information has to be disclosed
Level of Disclosure (ULB/Ward)
Frequency of Disclosure
Reference Remarks
18 Regulation of slaughter houses and tanneries
ULBs (i) Number, Location of Slaughter House / Tanneries along with facilities available and capacity
Current status ULB Annually Table 18.1(a) and (b)
Manual on Public Disclosure Schedules
TP Nagamangala | 45
Table.18.1(a): list of Slaughter houses
Number of Slaughter Houses Functional
Number of slaughter houses Non functional
No Slaughter House found Table 18.1 (b): Details of Slaughter House Location of the slaughter House
Whether the Slaughter house is been regulated by KSCB (Yes/No)
Capacity Number of animals slaughtered per week
Facilities Washing Medical
Examination
Removal of Waste
Others if any
No Slaughter House found