HSE Statistics, Facilities &

Incident Reporting System

IMPLEMENTATION OF SAFETY PROGRAM

By: Ishtiaq Aziz Hashmi (QHSE Division Manager) Mind-Merge

Mind-Merge Motto : “No Compromise withSafety”

Page 2: Tower Project HSE Presentation

HSE Arrangement For Tower ProjectHSE Plan and Procedure (HSE-MS)

Safe Plan for Construction Phase

Safe Working Plan for Summer (Heat Stress)

Safe Working Plan for Steel Structure Work

Safe Plan for Dust Control / Heavy Wind Work

Emergency Evacuation Plan / Scape

Safety Rules & Regulation for Contractors

Safe Working Plan for Tower Installation

QHSE Documentation Control System

IMPLEMENTATION OF SAFETY PROGRAM

Page 3: Tower Project HSE Presentation

Accident / Incident Reporting System

Accident and Incident Safe Reporting System

Cost Saving Incident Reporting System

Safe from Penalty as endorsed by Agreement (Accident)

Safe from Incident affects (Company & Staff)

How to Safe the Cost and Delay Penalty due to Incident

Criteria for Selection of Sub-Contractor

External and Internal QHSE Audit

IMPLEMENTATION OF SAFETY PROGRAM

Page 4: Tower Project HSE Presentation

HSE Arrangement For Tower Project PTW (Permit To Work) Hot work, Cold work, Work at

Height, Scaffolding Permit, Crane work, Client Work

Permit, etc.

JSA For Excavation Work

JSA For Concrete Work

JSA For Electrical Work

JSA for Other Civil Work

JSA for Cable Work

IMPLEMENTATION OF SAFETY PROGRAM

Page 5: Tower Project HSE Presentation

Important Trainings For Tower Project

Training For Flagman Work (Green-man & Red-man Safety)

Training For Working at Height Safety (Tower)

Training For Electrical Work Safety

Training For Defensive Driving –DD1 (Long Drive)

Training For Emergency Escape & Assembled

Training For Hand Safety

Training For Heavy Equipment Safety

Training for Behavior Base Safety (Site Staff)

IMPLEMENTATION OF SAFETY PROGRAM

Page 6: Tower Project HSE Presentation

Important Trainings For Tower Project

Training For Fire Fighting (Generator Safety)

Training For First Aid Treatment (Tower Staff)

Training For Fall from Tower Height Safety

Training For Hand Tools Safety (M/A)

Training For Cable Pulling Safety

Training For Proper Use of PPEs

Training For Crane Operation Safety

Training For Rigger Level-3 for Equipment Operation

IMPLEMENTATION OF SAFETY PROGRAM

Page 7: Tower Project HSE Presentation

Safety Observation Program by HSE Officers on Weekly

Basis, Searching for Both (Positive and Negative Points

about Safety) and Unsafe Conditions

HSE Weekly Or Monthly Statistics Report

TBT –Tool Box Talk Topics (Weekly-03)

Safety Walk Through by Manager/Engn. (Weekly)

Record of Reported Near-misses

Record of Reported First Aid Cases

Record of Environmental Incident Cases

Safety Documentation for Tower Project

IMPLEMENTATION OF SAFETY PROGRAM

Page 8: Tower Project HSE Presentation

Safety Implementation PTW System (Hot work, Cold work, Height work, Scaffold

work, Excavation work, etc.)

Safety Orientation for New Staff

Fire Extinguishers Monthly Inspection

Color Coding for Inspection of Equipment

Fixed Safety Posters and Sign Boards

Incident Reporting System and Flow Chart

Proper Rope and Hard Barrication Providing for Site

IMPLEMENTATION OF SAFETY PROGRAM

Page 9: Tower Project HSE Presentation

Security, Safety and Emergency Plan

Providing Security Guards for Site

Fire Alarm will Use Manual Horn for any Emergency

Fire Extinguishers Fixing as per Requirement

Emergency Evacuation Layout will Provide

Emergency Contract Numbers posters and board will

Provide.

Safety Statistical Board will be Provided near Office

IMPLEMENTATION OF SAFETY PROGRAM

Page 10: Tower Project HSE Presentation

Important PPEs for Tower Project

IMPLEMENTATION OF SAFETY PROGRAM

Page 11: Tower Project HSE Presentation

Important PPEs for Tower Project

IMPLEMENTATION OF SAFETY PROGRAM

Page 12: Tower Project HSE Presentation

Tower Installation by Cranes

IMPLEMENTATION OF SAFETY PROGRAM

Page 13: Tower Project HSE Presentation

Site Staff Rest Room / Assembly Point

IMPLEMENTATION OF SAFETY PROGRAM

Page 14: Tower Project HSE Presentation

Site Office/Site Security Guard

IMPLEMENTATION OF SAFETY PROGRAM

Page 15: Tower Project HSE Presentation

Site Smoking Shelter as per Policy

IMPLEMENTATION OF SAFETY PROGRAM

Page 16: Tower Project HSE Presentation

Management Safety Training Program

IMPLEMENTATION OF SAFETY PROGRAM

Page 17: Tower Project HSE Presentation

Site Staff Training Program

IMPLEMENTATION OF SAFETY PROGRAM

Page 18: Tower Project HSE Presentation

Tool Box Talk (TBT) Meetings for workers

IMPLEMENTATION OF SAFETY PROGRAM

Page 19: Tower Project HSE Presentation

Achievements for Project

Man-hours Completed

without LTI = xxxxxxxxx m/hr

01-01-xxxx TO 31-12-xxxx

Should Mentioned on Board near to Site Office