Towards Increased Coordination of R&D Activities for Decommissioning Christine Georges, CEA , France 1

Towards Increased Coordination of R&D Activities for ... Annual Forum 2… · Christine Georges, CEA , France 1 •Various dismantling techniques at the level of industrial maturity

  • Upload
    others

  • View
    0

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Towards Increased Coordination of R&D Activities for ... Annual Forum 2… · Christine Georges, CEA , France 1 •Various dismantling techniques at the level of industrial maturity

Towards Increased Coordination of R&D Activities for Decommissioning

Christine Georges, CEA , France

1

Page 2: Towards Increased Coordination of R&D Activities for ... Annual Forum 2… · Christine Georges, CEA , France 1 •Various dismantling techniques at the level of industrial maturity

• Various dismantling techniques at the level of industrial maturity

• But still specific challenges ahead regarding safety, environmental impacts, efficiency and cost-effectiveness for: In situ and waste investigations and

characterization before, during and after dismantling

Decontamination and site release Segmentation and handling , IT tools for simulation of scenarios and data

management, waste management in an holistic approach

(treatment, conditioning and packaging, before disposal).

2

Context of “SHARE” / 1: Still needs for R&D in D&ER

Page 3: Towards Increased Coordination of R&D Activities for ... Annual Forum 2… · Christine Georges, CEA , France 1 •Various dismantling techniques at the level of industrial maturity

On one hand: • Increasing difficulties for Individual countries to justify expenditures on new developments •Reluctance to use innovative technologies and search for approved technologies to

minimize risks On the other hand: • Significant redundancy in current R&D programmes for Decommissioning in different

countries • Lot of exchanges between operators through IAEA/OCDE or bilateral collaboration

agreement but very few projects in common in D&ER before 2017

3

Incentives to SHARE initiative: • Public research should provide solutions to D&ER challenges • Promotion and organization at multinational level of the co-

financing of R&D developments in Decommissioning by actors with common objectives is a Necessity

Context of “SHARE” / 2: More impulse needed to use results of R&D

Page 4: Towards Increased Coordination of R&D Activities for ... Annual Forum 2… · Christine Georges, CEA , France 1 •Various dismantling techniques at the level of industrial maturity

Implementation of « SHARE » Initiative – Scope & expected impact

4

Working group within IAEA International Decommissioning Network (IDN) created in November 2016 as an output of Madrid conference

Scope: To strengthen networking and complementarity between national research programmes for decommissioning: Promotion for greater coordination of research Identification of R&I needs Identification of innovative techniques and methods where there is a clear benefit from multiparty implementation Proposal of possible funding schemes for collaborative projects addressing those needs and development of a framework for coordination of the implementation of selected projects

Decision to propose a project under EURATOM Research and Training Programme Horizon 2020 as an Initial step: 2 years Coordination and Support Action (CSA)

Page 5: Towards Increased Coordination of R&D Activities for ... Annual Forum 2… · Christine Georges, CEA , France 1 •Various dismantling techniques at the level of industrial maturity

5

Page 6: Towards Increased Coordination of R&D Activities for ... Annual Forum 2… · Christine Georges, CEA , France 1 •Various dismantling techniques at the level of industrial maturity

6

Page 7: Towards Increased Coordination of R&D Activities for ... Annual Forum 2… · Christine Georges, CEA , France 1 •Various dismantling techniques at the level of industrial maturity

7

Page 8: Towards Increased Coordination of R&D Activities for ... Annual Forum 2… · Christine Georges, CEA , France 1 •Various dismantling techniques at the level of industrial maturity

Implementation of « share » initiative – Proposal to Euratom H2020

8

Stakeholders to be defined (e.g. national Technical Support Organizations, representatives of different types of facilities requiring decommissioning, etc. ) Questionnaires to stakeholders and seminars to be defined Preparatory work Support to future coordination of R&I

efforts: Benchmarking on financial and organizational models

Expected Impact: • A roadmap for decommissioning research providing

guidance to stakeholders on the steps needed during the next 10-15 years in the following fields: Characterization Decontamination & Remediation Dismantling techniques Advanced information technologies Waste treatment, conditioning and packaging

Page 9: Towards Increased Coordination of R&D Activities for ... Annual Forum 2… · Christine Georges, CEA , France 1 •Various dismantling techniques at the level of industrial maturity

9

Schedule – zoom 2017/2018

2016

DEC JAN FEB MAR APR MAY JUN JUL AUG SEPT OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC JAN FEV MAR APR MAY JUN JUL AUG SEPT OCT NOV DEC JAN FEV MAR APR MAY JUN JUL AUG SEPT OCT NOV DEC JAN FEV MAR APR MAY JUN JUL AUG SEPT OCT NOV DEC JAN FEV MAR APR MAY JUN JUL AUG SEPT OCT NOV DEC

First Draft *

Meetings * * * *

Designation of

WP leaders Choice of PMO * List of partners

Call WP2018

dead line for

submission

WP2018

Implementation

SHARE

future RTD call

for R&D

Implementation

of cofinanced

R&D

2021 20212017 2018 2019 2020

Page 10: Towards Increased Coordination of R&D Activities for ... Annual Forum 2… · Christine Georges, CEA , France 1 •Various dismantling techniques at the level of industrial maturity

Interested parties

• Main Partners (i.e. future consortium members) and advisory commitee • Cooperation with non-EU countries seen as a potential promising path for the exploitation of

advanced technological capabilities • International organizations (IAEA , OECD ) providing technical support

10

Page 11: Towards Increased Coordination of R&D Activities for ... Annual Forum 2… · Christine Georges, CEA , France 1 •Various dismantling techniques at the level of industrial maturity

Sources and links

When writing the proposal, as imputs from past initiatives and in the future as partners:

• JOPRAD JP-RWM,

• OECD WPDD, CPD, NI2050,

• (WIKI, etc.), Environet, IPN, etc.

• EC (DB Tool, TND, CND, various platforms…)

• Outputs from conferences and workshops

• Websites (e.g: IRID, etc.)

• etc.

11

Page 12: Towards Increased Coordination of R&D Activities for ... Annual Forum 2… · Christine Georges, CEA , France 1 •Various dismantling techniques at the level of industrial maturity

Way Forwards

• Call EU H2020 WP2018 expected October 2017

• List of partners to be fixed by end of 2017 and list of advisory committee by March 2018

• All entities involved in R&I for D&ER are welcome and, at least will be contacted as stakeholders

12

Page 13: Towards Increased Coordination of R&D Activities for ... Annual Forum 2… · Christine Georges, CEA , France 1 •Various dismantling techniques at the level of industrial maturity

13

• 5 previous editions : 1992, 1998, 2003, 2008, 2013

• In 2013: 115 oral papers, 355 participants from 22 countries

• Up to now : 160 papers registered for DEM2018

Page 14: Towards Increased Coordination of R&D Activities for ... Annual Forum 2… · Christine Georges, CEA , France 1 •Various dismantling techniques at the level of industrial maturity

14

• Dismantling Strategy and Program Development

• Regulation Evolution

• Initial Radiological State Characterization

• Project Feedback Experience

• Material and Radioactive Waste Management

• Buildings and Sites Rehabilitation

• Economic and Financial Aspects

• Stakeholders Involvements and Public Acceptance

• Development of New D&Ds' Technologies

• Digital Contribution to Dismantling Operations

• Fukushima: feedback and operation in progress

Page 15: Towards Increased Coordination of R&D Activities for ... Annual Forum 2… · Christine Georges, CEA , France 1 •Various dismantling techniques at the level of industrial maturity