TOWARD ZERO DEATHS: TSMO AND HIGHWAY SAFETY PROGRAM UPDATES FROM ODOT DISTRICT 8 ITE/ITS MIDWEST FALL WORKSHOP • SEPT 16, 2020

TOWARD ZERO DEATHS: TSMO AND HIGHWAY SAFETY …...ODOT D8 Updates, ITE/ITS Midwest Fall Workshop • Sept 16, 2020 $2,723 $1,654 $962 $2,484 $1,500 $881 ($239) ($154) ($81) ($500)

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: TOWARD ZERO DEATHS: TSMO AND HIGHWAY SAFETY …...ODOT D8 Updates, ITE/ITS Midwest Fall Workshop • Sept 16, 2020 $2,723 $1,654 $962 $2,484 $1,500 $881 ($239) ($154) ($81) ($500)

TOWARD ZERO DEATHS: TSMO AND HIGHWAY SAFETY

PROGRAM UPDATES FROM ODOT DISTRICT 8ITE/ITS MIDWEST FALL WORKSHOP • SEPT 16, 2020

Page 2: TOWARD ZERO DEATHS: TSMO AND HIGHWAY SAFETY …...ODOT D8 Updates, ITE/ITS Midwest Fall Workshop • Sept 16, 2020 $2,723 $1,654 $962 $2,484 $1,500 $881 ($239) ($154) ($81) ($500)

2 |

SUMMARY FOR TODAY

o ODOT Updates

o Reducing crashes Towards Zero Deaths

o TSMO Applications in D8

ODOT D8 Updates, ITE/ITS Midwest Fall Workshop • Sept 16, 2020

Page 3: TOWARD ZERO DEATHS: TSMO AND HIGHWAY SAFETY …...ODOT D8 Updates, ITE/ITS Midwest Fall Workshop • Sept 16, 2020 $2,723 $1,654 $962 $2,484 $1,500 $881 ($239) ($154) ($81) ($500)

3 |

ODOT UPDATES

Page 4: TOWARD ZERO DEATHS: TSMO AND HIGHWAY SAFETY …...ODOT D8 Updates, ITE/ITS Midwest Fall Workshop • Sept 16, 2020 $2,723 $1,654 $962 $2,484 $1,500 $881 ($239) ($154) ($81) ($500)

4 |

REVENUE: ACTUAL VS. ESTIMATED

ODOT D8 Updates, ITE/ITS Midwest Fall Workshop • Sept 16, 2020

$2,723

$1,654

$962

$2,484

$1,500

$881

($239) ($154) ($81)

($500)

$0

$500

$1,000

$1,500

$2,000

$2,500

$3,000

Available for Distribution ODOT Share Local Share

FY20 Actual vs. Estimated MFT Revenue

2020 Original Estimate 2020 Actuals (COVID) 2020 Actual vs. Estimate

Ohio Department of Transportation

Revenue based on 7/1/2020 Rate Increase (Gasoline: $0.385/gallon & Diesel: $0.47/gallon)

*Actuals based on 11 month return data, 12th month estimated with 30% reduction

Page 5: TOWARD ZERO DEATHS: TSMO AND HIGHWAY SAFETY …...ODOT D8 Updates, ITE/ITS Midwest Fall Workshop • Sept 16, 2020 $2,723 $1,654 $962 $2,484 $1,500 $881 ($239) ($154) ($81) ($500)

5 |

TSMO IS MORE IMPORTANT THEN EVER

ODOT D8 Updates, ITE/ITS Midwest Fall Workshop • Sept 16, 2020

6.4

6.4 6.4

6.5

6.66.5

6.56.5

6.5

6.3

6.3

6.46.4

6.3

6.4

6.5

6.6

6.7

6.8 6.8

6.3

6.0

6.1

6.2

6.3

6.4

6.5

6.6

6.7

6.8

6.92000

2001

2002

2003

2004

2005

2006

2007

2008

2009

2010

2011

2012

2013

2014

2015

2016

2017

2018

2019

2020

Due to COVID-19 pandemic, FY2020 consumption retraced to FY2009 & FY2010 levels. levels

Page 6: TOWARD ZERO DEATHS: TSMO AND HIGHWAY SAFETY …...ODOT D8 Updates, ITE/ITS Midwest Fall Workshop • Sept 16, 2020 $2,723 $1,654 $962 $2,484 $1,500 $881 ($239) ($154) ($81) ($500)

6 |

TSMO IS MORE IMPORTANT THEN EVER

ODOT D8 Updates, ITE/ITS Midwest Fall Workshop • Sept 16, 2020

Page 7: TOWARD ZERO DEATHS: TSMO AND HIGHWAY SAFETY …...ODOT D8 Updates, ITE/ITS Midwest Fall Workshop • Sept 16, 2020 $2,723 $1,654 $962 $2,484 $1,500 $881 ($239) ($154) ($81) ($500)

7 |

NEW ODOT D8 MULTI-YEAR WORK PLAN WEBSITE

ODOT D8 Updates, ITE/ITS Midwest Fall Workshop • Sept 16, 2020

http://www.dot.state.oh.us/districts/D08/Pages/District-8-Multi-Year-Work-Plan.aspx

Page 8: TOWARD ZERO DEATHS: TSMO AND HIGHWAY SAFETY …...ODOT D8 Updates, ITE/ITS Midwest Fall Workshop • Sept 16, 2020 $2,723 $1,654 $962 $2,484 $1,500 $881 ($239) ($154) ($81) ($500)

8 |

ACTIVE AND PENDING CONSTRUCTION MAP

ODOT D8 Updates, ITE/ITS Midwest Fall Workshop • Sept 16, 2020

http://gis3.dot.state.oh.us/d08/ActivePendingConstruction/

Page 10: TOWARD ZERO DEATHS: TSMO AND HIGHWAY SAFETY …...ODOT D8 Updates, ITE/ITS Midwest Fall Workshop • Sept 16, 2020 $2,723 $1,654 $962 $2,484 $1,500 $881 ($239) ($154) ($81) ($500)

10 |

ODOT HIGHWAY SAFETY

PROGRAM OVERVIEW

ODOT D8 Updates, ITE/ITS Midwest Fall Workshop • Sept 16, 2020

Page 11: TOWARD ZERO DEATHS: TSMO AND HIGHWAY SAFETY …...ODOT D8 Updates, ITE/ITS Midwest Fall Workshop • Sept 16, 2020 $2,723 $1,654 $962 $2,484 $1,500 $881 ($239) ($154) ($81) ($500)

11 |

SAMPLE SLIDE TITLE DARK ORANGE HEADER

o Sample Text

ODOT D8 Updates, ITE/ITS Midwest Fall Workshop • Sept 16, 2020ODOT Updates, Colerain Township, 1/14/2020

1,068816

Page 12: TOWARD ZERO DEATHS: TSMO AND HIGHWAY SAFETY …...ODOT D8 Updates, ITE/ITS Midwest Fall Workshop • Sept 16, 2020 $2,723 $1,654 $962 $2,484 $1,500 $881 ($239) ($154) ($81) ($500)

12 |

CRASH TRENDS IN OHIO

53%

ODOT D8 Updates, ITE/ITS Midwest Fall Workshop • Sept 16, 2020

Traffic deaths on local

roads (2015-2019)

62%Serious injuries on local

roads (2015-2019)

40%Serious injuries and

fatalities on city/village

roads (2015-2019)

Page 13: TOWARD ZERO DEATHS: TSMO AND HIGHWAY SAFETY …...ODOT D8 Updates, ITE/ITS Midwest Fall Workshop • Sept 16, 2020 $2,723 $1,654 $962 $2,484 $1,500 $881 ($239) ($154) ($81) ($500)

13 |

DIG INTO THE DATA

ODOT D8 Updates, ITE/ITS Midwest Fall Workshop • Sept 16, 2020

http://www.dot.state.oh.us/Divisions/Planning/ProgramManagement/HighwaySafety/HSIP/Pages/Safety_Dash

board.aspx

Page 14: TOWARD ZERO DEATHS: TSMO AND HIGHWAY SAFETY …...ODOT D8 Updates, ITE/ITS Midwest Fall Workshop • Sept 16, 2020 $2,723 $1,654 $962 $2,484 $1,500 $881 ($239) ($154) ($81) ($500)

14 |

SAFETY UPDATES

o Distracted Driver Corridors

o Governor Top 150 projects

o $10M for Pedestrian Crashes

o Fall Safety applicationso No 100% safety funding

o 90/10 local match is required

ODOT D8 Updates, ITE/ITS Midwest Fall Workshop • Sept 16, 2020

Page 16: TOWARD ZERO DEATHS: TSMO AND HIGHWAY SAFETY …...ODOT D8 Updates, ITE/ITS Midwest Fall Workshop • Sept 16, 2020 $2,723 $1,654 $962 $2,484 $1,500 $881 ($239) ($154) ($81) ($500)

16 |

HOW TO APPLY

1. Prioritize a locationo Start with ODOT’s HSIP Priority List

o Check if the location is on a local priority list by contacting the local maintaining agency and by contacting

MVRPC

2. Check crash datao Review crash records for the site to determine if there are any crash trends. ODOT has developed an

excellent tool to streamline this process using the TIMS application (https://gis.dot.state.oh.us/tims/).

3. Call ODOT D8o Typically, sites need to have a minimum of 10 crashes in a three-year period to be eligible for safety funding.

o For projects under $500k, there are opportunities to pursue funding throughout the year.

o For higher cost projects, safety applications are due in April and September.

o Sign off from the District 8 Safety Review Team (DSRT) is required before safety applications can be

submitted.

ODOT D8 Updates, ITE/ITS Midwest Fall Workshop • Sept 16, 2020

Page 17: TOWARD ZERO DEATHS: TSMO AND HIGHWAY SAFETY …...ODOT D8 Updates, ITE/ITS Midwest Fall Workshop • Sept 16, 2020 $2,723 $1,654 $962 $2,484 $1,500 $881 ($239) ($154) ($81) ($500)

17 |

TSMO PROJECTS IN D8

ODOT D8 Updates, ITE/ITS Midwest Fall Workshop • Sept 16, 2020

Page 18: TOWARD ZERO DEATHS: TSMO AND HIGHWAY SAFETY …...ODOT D8 Updates, ITE/ITS Midwest Fall Workshop • Sept 16, 2020 $2,723 $1,654 $962 $2,484 $1,500 $881 ($239) ($154) ($81) ($500)

18 |

D8 EXAMPLE #1: SIGNAL TIMING SCOPE

ODOT D8 Updates, ITE/ITS Midwest Fall Workshop • Sept 16, 2020

Signal Timing Scope available at: www.dot.state.oh.us/Divisions/Operations/Traffic/miscellaneous/Pages/Signal-Timing-Scope.aspx

o ODOT Signal Timing

Scope and other docs

are available improve

signal corridors:

Page 19: TOWARD ZERO DEATHS: TSMO AND HIGHWAY SAFETY …...ODOT D8 Updates, ITE/ITS Midwest Fall Workshop • Sept 16, 2020 $2,723 $1,654 $962 $2,484 $1,500 $881 ($239) ($154) ($81) ($500)

19 |

SIGNAL TIMING STUDY

o Step 1: Inspect existing signals

o Step 2: Conduct traffic counts

o Step 3: Optimize Signal timing

o Step 4: Implement and evaluate

ODOT D8 Updates, ITE/ITS Midwest Fall Workshop • Sept 16, 2020

One signal was

out of sync by

59 minutes

Page 20: TOWARD ZERO DEATHS: TSMO AND HIGHWAY SAFETY …...ODOT D8 Updates, ITE/ITS Midwest Fall Workshop • Sept 16, 2020 $2,723 $1,654 $962 $2,484 $1,500 $881 ($239) ($154) ($81) ($500)

20 |

US 50 CORRIDOR LIMITS

ODOT D8 Updates, ITE/ITS Midwest Fall Workshop • Sept 16, 2020

Page 21: TOWARD ZERO DEATHS: TSMO AND HIGHWAY SAFETY …...ODOT D8 Updates, ITE/ITS Midwest Fall Workshop • Sept 16, 2020 $2,723 $1,654 $962 $2,484 $1,500 $881 ($239) ($154) ($81) ($500)

21 |

2015-2017 AVERAGE MONTHLY TRAVEL TIME

ODOT D8 Updates, ITE/ITS Midwest Fall Workshop • Sept 16, 2020

Source: www.streetlightdata.com

Legend:

Page 22: TOWARD ZERO DEATHS: TSMO AND HIGHWAY SAFETY …...ODOT D8 Updates, ITE/ITS Midwest Fall Workshop • Sept 16, 2020 $2,723 $1,654 $962 $2,484 $1,500 $881 ($239) ($154) ($81) ($500)

22 |

COLLABORATION

ODOT D8 Updates, ITE/ITS Midwest Fall Workshop • Sept 16, 2020

Page 23: TOWARD ZERO DEATHS: TSMO AND HIGHWAY SAFETY …...ODOT D8 Updates, ITE/ITS Midwest Fall Workshop • Sept 16, 2020 $2,723 $1,654 $962 $2,484 $1,500 $881 ($239) ($154) ($81) ($500)

23 |

SIGNAL TIMING RESULTS

ODOT D8 Updates, ITE/ITS Midwest Fall Workshop • Sept 16, 2020

Page 24: TOWARD ZERO DEATHS: TSMO AND HIGHWAY SAFETY …...ODOT D8 Updates, ITE/ITS Midwest Fall Workshop • Sept 16, 2020 $2,723 $1,654 $962 $2,484 $1,500 $881 ($239) ($154) ($81) ($500)

24 |

STREETLIGHT COMPARISON

ODOT D8 Updates, ITE/ITS Midwest Fall Workshop • Sept 16, 2020

Page 25: TOWARD ZERO DEATHS: TSMO AND HIGHWAY SAFETY …...ODOT D8 Updates, ITE/ITS Midwest Fall Workshop • Sept 16, 2020 $2,723 $1,654 $962 $2,484 $1,500 $881 ($239) ($154) ($81) ($500)

25 |

EASTERN CORRIDOR STUDY SUMMARY

ODOT D8 Updates, ITE/ITS Midwest Fall Workshop • Sept 16, 2020

22 Advisory

Committee/public

meetings in 2018

60 for

$60m

o 60 of 69 concepts are estimated at

less than $5.5m, with 33 under $1m.

o These 60 concepts total about $60m

in construction costs.

18 bike/ped concepts connecting:

o LMR Trail

o Wasson Way

o Lunken

o Five Mile Trail

o Murray Trail

o And more!

Project website: http://easterncorridor.org/

Page 26: TOWARD ZERO DEATHS: TSMO AND HIGHWAY SAFETY …...ODOT D8 Updates, ITE/ITS Midwest Fall Workshop • Sept 16, 2020 $2,723 $1,654 $962 $2,484 $1,500 $881 ($239) ($154) ($81) ($500)

26 |

D8 EXAMPLE #2: COLERAIN TSMO PILOT

o 2020: TSMO Pilot (PID 110279)o New software will constantly seek to optimize

signal timing

o Galbraith to Struble

o Estimate of about $440,000

o Under construction now

ODOT D8 Updates, ITE/ITS Midwest Fall Workshop • Sept 16, 2020

Page 27: TOWARD ZERO DEATHS: TSMO AND HIGHWAY SAFETY …...ODOT D8 Updates, ITE/ITS Midwest Fall Workshop • Sept 16, 2020 $2,723 $1,654 $962 $2,484 $1,500 $881 ($239) ($154) ($81) ($500)

27 |

D8 EXAMPLE #3: HAM-275 SMART LANE

ODOT D8 Updates, ITE/ITS Midwest Fall Workshop • Sept 16, 2020

Project website: http://www.dot.state.oh.us/districts/D08/Pages/Interstate-275-SmartLane.aspx

o Design-build (PID 94256)

o Sale: 2nd Quarter of FY22

(Oct-Dec of CY2021)

o Loveland Madeira to Reed

Hartman

o Westbound direction only

Page 28: TOWARD ZERO DEATHS: TSMO AND HIGHWAY SAFETY …...ODOT D8 Updates, ITE/ITS Midwest Fall Workshop • Sept 16, 2020 $2,723 $1,654 $962 $2,484 $1,500 $881 ($239) ($154) ($81) ($500)

28 |

D8 EXAMPLE #3: HAM-275 SMART LANE

ODOT D8 Updates, ITE/ITS Midwest Fall Workshop • Sept 16, 2020

o ODOT is planning a lower

build compared with

Columbus system

o Total project estimate

$18-$20m, including

resurfacing

NOTE: images are

from I-670 project; I-

275 project will

utilize cantilever

signs over the smart

lane only

Page 29: TOWARD ZERO DEATHS: TSMO AND HIGHWAY SAFETY …...ODOT D8 Updates, ITE/ITS Midwest Fall Workshop • Sept 16, 2020 $2,723 $1,654 $962 $2,484 $1,500 $881 ($239) ($154) ($81) ($500)

29 |

WHAT COULD THE FUTURE BRING?

ODOT D8 Updates, ITE/ITS Midwest Fall Workshop • Sept 16, 2020

o ODOT is also working with a team

led by UC to study the benefits of

providing non-freeway travel times

(PID 107307)

o In June of 2020, USDOT awarded

Ohio $4.4m for I-70 truck

automation project (total project

cost is $8.9m)

Page 30: TOWARD ZERO DEATHS: TSMO AND HIGHWAY SAFETY …...ODOT D8 Updates, ITE/ITS Midwest Fall Workshop • Sept 16, 2020 $2,723 $1,654 $962 $2,484 $1,500 $881 ($239) ($154) ($81) ($500)

30 |

?

QUESTIONS

Last updated 9/16/2020

ODOT D8 Updates, ITE/ITS Midwest Fall Workshop • Sept 16, 2020

Visit our Website at:www.transportation.ohio.gov

Feel free to contact

me:E. Thomas Arnold, Jr., P.E.District Planning Engineer

ODOT District 8

513.933.6588

[email protected]