Upload
others
View
5
Download
0
Embed Size (px)
Citation preview
Project Name: St. George’s School
Project OverviewSt. George’s 30,000 sq. ft. Academic Center welcomes a new laboratory science wing with a complete renovation of the duPont building. This state-of-the-art facility on the historic hilltop campus overlooking the shores of Aquidneck Island is now home to seven modern lab classrooms. The architectural team implemented a variety of sustainable design strategies to help achieve their finishing goal of a LEED Gold Certification.
Ø CiF Lab Solutions Steamed Beech Veneer Casework Ø Durcon Light Grey Epoxy Resin Countertops Ø Labconco High Performance Fume Hoods Ø Stainless Steel Tables and Shelving Provided by CSP
New England | New York | Pennsylvaniawww.neis.cc
Project Statistics
Project Location: Newport, RI
Project Participants
©2015 Northeast Interior Systems
Total Solution Provider
Ø Architect: EYP Ø Construction Manager: Shawmut Ø Dealer: Northeast Interior Systems
Ø Project Size: 30,000 sq. ft. Ø Project Budget: $1.2 Million