20
8/11/2019 Total RFI Unit 101-106-133 22-Jan-2014 http://slidepdf.com/reader/full/total-rfi-unit-101-106-133-22-jan-2014 1/20

Total RFI Unit 101-106-133 22-Jan-2014

Embed Size (px)

Citation preview

Page 1: Total RFI Unit 101-106-133 22-Jan-2014

8/11/2019 Total RFI Unit 101-106-133 22-Jan-2014

http://slidepdf.com/reader/full/total-rfi-unit-101-106-133-22-jan-2014 1/20

Page 2: Total RFI Unit 101-106-133 22-Jan-2014

8/11/2019 Total RFI Unit 101-106-133 22-Jan-2014

http://slidepdf.com/reader/full/total-rfi-unit-101-106-133-22-jan-2014 2/20

166000-RFI-03092 RFI 3092 - Anchor bolts Damage 101 Civil Structural

166000-RFI-03094 RFI 3094 - Flange Installed out of square during shop fab 101 Civil Structural

166000-RFI-03096 RFI 3096 - 101-DG-CV07-0005.05 Detail 72, Pidestal Int 101 Civil Structural

166000-RFI-03108 RFI 3108 - 101-80-OWS-0096-03, Damaged by constructi 101 Piping

166000-RFI-03120 RFI 3120 - Difference in plane coordinates for pump 101 101 Civil Structural

166000-RFI-03122 RFI 3122 - Anchor Bolts Inconsistency 101 Civil Structural

166000-RFI-03133 RFI 3133 - 101-SGU-E-004 nozzle S1 clashing with found 101 Construction166000-RFI-03148 RFI 3148 - Anchor Bolts Inconsistency 101 Civil Structural

166000-RFI-03214 RFI 3214 - Pipe Support 101 Civil Structural

166000-RFI-03319 RFI 3319 - Spool 101-91-PR-0149-04-2 is damaged 101 Piping

166000-RFI-03332 RFI 3332 - Lifting lug 101-SGU-D-015 Clashing with steel 101 Mechanical

166000-RFI-03380 RFI 3380 - Drum 101-SGU-D-013 is clashing with support 101 Mechanical

166000-RFI-03382 RFI 3382 - 101-T-005, anchorbolts clashing with skirt acc 101 Mechanical

166000-RFI-03399 RFI 3399 - Underground cooling water lines placed in th 101 Piping

166000-RFI-03433 RFI 3433 - Missing Foundations for SB 13 platforms 101 Civil Structural

166000-RFI-03439 RFI 3439 - 101-SGU-E-010 nozzle S1 clashing with found 101 Civil Structural

166000-RFI-03478 RFI 3478 - INCONSISTENCIES UPPER/LOWER FLANGES 106 Instrumentation

166000-RFI-03501 RFI 3501 - MISMATCH DETAIL 101 Electrical

166000-RFI-03592 RFI 3592 - mismatch detail 101 Electrical

166000-RFI-03593 RFI 3593 - Expand the foundation P-006 A/B 101 Civil Structural

166000-RFI-03618 RFI 3618 - Detail on Paving drawing 101 Civil Structural

166000-RFI-03621 RFI 3621 - Mechanical Hilti Bolts for Drain pots compres 101 Mechanical

166000-RFI-03644 RFI 3644 - Mismatch in drawings 101 Piping

166000-RFI-03648 RFI 3648 - 106-D-004 Structural Perforations 101 Civil Structural

166000-RFI-03658 RFI 3658 - Position, elevation and location Drumm 106- 101 Mechanical

166000-RFI-03659 RFI 3659 - Plateâÿ ÿ¹s supports for Ladder/Tower. 101 Civil Structural

166000-RFI-03705 RFI 3705 - lathe workshop for Bolts of frame attacheme 101 Mechanical

166000-RFI-03728 RFI 3728 - Material specification unit 101 - Fireproofing 101 Mechanical166000-RFI-03751 RFI 3751 - Misc. Foundation 101 Civil Structural

166000-RFI-03752 RFI 3752 - Plates Supports Ladder #4 101 Civil Structural

166000-RFI-03778 RFI 3778 - Non-Conformance Report No 359 101 Civil Structural

166000-RFI-03830 RFI 3830 - Pipe in the Foundation 106-P-004 A/B 101 Civil Structural

166000-RFI-03852 RFI 3852 - Structural Floor Compressor 101 Civil Structural

166000-RFI-03853 RFI 3853 - Flange bolt holes do not straddle the flange N 101 Piping

166000-RFI-03858 RFI 3858 - Pedestals P-002 A/B Y P 003 A/B 101 Civil Structural

166000-RFI-03860 RFI 3860 - Fireproofing requirement for aircoolers 101 Mechanical

166000-RFI-03949 RFI 3949 - Piping in the Sleeper & MPS Detail 111 101 Civil Structural

166000-RFI-03956 RFI 3956 - 101-MPS-08-010 Difference in coordenates 101 Civil Structural

166000-RFI-03957 RFI 3958 - Misc Typ I and IA 101 Civil Structural166000-RFI-03997 RFI 3997 - 101-XV-1339 BROKEN POSITIONER SWITCH 101 Instrumentation

166000-RFI-04018 RFI 4018 - 101-MPS-91-005 & 101-MPS-91-011 Interfere 101 Civil Structural

166000-RFI-04019 RFI 4019 - Guard Post 101 Civil Structural

166000-RFI-04060 RFI 4060 - Compressor Shelter 101 Civil Structural

166000-RFI-04061 RFI 4061 - foundation Sleeper & MPS Detail 111 101 Civil Structural

166000-RFI-04063 RFI 4063 - Column Interference with aircooler 101-AC-0 101 Civil Structural

166000-RFI-04064 RFI 4064 - Inconvenients with the platforms channels fo 101 Civil Structural

166000-RFI-04115 RFI 4115 - foundation Sleeper & MPS Detail 111 101 Civil Structural

Page 3: Total RFI Unit 101-106-133 22-Jan-2014

8/11/2019 Total RFI Unit 101-106-133 22-Jan-2014

http://slidepdf.com/reader/full/total-rfi-unit-101-106-133-22-jan-2014 3/20

166000-RFI-04203 RFI 4203 - MPS-08-05 Anchor Bolt and MPS 101-08-006 101 Civil Structural

166000-RFI-04207 RFI 4207 - Stairs substation #13 101 Civil Structural

166000-RFI-04211 RFI 4211 - Bolts Misc 101 Civil Structural

166000-RFI-04243 RFI 4243 - Definition Vendor Piping WPS - MERICHEM M 101 Piping

166000-RFI-04246 RFI 4246 - 101-MPS 03-011 101 Civil Structural

166000-RFI-04275 RFI 4275 - MPS And AC Clashing 101 Civil Structural

166000-RFI-04311 RFI 4311 - Erect 133-D-002 Sump cover PUMP 101 Civil Structural166000-RFI-04343 RFI 4343 - Concrete base for RIE access 101 Civil Structural

166000-RFI-04366 RFI 4366 - foundation Sleeper Detail 108 101 Civil Structural

166000-RFI-04402 RFI 4402 - Method and scope statement Installation inte 101 Mechanical

166000-RFI-04407 RFI 4407 - MISTMATCH HOLES BASE PLATE STRUCTURE 101 Mechanical

166000-RFI-04423 RFI 4423 - Davit Erection 133 -T-001A/B 101 Civil Structural

166000-RFI-04478 RFI 4478 - Erection Clip 101 -T-001 101 Civil Structural

166000-RFI-04520 RFI 4520 - Cover the water channels at the west of unit 101 Civil Structural

166000-RFI-04525 RFI 4525 - Anchor Points For Misc Steel 101 Civil Structural

166000-RFI-04547 RFI 4547 - Scope of Fireproofing 106 Mechanical

166000-RFI-04560 RFI 4560 - Anchor Bolts Misc 101 Civil Structural

166000-RFI-04572 RFI 4572 - Pedestal dimensions Misc 101 Civil Structural

166000-RFI-04601 RFI 4601 - foundation Sleeper Detail 110 101 Civil Structural

166000-RFI-04661 RFI 4661 - Drawing update 101 Piping

166000-RFI-04736 RFI 4736 - 106-BIU-D002 Platform 1 Handrail Modificati 101 Civil Structural

166000-RFI-04737 RFI 4737 - 101-SGU-T005 Platforms modifications 101 Civil Structural

166000-RFI-04747 RFI 4747 - 133-06-FG-5042-01-1 101 Piping

166000-RFI-04756 RFI 4756 - 101-91-LS-6100-10-1 101 Piping

166000-RFI-04763 RFI 4763 - Fitment on Grating for Sump Cover.106/133 101 Civil Structural

166000-RFI-04766 RFI 4766 - 101/120/121/123 DIAMETER DISCREPANCY 101 Instrumentation

166000-RFI-04802 RFI 4802 - CHANGE SUPPORT FOR LIGHTING IN UNIT 101 101 Electrical

166000-RFI-04893 RFI 4893 - VALVULE ANSI IS DIFFERENT 106 Instrumentation166000-RFI-04976 RFI 4976 - 101-T-001 Platform #10 101 Civil Structural

166000-RFI-05043 RFI 5043 - Bolts in Acces - SKIRTS 101 Civil Structural

166000-RFI-05088 RFI 5088 - DIFFERENT VALVE ACCESSORIES TO DATASHE 106 Instrumentation

166000-RFI-05090 RFI 5090 - 133-06-SG-0003-01 & 133-06-SG-0007-01 101 Piping

166000-RFI-05104 RFI 5104 - Lifting lug in D-008 101 Mechanical

166000-RFI-05130 RFI 5130 - Bolts in Access (manholes) 101 Mechanical

166000-RFI-05149 RFI 5149 - 101-01-SG-5086-01-1 101 Piping

166000-RFI-05255 RFI 5255 - Bolts in Access (manholes) and studs (clips) m 106 Other

166000-RFI-05386 RFI 5386 - Mismatch detail 101 Electrical

166000-RFI-05426 RFI 5426 - 101-MPS 0242 101 Civil Structural

166000-RFI-05436 RFI 5436 - 101-MPS 007-1/2/3 101 Civil Structural166000-RFI-05449 RFI 5449 - 133-06-FL-6025-01 101 Civil Structural

166000-RFI-05455 RFI 5455 - Platforms and ladders Bases for SS and RIE 101 Civil Structural

166000-RFI-05486 RFI 5486 - MES-101-TS-007 & MES-101-TS-008 101 Civil Structural

166000-RFI-05592 RFI 5592 - Bus Ducts Supports Unit 101 101 Civil Structural

166000-RFI-05611 RFI 5611 - MPS for Unit 101 (Deluge Piping) 101 Civil Structural

166000-RFI-05722 RFI 5722 - MPS's Overlapped Coordinates 101 Civil Structural

166000-RFI-05825 RFI 5825 - RGS CONNECTING THE UNDERGOUND - Unit 101 Electrical

166000-RFI-06027 RFI 6027 - SUBSTATION STRUCTUAL STEEL/BUS DUCT - U 101 Civil Structural

Page 4: Total RFI Unit 101-106-133 22-Jan-2014

8/11/2019 Total RFI Unit 101-106-133 22-Jan-2014

http://slidepdf.com/reader/full/total-rfi-unit-101-106-133-22-jan-2014 4/20

166000-RFI-06076 RFI 6076 - 106-09-BU-0015-01 Pipe shoe too high that 101 Piping

166000-RFI-06143 RFI 6143 - ELECTRICAL - GROUNDING - UNIT 101 101 Electrical

166000-RFI-06155 RFI 6155 - Missing Central Point To Ground Instruments 101 Electrical

166000-RFI-06173 RFI 6173 - 101-06-AD-6197-01 Piping does not fit due to 101 Piping

166000-RFI-06177 RFI 6177 - 101-03-NAP-0071-01 & 101-03-NAP-0071-02 101 Piping

166000-RFI-06179 RFI 6179 - 101-02-NAP-5035-01 Piping does not fit corre 101 Piping

166000-RFI-06182 RFI 6182 - 101-08-BU-5041-02 Spool does not fit to 101- 101 Piping166000-RFI-06374 RFI 6374 - 106-09-VT-5069-01. Check Valve is not orient 106 Piping

166000-RFI-06472 RFI 6472 - MISSING NEEDLE VALVE 101-FI-1545 109-FI- 101 Instrumentation

166000-RFI-06499 RFI 6499 - WRONG TAG UNIT 106 106 Instrumentation

166000-RFI-06500 RFI 6500 - LEAKING PROBLEM 106-PT-1242-A. 106 Instrumentation

166000-RFI-06630 RFI 6630 - Platform Outstanding 101-T-005 101 Civil Structural

166000-RFI-06712 RFI 6712 - 106-BIU-X-004 Misalignment with Anchor Bol 106 Civil Structural

166000-RFI-06832 RFI 6832 - Foundation 106-BIU-X-004 and 106-BIU-X-00 101 Civil Structural

166000-RFI-06857 RFI 6857 - Missing Brackets for the Feed Baffle, above Tr 106 Mechanical

166000-RFI-06879 RFI 6879 - Line # 101-08-BU-5601-01 Missing Elbow 101 Piping

166000-RFI-06894 RFI 6894 - underground details 101 Electrical

166000-RFI-06919 RFI 6919 - Line # 101-02-P-0013-02 Branch fitting is not 101 Piping

166000-RFI-06971 RFI 6971 - STRUCTUAL CABLE TRAY SUPPORTS - AREA 11 101 Civil Structural

166000-RFI-06986 RFI 6986 - Line # 101-02-SG-5000-01 Spool fabricated wi 101 Piping

166000-RFI-07038 RFI 7038 - Asphalt Road Access -East Side U101 101 Civil Structural

166000-RFI-07092 RFI 7092 - CONDUIT SUPPORT - AREA 91 - UNIT 101 101 Electrical

166000-RFI-07102 RFI 7102 - X-005 Curb Adjustment 106 Civil Structural

166000-RFI-07106 RFI 7106 - Line # 106-04-BU-0051-02 Fabrication Error 106 Piping

166000-RFI-07119 RFI 7119 - LIGHT FIXTURE ELEVATION - P/R 91 101 Electrical

166000-RFI-07172 RFI 7172 - CABLE DESIGNATIONS IN CONDUIT 101 Electrical

166000-RFI-07209 RFI 7209 - Fireproofing for MPS Unit 101 101 Mechanical

166000-RFI-07220 RFI 7220 - T support dimension 101-MPS-0226 101 Civil Structural166000-RFI-07372 RFI 7372 - Fireproofing material for block outs 101 Mechanical

166000-RFI-07472 RFI-7472 Line # 106-09-BU-0018-02 Pipe does not fit. C 106 Piping

166000-RFI-07485 RFI 7485 - Missin clip 101-T-005 101 Civil Structural

166000-RFI-07529 RFI 7529 - CABLE TRAY 101 Electrical

166000-RFI-07539 RFI 7539 - Line # 101-06-AD-6198-01 Incorrect spool fab 101 Piping

166000-RFI-07643 RFI 7643 - CABLE TRAY CLEARANCE 101 Piping

166000-RFI-07652 RFI 7652 - CABLE TRAY CLEARANCE 101 Piping

166000-RFI-07679 RFI 7679 - PIPING CLEARANCE FROM CABLE TRAY 101 Piping

166000-RFI-07691 RFI 7691 - CABLE TRAY SUPPORT 101 Civil Structural

166000-RFI-07692 RFI 7692 - CONNETIONS SPLIT BOX 101 Electrical

166000-RFI-07709 RFI 7709 - CABLE TRAY SUPPORT 101 Civil Structural166000-RFI-07744 RFI 7744 - CABLE TRAY 101 Electrical

166000-RFI-07788 RFI 7788 - SS# 13 Drain and Gutter System 101 Electrical

166000-RFI-08002 RFI 8002 - REQUEST FOR INFORMATION UNIT 101 101 Electrical

166000-RFI-08081 RFI 8081 - Line # 101-03-NAP-0071-01 & 101-03-NAP-00 101 Piping

166000-RFI-08122 RFI 8122 - 133-06-FL-6045-01 101 Civil Structural

166000-RFI-08128 RFI 8128 - 101-85-FW-7318-01 101 Piping

166000-RFI-08242 RFI 8242 - 133-06-AR-5023-01 133 Piping

166000-RFI-08317 RFI 8317 - CABLE TRAY SUPPORT 101 Civil Structural

Page 5: Total RFI Unit 101-106-133 22-Jan-2014

8/11/2019 Total RFI Unit 101-106-133 22-Jan-2014

http://slidepdf.com/reader/full/total-rfi-unit-101-106-133-22-jan-2014 5/20

166000-RFI-08326 RFI 08326 - Unit 101 Steam Traps orientation 101 Piping

166000-RFI-08337 RFI 8337 - Line # 101-02-MS-6116-03 Fabrication Error 101 Piping

166000-RFI-08400 RFI 8400 -106-XV-1224 & 106-XV-1239A/B 101 Piping

166000-RFI-08401 RFI 8401 - Steam Traps orientation 101 Piping

PENDING 101-05-SL-6541-01 Spool was fabricated with the wrong 101 Piping

PENDING 133-06-HL-5024-01 Spool was fabricated in 1 ½“ diamet 133 Piping

PENDING 101-08-PR-5173-01 Flanges are not aligning. 101 PipingPENDING 101-08-FL-6027-01 Pipe flange is not aligning with the d 101 Piping

PENDING 101-08-CWR-6571-01 and 101-08-CWR-6051-01 Flanges 101 Piping

PENDING 101-08-PR-0141-02 Support is not resting in the structur 101 Piping

PENDING 101-08-CL-6706-01 Steam trap in the incorrect position 101 Piping

PENDING 101-08-CL-6699-01 Steam trap in the incorrect position 101 Piping

PENDING 101-08-LS-6091-10 Steam trap in the incorrect position ( 101 Piping

PENDING 101-08-CWS-6648-01 Rotate 45° Elbow to prevent interf 101 Piping

PENDING 101-08-BU-5231-01 Is not aligning with the 101-SGU-P-0 101 Piping

PENDING 101-08-LS-6698-01 Fabrication error 101 Piping

PENDING 101-08-BU-5223-02 Is not aligning with nozzle of 101-SG 101 Piping

PENDING 101-08-BU-5227-01 Nozzle is not aligning. 101 Piping

PENDING 101-08-BU-5230-01 Nozzle is not aligning. 101 Piping

PENDING 101-91-LS-6623-01 Steam trap in the incorrect position ( 101 Piping

PENDING 101-03-RV-6316-01 Is not able to set on the bean due to 101 Piping

PENDING 101-07-NA-0167-01 the valve is missing and is not in the 101 Piping

PENDING 106-92-LS-6331-02 Steam Trap missing. 106 Piping

PENDING 101-92-HS-6169-02 Steam trap missing 101 Piping

PENDING 106-92-PRW-6099-01 Y missing 106 Piping

PENDING 101-92-LS-6327-02 Steam trap missing 101 Piping

PENDING 106-10-OWS-6266-01 not aligning with the drain 101 Piping

PENDING 101-03-P-5115-01 not aligning with the pump nozzle 101 PipingPENDING 101-02-P-0044-03 not aligning with the pump nozzle 101 Piping

PENDING 101-03-P-5112-01 not aligning with the pump nozzle 101 Piping

PENDING 101-03-CWS-6678-01 not aligning with flange 101 Piping

PENDING 101-02-P-5095-02 not aligning with flange 101 Piping

PENDING 101.02-CWR-6675-01 not aligning with flange 101 Piping

PENDING 101-02-CWS-6676-01 not aligning with flange 101 Piping

PENDING 106-XV-1224 Volume tank can't be supported from all th 106 Structural Steel

PENDING 106-XV-1239 A/B Volume tank can't be supported from 106 Structural Steel

PENDING 101-07-SN-0168-01 Support S15, change to another S16, 101 Piping

PENDING 101-08-PR-0145-01 Control valve interference with dru 101 Piping

PENDING 101-04-RV-6124-01 Interference with MPS 101-MPS-02 101 PipingPENDING 101-02-LPG-5147-01 Spool is not reaching to the Tee 101 Piping

PENDING 101-02-CD-6358-01 Spool is not reaching to the next fla 101 Piping

PENDING 101-02-LPG-5144-01 Flanges are not aligning. Field want 101 Piping

PENDING 101-02-AV-7246-01 Line is too short 101 Piping

PENDING 101-02-MS-6125-01 Pipe is short so is not aligning with t 101 Piping

PENDING 101-02-HS-5023-01 Spool 101-02-HS-5023-01 is not alig 101 Piping

PENDING 101-02-HS-6130-01 101 Piping

PENDING 101-02-HS-6030-01 Pipe supports are too long. 101 Piping

Page 6: Total RFI Unit 101-106-133 22-Jan-2014

8/11/2019 Total RFI Unit 101-106-133 22-Jan-2014

http://slidepdf.com/reader/full/total-rfi-unit-101-106-133-22-jan-2014 6/20

PENDING 101-02-N-6150-01 Tee in the wrong direction (Fabricatio 101 Piping

PENDING 101-03-P-0058-01 Line is rotated and is not aligned with 101 Piping

PENDING 101-03-P-5102-01 Lines connecting to P012 are not alig 101 Piping

Page 7: Total RFI Unit 101-106-133 22-Jan-2014

8/11/2019 Total RFI Unit 101-106-133 22-Jan-2014

http://slidepdf.com/reader/full/total-rfi-unit-101-106-133-22-jan-2014 7/20

Originator Date Issued Respondent Response Due Response Recd

Deisy Cepeda 6/16/2011 Marvin Florez 6/23/2011 6/17/2011

Jeroen Schreuder 2/2/2012 Marvin Florez 2/4/2012 2/2/2012

Jeroen Schreuder 2/13/2012 Jeroen Schreuder 2/15/2012 2/14/2012

Jeroen Schreuder 2/14/2012 William Mora 2/16/2012 2/20/2012

Deisy Cepeda 2/20/2012 Jeroen Schreuder 2/22/2012 2/21/2012

Silvana Guerrero 4/6/2012 Jeroen Schreuder 4/9/2012 4/6/2012Saul Meneses 5/10/2012 Marvin Florez 5/12/2012 5/11/2012

Jorge Duran 6/1/2012 Jeroen Schreuder 6/3/2012 6/1/2012

Jose Marin Ariza 7/19/2012 Gary Davison 7/21/2012 7/23/2012

Amelia Guardo 7/25/2012 Gary Davison 7/27/2012 7/27/2012

Jeroen Schreuder 7/30/2012 John Webb 8/1/2012 7/30/2012

Alejandro Herrera 8/1/2012 Kimberly Shakinis 8/3/2012 8/10/2012

Saul Meneses 8/2/2012 Marvin Florez 8/4/2012 8/3/2012

Alberto Gomez 8/11/2012 Jeroen Shreuder 8/13/2012 8/13/2012

Alberto Gomez 8/11/2012 Jeroen Shreuder 8/13/2012 8/13/2012

Jorge Duran 8/11/2012 Jeroen Shreuder 8/13/2012 8/13/2012

Jeroen Schreuder 8/30/2012 Sergio Villar 9/1/2012 8/31/2012

Jeroen Schreuder 9/4/2012 Sergio Villar 9/6/2012 9/6/2012

Alberto Gomez 9/5/2012 Jeroen Schreuder 9/7/2012 9/5/2012

Jorge Duran 9/6/2012 kimberly Shakinis 9/8/2012 9/10/2012

Alberto Gomez 9/21/2012 Jeroen Schreuder 9/23/2012 9/21/2012

Alvaro Gomez 9/26/2012 Jeroen Schreuder 9/28/2012 9/26/2012

Jorge Ortiz 9/27/2012 Jeroen Schreuder 9/29/2012 9/27/2012

Jairo Manzano 9/27/2012 Marvin Florez 9/29/2012 10/3/2012

Alberto Gomez 9/28/2012 Jeroen Schreuder 9/30/2012 9/28/2012

Jeroen Schreuder 10/1/2012 Sergio Villar 3/5/2013 10/9/2012

Jorge Duran 10/3/2012 Jeroen Schreuder 10/5/2012 10/3/2012Alberto Gomez 10/9/2012 Jeroen Schreuder 10/11/2012 10/10/2012

Jeroen Schreuder 10/10/2012 William Bala 10/12/2012 10/18/2012

Jorge Duran 10/17/2012 Jeroen Schreuder 10/19/2012 10/19/2012

Ivan Valle 10/30/2012 Jeroen Schreuder 11/1/2012 10/31/2012

Jairo Manzano 11/13/2012 Jeroen Schreuder 11/15/2012 11/13/2012

Dairo Caraballo 11/15/2012 Jeroen Schreuder 11/17/2012 11/15/2012

Alejandro Herrera 11/14/2012 Rafael Pena 11/16/2012 11/26/2012

Jorge Ortiz 11/16/2012 Jeroen Schreuder 11/18/2012 11/16/2012

Jeroen Schreuder 11/22/2012 Marvin Florez 11/24/2012 11/27/2012

Jeroen Schreuder 11/24/2012 Marvin Florez 11/26/2012 11/26/2012

Nelly Hernandez 12/1/2012 Marvin Florez 12/3/2012 12/4/2012

Jorge Ortiz 12/4/2012 Sergio Villar 12/6/2012 12/5/2012

Jeroen Schreuder 12/4/2012 Marvin Florez 12/6/2012 12/5/2012

Fernando Arenas 12/4/2012 Jeroen Schreuder 12/6/2012 12/4/2012

Jeroen Schreuder 12/7/2012 Marvin Florez 12/9/2012 12/7/2012

Katiana Azar 12/12/2012 Brett Lamb 12/14/2012 12/13/2012

Jeroen Schreuder 12/15/2012 Kimberly Shakinis 12/17/2012 11/28/2012

Alejandro Barreto 12/18/2012 Sergio Villar 12/20/2012 12/18/2012

Page 8: Total RFI Unit 101-106-133 22-Jan-2014

8/11/2019 Total RFI Unit 101-106-133 22-Jan-2014

http://slidepdf.com/reader/full/total-rfi-unit-101-106-133-22-jan-2014 8/20

Katiana Azar 12/21/2012 Marvin Florez 12/23/2012 12/26/2012

Cidnes Canabal 12/21/2012 Omer Babadag 12/23/2012 12/27/2012

Jeroen Schreuder 12/21/2012 Marvin Florez 12/23/2012 12/26/2012

Dairo Caraballo 12/27/2012 Jeroen Schreuder 12/19/2012 12/28/2012

Katiana Azar 12/28/2012 Marvin Florez 12/30/2012 1/3/2013

Katiana Azar 12/28/2012 Marvin Florez 12/30/2012 1/12/2013

Jeroen Schreuder 1/3/2013 Marvin Florez 1/5/2013 1/8/2013Katiana Azar 1/8/2013 Marvin Florez 1/10/2013 1/10/2013

Katiana Azar 1/17/2013 Javier Charry 1/19/2013 1/18/2013

Dairo Caraballo 1/29/2013 Jeroen Schreuder 1/31/2013 1/29/2013

Jorge Duran 1/31/2013 Jeroen Schreuder 2/2/2013 1/31/2013

Jeroen Schreuder 2/1/2013 Sergio Villar 2/3/2013 2/4/2013

Jeroen Schreuder 2/2/2013 Luis Navarro 2/4/2013 2/18/2013

Katiana Azar 2/4/2013 Richard Franke 2/6/2013 2/7/2013

Alejandra Barakat 2/5/2013 Jeroen Schreuder 2/7/2013 2/6/2013

Katiana Azar 2/7/2013 Marvin Florez 2/9/2013 2/8/2013

Alejandro Herrera 2/11/2013 Guillermo Mantilla 2/13/2013 2/20/2013

Luis Barraza 2/12/2013 Fred Bartonico 2/14/2013 2/22/2013

Luis Barraza 2/20/2013 Cesar Baron 2/22/2013 5/9/2013

Maria Nova 2/21/2013 Marvin Florez 2/23/2013 2/22/2013

Maria Ramirez 2/23/2013 Marvin Florez 2/25/2013 2/28/2013

Jorge Duran 2/24/2013 Luis Navarro 2/26/2013 2/26/2013

Katiana Azar 2/26/2013 Richard Franke 2/28/2013 2/28/2013

Alejandro Barreto 2/27/2013 Oswaldo Guadamuz 3/1/2013 2/27/2013

Jorge Duran 2/27/2013 Luis Navarro 3/1/2013 3/12/2013

Alejandro Barreto 2/27/2013 Sergio Villar 3/1/2013 2/28/2013

Jorge Duran 3/4/2013 Luis Navarro 3/6/2013 3/4/2013

Luz Herazo 3/5/2013 Francisco Ortega 3/7/2013Andres Meza 3/8/2013 Oswaldo Guadamuz 3/10/2013 3/20/2013

Alejandro Barreto 3/8/2013 Sergio Villar 3/10/2013 3/9/2013

Andres Meza 3/11/2013 Marvin Florez 3/13/2013 3/13/2013

Andres Meza 3/14/2013 Marvin Florez 3/16/2013 3/14/2013

Alejandro Barreto 3/16/2013 Oswaldo Guadamuz 3/18/2013 3/18/2013

Alvaro Gomez 3/18/2013 Jeroen Schreuder 3/20/2013 3/18/2013

MariA Nova 3/18/2013 Marvin Florez 3/20/2013 3/19/2013

Jeroen Schreuder 3/18/2013 Dinesh Dalal 3/20/2013 3/20/2013

Maria Nova 3/23/2013 Oswaldo Guadamuz 3/25/2013 3/25/2013

Katiana Azar 3/25/2013 Oswaldo Guadamuz 3/27/2013 3/27/2013

Maria Nova 3/23/2013 Oswaldo Guadamuz 3/25/2013 4/1/2013Alejandro Herrera 3/28/2013 Guillermo Mantilla 3/30/2013 4/4/2013

Katiana Azar 4/2/2013 Sergio Villar 4/4/2013 4/20/2013

Maria Nova 4/2/2013 Marvin Florez 4/4/2013 4/5/2013

Alejandro Barreto 4/4/2013 Jeroen Schreuder 4/6/2013 4/5/2013

Maria Nova 4/4/2013 Marvin Florez 4/6/2013 4/5/2013

Katiana Azar 4/5/2013 Sergio Villar 4/7/2013 4/22/2013

Katiana Azar 4/5/2013 Sergio Villar 4/7/2013 4/9/2013

Maria Nova 4/9/2013 Cesar Baron 4/11/2013 4/18/2013

Page 9: Total RFI Unit 101-106-133 22-Jan-2014

8/11/2019 Total RFI Unit 101-106-133 22-Jan-2014

http://slidepdf.com/reader/full/total-rfi-unit-101-106-133-22-jan-2014 9/20

Maria Nova 4/19/2013 Oswaldo Guadamuz 4/21/2013 4/20/2013

Maria Nova 4/16/2013 marvin florez 4/18/2013 4/23/2013

Maria Nova 4/16/2013 Oswaldo Guadamuz 4/18/2013 7/5/2013

Jorge Duran 4/18/2013 Omer Babadag 4/20/2013 4/19/2013

Maria Nova 4/19/2013 Oswaldo Guadamuz 4/21/2013 4/24/2013

Alejandro Barreto 4/22/2013 Sergio Villar 4/24/2013 4/23/2013

Alejandro Barreto 4/23/2013 Sergio Villar 4/25/2013 5/1/2013Alejandro Barreto 4/25/2013 Sergio Villar 4/27/2013 5/1/2013

Maria Nova 4/27/2013 Oswaldo Guadamuz 4/29/2013 4/30/2013

Jorge Duran 4/30/2013 Luis Navarro 5/2/2013 5/4/2013

Jorge Duran 4/30/2013 Luis Navarro 5/2/2013 5/7/2013

Alejandro Barreto 5/1/2013 Sergio Villar 5/3/2013 5/10/2013

Alejandro Barreto 5/6/2013 Jeroen Schreuder 5/8/2013 5/6/2013

Katiana Azar 5/8/2013 Marvin J Florez 5/10/2013 5/8/2013

Alejandro Barreto 5/8/2013 Sergio Villar 5/10/2013 7/13/2013

Vanessa Gomez 5/9/2013 Peter Smith 5/11/2013 6/5/2013

Maria Nova 5/10/2013 Oswaldo Guadamuz 5/11/2013 5/13/2013

Maria Nova 5/14/2013 Oswaldo Guadamuz 5/16/2013 5/14/2013

Maria Nova 5/16/2013 Oswaldo Guadamuz 5/18/2013 5/21/2013

Katiana Azar 5/20/2013 Richard Franke 5/22/2013 5/24/2013

Alejandro Herrera 5/24/2013 Oswaldo Guadamuz 5/26/2013 5/24/2013

Alejandro Herrera 5/24/2013 Sergio Villar 5/26/2013 5/24/2013

Dairo Caraballo 5/24/2013 5/26/2013

Dairo Caraballo 5/29/2013 Richard Franke 5/31/2013 5/30/2013

Alejandro Barreto 5/27/2013 Oswaldo Guadamuz 5/29/2013 5/27/2013

Alejandro Herrera 5/27/2013 Carlos Alzate 5/29/2013 5/30/2013

Luis Baraza 5/29/2013 Javier Munoz 5/31/2013

Alejandro Herrera 6/4/2013 Daniel Sanjuan 6/6/2013 6/7/2013Alejandro Barreto 6/11/2013 Sergio Villar 6/12/2013

Deisy Cepeda Peter Smith 6/15/2013

Alejandro Herrera 6/15/2013 Hugo Pena 6/17/2013 6/24/2013

Dairo Caraballo 6/15/2013 Jeroen Schreuder 6/17/2013 6/17/2013

Vanessa Gomez 6/17/2013 Francisco Ortega 6/19/2013 6/17/2013

Vanessa Gomez 6/18/2013 Francisco Ortega 6/20/2013 6/19/2013

Dairo Caraballo 6/19/2013 Marlon Palacios 6/22/2013 6/28/2013

Vanessa Gomez 6/25/2013 Francisco Ortega 6/27/2013 6/26/2013

Luis Baraza 7/3/2013 Jose Mendoza 7/5/2013 7/4/2013

Maria Nova 7/8/2013 Marvin Florez 7/10/2013 7/8/2013

Maria Nova 7/8/2013 Sergio Villar 7/10/2013 7/16/2013Dairo Caraballo 7/10/2013 Cesar Baron 7/12/2013 7/12/2013

Alejandro Herrera 7/10/2013 Sergio Villar 7/12/2013 7/19/2013

Maria Nova 7/11/2013 Sergio Villar 7/13/2013 7/13/2013

Alejandro Barreto 7/18/2013 Sergio Villar 7/20/2013 7/23/2013

Alejandro Barreto 7/22/2013 Oswaldo Guadamuz 7/24/2013 7/31/2013

Alejandro Barreto 7/31/2013 Sergio Villar 8/2/2013 8/1/2013

Marcus Morales 8/7/2013 Jose Mendoza 8/9/2013 8/7/2013

Marcus Morales 8/17/2013 Sergio Villar 8/19/2013 10/23/2013

Page 10: Total RFI Unit 101-106-133 22-Jan-2014

8/11/2019 Total RFI Unit 101-106-133 22-Jan-2014

http://slidepdf.com/reader/full/total-rfi-unit-101-106-133-22-jan-2014 10/20

Jorge Romero 8/22/2013 Andrew Vos 8/24/2013 8/22/2013

Christopher Edmiast 8/27/2013 Jose Mendoza 8/30/2013 8/29/2013

Christopher Edmiast 8/27/2013 Scott Milligan/Fred 8/30/2013 8/29/2013

Jorge Romero 8/30/2013 Andrew Vos 9/3/2013 8/30/2013

Jorge Romero 8/30/2013 Andrew Vos 9/3/2013 8/30/2013

Jorge Romero 8/30/2013 Rusty Husband 9/3/2013 10/7/2013

Dairo Caraballo 8/30/2013 Andrew Vos 9/3/2013 8/30/2013Jorge Romero 9/30/2013 Rusty Husband 10/2/2013 9/30/2013

Alejandro Herrera 10/4/2013 Gifferson Romero 10/6/2013 10/7/2013

Alejandro Hererra 10/5/2013 Carlos Alzate 10/7/2013 10/8/2013

Alejandro Hererra 10/5/2013 Harold Blanco 10/7/2013 10/8/2013

Alejandro Barreto 10/15/2013 Sergio Villar 10/17/2013 10/17/2013

Rusty Husband 10/21/2013 Oswaldo Guadamuz 10/23/2013 10/28/2013

Maria Nova 10/26/2013 Marvin Florez 10/28/2013 11/16/2013

Rusty Husband 10/29/2013 Luis Navarro 10/31/2013 11/26/2013

Rusty Husband 10/30/2013 Rusty Husband 11/1/2013 10/31/2013

Luis Barraza 10/30/2013 Javier Munoz 11/1/2013 11/6/2013

Eli Camargo 10/31/2013 Rusty Husband 11/2/2013 10/31/2013

Christopher Edmiast 11/2/2013 Cesar Baron 11/4/2013 11/5/2013

Eli Camargo 11/5/2013 Rusty Husband 11/7/2013 11/5/2013

Renato Belli 11/7/2013 Oswaldo Guadamuz 11/9/2013 11/11/2013

Marcus Morales 11/13/2013 Javier Munoz 11/15/2013 11/16/2013

Renato Belli 11/13/2013 Cesar Baron 11/15/2013 11/29/2013

Jorge Romero 11/14/2013 Rusty Husband 11/16/2013 11/14/2013

Christopher Edmiast 11/15/2013 Javier Munoz 11/17/2013 11/16/2013

Christopher Edmiast 11/18/2013 11/20/2013

Alejandro Galeano 11/19/2013 Alvaro Nunez 11/21/2013 11/29/2013

Alejandro Barreto 11/20/2013 Andrew Wells 11/22/2013 11/21/2013Deisy Cepeda 11/27/2013 Oswaldo Guadamuz 11/29/2013 12/2/2013

Jorge Romero 12/3/2013 12/5/2013

Alejandro Herrera 12/3/2013 Cesar Baron 12/5/2013 12/3/2013

Christopher Edmiast 12/5/2013 Javier Munoz 12/7/2013 12/7/2013

Juan S. Dominguez 12/5/2013 12/7/2013

Christopher Edmiast 12/9/2013 Richard Franke 12/11/2013 12/11/2013

Christopher Edmiast 12/9/2013 12/11/2013

Christopher Edmiast 12/10/2013 12/12/2013 12/12/2013

Christopher Edmiast 12/11/2013 12/13/2013

Luis Barraza 12/11/2013 Javier Munoz 12/13/2013 12/14/2013

Christopher Edmiast 12/11/2013 Andrew Wells 12/13/2013 12/17/2013Christopher Edmiast 12/12/2013 Javier Munoz/Scott 12/14/2013 12/17/2013

Alejandro Barreto 12/14/2013 Richard Franke 12/16/2013 12/18/2013

Luis Barraza 12/20/2013 Javier Munoz 12/22/2013 1/3/2014

Katiana Azar 1/3/2014 Rusty Husband 1/5/2014 1/3/2014

Jorge Romero 1/9/2014 Sergio Villar 1/11/2014 1/9/2014

Jorge Romero 1/9/2014 Rusty Husband 1/11/2014 1/9/2014

Jorge Romero 1/14/2014 Rusty Husband 1/16/2014 1/14/2014

luis barraza 1/17/2014 1/19/2014

Page 11: Total RFI Unit 101-106-133 22-Jan-2014

8/11/2019 Total RFI Unit 101-106-133 22-Jan-2014

http://slidepdf.com/reader/full/total-rfi-unit-101-106-133-22-jan-2014 11/20

Jorge Romero 1/17/2014 Rusty Husband 1/19/2014 1/17/2014

Jorge Romero 1/17/2014 Rusty Husband 1/17/2014 1/17/2014

Jorge Romero 1/18/2014 Rusty Husband 1/20/2014

Jorge Romero 1/20/2014

Jorge Romero

Jorge Romero

Jorge RomeroJorge Romero

Jorge Romero

Jorge Romero

Jorge Romero

Jorge Romero

Jorge Romero

Jorge Romero

Jorge Romero

Jorge Romero

Jorge Romero

Jorge Romero

Jorge Romero

Jorge Romero

Jorge Romero

Jorge Romero

Jorge Romero

Jorge Romero

Jorge Romero

Jorge Romero

Jorge Romero

Jorge RomeroJorge Romero

Jorge Romero

Jorge Romero

Jorge Romero

Jorge Romero

Jorge Romero

Jorge Romero

Jorge Romero

Jorge Romero

Jorge Romero

Jorge RomeroJorge Romero

Jorge Romero

Jorge Romero

Jorge Romero

Jorge Romero

Jorge Romero

Jorge Romero

Jorge Romero

Page 12: Total RFI Unit 101-106-133 22-Jan-2014

8/11/2019 Total RFI Unit 101-106-133 22-Jan-2014

http://slidepdf.com/reader/full/total-rfi-unit-101-106-133-22-jan-2014 12/20

Jorge Romero

Jorge Romero

Jorge Romero

Page 13: Total RFI Unit 101-106-133 22-Jan-2014

8/11/2019 Total RFI Unit 101-106-133 22-Jan-2014

http://slidepdf.com/reader/full/total-rfi-unit-101-106-133-22-jan-2014 13/20

Issue State

Issued for Information

Issued for Information

Issued for Information

Issued for Information

Issued for Information

Issued for InformationIssued for Information

Issued for Information

Issued for Information

Issued for Information

Issued for Information

Issued for Information

Issued for Information

Issued for Information

Issued for Information

Issued for Information

Issued for Information

Issued for Information

Issued for Information

Issued for Information

Issued for Information

Issued for Information

Issued for Information

Issued for Information

Issued for Information

Issued for Information

Issued for InformationIssued for Information

Issued for Information

Issued for Information

Issued for Information

Issued for Information

Issued for Information

Issued for Information

Issued for Information

Issued for Information

Issued for Information

Issued for Information

Issued for Information

Issued for Information

Issued for Information

Issued for Information

Issued for Information

Issued for Information

Issued for Information

Page 14: Total RFI Unit 101-106-133 22-Jan-2014

8/11/2019 Total RFI Unit 101-106-133 22-Jan-2014

http://slidepdf.com/reader/full/total-rfi-unit-101-106-133-22-jan-2014 14/20

Issued for Information

Issued for Information

Issued for Information

Issued for Information

Issued for Information

Issued for Information

Issued for InformationIssued for Information

Issued for Information

Issued for Information

Issued for Information

Issued for Information

Issued for Information

Issued for Information

Issued for Information

Issued for Information

Issued for Information

Issued for Information

Issued for Information

Issued for Information

Issued for Information

Issued for Information

Issued for Information

Issued for Information

Issued for Information

Issued for Information

Issued for Information

Issued for InformationIssued for Information

Issued for Information

Issued for Information

Issued for Information

Issued for Information

Issued for Information

Issued for Information

Issued for Information

Issued for Information

Issued for Information

Issued for InformationIssued for Information

Issued for Information

Issued for Information

Issued for Information

Issued for Information

Issued for Information

Issued for Information

Issued for Information

Page 15: Total RFI Unit 101-106-133 22-Jan-2014

8/11/2019 Total RFI Unit 101-106-133 22-Jan-2014

http://slidepdf.com/reader/full/total-rfi-unit-101-106-133-22-jan-2014 15/20

Issued for Information

Issued for Information

Issued for Information

Issued for Information

Issued for Information

Issued for Information

Issued for InformationIssued for Information

Issued for Information

Issued for Information

Issued for Information

Issued for Information

Issued for Information

Issued for Information

Issued for Information

Issued for Information

Issued for Information

Issued for Information

Issued for Information

Issued for Information

Issued for Information

Issued for Information

Issued for Information

Issued for Information

Issued for Information

Issued for Information

Issued for Information

Issued for InformationIssued for Information

Issued for Information

Issued for Information

Issued for Information

Issued for Information

Issued for Information

Issued for Information

Issued for Information

Issued for Information

Issued for Information

Issued for InformationIssued for Information

Issued for Information

Issued for Information

Issued for Information

Issued for Information

Issued for Information

Issued for Information

Issued for Information

Page 16: Total RFI Unit 101-106-133 22-Jan-2014

8/11/2019 Total RFI Unit 101-106-133 22-Jan-2014

http://slidepdf.com/reader/full/total-rfi-unit-101-106-133-22-jan-2014 16/20

Issued for Information

Issued for Information

Issued for Information

Issued for Information

Issued for Information

Issued for Information

Issued for InformationIssued for Information

Issued for Information

Issued for Information

Issued for Information

Issued for Information

Issued for Information

Issued for Information

Issued for Information

Issued for Information

Issued for Information

Issued for Information

Issued for Information

Issued for Information

Issued for Information

Issued for Information

Issued for Information

Issued for Information

Issued for Information

Issued for Information

Issued for Information

Issued for InformationIssued for Information

Issued for Information

Issued for Information

Issued for Information

Issued for Information

Issued for Information

Issued for Information

Issued for Information

Issued for Review

Issued for Information

Issued for InformationIssued for Information

Issued for Information

Issued for Information

Issued for Information

Issued for Information

Issued for Information

Issued for Information

Issued for Information

Page 17: Total RFI Unit 101-106-133 22-Jan-2014

8/11/2019 Total RFI Unit 101-106-133 22-Jan-2014

http://slidepdf.com/reader/full/total-rfi-unit-101-106-133-22-jan-2014 17/20

Issued for Information

Issued for Information

Issued for Information

Issued for Review

Page 18: Total RFI Unit 101-106-133 22-Jan-2014

8/11/2019 Total RFI Unit 101-106-133 22-Jan-2014

http://slidepdf.com/reader/full/total-rfi-unit-101-106-133-22-jan-2014 18/20

Page 19: Total RFI Unit 101-106-133 22-Jan-2014

8/11/2019 Total RFI Unit 101-106-133 22-Jan-2014

http://slidepdf.com/reader/full/total-rfi-unit-101-106-133-22-jan-2014 19/20

Unit Disc CWA CWP # Title Description Budgets Mhrs

101 EW 101-CWA-PR 10016 Zahorra backfill in the southern Unit 101 around pedestal 600

101 EL 101-CWA-PR 10031 Repair damage grounding cables Unit 101 0

101 ST 101-CWA-PR 10047 Steel Remedial Work for Unit 101/106/133 1

101 PI 101-CWA-CB 10122 OWS Piping modification Unit 101. 238

101 CV 101-CWA-04 10152 Rectification Work as detalled out in site instruction 16600 143

101 PI 101-CWA-CB 10184 Rework due to fabrication errors on OWS piping in unit 10 1,900101 PI 101-CWA-CB 10284 Oily water sewage piping re-routing 150

101 ST 101-CWA-CB 10294 unit 101 ladder modification work 0

101 PI 101-CWA-CB 10314 Oliy water sewage piping rework to avoid clashing with uni 0

101 ST 101-CWA-PR 11011 PR 91 plate washers 60

101 PI 101-CWA-06 11017 Modify vent piping according to drawings 101-80-PCSW-7 100

101 ST 101-CWA-06 11061 Ladders Fabrication 450

101 CV 101-CWA-CB 11155 Demolition Concrete 4 pedestals 0

101 CV 101-CWA-CB 11156 Construction 4 New pedestals 0

101 ST 101-CWA-PR 11157 Missing Clips on beam 101-91-01-114B5 0

101 ST 101-CWA-PR 11158 Tightening of Bolts of sliding connections Pipe Rack 91 0

101 ST 101-CWA-03 11159 Anchor Bolts Foundations 101-D-003 0

101 CV 101-CWA-CB 11208 Cleaning Area, Surface preparation and Pour Concrete to g 0

101 CV 101-CWA-CB 11224 Remove valve and pipe from LITHOS, apply grout and put 0

101 PI 101-CWA-PR 11243 Spool Modification, Verify Dimensions. 24"-CS-A/G(RFI 33 0

101 ST 101-CWA-06 11292 Plate's Support for Ladder/Tower -106-BIU-T-001(RFI 3659 0

101 ST 101-CWA-06 11306 Fabricate New Plate and weld/ 106-BIU-T001/ Plates Supp 0

101 ST 101-CWA-03 11334 Restore the clip back to It's original dimension (RFI 3845) 0

101 PI 101-CWA-05 11342 Cut Rotate Flange and Reweld (RFI 3853) 0

101 ST 101-CWA-03 11344 MPS-08-010 - Plug weld previous drilled holes, drill holes i 0

101 ST 101-CWA-05 11356 Fabrication of Missing steel pieces (Platforms) for Towers 0

101 ST 101-CWA-03 11415 MPS Modifications due to differences between civil and st 0101 ST 101-CWA-PR 11416 Interference between MPS and Air cooler braces RFI 4018 0

101 ST 101-CWA-PR 11419 Column Interference with Ac-001 RFI 4063 0

101 ST 101-CWA-07 11484 Unit 101 Modify "L" Steel member in T - 001 A/B 0

101 PI 101-CWA-07 11511 Spool modifications as detailed in RFI 4661 150

101 PI 101-CWA-04 11512 New Piece of pipe of 4" - Spool modifications as detailed i 120

101 PI 101-CWA-PR 11531 ISO changes, need fabricate new spool, weld and headers, 200

101 PI 101-CWA-PR 11532 Remove both shoes support and relocated to correct locat 120

101 PI 101-CWA-05 11564 Piping Modification as detailed in RFI 5149, Unit 101 60

101 PI 101-CWA-05 11579 Pipe Modifications 101-91-RV-6240-02, Unit 101 30

101 PI 101-CWA-05 11581 Spool modification ISO 101-01-RV-6222-01, Unit 101. 60

101 PI 101-CWA-05 11582 Spool modification ISO 101-91-RV-6240-01, Unit 101 90101 EL 101-CWA-CB 11591 Field Modifications in Transformers at SS#13 as detailed in 250

101 PI 101-CWA-05 11639 Pipe Modifications as detailed in Rev ISO 101-01-CWR-606 80

101 EL 101-CWA-CB 11650 Cable Trays Supports Modifications, Unit 101. 1,420

101 EL 101-CWA-CB 11651 Conduit & Fittings Modifications, Unit 101. 1,800

101 ST 101-CWA-03 11672 Platforms modifications of the T005 as detailed in RFI 473 930

101 ST 101-CWA-02 11731 Buss Duct Supports as detailed in RFI 5592, Unit 101 2,000

101 ME 101-CWA-CB 11744 WP Modifications in Pumps as detailed in NCR 387 (256 M 256

106 ME 106-CWA-CB 11745 Modifications in Pumps as detailed in NCR 387 (32 Mhrs), 32

Page 20: Total RFI Unit 101-106-133 22-Jan-2014

8/11/2019 Total RFI Unit 101-106-133 22-Jan-2014

http://slidepdf.com/reader/full/total-rfi-unit-101-106-133-22-jan-2014 20/20

101 PI 101-CWA-05 11748 Piping Modification as detailed in RFI 6173, Unit 101. 80

101 ST 101-CWA-CB 11794 Fabrication of Stands for Instrument Junction Boxes, Unit 250

101 ST 101-CWA-01 11796 Lighting panel Stands fabrication, Unit 101 208

101 ST 101-CWA-05 11830 Structure for equipment 101 - E- 005 must be modified RFI 432

101 PI 101-CWA-PR 11873 Piping Modification as per revision of ISO 101-91-FL-6201- 120

101 PI 101-CWA-PR 11874 Piping Modification as per revision of ISO 101-91-FL-6201- 320

101 EL 101-CWA-CB 11878 Required field rework for substation, Unit 101 2,497101 PI 101-CWA-05 11925 Piping modifications - cur and reweld on file as detailed in 60

101 PI 101-CWA-05 11926 Piping Modifications - cut and reweld as detailed in RFI 69 80

101 ST 101-CWA-01 11930 Fabricate beams, channels, base plate, and drilling holes t 1,320

101 PI 101-CWA-PR 11933 Piping Modifications - ISO 101-91-FL-6201-04, Unit 101. 200

101 PI 101-CWA-06 11940 RFI 7106 -Field to Cut and weld pipe to correct de Trunnio 80

101 CV 101-CWA-CB 11944 Cleaning and removing debris and general clean up . adeq 2,160

101 PI 101-CWA-06 11968 Fabricate new VPS5 Support corresponding to 146-04-BU- 60

101 ST 101-CWA-CB 12041 Rotate stairs and fabricate and install platform, handrails, 114

101 PI 101-CWA-06 12066 According to new revision of Iso 133-06-AR-0032-02 - Mod 60

101 PI 101-CWA-02 12087 Piping modifications as described in RFI 7472, Unit 101 30

101 PI 101-CWA-05 12123 Piping Modifications According to the Iso 133-06-SG-5001- 80

101 EL 101-CWA-CB 12154 Unit 101 - Transformer's Dielectric Test - Oil Vacum proces 2,330

101 PI 101-CWA-06 12161 As per Rev 01 of Referenced ISO, Its necessary to Re-Fabri 80

101 PI 101-CWA-03 12162 Cut The weld between the 1fst Elbow and Tee as describe 40

101 CV 101-CWA-CB 12165 Demolition existing curb as described in RFI 7102 - Unit 10 150

101 CV 101-CWA-CB 12166 Rebuilt Concrete-Extent the concrete Pdestal -Pouring a Le 150

101 CV 101-CWA-CB 12167 Works to Expansion Joints and Contraction Joints (Sealer P 300

101 PI 101-CWA-05 12200 Cut and Relocate the clashing beam to clear the interferen 80

101 PI 101-CWA-03 12208 Cut, rotate an reweld the pipe to left the outlet in the corr 64

101 PI 101-CWA-PR 12209 Piping modifications to related ISO 101-91-FL-6201-07 _ 1 126

101 PI 101-CWA-PR 12210 Field Modify spool after revision - ISO 101-91-HS-6125-01, 30101 PI 101-CWA-PR 12211 Spool needs to be re-fabricate in field ISO 101-02-SG-500 90

101 PI 101-CWA-PR 12212 Make several changes in lines around of cable tray for it in 249

101 PI 101-CWA-06 12246 Unit 101 - Piping modifications to ISO 133-06-AR-5023-01 64

101 PI 101-CWA-02 12250 Unit 101 - Line 101-02-MS-6116-03 Fabrication Error - RFI 36

101 PI 101-CWA-CB 12251 Unit 101 - Cut the existing pipe from the two ends where t 764

101 ME 101-CWA-CB 18003 Unit 101 Preservation 0

106 PI 106-CWA-CB 19902 Pipe Fab Shop for unit 106 0

101 PI 101-CWA-CB 19904 Pipe Fab Shop for Unit 101 0

23944