26
Table ED.13 Total Department of Education expenses in relation to maintenance, 2017/18 Maintenance School Amount £ Date Purpose Notre Dame First School £40.00 05/04/2016 Repair fresh water pipe Westside School £1,553.51 04/10/2017 Investigate leak from water ingress Bishop Fitzgerald Middle School £2,414.00 13/10/2017 Covering of gaps behind portacabins and science area St Anne's Middle School £70.00 31/10/2017 Toilet Leaking - repairs St Mary's First School £3,005.50 01/11/2017 Manhole covers to be removed and replaced College £1,560.68 05/02/2018 Repairs to toilet Bishop Fitzgerald Middle School £879.84 07/02/2018 Fixing off all netting around tennis court St Josephs 1st School £40.00 07/02/2018 Mezzanine floor skirting to be replaced off due to a hole in the wall. Repairs to the wall and fit skirting St Bernard's Middle School £80.00 16/02/2018 Roof gutter in pupils toilet blocked Bayside Comprehensive School £100.00 23/02/2018 No water supply - repairs Westside School £40.00 08/03/2018 Repairs to x2 No. Boilers Education Department £150.00 13/03/2018 Repairs to desk St Joseph's First School £230.00 13/03/2018 Investigation & repairs to water ingress Bayside Comprehensive School £50.00 22/03/2018 DT sink blocked Bayside Comprehensive School £140.00 22/03/2018 Repair leak from boiler pipe Bayside Comprehensive School £165.14 22/03/2018 Wooden base of support holes loose Bayside Comprehensive School £174.31 22/03/2018 Fitting of new lathe, bolt fret saws into place, sanders relocated & extraction systems fitted Bishop Fitzgerald Middle School £234.50 22/03/2018 Require 7 pieces of rectangular plywood A3 size for playground signs Hebrew Primary School £104.48 22/03/2018 Shelves to be cut to size & installed Notre Dame First School £61.27 22/03/2018 Unblock sink Notre Dame First School £283.58 22/03/2018 Burst pipe under sink St Anne's Middle School £140.00 22/03/2018 Repair to leak in toilet St Bernard's Middle School £88.05 22/03/2018 Fit a display board onto wall St Bernard's Nursery School £90.00 22/03/2018 Damp plaster beside window St Joseph's Middle School £40.00 22/03/2018 Fitting of wall mounted phone

Total Department of Education expenses in relation to ... · St Anne's Middle School £70.00 31/10/2017 Toilet Leaking - repairs ... Education Department £54.49 09/04/2018 Replaced

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Total Department of Education expenses in relation to ... · St Anne's Middle School £70.00 31/10/2017 Toilet Leaking - repairs ... Education Department £54.49 09/04/2018 Replaced

Table ED.13Total Department of Education expenses in relation to maintenance, 2017/18

MaintenanceSchool Amount £ Date PurposeNotre Dame First School £40.00 05/04/2016 Repair fresh water pipeWestside School £1,553.51 04/10/2017 Investigate leak from water ingressBishop Fitzgerald Middle School £2,414.00 13/10/2017 Covering of gaps behind portacabins and science areaSt Anne's Middle School £70.00 31/10/2017 Toilet Leaking - repairsSt Mary's First School £3,005.50 01/11/2017 Manhole covers to be removed and replacedCollege £1,560.68 05/02/2018 Repairs to toiletBishop Fitzgerald Middle School £879.84 07/02/2018 Fixing off all netting around tennis courtSt Josephs 1st School £40.00 07/02/2018 Mezzanine floor skirting to be replaced off due to a hole in the wall. Repairs to the wall and fit skirtingSt Bernard's Middle School £80.00 16/02/2018 Roof gutter in pupils toilet blockedBayside Comprehensive School £100.00 23/02/2018 No water supply - repairsWestside School £40.00 08/03/2018 Repairs to x2 No. BoilersEducation Department £150.00 13/03/2018 Repairs to deskSt Joseph's First School £230.00 13/03/2018 Investigation & repairs to water ingressBayside Comprehensive School £50.00 22/03/2018 DT sink blockedBayside Comprehensive School £140.00 22/03/2018 Repair leak from boiler pipeBayside Comprehensive School £165.14 22/03/2018 Wooden base of support holes looseBayside Comprehensive School £174.31 22/03/2018 Fitting of new lathe, bolt fret saws into place, sanders relocated & extraction systems fittedBishop Fitzgerald Middle School £234.50 22/03/2018 Require 7 pieces of rectangular plywood A3 size for playground signsHebrew Primary School £104.48 22/03/2018 Shelves to be cut to size & installedNotre Dame First School £61.27 22/03/2018 Unblock sinkNotre Dame First School £283.58 22/03/2018 Burst pipe under sinkSt Anne's Middle School £140.00 22/03/2018 Repair to leak in toiletSt Bernard's Middle School £88.05 22/03/2018 Fit a display board onto wallSt Bernard's Nursery School £90.00 22/03/2018 Damp plaster beside window St Joseph's Middle School £40.00 22/03/2018 Fitting of wall mounted phone

Page 2: Total Department of Education expenses in relation to ... · St Anne's Middle School £70.00 31/10/2017 Toilet Leaking - repairs ... Education Department £54.49 09/04/2018 Replaced

St Martin's School £91.85 22/03/2018 Sink taps in brokenSt Mary's First School £53.80 22/03/2018 Toilet handles replacedSt Mary's First School £55.41 22/03/2018 Sink coming of wallSt Paul's First School £301.39 22/03/2018 Hang up 6 tyres on the wall, 2 hooks per tyre. Fit 2 wooden cratesWestside School £40.00 22/03/2018 Remove kitchen cabinets to check/repair covered hole on the bottom of cupboardWestside School £206.90 22/03/2018 Mount clay coil making machine on the wall and to secure another by tightening raw boltsBishop Fitzgerald Middle School £50.00 23/03/2018 Door to toilet has come off it's hingesBleak House £40.00 23/03/2018 Repairs to fallen door from kitchen unitGovernors Meadow First School £40.00 23/03/2018 Fix hand towel dispenser to wallGovernors Meadow First School £50.00 23/03/2018 Repairs to toilet cistern.Notre Dame First School £40.00 23/03/2018 Loose post in playgroundSt Bernard's First School £40.00 23/03/2018 Wall mounted satchel/coat hooks to be fittedSt Bernard's First School £40.00 23/03/2018 Headteachers office key safe to be fittedSt Bernard's Middle School £40.00 23/03/2018 Fix metal shelf unit, bottom shelf falling off Bayside Comprehensive School £44.38 27/03/2018 Replace door handleBayside Comprehensive School £426.80 27/03/2018 Replace 4 taps & repairs to wash basinBayside Comprehensive School £40.00 03/04/2018 Replace broken leading off from one of the urinalsBishop Fitzgerald Middle School £231.92 03/04/2018 Emergency exit doors need threshold in form of ramp and luminous tapeNotre Dame First School £60.00 03/04/2018 Repairs to broken windowNotre Dame First School £161.59 03/04/2018 Repairs to lifted floor linoSt Bernard's Middle School £240.00 03/04/2018 Staffroom balcony sewage needs to be made biggerSt Joseph's Middle School £40.00 03/04/2018 Repairs to leaking pipeworkSt Mary's First School £170.00 03/04/2018 W.C toilet overflowingBayside Comprehensive School £50.00 05/04/2018 Replace broken section of pipe in art roomBayside Comprehensive School £80.00 05/04/2018 Fix hanging broken windowBayside Comprehensive School £91.20 05/04/2018 Key snapped off in lock - replace lockBishop Fitzgerald Middle School £150.00 05/04/2018 Lock needs to be fitted on the windowsHebrew Primary School £113.94 05/04/2018 Lock to be installed onto doorNotre Dame First School £40.00 05/04/2018 Door unable to close - repairsNotre Dame First School £48.63 05/04/2018 Water continously running from tap - repairs

Page 3: Total Department of Education expenses in relation to ... · St Anne's Middle School £70.00 31/10/2017 Toilet Leaking - repairs ... Education Department £54.49 09/04/2018 Replaced

Notre Dame First School £60.00 05/04/2018 Window not closing - repairsSt Anne's Middle School £181.70 05/04/2018 Gate does not close properly - repairsSt Bernard's First School £40.00 05/04/2018 2 hooks attached to the sides of the entrance doorSt Bernard's First School £40.00 05/04/2018 Small box with perspex cover to be fitted outside the schoolSt Bernard's Middle School £40.00 05/04/2018 Shelf brackets to be installed in a file shelf, coat hanger to be fittedSt Joseph's Middle School £40.00 05/04/2018 Carpenter to fix water heater inside of cupboardSt Joseph's Middle School £186.30 05/04/2018 Replace bin store lock with digital lockSt Joseph's Middle School £262.52 05/04/2018 2 water fountains leaking - repairsSt Martin's School £40.00 05/04/2018 Water leakingSt Paul's First School £40.00 05/04/2018 Remove wheels from paper storage unit Westside School £40.00 05/04/2018 Mount clay coil making machine on the wall secure Bayside Comprehensive School £40.00 09/04/2018 Door lock looseBayside Comprehensive School £60.00 09/04/2018 Unblock toiletBayside Comprehensive School £188.69 09/04/2018 Corridor repair/replace lock in double doorsBayside Comprehensive School £260.00 09/04/2018 Repairs to blocked toiletBishop Fitzgerald Middle School £40.00 09/04/2018 Storeroom roof broken and lights hangingBishop Fitzgerald Middle School £80.00 09/04/2018 Door difficult to open - repiarsBishop Fitzgerald Middle School £80.00 09/04/2018 Unblock drains Bishop Fitzgerald Middle School £115.93 09/04/2018 Repairs to broken window lockEducation Department £54.49 09/04/2018 Replaced ball valve and tap connectorGibraltar College £80.00 09/04/2018 Unblock drains Gibraltar College £160.70 09/04/2018 Water has been cut of due to leak in toiletGovernors Meadow First School £160.00 09/04/2018 Assemble Cupboard Hebrew Primary School £238.25 09/04/2018 Key pad lock stuckNotre Dame First School £60.00 09/04/2018 Pipe at the back of the toilet is broken, repair/replaceNotre Dame First School £60.00 09/04/2018 Repairs to fire exit doorNotre Dame First School £100.00 09/04/2018 Repair aluminium doorSt Joseph's First School £60.00 09/04/2018 Repairs to flooded toiletSt Joseph's First School £80.00 09/04/2018 Unlock drains outside to avoid flooding to schoolSt Joseph's Middle School £40.00 09/04/2018 Cupboard doors need fixing

Page 4: Total Department of Education expenses in relation to ... · St Anne's Middle School £70.00 31/10/2017 Toilet Leaking - repairs ... Education Department £54.49 09/04/2018 Replaced

St Joseph's Middle School £46.90 09/04/2018 Leak kitchen cupboard under sink St Joseph's Middle School £80.00 09/04/2018 3 Book shelves units fixed to the wallSt Joseph's Middle School £140.00 09/04/2018 Repairs to soap dispensersSt Joseph's Middle School £537.61 09/04/2018 Cistern leakingSt Joseph's Middle School £654.43 09/04/2018 Cistern leakingSt Paul's First School £104.15 09/04/2018 Flush handle brokenWestside School £61.74 09/04/2018 Electronic gate is not sliding properly and needs greasingWestside School £82.25 09/04/2018 Repair leaking boiler. Fit wate pipe & secureWestside School £360.00 09/04/2018 Math storeroom ceilling cracked due to leakGovernors Meadow First School £69.09 10/04/2018 No water supply on one of the toiletsNotre Dame First School £160.00 10/04/2018 Unblock drainsSt Paul's First School £80.00 10/04/2018 Unblock drainsBayside Comprehensive School £47.25 17/04/2018 Replace drain pipe from sinkBayside Comprehensive School £60.00 17/04/2018 Repairs to loose door handleBayside Comprehensive School £124.04 17/04/2018 Piece of pipe brokenBayside Comprehensive School £139.47 17/04/2018 Unblock waste & replace fittings in WC sinkBayside Comprehensive School £600.00 17/04/2018 Cleaning of roots, lifting drain grills and clean.Bishop Fitzgerald Middle School £58.98 17/04/2018 Toilet flush broken - repairsBishop Fitzgerald Middle School £59.78 17/04/2018 Overflow and flush brokenGibraltar College £60.35 17/04/2018 Repairs to urinals leakingGovernors Meadow First School £40.00 17/04/2018 Intercom door not closing by itselfHebrew Primary School £60.00 17/04/2018 Wall handle fallen off wallHebrew Primary School £177.05 17/04/2018 Water fountain brokenNotre Dame First School £1,690.00 17/04/2018 Remove and replace rain water gutterSt Anne's Middle School £40.00 17/04/2018 Repairs to door lockSt Bernard's Middle School £53.23 17/04/2018 Repairs to cistern handleSt Bernard's Middle School £78.98 17/04/2018 Repairs to broken pipework in toiletSt Joseph's Middle School £80.00 17/04/2018 Large pin board covering wall coming awaySt Mary's First School £40.00 17/04/2018 Kitchen unit dislodged from doorSt Mary's First School £203.33 17/04/2018 Caretakers office leak at top

Page 5: Total Department of Education expenses in relation to ... · St Anne's Middle School £70.00 31/10/2017 Toilet Leaking - repairs ... Education Department £54.49 09/04/2018 Replaced

St Paul's First School £143.37 17/04/2018 Drinking fountain pipes brokenWestside School £160.00 17/04/2018 Unblock toiletGovernors Meadow First School £119.68 24/04/2018 Repairs to burst pipeSt Joseph's First School £125.09 24/04/2018 Cistern in reception toilet rusty and brokenSt Mary's First School £56.10 24/04/2018 Handle of 2 toilets replacing, re-fixing of cistern to wallGovernors Meadow First School £40.00 25/04/2018 Lifted metal strip has sharp egdesHebrew Primary School £376.80 25/04/2018 Portable stand to built/placed in front of smartboardBayside Comprehensive School £140.00 26/04/2018 Three external notice boards to be fitted in three playgroundsBayside Comprehensive School £210.00 26/04/2018 Remove & repairs fire exit doorBishop Fitzgerald Middle School £50.00 26/04/2018 Toilet overflowing - repairsEducation Department £60.00 26/04/2018 Emergency exit door and 2 windows not closing properly - repairsEducation Department £60.00 26/04/2018 WC Support bar had come off wallGovernors Meadow First School £40.00 26/04/2018 Change soap dispenserGovernors Meadow First School £105.08 26/04/2018 Cleaned gutters and replaced broken guttersGovernors Meadow First School £120.00 26/04/2018 Plastic gutter repair and unblockGovernors Meadow First School £146.84 26/04/2018 Repairs to windowHebrew Primary School £90.00 26/04/2018 Repairs to leak in toiletSt Anne's Middle School £100.00 26/04/2018 Corridor windows do not close properlySt Anne's Middle School £100.59 26/04/2018 Repairs to door not closingSt Bernard's First School £54.38 26/04/2018 Repairs to broken door handleSt Martin's School £90.00 26/04/2018 Unblock & clean drainsSt Paul's First School £230.29 26/04/2018 Water seeping through window, repairs to wndow and sealingWestside School £80.00 26/04/2018 Timber windows leaking - repairsWestside School £126.24 26/04/2018 Fit combination lock on doorWestside School £126.24 26/04/2018 Fit combination lock on entranceWestside School £190.12 26/04/2018 Repairs panelling to cover front and back of the pipeBayside Comprehensive School £80.00 02/05/2018 Repairs to leaking boilerBayside Comprehensive School £154.75 02/05/2018 Table sander requires extraction systemBleak House £127.20 02/05/2018 Main building entrance door to bleak house metal carpet strip placeGibraltar College £100.00 02/05/2018 Fix doors and repair window

Page 6: Total Department of Education expenses in relation to ... · St Anne's Middle School £70.00 31/10/2017 Toilet Leaking - repairs ... Education Department £54.49 09/04/2018 Replaced

Governors Meadow First School £120.00 02/05/2018 Unblock drainsGovernors Meadow First School £230.13 02/05/2018 Deadbolts installed to all main doorsHebrew Primary School £60.00 02/05/2018 Repair/replace entry door to tread to classroomSt Anne's Middle School £40.00 02/05/2018 Bird deterrent on roof falling off into playgroundSt Bernard's First School £40.00 02/05/2018 Lockable cabinet to be fitted outside school wall for school notesSt Bernard's First School £40.00 02/05/2018 Wall socket repairsSt Joseph's First School £920.00 02/05/2018 Assembling of furnitureSt Martin's School £190.00 02/05/2018 Fence to be made safeSt Martin's School £570.88 02/05/2018 Two outside sheds windows and replacingSt Mary's First School £100.00 02/05/2018 Cupboard under sink mould & dampness repairsSt Paul's First School £60.00 02/05/2018 Repairs to leaking toiletBayside Comprehensive School £50.00 03/05/2018 Replace locker hinge and repairs to broken doorBishop Fitzgerald Middle School £880.90 03/05/2018 Repairs to Toilets broken off wallSt Joseph's First School £47.85 03/05/2018 Repair flush handleSt Joseph's First School £60.00 03/05/2018 Doors need hook and eyeSt Joseph's First School £347.09 03/05/2018 Replace boiler - Fix pipework and new stop valveWestside School £396.09 03/05/2018 Removal of ceiling cladding fixing of leak and re-fittingBayside Comprehensive School £140.00 07/05/2018 Wood lathe fixing back to it's boltsBishop Fitzgerald Middle School £46.84 07/05/2018 Boiler leaking - repairsBishop Fitzgerald Middle School £48.80 07/05/2018 Repairs to faulty door lockBishop Fitzgerald Middle School £87.07 07/05/2018 Gutter broken - repairsBishop Fitzgerald Middle School £100.00 07/05/2018 School gates board falling offGibraltar College £100.00 07/05/2018 Repairs to broken secruity fence in patioGibraltar College £100.00 07/05/2018 Installation of safeHebrew Primary School £68.93 07/05/2018 Repairs to broken lockNotre Dame First School £40.00 07/05/2018 Door not closing - repairsSt Bernard's First School £40.00 07/05/2018 Door jammed - repairSt Joseph's First School £160.00 07/05/2018 Unblock drainsSt Martin's School £40.00 07/05/2018 Secure roof coveringSt Martin's School £328.50 07/05/2018 Replace sink

Page 7: Total Department of Education expenses in relation to ... · St Anne's Middle School £70.00 31/10/2017 Toilet Leaking - repairs ... Education Department £54.49 09/04/2018 Replaced

St Martin's School £402.04 07/05/2018 Repairs to leaking tap and leak under sinkSt Mary's First School £40.00 07/05/2018 Playground awning unable to roll outSt Mary's First School £466.42 07/05/2018 W/C door placed back to open outwardsWestside School £375.34 07/05/2018 Replace boilerBayside Comprehensive School £497.50 11/05/2018 Heavy rain caused water ingress through roofBishop Fitzgerald Middle School £40.00 11/05/2018 2No pupil desk loose - repairsGovernors Meadow First School £60.70 11/05/2018 Toilet seat needs to be replacedGovernors Meadow First School £320.30 11/05/2018 Boiler needs to be replacedSt Anne's Middle School £390.69 11/05/2018 Support rails to be fittedSt Joseph's First School £73.46 11/05/2018 Repairs to broken pipe in water fountainSt Martin's School £365.53 11/05/2018 Kitchenette boiler burstSt Martin's School £869.50 11/05/2018 Repairs to water leak in roofWestside School £60.08 11/05/2018 Repair boiler waste pipeWestside School £345.16 11/05/2018 Replace broken water heaterBayside Comprehensive School £50.00 16/05/2018 Repairs to doorGibraltar College £1,600.63 16/05/2018 Repairs to broken floor tiles - removal and re-fittingGovernors Meadow First School £40.00 16/05/2018 Hand towel dispenser to be fitted to different locationGovernors Meadow First School £136.23 16/05/2018 Replace toiletGovernors Meadow First School £247.60 16/05/2018 Bolt down 6 existing beaches in the upper school playground, removal of old boltsHebrew Primary School £237.79 16/05/2018 New 15 litre water heaterNotre Dame First School £100.00 16/05/2018 Repairs to leakSt Anne's Middle School £100.00 16/05/2018 Clean & unblock drainsSt Bernard's Middle School £40.00 16/05/2018 Door knob broken St Bernard's Middle School £80.00 16/05/2018 Installation of toilet paper dispenser St Bernard's Middle School £120.00 16/05/2018 Unblock drainsSt Joseph's Middle School £148.87 16/05/2018 Two cubicles and urinals flush has too much pressure and overflows St Joseph's Middle School £178.25 16/05/2018 Window unable to open - repairsSt Mary's First School £80.00 16/05/2018 W/C leak in salt water valve -repairsSt Paul's First School £59.43 16/05/2018 Lunch trolley broken repairsWestside School £343.86 16/05/2018 Repair water pressure in sink tap W/C cistern broken replace tap and fittings

Page 8: Total Department of Education expenses in relation to ... · St Anne's Middle School £70.00 31/10/2017 Toilet Leaking - repairs ... Education Department £54.49 09/04/2018 Replaced

Westside School £686.92 16/05/2018 Repairs to all basins in girls toilet unitsBayside Comprehensive School £40.00 24/05/2018 Repairs to burst pipeBayside Comprehensive School £40.00 24/05/2018 Secure roofs and year 8 playgroundBayside Comprehensive School £80.00 24/05/2018 Put up a notice boardBishop Fitzgerald Middle School £71.20 24/05/2018 Glass doors not closingEducation Department £105.30 24/05/2018 2 white boards need fixing to the wallEducation Department £235.49 24/05/2018 Kitchen boiler leakingGovernors Meadow First School £50.00 24/05/2018 Hand towel dispenser brokenSt Anne's Middle School £150.29 24/05/2018 Tiles fallen off windowSt Bernard's Middle School £40.00 24/05/2018 Loose window frame - repairsSt Joseph's First School £40.00 24/05/2018 Water leaking from sinkSt Martin's School £28.75 24/05/2018 Water coming through doorSt Martin's School £1,186.87 24/05/2018 Replace sink and worktopSt Mary's First School £60.00 24/05/2018 Dismantle door lock, adjustment to door repairsSt Paul's First School £80.00 24/05/2018 Unblock sinkWestside School £809.64 24/05/2018 Repairs to leakBayside Comprehensive School £169.00 05/06/2018 Install window locksBleak House £180.37 05/06/2018 Fix blocked and leaking urinalsGovernors Meadow First School £1,350.50 05/06/2018 Barrier system to be installedHebrew Primary School £65.69 05/06/2018 Lock to be installed onto doorHebrew Primary School £66.90 05/06/2018 Door handles to be fixedNotre Dame First School £286.62 05/06/2018 Water ingress through floor repairsSt Anne's Middle School £260.00 05/06/2018 Unblock/cleaning of drains and toiletsSt Anne's Middle School £276.00 05/06/2018 Window mechanism brokenSt Bernard's First School £66.11 05/06/2018 Water tap check/repairSt Bernard's Middle School £92.20 05/06/2018 Toilet windows to be covered with translucent contact paperSt Joseph's First School £118.40 05/06/2018 Toilet repairsSt Joseph's Middle School £60.00 05/06/2018 Adjust and repairs to jammed windowSt Joseph's Middle School £60.00 05/06/2018 Window jammedSt Joseph's Middle School £116.70 05/06/2018 Replace leaking tap

Page 9: Total Department of Education expenses in relation to ... · St Anne's Middle School £70.00 31/10/2017 Toilet Leaking - repairs ... Education Department £54.49 09/04/2018 Replaced

St Martin's School £322.00 05/06/2018 Paint and install mesh barrierSt Paul's First School £149.35 05/06/2018 Leaking pipe in water fountainSt Paul's First School £367.62 05/06/2018 Urinals blockedGibraltar College £147.30 06/06/2018 Fresh water leakGovernors Meadow First School £100.36 06/06/2018 Tap/sinks replacedGovernors Meadow First School £112.20 06/06/2018 No water in toiletGovernors Meadow First School £359.10 06/06/2018 Green netting fallenSt Paul's First School £87.99 06/06/2018 Metal strip holding line has come offSt Paul's First School £92.20 06/06/2018 3 Toilet handles replacedBishop Fitzgerald Middle School £40.00 13/06/2018 Remove unit to retrieve child's glassesGovernors Meadow First School £40.00 13/06/2018 Remove large plywood boards Governors Meadow First School £301.95 13/06/2018 Rotten plywood and remove broken guttersSt Bernard's Middle School £40.00 13/06/2018 Disposing of old thread carpetSt Bernard's Nursery School £88.05 13/06/2018 Broken window paneSt Joseph's First School £40.00 13/06/2018 Remove blindSt Joseph's Middle School £600.00 13/06/2018 Cleaning of guttering Bishop Fitzgerald Middle School £50.00 14/06/2018 Remove two poles holding netsGovernors Meadow First School £47.15 14/06/2018 Lunch trolley wheel broken repairsSt Martin's School £80.00 14/06/2018 Top part of main gate adjustedBayside Comprehensive School £50.00 20/06/2018 Secure window mechanism brokenBayside Comprehensive School £61.56 20/06/2018 Whiteboard to be put up in art roomBayside Comprehensive School £124.62 20/06/2018 Replace pipework to tapBayside Comprehensive School £149.79 20/06/2018 Staircase repair door damagedBayside Comprehensive School £321.52 20/06/2018 Repair leak, dismantle/replace water supply + unblock waste pipe/fix leakBishop Fitzgerald Middle School £40.00 20/06/2018 Clear out floodingGovernors Meadow First School £84.60 20/06/2018 Bench fixed to floor needs to be moved + blocked cabinet St Bernard's First School £196.90 20/06/2018 Install 24 toilet paper dispensersSt Bernard's Nursery School £379.85 20/06/2018 Repaint corridorSt Joseph's First School £992.98 20/06/2018 Cleaning out of playgroundSt Martin's School £272.50 20/06/2018 Kitchen unit to be fitted

Page 10: Total Department of Education expenses in relation to ... · St Anne's Middle School £70.00 31/10/2017 Toilet Leaking - repairs ... Education Department £54.49 09/04/2018 Replaced

Bayside Comprehensive School £96.16 22/06/2018 Mice entering kitchen, fit brush strip, repairs + replace window sealGibraltar College £246.60 22/06/2018 Unblock drainHebrew Primary School £80.00 22/06/2018 Cupboard door and desk draw need fixingHebrew Primary School £142.10 22/06/2018 Toilet flush broken - repairsSt Bernard's Nursery School £240.00 22/06/2018 Remove weedsSt Martin's School £118.00 22/06/2018 Bad smell from drainsVaryl Begg Estate £304.88 22/06/2018 Toilet wash basin fallenBishop Fitzgerald Middle School £120.00 24/06/2018 Loose tiles - repairsGovernors Meadow First School £80.00 25/06/2018 Toilet overflowing - repairsGovernors Meadow First School £264.90 25/06/2018 Burst pipe St Martin's School £369.00 25/06/2018 Paint roofSt Martin's School £449.00 25/06/2018 Water leakHebrew Primary School £45.69 26/06/2018 Install locksHebrew Primary School £53.69 26/06/2018 Install locksHebrew Primary School £95.99 26/06/2018 Linoleum repairHebrew Primary School £97.08 26/06/2018 Replace locks x3St Joseph's Middle School £80.00 26/06/2018 Repairs to deskBayside Comprehensive School £60.00 29/06/2018 Fix whiteboard to wall in room 40 Bayside Comprehensive School £87.76 29/06/2018 Repair locker in room 50 Governors Meadow First School £114.61 29/06/2018 Water drainage pipe under sink damaged Governors Meadow First School £693.88 29/06/2018 Cistern of both toilets in sunshinenursery not workingSt Annes Middle School £97.29 29/06/2018 Playground drinking fountain pulled off the wall St Bernards 1st School £145.30 29/06/2018 Staffroom toilet cistern taking very long to fill up St Bernards 1st School £269.13 29/06/2018 Install stopcock to water heater St Josephs 1st School £40.00 29/06/2018 W/C block remove metal strip on wall piece detached from wall and sticking out St Martin's Special School £40.00 29/06/2018 Door lock leading to patio in class 5L broken Westside School £40.00 29/06/2018 Flushing system in men's toilet broken St Paul's 1st School £338.96 02/07/2018 Staffroom boiler leaking Bayside Comprehensive School 83.91£ 02/07/2018 Remove tap in the bin shedBishop Fitzgerald Middle School £67.03 02/07/2018 Toilet seat broken

Page 11: Total Department of Education expenses in relation to ... · St Anne's Middle School £70.00 31/10/2017 Toilet Leaking - repairs ... Education Department £54.49 09/04/2018 Replaced

Bishop Fitzgerald Middle School £101.39 02/07/2018 Tap in classroom difficult to close Governors Meadow First School £489.50 02/07/2018 Supply and fit new debris netting Hebrew Primary School £218.04 02/07/2018 Flushing system in toilet not working St Bernards Middle School £87.25 02/07/2018 Cleaners sink blocked St Josephs 1st School £40.00 02/07/2018 Hand writing blind broken in 3D class St Josephs 1st School £166.36 02/07/2018 Handle broken and cannot flush St Josephs 1st School £360.00 02/07/2018 Cleaning of guttersSt Josephs 1st School £482.94 02/07/2018 Repairs to broken pipeSt Josephs Middle £819.33 02/07/2018 Foul smell from guttersSt Martins Special School £40.00 02/07/2018 Therapist office window does not close St Paul's First School £38.05 02/07/2018 1 toilet flush handle broken Hebrew Primary School £40.00 20/07/2018 Door hanging from one hinge - repairsNotre Dame First School £40.00 20/07/2018 Replace broken cristern handleSt Annes Middle School £50.00 20/07/2018 Unblock toiletSt Annes Middle School £100.00 20/07/2018 Repairs to School white main doorSt Bernard's 1st School £61.79 20/07/2018 Repairs to broken handleSt Josephs 1st School £60.00 20/07/2018 2 pin boards to be put upSt Josephs 1st School £159.10 20/07/2018 Replace thick plastic fitted under playground gatesSt Josephs Middle £60.00 20/07/2018 Gutter in playground blockedSt Martins Special School £397.62 20/07/2018 Waterproof cover wooden panels outside nursery playground to avoid getting wetSt Martins Special School £580.42 20/07/2018 3 shelves 40cm X 210L 3 shelves 40cm 3mts Bayside Comprehensive School £60.00 23/07/2018 Secure glass on doorBayside Comprehensive School £307.88 23/07/2018 Replace 3 broken windows Bayside Comprehensive School £1,788.25 23/07/2018 Fitting of blackout blind for smartboardBishop Fitzgerald Middle School 153.66£ 23/07/2018 Change door lockBishop Fitzgerald Middle School £2,099.90 23/07/2018 Replace all blindsCollege £40.00 23/07/2018 Fit key safeCollege £42.07 23/07/2018 Fitting of pin board on wallCollege £187.89 23/07/2018 Fix broken bench College £1,249.08 23/07/2018 Door broken - repairs

Page 12: Total Department of Education expenses in relation to ... · St Anne's Middle School £70.00 31/10/2017 Toilet Leaking - repairs ... Education Department £54.49 09/04/2018 Replaced

Education Department £40.00 23/07/2018 Staff entrance lock faulty repairsEducation Department £571.30 23/07/2018 Outside door brokenGovernors Meadow First School £94.89 23/07/2018 Broken steps in entrance hallNotre Dame First School £80.00 23/07/2018 One of the windows in lunch hall broken cant be lockedSt Bernard's Nursery School £80.00 23/07/2018 3 Windows stuck in the classroom unable to openSt Josephs 1st School £40.00 23/07/2018 Provide new cover for drainSt Josephs 1st School £1,637.89 23/07/2018 Mezzanine floor new blind supply and fitSt Paul's First School £32.53 23/07/2018 Fit perspex poster St Paul's First School £50.00 23/07/2018 Handwriting blind above whiteboard in classes to be movedSt Paul's First School £120.00 23/07/2018 Remove and replace 2 notice boardsSt Paul's First School £218.21 23/07/2018 Install blinds in secretary's officeBayside Comprehensive School £40.00 24/07/2018 Repair door leading out from prep lab onto patio broken cannot be closedBishop Fitzgerald Middle School £108.05 24/07/2018 Boy's toilet top floor toilet repairsBishop Fitzgerald Middle School £120.82 24/07/2018 Toilet repairsSt Josephs 1st School £377.71 24/07/2018 Main building protruding wall-repairsSt Josephs Middle £63.48 24/07/2018 Repairs to broken benchSt Paul's First School £45.75 24/07/2018 Flushing system not working - repairsSt Paul's First School £127.06 24/07/2018 Burst pipe Varyl Begg Estate £380.00 24/07/2018 Assemble metal shed outside areaWestside School £77.14 24/07/2018 Door handle brokenWestside School £957.76 24/07/2018 Broken pipe in wall of stairs in reception areaBayside Comprehensive School £56.43 06/08/2018 Replace urinal water supply torn looseBayside Comprehensive School £546.17 06/08/2018 Repaint wallBishop Fitzgerald Middle School £40.00 06/08/2018 Repairs tpo leaking pipeBishop Fitzgerald Middle School £2,047.16 06/08/2018 Check all stop cocks from school and repair/replaceGovernors Meadow First School £60.00 06/08/2018 Metal strip belonging to bottom of frame of headteacher lifted repairsGovernors Meadow First School £60.00 06/08/2018 One of the water fountain's not working properly repairsGovernors Meadow First School £80.00 06/08/2018 Block tiles around drain have become loose-repairHebrew Primary School £174.38 06/08/2018 Upper wall skirting fallen down exposing bricks and cement Notre Dame First School £68.93 06/08/2018 Lock of fire exit door faulty

Page 13: Total Department of Education expenses in relation to ... · St Anne's Middle School £70.00 31/10/2017 Toilet Leaking - repairs ... Education Department £54.49 09/04/2018 Replaced

St Bernard's Middle School £529.46 06/08/2018 Installation of new hand towel dispensersSt Josephs 1st School £40.00 06/08/2018 Crack on corridor wall outside class - Fill cracksSt Josephs 1st School £80.25 06/08/2018 Repairs to cracked stepSt Josephs 1st School £105.58 06/08/2018 Patch from wall in playground has come off down pipe exposedSt Paul's First School £41.73 06/08/2018 Repairs to broken gutterSt Paul's First School £150.01 06/08/2018 Big gap on main gateSt Paul's First School £538.29 06/08/2018 Require lock on classes with two doors x 90 NoWestside School £215.00 06/08/2018 Installation of combination lockBishop Fitzgerald Middle School £111.13 21/08/2018 Repairs to external burst pipeGovernors Meadow First School £40.00 21/08/2018 Repairs to leaking tap Governors Meadow First School £64.95 21/08/2018 Toilet handle brokenGovernors Meadow First School £100.13 21/08/2018 Repairs to leaking toiletNotre Dame First School £128.06 21/08/2018 Burst pipe caused by break in - repairs water to supplySt Annes Middle School £120.00 21/08/2018 3 windows to be secured St Annes Middle School £386.85 21/08/2018 Burst boiler repairsSt Bernard's 1st School £372.75 21/08/2018 Burst boiler - repairsSt Bernards 1st School £40.00 21/08/2018 Broken window repairsSt Bernards Middle School £543.51 21/08/2018 Water fountain 1st floor leaking onto ground floorSt Josephs 1st School £40.00 21/08/2018 Repairs to toilet cisternSt Josephs 1st School £40.00 21/08/2018 Notice boards secured to wallSt Josephs 1st School £60.00 21/08/2018 Windows in class 2SG cannot close propperly hinges faultySt Josephs Middle £44.00 21/08/2018 Leak in school - repairsSt Josephs Middle £260.00 21/08/2018 Movement of furnitureSt Paul's First School £119.68 21/08/2018 10 hooks to be put up in corrodor outside classroomSt Paul's First School £123.91 21/08/2018 Removal of sink from classroomSt Paul's First School £170.93 21/08/2018 Repairs to broken gutterWestside School £66.67 21/08/2018 Repairs to fresh water leak

Total 81,477.68£

Source: Department of Education

Updated 14 September 2018

Page 14: Total Department of Education expenses in relation to ... · St Anne's Middle School £70.00 31/10/2017 Toilet Leaking - repairs ... Education Department £54.49 09/04/2018 Replaced

Payment made toGJBSGJBSGJBSGJBSGJBSGJBSGJBSGJBSGJBSGJBSGJBSGJBSGJBSGJBSGJBSGJBSGJBSGJBSGJBSGJBSGJBSGJBSGJBSGJBSGJBS

Page 15: Total Department of Education expenses in relation to ... · St Anne's Middle School £70.00 31/10/2017 Toilet Leaking - repairs ... Education Department £54.49 09/04/2018 Replaced

GJBSGJBSGJBSGJBSGJBSGJBSGJBSGJBSGJBSGJBSGJBSGJBSGJBSGJBSGJBSGJBSGJBSGJBSGJBSGJBSGJBSGJBSGJBSGJBSGJBSGJBSGJBSGJBSGJBSGJBS

Page 16: Total Department of Education expenses in relation to ... · St Anne's Middle School £70.00 31/10/2017 Toilet Leaking - repairs ... Education Department £54.49 09/04/2018 Replaced

GJBSGJBSGJBSGJBSGJBSGJBSGJBSGJBSGJBSGJBSGJBSGJBSGJBSGJBSGJBSGJBSGJBSGJBSGJBSGJBSGJBSGJBSGJBSGJBSGJBSGJBSGJBSGJBSGJBSGJBS

Page 17: Total Department of Education expenses in relation to ... · St Anne's Middle School £70.00 31/10/2017 Toilet Leaking - repairs ... Education Department £54.49 09/04/2018 Replaced

GJBSGJBSGJBSGJBSGJBSGJBSGJBSGJBSGJBSGJBSGJBSGJBSGJBSGJBSGJBSGJBSGJBSGJBSGJBSGJBSGJBSGJBSGJBSGJBSGJBSGJBSGJBSGJBSGJBSGJBS

Page 18: Total Department of Education expenses in relation to ... · St Anne's Middle School £70.00 31/10/2017 Toilet Leaking - repairs ... Education Department £54.49 09/04/2018 Replaced

GJBSGJBSGJBSGJBSGJBSGJBSGJBSGJBSGJBSGJBSGJBSGJBSGJBSGJBSGJBSGJBSGJBSGJBSGJBSGJBSGJBSGJBSGJBSGJBSGJBSGJBSGJBSGJBSGJBSGJBS

Page 19: Total Department of Education expenses in relation to ... · St Anne's Middle School £70.00 31/10/2017 Toilet Leaking - repairs ... Education Department £54.49 09/04/2018 Replaced

GJBSGJBSGJBSGJBSGJBSGJBSGJBSGJBSGJBSGJBSGJBSGJBSGJBSGJBSGJBSGJBSGJBSGJBSGJBSGJBSGJBSGJBSGJBSGJBSGJBSGJBSGJBSGJBSGJBSGJBS

Page 20: Total Department of Education expenses in relation to ... · St Anne's Middle School £70.00 31/10/2017 Toilet Leaking - repairs ... Education Department £54.49 09/04/2018 Replaced

GJBSGJBSGJBSGJBSGJBSGJBSGJBSGJBSGJBSGJBSGJBSGJBSGJBSGJBSGJBSGJBSGJBSGJBSGJBSGJBSGJBSGJBSGJBSGJBSGJBSGJBSGJBSGJBSGJBSGJBS

Page 21: Total Department of Education expenses in relation to ... · St Anne's Middle School £70.00 31/10/2017 Toilet Leaking - repairs ... Education Department £54.49 09/04/2018 Replaced

GJBSGJBSGJBSGJBSGJBSGJBSGJBSGJBSGJBSGJBSGJBSGJBSGJBSGJBSGJBSGJBSGJBSGJBSGJBSGJBSGJBSGJBSGJBSGJBSGJBSGJBSGJBSGJBSGJBSGJBS

Page 22: Total Department of Education expenses in relation to ... · St Anne's Middle School £70.00 31/10/2017 Toilet Leaking - repairs ... Education Department £54.49 09/04/2018 Replaced

GJBSGJBSGJBSGJBSGJBSGJBSGJBSGJBSGJBSGJBSGJBSGJBSGJBSGJBSGJBSGJBSGJBSGJBSGJBSGJBS GJBSGJBSGJBSGJBSGJBSGJBSGJBSGJBSGJBSGJBS

Page 23: Total Department of Education expenses in relation to ... · St Anne's Middle School £70.00 31/10/2017 Toilet Leaking - repairs ... Education Department £54.49 09/04/2018 Replaced

GJBSGJBSGJBSGJBSGJBSGJBSGJBSGJBSGJBSGJBSGJBSGJBSGJBSGJBSGJBSGJBSGJBSGJBS GJBS GJBSGJBSGJBS GJBS GJBS GJBS GJBS GJBS GJBS GJBSGJBS

Page 24: Total Department of Education expenses in relation to ... · St Anne's Middle School £70.00 31/10/2017 Toilet Leaking - repairs ... Education Department £54.49 09/04/2018 Replaced

GJBS GJBS GJBS GJBS GJBS GJBS GJBSGJBSGJBSGJBS GJBS GJBSGJBSGJBSGJBSGJBSGJBSGJBSGJBSGJBSGJBSGJBSGJBSGJBSGJBSGJBSGJBSGJBSGJBSGJBS

Page 25: Total Department of Education expenses in relation to ... · St Anne's Middle School £70.00 31/10/2017 Toilet Leaking - repairs ... Education Department £54.49 09/04/2018 Replaced

GJBSGJBSGJBSGJBSGJBSGJBSGJBSGJBS GJBSGJBSGJBSGJBSGJBSGJBSGJBSGJBSGJBSGJBSGJBSGJBSGJBSGJBSGJBSGJBSGJBSGJBSGJBSGJBSGJBSGJBS

Page 26: Total Department of Education expenses in relation to ... · St Anne's Middle School £70.00 31/10/2017 Toilet Leaking - repairs ... Education Department £54.49 09/04/2018 Replaced

GJBSGJBSGJBSGJBSGJBSGJBSGJBSGJBSGJBSGJBSGJBSGJBSGJBSGJBSGJBSGJBSGJBSGJBSGJBSGJBSGJBSGJBSGJBSGJBSGJBSGJBSGJBS