To r r e y P i n e s H i g h S c h o o l M a s t e r P l a nSchematic Plan Submittal, 21 November, 2011Roesling Nakamura Terada Architects
Torrey Pines High School Master PlanSan Dieguito Union High School DistrictPage 3
I n t r o d u c t i o n
I n t r o d u c t i o n1.0 INTRODUCTION
The vision for the facilities of the San Dieguito Union High School District focuses on creating learning environments that embrace variety in teaching and learning styles, are responsive to our rapidly changing world, and will encourage students to be good stewards and citizens of a greater community.
Three areas of focus are:
-Flexible, Adaptable, and Technology Rich Facilities-Sustainable High Performance Environments for Learning-Community Focused Campuses
1.0 Campus Capacity
The current campus enrollment is approximately 2,670 students. The campus can serve 3,000 students at capacity.
The goal of the campus build out is to provide permanent classroom buildings and facilities to function at campus capacity.
1.1 Scope
The scope of services to accomplish the Master Plans for Torrey Pines High School includes:
-Facility Evaluations -Programming -Site and Facilities Development
-Project Budget Development -Master Plan Document Preparation
1.2 Campus Identity
The Torrey Pines High School campus evokes a collegate environment. This is due to the varied and mature landscape, and reinforced with rigorous academic, athletic, and extracurricular programs. The goal of the master plan is to strengthen the campus through increased interaction and flexibility. Interactions sought after include: student to student, student to faculty, and school to community through a variety of flexible spaces.
The master plan process focused on reenvisioning the campus and facilities to foster 21st Century Learning, providing students with the tools and understanding to prepare for the unforseen. In a world with so much information the critical issue becomes a student’s ability to discernably synthesize and collaborate. To accomplish this goal the faculty strives to foster imagination, effective communication, adaptability, curiosity, critical thinking and problem solving.
Campus design and spaces need to be flexible, adaptable and varied. To foster cross disciplinary exchange, and campus identity, the master plan draws connections between disparate sections of campus to create a unified whole.
1.3 Requirements of Learning
Many of the spaces and techniques found to foster 21st century learning have been established as timeless elements of learning. These include social learning, hands on learning, exposure to the unfamiliar, and comprehension.
Environmental aspects that contribute to learning include:
- natural light & fresh air- complexity & contrast- scale- interaction- flexibility/adaptability
The master plan provides spaces throughout for project display, critique, and cross-disciplinary integration. Indoor/outdoor teaching space gives teachers flexibility, while large outdoor gathering space accomodate whole campus activities.
Technology facilitates information transfer, and organization, accomodating group and individualized learning. Flexible laboratories, and shops not only provide spaces for organized classroom learning, but also space for clubs and extracurricular activities, where students can engage in flexible, rigorous, and technology rich learning.
1.4 Reflection of Campus Ideals
The two strongest critiques of the existing Torrey Pines High School campus related to
division. Division within the campus, and division of the campus from the surrounding community.
It is a goal of the reenvisioned master plan to remedy this division by increasing campus connections and visibility, and improving pathways and gathering space within the center of campus. These connections are strengthed by the placement and layout of new campus facilities, and tie the campus together as a whole.
The new campus connections also serve to connect the long divided athletic facilities with the academic campus. As a school equally strong in athletics it is important to show the connection between physical and mental activities.
The third division is felt between the campus and the community. The elevated campus presents an intimidating facade to the surrounding community, contrary to the open and progressive learning environment. For this reason, the reenvisioned master plan includes a new accessible entry, facilitating community, and parental interaction with school staff, while ameliorating the street presence. This is coupled with facilities through which students can interact with the community through work display, competitions, or performance.
Existing Arts Building Entrance
Campus Green from North-West
Bridge toward Arts Building
Building B South Entrance
Torrey Pines High School Master PlanSan Dieguito Union High School DistrictPage 4
NORTH E x i s t i n g C a m p u s P l a n
E x i s t i n g C a m p u s P l a n
Building B
Building DLecture Hall
Building E
Buildin
g G
0 100 200
M & O
Campus Green
Arts
Varsity Baseball
Field
Basketball Hard Courts
Tennis Courts
Softball Field
Practice Field
Practice Baseball
Field
Football Field
Southeast
Entry Access
Building A
West Campus
Quad
Field Storage
Student Drop-Off
Food Service
South Campus Entrance
Campus Green Toward Stage
Campus Green Toward Existing Gymnasium
Library
Torrey Pines High School Master PlanSan Dieguito Union High School DistrictPage 5
NORTH E x i s t i n g C a m p u s P l a n
E x s i t i n g C a m p u s D i a g r a m s
Community Face of School
Main Entrance from Parking
0 100 200
IntrovertedCampus
Library -Academic
Center
Building B Trellis
Building E
Building G
Building G
Torrey Pines High School Master PlanSan Dieguito Union High School DistrictPage 6
NORTH E x i s t i n g C a m p u s P l a n
F u t u r e C a m p u s G o a l s
Community Face of School
Back Entrance from Parking
0 100 200
ConnectedCampus
New Front Entry
- Connect disparate sections of campus
- Represent an accurate and welcoming image to the community
- Create a more welcoming front entrance
Campus Goals
Torrey Pines High School Master PlanSan Dieguito Union High School DistrictPage 7
NORTH E x i s t i n g C a m p u s P l a n
C a m p u s T i m e l i n e
Original Campus
2003 Addition
Portables Added
0 100 200
1980 Addition
The original campus included the: - Administration Building - Arts Building- Gymnasium- Original B Building
Original Campus - 1974
- B Building addition (iconic facade)- Stadium- Weight Room
Addition - 1980
- Food Service Building- Shade Lunch Structure
Food Service Addition - 1999
1999Food Service Addition
- Building G- Building E- West Campus Quad- New Staff Parking Lot- New Pedestrian and Service Entry
West Campus Addition - 2003
- Classroom Portables- M & O Portables- Field Portables
Portables Added
Torrey Pines High School Master PlanSan Dieguito Union High School District
NTS
NORTH C a m p u s R e n o v a t i o n P l a nPage 8
C a m p u s R e n o v a t i o n P l a n
Minor RenovationsMajor RenovationsNew ConstructionSecondary - Wishlist
1. Technology Upgrades2. West Quad Site upgrades3. Interim Housing
Phase 0
Technology Upgrades Only
1A. Student Center Renovation1B. Existing Class. Tech upgrade1C. Existing Class. Tech upgrade1D. Science Classroom Renovation
Phase 1
New 1-Story Structure32,900 Sq. Ft.Visual/Performing Arts Center
2A. New Construction: Arts/Gym2B. New Construction: VPAC/Music2C. New Construction: Flex Space
Phase 2
3A. Administration Renovation3B. Stage Expansion 3C. Campus Green3D. Field Upgrades
Phase 3
Existing 1-Story Structure30,200 Sq. Ft.Minor Renovation of Gym into Field House
Existing 1-Story Structure5,900 Sq. Ft.Administration Building remodeled to include Student Commons
Existing 1-Story Structure135,700 Sq. Ft.Student Center, Science, and TAP to be renovated, with new Food Service, Science Labs, and Administration
New 2-Story Structure23,400 Sq. Ft.
New Gymnasium Building with
Concessions and Restrooms
New 2-Story Structure44,200 Sq. Ft.
New Shop, Arts, and Technology Building
BUILDING B
BUILDING E
BUILDIN
G G
FIELD HOUSEPreviously Gym
GYM
ADMIN
VPAC
M & O
ARTS
Interim Housing & Infrastructure
INTERIM HOUSING
New 1-Story Structure3,800 Sq. Ft.Maintenance & Operations
Building B Renovation
North Campus Expansion
Campus Site Improvements
Torrey Pines High School Master PlanSan Dieguito Union High School DistrictPage 9
NORTH S i t e P l a n
O v e r a l l S i t e P l a n
Building B
Gymnasium Remodeled to Field House
VPAC
New Gym
Arts & Tech
Building E
Building G
0 100 200
M & O
New Practice
Field
Campus Green
Student Paseo
New J.V.
Baseball Field
Varsity Baseball
Field
(E) Basketball
Hard Courts
(E) Tennis Courts
(E) Softball Field
(E) Practice Field
(E) Practice Baseball
Field
(E) Football Field
New Visitors Concessions &
RestroomNew Field Corridor
Home Team Bleacher Expansion
Southeast
Entry Access Improvements
Main Entry
Improvements
Admin & Commons
West Campus
Quad
(N) Warm Up
Area
Field Storage
Parking and Access
Improvements
Site Additions/Changes
Campus Entry 1. New Entry/ Administration Addition w/ Elevator and Stairs2. New Formal Stair Entry with Terraced Courtyards3. Student “Street” Corridor
Athletics1. New Outdoor Warm Up Area2. New Field Overlook Plaza and Announcers Bldg.3. Expanded Stadium Seating 4. Field Improvements/ Expand &
Reconfigure Fields5. Develop Stadium Access
Arts1. New Performing Arts Porch2. New Arts Courtyard3. New Performing Arts Entry Plaza
Exterior Student Commons1. New Outdoor Cafe Seating 2. Expanded Campus Green 3. Outdoor Seating Area with Shade Trees4. West Campus Quad Improvements5. Torrey Pines Tree Grove
Administration Building1. Expanded overlook patio
Parking / Access / Signage1. Way Finding Signage Plan2. School Marque3. Secondary Campus Drop-off at PAC
Existing BuildingNew Building
Torrey Pines High School Master PlanSan Dieguito Union High School DistrictPage 10
NORTH
15 30
B B u i l d i n g
B u i l d i n g B
Food Service Restaurant Culinary
Arts
ScreenedService
Area
Field House
LectureHall
West Quad
Admin Below
Lunch Shelter
LibraryBelow
PrototypeClassroom
Light Well
StaffT.R.
StudentPaseo
Campus Entry
Science Classrooms
Science Classroom
Prep. Room, Typical
ScienceYard
SH
TAP
Classrooms
ClassroomsClassrooms
Key Map
Admin.
Student Center
Library
Staff Mail Work RoomComm.
Tutor
Tutor
OfficeOffice
Office
Office
Student Center Below Building B Lower Level
Building B Upper Level
Torrey Pines High School Master PlanSan Dieguito Union High School DistrictPage 11
NORTH N o r t h C a m p u s G r o u n d F l o o r P l a n
Site Storage
PAC
Flex Class
Ceramics/Sculpture
Court
Team Room
TeamRoom
Dance
Black Box
MusicChoir
Tech Shop
Art Yard
Gallery
J.
Orchestra
M & O Offices
Tech. Classrooms
Campus Green
Courtyard Stage & Seating
Sports Drop-Off
Band Porch
Stor.
DataT.R.T.R. Shop
Stage
T.R.
(N) Parking
StudentPaseo
PACPorch
CreativeCourt
Key Map
N o r t h C a m p u s
(N) Warm-Up
Area
T.R.
ConcessionsOffice
15 30
PAC
Arts & TechGym
Service
Torrey Pines High School Master PlanSan Dieguito Union High School DistrictPage 12
NORTH N o r t h C a m p u s S e c o n d F l o o r P l a n
N o r t h C a m p u s
Roof Below
RoofBelow
Painting/Drawing
Upper Bleachers
CourtBelow
Classroom
Classroom
ClassroomsGalleryBelow
Data
Stairs
Stairs
Campus Green
J.T.R.
Teacher’s Room, Typ.
Key Map
Roof Below
Classroom
T.R.
Roof Below
15 30
PAC
Arts & TechGym
Torrey Pines High School Master PlanSan Dieguito Union High School DistrictPage 13
NORTH M i s c e l l a n e o u s B u i l d i n g P l a n s
A d m i n i s t r a t i o n & F i e l d H o u s e
FlexibleCommons
Administration
Foundation
EnlargedStage
Campus Green
Field House
Expanded Patio
Key Map
StudentPaseo
(N) Warm-Up Area
15 30
Torrey Pines High School Master PlanSan Dieguito Union High School DistrictPage 14
NORTH S i t e S e c t i o n s
S i t e S e c t i o n s
Key Map
Section B - SouthGymnasium Beyond
Paseo CourtyardFlex Classroom
Mat
ch L
ine
A
B
Section A
Auditorium / StageO & M Orchestra
Band Porch
Performing Arts CenterCreative CourtDance / Classrooms Campus Green
A
Section B - North
Lecture Hall
Building B Administration
Front Entry
Mat
ch L
ine
A
Student CenterLibrary
10 30
Torrey Pines High School Master PlanSan Dieguito Union High School DistrictPage 15
NORTH S i t e S e c t i o n s
S i t e S e c t i o n s
10 30
Section CArt GalleryShop / Classrooms
GalleryClassroom
Tech
Key Map
DC
Section E
CourtsTeamRoom
Drawing
Ceramics / Sculpture
Classroom
Tech Shop
Teach
Digital Arts
Film
New Gymnasium
Arts BuildingArt YardShop / Classrooms
Section D
Concession Building Beyond
E
T.R.