Protection contre les glissements de terrain et leslaves torrentielles
TOPOLOVENI - CHECK DAM, RO
Protection contre les glissements de terrain et les laves torrentielles | Topoloveni - Check Dam, RO 2/7
TOPOLOVENI - CHECK DAMProtection contre les glissements de terrain et les laves torrentielles
Projet Topoloveni - Check DamNumro de projet 100910-RORue Ring Road TopoloveniCode postal 115500Ville TopoloveniPays / rgion Roumanie
Anne dinstallation 2010
Client City Hall TopoloveniIngnierie Expert Proiect 2002 S.R.L.Entrepreneur Chirulli Andreea S.R.L.Autres socits participantes Schsische Bau GmbH Dresden, Sibiu Branch
Situation The road connecting Topoloveni with the A1 Highway became compromisedwhen the bridge foundations, supporting the highway, over the Arges River,began to erode. Initally a check dam was planned to prevent further damage tothe bridge.
Description To protect the bridge foundations, Geobrugg proposed and designed analternative solution to a massive and heavy concrete check dam. With our specialdesign, using Geobrugg debris flow barriers and Geobrugg DEBFLOWdimensioning software, two flexible check dams were designed and installed.Thanks to this unique technology, a new diversion channel was not required.
The installed barriers were filled with rock blocks. By changing the river'shydraulic gradient and slowing down the flow of the river, further erosion of thebridge foundations was prevented.
Objet protg Route/Rue, InfrastructureSystmes VX
Protection anticorrosion Galvanized, GEOBRUGG SUPERCOATING
Hauteur du systme 4.5 m, 6.5 mLongueur du systme 25 m - 35 m
Nombre de barrires 2Capacit de rtention 100 m
Protection contre les glissements de terrain et les laves torrentielles | Topoloveni - Check Dam, RO 3/7
Two debris flow barriers, VX-140 and VX160, servingtogether as check dam at the Arges River - visible riverflow influence
Site situation prior to installation - visible heavy erosionand bridge piles exposure
Original protection using gabions unfortunately did notwork out
Protection contre les glissements de terrain et les laves torrentielles | Topoloveni - Check Dam, RO 4/7
Installation of 12 to 16 meters long self drilling anchorsserving as debris flow barriers anchoring points
Second debris flow barrier during ring net installation bycrane - the first barrier is already ballasted andinfluences water flow
Abrasion protection during installation - visibleanchoring using self drilling anchors and Flex Heads
Protection contre les glissements de terrain et les laves torrentielles | Topoloveni - Check Dam, RO 5/7
All the works were executed in the river bed filled withwater - to avoid future barrier under flow, the net wasextra ballasted and the bottom with precast concreteblocks
Second barrier ready to be filled out - visible river bedballasting using precast concrete blocks
Two debris flow barriers, VX-140 and VX160, ready to befilled with rock blocks
Protection contre les glissements de terrain et les laves torrentielles | Topoloveni - Check Dam, RO 6/7
Closer look at the final installation - both debris flowbarriers, VX-140 and VX160, filled and covered with rocks
Unique solution after installation - visible water flowslowing effect
One year after installation - Geobrugg's debris flowbarriers are designed as permanent solutions
Protection contre les glissements de terrain et les laves torrentielles | Topoloveni - Check Dam, RO 7/7
Pour toute question, contactez votre spcialiste Geobrugg le plus proche
Head office and production
Tlphone+1 505 771 4080
Geobrugg North America, LLC22 Centro Algodones | Algodones NM 87001 | Etats-Unis| www.geobrugg.comA company of the BRUGG Group | Certified to ISO 9001