16
TOPEM Rome meeting 05-07-2010 Informazioni da Mozinski: Hi Franco, Timing tests are done with a small LSO (3x3x3 mm). Timing is improved down to 220 ps per one detector due to a current preamp and a higher bias voltage. But this is not yet a full optimization. Tomek has waited a longtime for the home made preamp, but it was sufficient to get first results and submit abstract for IEEE in Knoxville. Please call tome on Monday. Best regards Marek. (stiamo pensando di invitarlo per qualche giorno a Bari fine giugno/primissimi di Luglio) Ordine del giorno 1. Introduzione (Franco) 2. Breve discussione della elettronica (ASIC e il resto) per avere anche un parere di Angelo) (Paolo/Alessandro e Antonio/Flavio) 3. Stato e prospettive delle varie parti del sistema in funzione dei 4 items dei referees circa lo studio di fattibilita’ - layout del sistema e problemi connessi - FOV e simulazione (Franco) - effetti della PET su c.m. MRI (e vice versa) (Franco) - TOF (vantaggi) (Franco) - misure di timing- PMT (De Leo/Perrino)- SiPM (Finocchiaro/Cosentino) - elettronica - architettura (Paolo/Alessandro) - ASIC (Antonio/Flavio/ Angelo (gigatracker) - temperatura, sua misura e feedback sulla elettronica (Meddi) - SiPm (altre misure (PDE etc)) (Cosentino) - scintillatori (caratterizzazione) (De Leo)- altro...... - e’ necessario rispondere alle 4 richieste dei referees (Luglio/Settembre Dicembre) a) realizzazione di un rivelatore PET composto da due testate delle dimensioni di circa 2 x 2 cm2 con cristalli pixellati di LYSO/LSO e lettura della luce di scintillazione mediante array di SiPM; b) verifica della sua compatibilita_ con MRI mediante test degli effetti del campo magnetico sull_imaging PET e degli effetti dell_apparato PET sull_ imaging MRI; c) studio della coincidenza temporale con SiPM per valutare i vantaggi della tecnica ToF sull_imaging prostatico; d) progettazione di un front-end integrato per la lettura e l_analisi timing dei SiPM. La Commissione ritiene che i risultati dello studio di fattibilita’ siano vincolanti ai fini del prosieguo dell_esperimento. Dobbiamo cercar di capire l’evoluzione dell’esperimento, a partire dal prossimo anno (cosa fare, cosa chiedere) Dobbiamo mostrare di aver affrontato tutti i problemi (inclusi quelli di compatibilita’ con MRI e “pratici” (dimensioni, layout, etc). Non possiamo proporre cose (eventualmente) non fattibili. [ problemi legati alle dimensioni, alla temperatura, architettura del readout (tutto dentro vicino al rivelatore? Tutti i segnali fuori mediante tab bonding? Etc. etc. Non dico che dobbimamo aver “risolto” i propblemi, ma mostrare di correttamente impostati avendo idee su come risolverli “realisticamente”. Informazioni sui radiotraccianti: (mail da Martin Pomper (Jhohns Hopkins) Yes... we have progress with the radiotracer. It has been slow, but we finished the validation runs for our new PET probe last week and are now applying to our IRB for the "first-in-man" study, which should be in about eight weeks. Thanks for keeping me updated.Marty

TOPEM Rome meeting 05-07-2010 Informazioni da Mozinski: Hi Franco, Timing tests are done with a small LSO (3x3x3 mm). Timing is improved down to 220 ps

Embed Size (px)

Citation preview

Page 1: TOPEM Rome meeting 05-07-2010 Informazioni da Mozinski: Hi Franco, Timing tests are done with a small LSO (3x3x3 mm). Timing is improved down to 220 ps

TOPEM Rome meeting 05-07-2010

Informazioni da Mozinski: Hi Franco, Timing tests are done with a small LSO (3x3x3 mm). Timing is improved down to 220 ps per one detector due to a current preamp and a higher bias voltage. But this is not yet a full optimization. Tomek has waited a longtime for the home made preamp, but it was sufficient to get first results and submit abstract for IEEE in Knoxville. Please call tome on Monday. Best regards Marek.

(stiamo pensando di invitarlo per qualche giorno a Bari fine giugno/primissimi di Luglio)

Ordine del giorno1. Introduzione  (Franco)2. Breve discussione della elettronica (ASIC e il resto) per avere anche un parere di Angelo) (Paolo/Alessandro e Antonio/Flavio)3. Stato e prospettive delle varie parti del sistema in funzione dei 4 items dei referees circa lo studio di fattibilita’

- layout del sistema e problemi connessi - FOV e simulazione (Franco)                - effetti della PET su c.m. MRI (e vice versa) (Franco)                - TOF (vantaggi) (Franco)- misure di timing- PMT (De Leo/Perrino)- SiPM (Finocchiaro/Cosentino)                - elettronica

- architettura (Paolo/Alessandro)- ASIC (Antonio/Flavio/ Angelo (gigatracker)   - temperatura, sua misura e feedback sulla elettronica (Meddi)- SiPm (altre misure (PDE etc)) (Cosentino)- scintillatori (caratterizzazione) (De Leo)- altro......

- e’ necessario rispondere alle 4 richieste dei referees (Luglio/Settembre Dicembre) a) realizzazione di un rivelatore PET composto da due testate delle dimensioni di circa 2 x 2 cm2 con cristalli pixellati di LYSO/LSO e lettura della luce di scintillazione mediante array di SiPM; b) verifica della sua compatibilita_ con MRI mediante test degli effetti del campo magnetico sull_imaging PET e degli effetti dell_apparato PET sull_ imaging MRI; c) studio della coincidenza temporale con SiPM per valutare i vantaggi della tecnica ToF sull_imaging prostatico; d) progettazione di un front-end integrato per la lettura e l_analisi timing dei SiPM.

La Commissione ritiene che i risultati dello studio di fattibilita’ siano vincolanti ai fini del prosieguo dell_esperimento.Dobbiamo cercar di capire l’evoluzione dell’esperimento, a partire dal prossimo anno (cosa fare, cosa chiedere)Dobbiamo mostrare di aver affrontato tutti i problemi (inclusi quelli di compatibilita’ con MRI e “pratici” (dimensioni, layout, etc). Nonpossiamo proporre cose (eventualmente) non fattibili. [ problemi legati alle dimensioni, alla temperatura, architettura del readout (tutto dentrovicino al rivelatore? Tutti i segnali fuori mediante tab bonding? Etc. etc. Non dico che dobbimamo aver “risolto” i propblemi, ma mostrare di correttamente impostati avendo idee su come risolverli “realisticamente”.

Informazioni sui radiotraccianti: (mail da Martin Pomper (Jhohns Hopkins)

Yes... we have progress with the radiotracer.  It has been slow, but we finished the validation runs for our new PET probe last week and are now applying to our IRB for the "first-in-man" study, which should be in about eight weeks. Thanks for keeping me updated.Marty

Page 2: TOPEM Rome meeting 05-07-2010 Informazioni da Mozinski: Hi Franco, Timing tests are done with a small LSO (3x3x3 mm). Timing is improved down to 220 ps

Dedicated PET detector ring (Moses)

Better than standard scannner but still limited.

- Endorectal probe: PET coupled to a dedicated detector or to a standard PET scanner

huge backgroundfrom the bladder !!

Could we reduce or eliminate it?

drawback of the standard PET

- detectors far away from prostate- poor spatial resolution (6 – 12 mm)- poor photon detection efficiency (<1%)- activity ouside the organ -> poor contrast resolution

Page 3: TOPEM Rome meeting 05-07-2010 Informazioni da Mozinski: Hi Franco, Timing tests are done with a small LSO (3x3x3 mm). Timing is improved down to 220 ps

Simulazioni (Roma1 – ISS)BGO_nonzero :1012

LSO_nonzero :3668LSO_single = 1886BGO_single = 634LSO_BGO_coincidence = 33Only_BGO 905

BGO_nonzero :1105LSO_nonzero :2351LSO_single = 1184BGO_single = 718LSO_BGO_coincidence = 31Only_BGO 1026

BGO_nonzero :1065LSO_nonzero :2376LSO_single = 1269BGO_single = 697LSO_BGO_coincidence = 35Only_BGO 977

BGO_nonzero :1142LSO_nonzero :1282LSO_single = 705BGO_single = 773LSO_BGO_coincidence = 0Only_BGO 11

center source

BGO_nonzero :1037LSO_nonzero :6523LSO_single = 3413BGO_single = 645LSO_BGO_coincidence = 65Only_BGO 869

Page 4: TOPEM Rome meeting 05-07-2010 Informazioni da Mozinski: Hi Franco, Timing tests are done with a small LSO (3x3x3 mm). Timing is improved down to 220 ps
Page 5: TOPEM Rome meeting 05-07-2010 Informazioni da Mozinski: Hi Franco, Timing tests are done with a small LSO (3x3x3 mm). Timing is improved down to 220 ps

• Limited space for the PET detector

• PET detector must not use magnetic materials

Could distort MR image

• PET detector must not emit in MR frequency

Could produce MR image artifacts

• MR-compatible PET shielding materials

Could distort MR image

MR gradient field-eddy currents

Could produce noise in detector

Could heat detector

MR RF transmit

Could produce false PET events

MR materials

Will produce more gamma attenuation

PET/MR Design Challenges

-CITRATE that is present in the normal prostate

-CREATINA that may increase in the phlogosis and all the proliferative processes

-COLINE more specific for a neoplastic transformation

MRI & MRS

Page 6: TOPEM Rome meeting 05-07-2010 Informazioni da Mozinski: Hi Franco, Timing tests are done with a small LSO (3x3x3 mm). Timing is improved down to 220 ps

Effetti della PET su MRI e viceversa

In comparison to the previous work (19) carriedout with large hybrid amplifiers, the 9 APD signals are now fed into a highly integrated 9-channel charge sensitive preamplifier (Siemens Preclinical Solutions, USA) (17). The output signals of the preamplifier are buffered and led outside the magnet by 6 m fully 9/2727 shielded non magnetic coaxial cables (Leoni, Germany). All electronic parts are selectedto be non magnetic and mounted on a custom made 6-layer printed circuit board (PCB) which has a flexible connection between the APD and the preamplifier in order to allow a height adjustment of the LSO-APD detector in the radial position of the gantry (Fig 2).

The PCB was optimized for operation in a high magnetic field to keep eddy currents in and ground planes low. While the LSO-APD detector, preamplifier, and buffers (Fig 2) are residing inside the magnet, the 9 analog signals are processed, outside the 5 Gauss line, with a custom made 9 to 4 analog multiplexer, providing event position and energy information from the 12 x 12 crystal block. For the test setup used in this work, the analog signals were post processed with standard nuclear instrument modules (NIM) analog-to-digital conversion achieved by using a PD2-MFS-8 2M/14 data acquisition (DAQ) board (United Electronic Industries Inc., USA) mounted in a standard PC (20). For the final detector ring, dedicated PET electronics (Siemens Preclinical Solutions) will be sed to digitize the signals and perform the coincidence processing of all 10 detectors. Based on problems seen in preliminary studies (19), we used double-sided printed circuit board (PCB) material coated with 10 μm copper for electromagnetic shielding to protect the PET front-end electronics from distortions induced by MR sequences. The copper layer of this material was only 10 μm thin to avoid artifacts in MR images by eddycurrents induced in the material. The copper material was jet-cut into pieces and soldered together at the edges to form a solid box (Fig 2).

Si veda per esempio Pichler-nature.pdf e pichler nature supplement.pdf. Inoltre pet-mri-pichler.pdf (in particolare pg 8 e 9)

Page 7: TOPEM Rome meeting 05-07-2010 Informazioni da Mozinski: Hi Franco, Timing tests are done with a small LSO (3x3x3 mm). Timing is improved down to 220 ps

- misure “elementari” utili per la scelta della geometria (pixel identification etc) [ LYSO continuo vs LaBr3 (non ancora a disposizione)

- sandwitch di due rivelatori ~ 15 x 15 x 5 mm3 “visti” da 4 arrays di SiPM (minimizzazione DOI)

- test di “compatibilita’” PET MRI (entro meta’ Settembre): rivelatore e sk collegati con cavi di 2.5 m con l’elttronica

- impatto PET su MRI- impatto MRI su PET

- LYSO 3 x 3 mm2 pixel ; SiPM Hamamatsu (3 x 3 mm2 pixel)

- Readout (single photon) per PSPMT

Roma1-ISS

minirivelatore

SensL

Hamamatsu_new

Hamamatsu

Page 8: TOPEM Rome meeting 05-07-2010 Informazioni da Mozinski: Hi Franco, Timing tests are done with a small LSO (3x3x3 mm). Timing is improved down to 220 ps
Page 9: TOPEM Rome meeting 05-07-2010 Informazioni da Mozinski: Hi Franco, Timing tests are done with a small LSO (3x3x3 mm). Timing is improved down to 220 ps

Contemporaneamente

- simulazione (con A. Mantero (Genova)) “completa” per confronto 3 x 3 mm2 vs ~ 1.5 x 1.5 mm2 e continuo (confronto con misure su LaBr3 vs LYSO) e possibilmente con geometrie “ non “piane”

- disegno CAD per le differenti soluzioni e calcoli per sistema di raffreddamento

- misure con sensore, test di feedback per stabilizzazione temperatura

- costruzione fantoccio PET MRI e test in c.m.

- costruzione coil interno al probe e possibili test (??)

Page 10: TOPEM Rome meeting 05-07-2010 Informazioni da Mozinski: Hi Franco, Timing tests are done with a small LSO (3x3x3 mm). Timing is improved down to 220 ps
Page 11: TOPEM Rome meeting 05-07-2010 Informazioni da Mozinski: Hi Franco, Timing tests are done with a small LSO (3x3x3 mm). Timing is improved down to 220 ps

Figure 2. The figure shows three typical spectra acquired using the same reverse bias voltage (32.0V), but the detector thermostated at different temperatures: a) 13.5C, b) 24.3 C, c) 41.5C. Gain reduction with temperature is due to the variation of breakdown voltage with temperature.

Fig.2 Variazione della tensione di breakdown in funzione della

temperatura

Fig.3 Variazione di guadagno al variare dell’overvoltage

Fig. 1 Setup Roma1

Page 12: TOPEM Rome meeting 05-07-2010 Informazioni da Mozinski: Hi Franco, Timing tests are done with a small LSO (3x3x3 mm). Timing is improved down to 220 ps

entro Settembre- caratterizzazione Hamamatsu- prima misura “pixel identification” in camo magnetico (3 Tesla, Tor Vergata)

- entro Dicembre: caratterizzazione SenSL e Hamamatsu di diverse dimensioni e microcelle

2011- costruzione di due rivelatori in dimensioni “reali”

- 25 x 50 x 5 (10) mm3(moduli di array SiPM Hamamatsu con area morta minimizzata)

- 50 x 50 x 5 (10) mm3 (moduli di array SiPM Hamamatsu con area morta minimizzata)

scintillatori pixellati LYSO(LSO) (possibilmente dopati al Ca)

e’ il proto 0- confronto con moduli 3 x 3 mm2 IRST se disponibili

Page 13: TOPEM Rome meeting 05-07-2010 Informazioni da Mozinski: Hi Franco, Timing tests are done with a small LSO (3x3x3 mm). Timing is improved down to 220 ps
Page 14: TOPEM Rome meeting 05-07-2010 Informazioni da Mozinski: Hi Franco, Timing tests are done with a small LSO (3x3x3 mm). Timing is improved down to 220 ps
Page 15: TOPEM Rome meeting 05-07-2010 Informazioni da Mozinski: Hi Franco, Timing tests are done with a small LSO (3x3x3 mm). Timing is improved down to 220 ps

Bilancio 2010 > Riunione Assegnazioni > Gruppo V > Esperimento TOPEM > Verbale riunione

Verbale del Referee

L_esperimento intende realizzare un nuovo sistema di imaging della prostata, basato su un rivelatore PET in combinazione con una MRI di tipo endorettale.La tecnica proposta intende risolvere gli attuali problemi diagnostici del cancro della prostata attraverso un rivelatore PET in grado di migliorare efficienza e risoluzione spaziale dell_imaging prostatico dopo la somministrazione di Colina radiomarcata C11. L_immagine funzionale combinata con MRI ad alta risoluzione dovrebbe migliorare in modo consistente il valore prognostico.

Il finanziamento proposto avvia un primo studio di fattibilit_ articolato in quattro punti:

a) realizzazione di un rivelatore PET composto da due testate delle dimensioni di circa 2 x 2 cm2 con cristalli pixellati di LYSO/LSO e lettura della luce di scintillazione mediante array di SiPM;

b) verifica della sua compatibilita_ con MRI mediante test degli effetti del campo magnetico sull_imaging PET e degli effetti dell_apparato PET sull_ imaging MRI;

c) studio della coincidenza temporale con SiPM per valutare i vantaggi della tecnica ToF sull_imaging prostatico;

d) progettazione di un front-end integrato per la lettura e l_analisi timing dei SiPM.

La Commissione ritiene che i risultati dello studio di fattibilita_ siano vincolanti ai fini del prosieguo dell_esperimento.

Data la necessit_ di integrare fra di loro parti complesse (SiPM, FE chip, readout) la Commissione chiede alla collaborazione di indicare un Technical Coordinator che presenti un documento descrittivo del sistema per maggio 2010.

referees: Aloisio, Pani, Del Guerra, Greco, Ambrosi

Page 16: TOPEM Rome meeting 05-07-2010 Informazioni da Mozinski: Hi Franco, Timing tests are done with a small LSO (3x3x3 mm). Timing is improved down to 220 ps