12
Police Chief John B. Miller 170 Porter Avenue Biloxi, Mississippi 39530 Office: 228.435.6100 Fax: 228.374.1922 www.biloxi.ms.us Criminal Intelligence Unit T. (228) 435-6159 F. (228) 702-3179 [email protected] DATE: June 22, 2020 RE: Biloxi Police activity for June 15-21, 2020 TOTAL CALLS FOR SERVICE 1,943 TOTAL INCIDENT REPORTS (Case Numbers) 233 TOTAL OFFENSES (Violations/Reports) 301 TOTAL ARRESTS 123 Calls excluded from call type charts were: Checking Building 75; Extra Patrol 595; Suspicious Circumstances 94; Traffic Stops 113, and Walk & Talk 125. Additional details may be viewed at http://www.crimemapping.com/map/ms/biloxi . 0 20 40 60 80 TOP 20 CALL TYPES BY DESCRIPTION 0 5 10 15 20 25 AGGRAVATED… ALL OTHER… BURGLARY CREDIT… CRUELTY TO… DESTRUCTION/D… DISORDERLY… DRIVING UNDER… DRUG /… DRUG… DRUNKENNESSS EMBEZZLEMENT FALSE PRETENSE FAMILY OFFENSE FORCIBLE… IMPERSONATION INTIMIDATION MOTOR VEHICLE… ROBBERY SHOPLIFTING SIMPLE ASSAULT STOLEN… THEFT FROM… TRAFFIC TRESSPASS OF… WEAPON LAW… OFFENSES BY CRIME CATEGORY

TOP 20 CALL TYPES BY DESCRIPTION · - Belle La Vie Parkway - Division St. Houses Phase 2 - Division St. Houses Ph 3 - Eagle Point Park - East Biloxi Connector Rd - Ellzey Place Phase

  • Upload
    others

  • View
    2

  • Download
    0

Embed Size (px)

Citation preview

Page 1: TOP 20 CALL TYPES BY DESCRIPTION · - Belle La Vie Parkway - Division St. Houses Phase 2 - Division St. Houses Ph 3 - Eagle Point Park - East Biloxi Connector Rd - Ellzey Place Phase

Police Chief John B. Miller

170 Porter Avenue

Biloxi, Mississippi 39530 Office: 228.435.6100

Fax: 228.374.1922 www.biloxi.ms.us

Criminal Intelligence Unit T. (228) 435-6159 F. (228) 702-3179 [email protected]

DATE: June 22, 2020 RE: Biloxi Police activity for June 15-21, 2020

TOTAL CALLS FOR SERVICE 1,943

TOTAL INCIDENT REPORTS (Case Numbers) 233

TOTAL OFFENSES (Violations/Reports) 301

TOTAL ARRESTS 123

Calls excluded from call type charts were: Checking Building – 75; Extra Patrol – 595; Suspicious Circumstances – 94; Traffic Stops – 113, and Walk & Talk – 125. Additional details may be viewed at http://www.crimemapping.com/map/ms/biloxi.

020406080

TOP 20 CALL TYPES BY DESCRIPTION

0

5

10

15

20

25

AG

GR

AV

ATE

D…

ALL

OTH

ER…

BU

RG

LAR

Y

CR

EDIT

CR

UEL

TY T

O…

DES

TRU

CTI

ON

/D…

DIS

OR

DER

LY…

DR

IVIN

G U

ND

ER…

DR

UG

/…

DR

UG

DR

UN

KEN

NES

SS

EMB

EZZL

EMEN

T

FALS

E P

RET

ENSE

FAM

ILY

OFF

ENSE

FOR

CIB

LE…

IMP

ERSO

NA

TIO

N

INTI

MID

ATI

ON

MO

TOR

VEH

ICLE

RO

BB

ERY

SHO

PLI

FTIN

G

SIM

PLE

ASS

AU

LT

STO

LEN

THEF

T FR

OM

TRA

FFIC

TRES

SPA

SS O

F…

WEA

PO

N L

AW

OFFENSES BY CRIME CATEGORY

Page 2: TOP 20 CALL TYPES BY DESCRIPTION · - Belle La Vie Parkway - Division St. Houses Phase 2 - Division St. Houses Ph 3 - Eagle Point Park - East Biloxi Connector Rd - Ellzey Place Phase

Turned around in route (no fire) / Citizen Complaint/Explosion/ other 1

Fires (Structure & Vehicle) 8

Rescue & Emergency Medical Services 76

COVID 19 0

Medical Involving Homeless Persons 8

Hazardous Conditions 3

Service Call; 7

Good Intent Call: 8

Special Incident Type 0

Fire Alarm Calls; Active, Malfunction 10

Total 121

BILOXI FIRE DEPARTMENT

INCIDENT SUMMARY REPORT FOR

THE WEEK OF JUNE 15-21, 2020

1

8

76

0

8

3

7

8

0

10

121

0 20 40 60 80 100 120 140

Turned around in route (no fire) /

Citizen Complaint/Explosion/…

Fires (Structure & Vehicle)

Rescue & Emergency MedicalServices

COVID 19

Medical Involving HomelessPersons

Hazardous Conditions

Service Call;

Good Intent Call:

Special Incident Type

Fire Alarm Calls; Active,

Malfunction

Total

WEEKLY COUNT OF INCIDENT TYPE

Page 3: TOP 20 CALL TYPES BY DESCRIPTION · - Belle La Vie Parkway - Division St. Houses Phase 2 - Division St. Houses Ph 3 - Eagle Point Park - East Biloxi Connector Rd - Ellzey Place Phase

DATE: June 22, 2020 COMMUNITY DEVELOPMENT ACTIVITY REPORT FOR Jun. 15 - 21, 2020

Building permits issued 95

Construction Valuation of permits issued $1,651,700

Building inspections performed 139

Business licenses

Renewals Charter Boats Peddler’s licenses

4 1

Certificates of Occupancy issued 14(1 was Short-Term Rentals)

Code enforcement cases opened 116

Code enforcement cases resolved 161

Page 4: TOP 20 CALL TYPES BY DESCRIPTION · - Belle La Vie Parkway - Division St. Houses Phase 2 - Division St. Houses Ph 3 - Eagle Point Park - East Biloxi Connector Rd - Ellzey Place Phase

Engineering DepartmentChristy LeBatard, P.E.Director of Engineering

214-A Delauney StreetP. O. Box 429

Biloxi, Mississippi 39533Office: 228.435.6265

Fax: 228.435.6179

www.biloxi.ms.us

established 1699

Engineering Department Weekly UpdateJune 22, 2020

(updates in bold)

Proiects Out to Bid

Proiects in the Process of Being Awarded

- Lorraine Road Waterline (6/10)

- Snyder Pool Repairs (6/16)

Proiects Under Construction

- Asphalt Annual Contract

- Belle La Vie Parkway

- Division St. Houses Phase 2

- Division St. Houses Ph 3

- Eagle Point Park- East Biloxi Connector Rd

- Ellzey Place Phase III- Fishing Bridge Lights

John Henry Bock Park

- Tanglewood Infrastructure (5/20)

Keesler Gate Inside

Pavement Preservation Ward 4

Port Commission Roof

Saenger Theater

Sidewalk Annual Contract

Snyder Chiller

West Biloxi Boardwalk

Woolmarket City Center AdditionWoolmarket Rd. East Drainage

GRANT APPLICATIONS

BUILD Grant Application - Has been submitted and accepted by USDOT

CRISI Grant

- Main St. RR Crossing (recommended by CSX as a source of funding)- Railroad connector road from Iroquois to Porter north of tracks

Defense Communitv Infrastructure Pilot Program

- Keesler Gate Outside shortfall

- Pass Road paving from Popps Ferry Rd. to Keesler Gate- Rodeo Drive Closure

Page 1 of9

Page 5: TOP 20 CALL TYPES BY DESCRIPTION · - Belle La Vie Parkway - Division St. Houses Phase 2 - Division St. Houses Ph 3 - Eagle Point Park - East Biloxi Connector Rd - Ellzey Place Phase

GOMESA -All are now complete and either have been submitted or are ready to be submitted- Keegan Bayou Restoration- Causeway Floating Docks- Canaan Fishing Dock Improvements

- Point Cadet Living Shoreline & Bulkhead- Wave Outfalls

Tidelands are complete waiting for final signature to be submitted.- Kuhn St. Boat Ramp

- Canaan Fishing Dock Improvements

- West Biloxi Boardwalk White to Rodenberg

- Eagle Point Park- Causeway Floating Docks

- Point Cadet Living Shoreline (w/o bulkhead)

- Lee St. Boat Ramp

Csnire Fiber Install

- Subdivision Installs

o Bridgefield (boring) o Pelican Bayou (pulling fiber)o Bent Oaks (splicing fiber) o Peninsula (boring this week)o Channel Mark (permit pending) o Popps Ferry Landing (pulling fiber)o Emerald Lake o Reunion Place (pulling fiber)

o La Bonne Terre (pulling fiber) o River Place (splicing fiber/punchlist)o Malpass Landing (pulling fiber) o Rock Creek

o North Haven (pulling fiber) o Taylor Oaks (pulling fiber)

- Debuys & Pass Sewer Main damage - Hart's Const, filed a claim on their insurance,adjuster wanted to cut a check to COB for repair. Public Works is getting a cost.

Page 2 of 9

Page 6: TOP 20 CALL TYPES BY DESCRIPTION · - Belle La Vie Parkway - Division St. Houses Phase 2 - Division St. Houses Ph 3 - Eagle Point Park - East Biloxi Connector Rd - Ellzey Place Phase

- 911 Bordonne Dr. - sprinkler head damaged, Cspire working with homeowner to resolve- 425 Babineaux PI. - sidewalk needs repair

Centernoint Renairs

- Repairs - New Mains at

o 372 Reynoir St. o Cedar Crescent Subd.

o 133 Lee St. o Jefferson Davis Ave. (I-l 10o 444 Jordan Dr. to north of Hwy 90)o 266 Debuys Rd. o Hiller Drive East, East Driveo 304 Lee St. & West Drive (pending)

- New Services

o 421 Debuys Rd.o 734 Buddleia Cv.

Snarklight Projects

- 2108 Baywood Dr.- 2398 Beau Chene

- 859 Flamingo Cove- 675 Waters View Dr.

- 2600 LeJuene Dr.

AT&T Projects

- Repaying Roy St. - working with Insurance Adjuster

- Small Cell Tower Installs

- Glen Eagle Phase 2- Nature's Trail Phase 2

- Cedar Crescent (under review)

Proiects

- Atkinson Road Traffic Study - MOU waiting for MDOT Commission approval.

- Bayview Avenue Boardwalk - 30% plans have been reviewed, need to set up meeting forMayor to review.

- Belle La Vie Parkway - Notice to Proceed 2/8/2020; Completion 8/26/2020; work ongoing

- Canaan Fishing Dock Improvements (reconstruction) - received DMR & Corps permits,have DE contract, going to hold for now

Page 3 of9

Page 7: TOP 20 CALL TYPES BY DESCRIPTION · - Belle La Vie Parkway - Division St. Houses Phase 2 - Division St. Houses Ph 3 - Eagle Point Park - East Biloxi Connector Rd - Ellzey Place Phase

- Canaan Fishing Dock Maintenance Repairs - going out to bid, open bids end of July

- Cedar Lake Bridge Repairs (Const. Funding 2021) - Have executed MOA; drafting aletter to DE requesting completion of contract

- Churchill Drainage - redesign at approximately 50%

- Citywide Street Pavingo Snug Harbor - being done by Countyo Hattie K -in the Pavement Preservation bid packageo Webb Lane - add to Pavement Preservation contract

o McDonnell Avenue - $40K for just road, additional $40K to add utilitieso Sidewalks for Councilman Lawrence

o Woolmarket Lake Road

o Southern Ave.- requested by Councilman Lawrence, county going to handleo Greater Ave. - requested by Councilman Lawrence; county going to handleo Salvant Street (mill & overlay) - waiting for schedule from contractoro Lewis Street - waiting for schedule from contractor

Concrete Annual Contract

o Work under north contract

o Magnolia (Ph 1)o Croesus

o Reynoiro Murray (Phi)o Bohn(Phl)

o Base for Fred Haise Statue & Bollards

o Bollards at East Biloxi Boardwalk Project and around splashpado Destiny Planation Sidewalk - getting PO

- CSX Crossing Closure Delauney & Nixon - Negotiating price with contractor

- East Biloxi Public Access & Living Shoreline - sinkhole repairs held up during Cristobalbut the grassed slope did not;

- Eagle Point Park - Start date of June work on-going

- East Biloxi Connector Road (CDBG Funded) - clearing and grubbing, and housedemo's have started.

- Ellzey Place III (Medical Park Drive Extension) - NTP Feb. 17, 2020; completion July16, 2020; work on-going

Page 4 of 9

Page 8: TOP 20 CALL TYPES BY DESCRIPTION · - Belle La Vie Parkway - Division St. Houses Phase 2 - Division St. Houses Ph 3 - Eagle Point Park - East Biloxi Connector Rd - Ellzey Place Phase

- Old Hwy 90 Fishing Bridge Lighting repairs - project awarded May 26^, waiting oncontract documents to holdpre-construction meeting; reviewing submittals; we willfixthe light poles that are leaning due to Cristobal with this work

- Keesler Gate Outside - Ail asbestos survey completed; demolition will start this week

Offers madeo 1011 Division St.

Acquired not readyfor demolitiono 1057 Division St.

o 987 Division St.

o 974 Division St.

o 964 Division St.

Readyfor Demolitiono 1015 Division St.

o 997 Division St.

o 978 Division St.

o 962 Division St.

Ready for moving -o 956 Division St. - pending

moving other two houseso 960 Division St. - pending

moving other two houses

Acquired not requiring demolitiono 1029 Division St

o 1092 Division St.

o 1067 Division St.

o 0 Division St. 1310H-02-

077.000

o 0 Division St. 1310H-02-

035.000

o 305 Seal Ave.

o 970 Division St. (movinghouse back)

o 290 Forrest (only have ROE)o 1087 Division St.

o 1075 Division St.

o 290 Forrest Ave.

Already demolished/movedo 301 Seal Ave.

o 1001 Division St.

o 1007 Division St.

o 1098 Division St.

o 991 Division St.

- Keegan Bayou Restoration - Contraet on the May 19'^^ agenda, need to schedule kick offmeeting

- Keesler Gate Inside - Completion Date 6/2020; work on roundabout underway andLarcher Blvd. intersection underway

- Kuhn St. Boat Launch Expansion - Design contract on June 23'''^ council meeting

- Lorraine Road water line extension - received bids June 10'^, currently reviewing bid;apparent Low CB Developers $587,000

Page 5 of9

Page 9: TOP 20 CALL TYPES BY DESCRIPTION · - Belle La Vie Parkway - Division St. Houses Phase 2 - Division St. Houses Ph 3 - Eagle Point Park - East Biloxi Connector Rd - Ellzey Place Phase

- Main Street Railroad Crossing Upgrades (MOOT Funding 2020) - held the MDOTkickoff/field review meeting; looking for additional $500K in funding, working on CSXand MDOT review comments

- Malpass Landing/Watersview - regrading of rear yards is complete as a temporary fix;need to hire a DE to come up with a more permanent solution; using the Repair/Replacecontract

- Mason Rd. Waterline Extension - potential water line project using water/sewer funds

- Natatorium Roof Leaks -met with Machado Patano to look at roof March 4''^; they aregoing to get up there with water hoses this week to see if they can track down the leak

- Passenger Rail Platform - waiting on executed grant agreement

- Point Cadet Shoreline - met with BMA to kick off the project; design underway

- Point Cadet Marina West - Restore Act application has been submitted to Covington;have draft contract from BMA currently reviewing

- Point Cadet Traffic Analysis - MOU approved by council May 19^*^, sent to MDOT forapproval

- Point Cadet Waterfront (Boardwalk) - Design pending final scope of work

Popps Ferry Extension #913 - Coliseum has the draft MOU for Board approval; 33parcels to acquire; all surveys; appraisals, and review appraisals complete; demo specs atMDOTfor review, emailed Sharon Willis Friday for an update

Negotiationo 2400 Beach Blvd. (Coliseum) o 161 Oakmont (Coliseum)o 128 Oakmont (Coliseum) o 173 Oakmont (Shows)

Page 6 of 9

Page 10: TOP 20 CALL TYPES BY DESCRIPTION · - Belle La Vie Parkway - Division St. Houses Phase 2 - Division St. Houses Ph 3 - Eagle Point Park - East Biloxi Connector Rd - Ellzey Place Phase

o

o

o 2416 Beach Blvd. (Spencer)o 0 Hwy 90 (Coliseum)o 0 Briarfield (Bhakta)0 Briarfield (Coliseum)0 Pass Rd. (Salloum)0 Pass Rd. (Hardy Court)

2395 Pass Rd. (NM Markup)2395 Pass Rd. (Burger King)

o

o

o

o 2393 Pass Rd. (Exxon)o 0 Pass Rd. (Biloxi Management)o 2401 Pass Rd. (Stewart Family)o 2404 Pass Rd. (Shoppes @ PF West)o 2423 Pass Rd. (Take 5)o 0 Covenant Square (Hardy Court)o 2415 Pass Rd. (Hardy Court)o 2368 Pass Rd. (PF MS Dev Co)

Courts Purchased

o 141 Oakmont (Maddox) o 129 Oakmont (Trinh)o 145 Oakmont (Maddox) o 131 Oakmont (Trinh)

o 134 Oakmont (Stacy)Ready for Demolition o 137 Oakmont (Stacy)

o 135 Oakmont (Olin) o 149 Oakmont (Sumners)o 164 Oakmont (Patton) o 168 Oakmont (Best)o 165 Oakmont (Newton) o 169 Oakmont (Coliseum)

Already demolishedo 130 Oakmont (Serignet)

- Popps Ferry Bridge Submarine Cable - Closing out with MDOT

- Popps Ferry Bridge & Approaches - met with Sharen Willis March 4'^ to discuss how tomove into the ROWphase; BMA phasing out the project per that meeting

- Port Commission Roof Repairs - working on-going

Repair/Replace Contracto Churchhill Ditch - 50% plans complete; emergency repair almost complete;

there is new concrete pipe that has been upsized for the entire section crossing theKeesler gas easement north to the Pennzoil Park ditch

o Malpass/Watersview Drainage-o Lorraine Road (Bruce Wilson)o Seal @ Howard Sewer Repair

Page 7 of 9

Page 11: TOP 20 CALL TYPES BY DESCRIPTION · - Belle La Vie Parkway - Division St. Houses Phase 2 - Division St. Houses Ph 3 - Eagle Point Park - East Biloxi Connector Rd - Ellzey Place Phase

o Scenic River Drainageo Wash Fayard Rd. Culvertso IP Parking Loto McDonnell Ave. extension road base onlyo Magnolia Street driveways and curb cuts for Infrastructureo Cambridge Drive Drainageo Lorraine Road waterline

o 229 Dewey Circle inleto Tara Lane Drainage ($200,000)

- Saenger Theater Phase I & II Fly Tower & Exterior - very little water in building dueto Cristobal, have to reinstall their building containment system but no real setbacks ordamages

- Saenger Theater Interior Condition Assessment - after the 1 of the year

- Sediment Removal Phase III - hydrographic surveys complete, working on the permitapplications, the sites that have SAV, Seymour is trying to work with DMR on a way tomigitate.

o Hiller Park Pond

o Cedar Lake Rd. Canal

o Cedar Lake Broadus

o Kennedy Ln (SAV)o Savannah Estates (DMR stated not eligible)o Eagle Point Pin Oak (SAV)o Linda Dr. (SAV)

- Sediment Maintenance Plan - Seymour Engineering is currently working

- Small Craft to Oak St Boardwalk - DE contract approved, BMA is wanting to have akick off meeting, still waiting on MOU from DMR

- Snyder Center Chiller Replacement - contract awarded, going to be 8 weeks until chillergets here

- Snyder Pool Repairs - apparent low Ewing Pool at $69K, on 6/19 agendafor approval

- Tanglewood Infrastructure — received bids May 20'^, bids currently under review

- Visitors Center Repairs - working on scope of work to develop plans/specs in house

- Ward 4 Pavingo On The Green - on County's schedule to completeo Baywood, Rustwood, Darwood, Camp Wilkes out to bid; receive bids 2/12/2020o Will be awarded on April 28'^ council meeting

Page 8 of9

Page 12: TOP 20 CALL TYPES BY DESCRIPTION · - Belle La Vie Parkway - Division St. Houses Phase 2 - Division St. Houses Ph 3 - Eagle Point Park - East Biloxi Connector Rd - Ellzey Place Phase

- Watersview Drainage Cleaning - Council Glavan has requested assistance from HarrisonCounty and we have submitted application for wetlands permit; received email fromCorps that no permit was needed, OMR is issuing a waiver; County has agreed to hauloffdebris if City removes it from the wetlands

- West Biloxi Boardwalk Phase IB - NT? April 6, 2020/Comp Sept. 27, 2020, workunderway no issues; US Fish & Wildlife stopped work in one area due to least ternnesting, met on the project site with county engineer and both consultants last week andall conflict issues with county boat ramp have been resolved

- West Biloxi Boardwalk Phase 2 - east of existing boardwalk, met with BMA to develop apotential scope of work for next phase. They are drafting a contract for review.

- Woolmarket City Center Addition - Completion May 13, 2020, work underway

- Woolmarket Rd. East Drainage - received bids April 15^^, SCI apparent low, will be ableto award alt 1 which includes Shriners Drainage and a portion of the north/side ditchnorth of Woolmarket Road; award of contract on May 19^^ agenda; just received signedcontract documents need to schedule pre-construction meeting to set Notice To Proceeddate.

- Woolmarket Road Sidewalks - Have received the Machado-Patano design contract, willbe on the council agenda before the end of June.