2
TOO No.10 D CENTER Premium data center, offering the top quality and capability in Japan Ne,<enter Access 45 min drive from Haneda lnt'I Airport 10 min from the nearest station by bus Power receiving Realizing highly reliable power receiving from 3 substations by dual path : ' I I Seismic Isolation Structure Installed seismic isolation devices to support the building from the strong shock of the earthquake Cable Tunnel Directly connected to eahquake-proof cable tunnel to secure the communications network.

TOKYO No.10 DATA CENTER€¦ · Power receiving Realizing highly reliable power receiving from 3 substations by dual path : ' I I • Seismic Isolation Structure Installed seismic

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: TOKYO No.10 DATA CENTER€¦ · Power receiving Realizing highly reliable power receiving from 3 substations by dual path : ' I I • Seismic Isolation Structure Installed seismic

TOKYO No.10 DATA CENTER Premium data center, offering the top quality and capability in Japan

Ne,<c:enter

Access 45 min drive from Haneda lnt'I Airport

10 min from the nearest station by bus

Power receiving Realizing highly reliable power receiving from 3 substations by dual path

: ' I I •

Seismic Isolation Structure Installed seismic isolation devices to support the building from the strong shock of the earthquake

Cable Tunnel Directly connected to earthquake-proof cable tunnel to secure the communications network.

Page 2: TOKYO No.10 DATA CENTER€¦ · Power receiving Realizing highly reliable power receiving from 3 substations by dual path : ' I I • Seismic Isolation Structure Installed seismic