Request for Proposal

Design, Supply, Erection, Testing and Commissioning of

Hammer Mill and Its Subsystems

Satish Dhawan Space Centre SHAR

Indian Space Research Organization

Sriharikota -524 124

Andhra Pradesh

1

Page 2: Title of the Entity: SDSC SHAR · Web viewPreferably two nos. embedded in windings to monitor winding temperature and trip system upon high winding temperature or one no. only for

Proposal Document, bid preparation, submission, publicity, bid and supplier evaluation.

Proposals are invited from the interested Suppliers for the enclosed scope of work in two-part bid. Part-1 Technical and Unpriced part of the work and Part-2 Priced Commercial part.The RFP document is organized in five sections as follows.

Section –A General Terms and Conditions of the Contract Section –B Technical Specifications-Mechanical systemsSection –C Technical Specifications-Electrical systemsSection –D Technical Specifications-Instrumentation systemsSection –E Annexures

Title of the Entity: SDSC SHAR, SRIHARIKOTATitle of the proposal: Design, Supply, Erection, Commissioning of Hammer Mill with Its Sub-Systems Quantity: 2 numbers.

2

Page 3: Title of the Entity: SDSC SHAR · Web viewPreferably two nos. embedded in windings to monitor winding temperature and trip system upon high winding temperature or one no. only for

SECTION -AGENERAL TERMS

& CONDITIONS OF

CONTRACT

3

Page 4: Title of the Entity: SDSC SHAR · Web viewPreferably two nos. embedded in windings to monitor winding temperature and trip system upon high winding temperature or one no. only for

1. Proposal documenta. One set of proposal document is issued. Bidder shall sign and stamp each page of tender

document as token of his acceptance & submit along with his offer. Document shall be scanned and uploaded in e-procurement portal. In case it is not possible to upload due to higher file size, hard copy of the balance documents (without any price figures) shall be submitted physically before due date.

b. Transfer of tender document issued to one Bidder to another is not permissible.c. Tender documents shall remain the property of Department and if obtained by one

intending Bidder shall not be utilized by another without the consent of the Department.d. The proposal shall be completely filled in all respects and shall be submitted together

with requisite information. Any offer incomplete in any particulars is liable for rejection.e. Bidders shall set their quotations in firm figures and without qualifications or variations

or additions in the terms of the Tender documents. Proposal containing qualifying expressions such as "subject to minimum acceptance" or "subject to prior sale" or any other qualifying expressions or incorporating terms and conditions at variance with the terms and conditions incorporated in the Tender documents are liable to be rejected.

f. Quoted Price shall be firm and fixed.g. Price may be quoted in Indian National Rupee or foreign currency as applicable. h. Satish Dhawan Space Centre – SHAR (SDSC-SHAR) Sriharikota is declared as

prohibited place under official secrets act 1923. Hence during execution of site works necessary security requirements enforced by the department from time to time shall be followed strictly.

i. Before starting the site work (at SDSC SHAR), the supplier shall provide insurance as per workman compensation act to all his personnel working at site in Sriharikota against accidents till commissioning of Hammer mill and its sub-systems. Insurance for the same shall be borne by the supplier.

j. Quote shall be based on Delivery Duty Paid(DDP) / Delivery At Port(DAP) Sriharikota.k. All applicable taxes (like CGST/SGST/IGST/UGST, etc.) and duties shall be indicated

clearly in quotation. Incase of any import item the corresponding taxes also shall be indicated.

2. Addenda /CorrigendaAddenda/corrigenda to the tender document may be issued by SDSC SHAR prior to the date of opening of the tenders, to clarify or reflect modifications in the contract terms and conditions.Such addendum/corrigenda will be distributed to each firm or person who had purchased the tender documents. 3. AmbiguityShould there be any ambiguity or doubt as to the meaning of any of the tender clause/condition or if any further information is required, the matter shall be immediately brought to the notice of Sr. Head, Purchase & Stores, SDSC SHAR in writing for necessary clarifications prior to the opening of the tenders.4. Preparation of Bids4.1. Site Visit

a. Bidders can visit and examine the site and its surroundings to familiarize themselves of the existing facilities and may collect any other information which they may require for preparing and submitting the Bid.

4

Page 5: Title of the Entity: SDSC SHAR · Web viewPreferably two nos. embedded in windings to monitor winding temperature and trip system upon high winding temperature or one no. only for

b. Claims and objections due to ignorance of existing conditions or inadequacy of information will not be considered after submission of the Bid and during implementation.

4.2. Validity of Offera. Bid shall remain valid for acceptance for a period of six months from the due date of

submission of the Bid.b. The Bidder shall not be entitled during the said period to revoke or cancel his Bid or to

vary the Bid except and to the extent required by Department in writing.c. Bid shall be revalidated for extended period as required by Department in writing.d. In such cases, unless otherwise specified, it is understood that validity is sought and

provided without varying either the quoted price or any other terms and conditions of Bid finalized till that time.

4.3. Cost of BiddingAll direct and indirect costs associated with the preparation and submission of Bid (including clarification meetings and site visit, if any), shall be to Supplier's account and the Department will in no case be responsible or liable for those costs, regardless of the conduct or outcome of the Bid process.

4.4. Applicable LanguageThe Bid and all correspondence incidentals to and concerning the Bid shall be in the English Language. For supporting document and printing literature submitted in any other language, an accurate English translation shall also be submitted. Responsibility for correctness in translation shall lie with the supplier.

4.5. Arrangement of Bida. The Bid shall be neatly presented on white paper with consecutively numbered pages. It

should not contain any terms and conditions which are not applicable to the Bid.b. The Bid and all details submitted by the Supplier shall be signed and stamped on each

page as token of acceptance by a person, legally authorized to enter into agreement on behalf of the Supplier. Corrections/ alteration, if any, shall also be signed by the same person. Supplier shall submit Power of Attorney in favor of the person who signs the Bid and subsequent submissions on behalf of the Supplier.

c. Department will not be bound by any Power of Attorney granted by the Supplier or changes in the constitution of the firm made subsequent to submission of the Bid or after the award of the contract. Supplier may however, recognize such Power of Attorney and changes after obtaining proper legal advice, the cost of which will be borne by the Supplier.

d. The cancellation of any document such as Power of Attorney, Partnership Deed etc should be communicated by the Supplier to the Department in writing well in time, failing which Department shall have no responsibility or liability for any action taken by Supplier on the strength of the said documents.

e. In case the Supplier have a relative or relatives or in the case of firm or company one or more of its shareholders or a relative or relatives of the shareholder (s) employed in a senior capacity in Department's organization, the authority inviting Bids shall be informed of the fact at the time of submission of the Bid, failing which the Bid may be disqualified or, if such fact subsequently comes to light, Department reserves the right to take any other action as it deems fit in accordance with any applicable law, Rules, Regulations of the like in force for the time being.

4.6. Schedule of Prices

5

Page 6: Title of the Entity: SDSC SHAR · Web viewPreferably two nos. embedded in windings to monitor winding temperature and trip system upon high winding temperature or one no. only for

a. The schedule of prices shall be read in conjunction with all the sections of proposal document.

b. For Lump sum contract, the lump sum prices quoted by the Supplier shall be firm and fixed for the completion of the work, unless stated otherwise. The price must be filled in the format for ‘Schedule of Prices’ – Annexure-2 in section E.

4.7. Documents Comprising the BidThis is e-procurement tender. All the documents need to be scanned and attached to the bid under “documents solicited from Supplier” form. In case it is not possible to upload due to higher file size, hard copy of the balance documents (without any price figures) shall be submitted physically before due date.Offers shall be sent online only using standard digital signature certificate of class III with encryption / decryption. The tenders authorized online on or before the open authorization date and time only will be considered as valid tenders even though the bids are submitted online.

Bid shall be submitted in two parts i. Part -1 Techno-Commercial Part of the Bid

ii. Part-2 Price Part of the Bid

4.7.1. Part – I: Technical and Un-priced Commercial PartTechnical and un-priced commercial part shall comprise the following documents / information. All the documents shall be scanned and uploaded in the ISRO e-procurement portal.

a. Submission of bid letter along with one set of tender document duly signed and stamped as token of acceptance. Scanned copy shall be uploaded in the ISRO e-procurement portal.

b. Power of attorney shall be in favor of authorized signatory of the bid/ proposal documents.

c. Audited balance sheet including profit and loss account for last three financial years showing annual turnover.

d. Latest solvency certificate from a scheduled bank for a value of 100 lakhs. e. Any other relevant document, bidder desires to submit.f. Confirmation with respect to Minimum Criteria for Qualification g. Compliance statementh. Deviations, if any, with respect to technical and commercial terms & conditions shall be

clearly brought out in Annexure-3. Only the exceptions and deviations mentioned in Annexure-3 will be considered. If no deviations are found in Annexure-3, it will be presumed that the bidder is adhering to all the specification and terms & conditions given in this document.

Note: All the above documents shall be uploaded in the ISRO e-procurement portal.

4.7.2. Part – II Priced Commercial BidPriced commercial bid shall contain schedule of prices and shall be filled in ISRO e-procurement portal. No deviations, terms and conditions, assumptions, discounts etc. shall be stipulated in price bid. Department will not take cognizance of any such statement and may at their discretion reject such bids.

4.7.3. Bid Submissiona. Offers should be submitted On-line using standard digital signature of class -3 with

encryption/decryption options. b. The tenders authorized online on or before the open authorization date and time will only

6

Page 7: Title of the Entity: SDSC SHAR · Web viewPreferably two nos. embedded in windings to monitor winding temperature and trip system upon high winding temperature or one no. only for

be considered as valid tenders.c. Prices shall be mentioned in the space / column provided in the ISRO e-procurement portal

only for such purpose.d. Physical copy of the bid will be accepted only in case if the file size is bigger and not

possible to upload the same. In such case, the hard copy shall be submitted within due date. Documents received after due date will not be considered.

e. Prices quoted should be on the basis of F.O.R. Sriharikota.f. The department will not pay separately for transit insurance and same shall be included in

the cost quoted by the Bidder.g. All risks in transit shall be exclusively borne by the supplier and the department shall pay

only for such items actually received in good condition in accordance with the purchase order.

h. Bids duly filled in by the Bidder should invariably be submitted as stipulated in the e-procurement portal.

i. Department may open Part – I of the bid on the due date of opening at convenience. Price Bid (Part-II) of the bid of the technically and commercially acceptable bids shall be opened at a later date.

j. Department reserves the right to reject any or all the Bids without assigning any reasons thereof.

4.7.4. Bid Evaluationa. The bidder shall provide all the relevant data / information / details required for evaluating

the bid technical and commercially in the specific formats enclosed with the tender. Apart from this, Bidder is free to add any other relevant information.

b. During evaluation, Department may request Bidder for any clarification on the bid / additional documents / information required. Bidder shall submit all clarifications / additional documents / information requested in original. If not submitted within the stipulated time department has right to reject such bids.

c. Techno-commercial discussion shall be arranged with Bidder, if needed. Bidder shall depute his authorized representatives for attending discussions.

d. The complete scope of work is defined in the Tender document. Only those Bidders who undertake total responsibility for the complete scope of work as defined in the Tender document only will be considered.

e. In case Bid does not fully comply with the requirement of Tender document and the bidder stipulates deviations to the clauses of the tender, which are unacceptable to the Department, the Bid will be rejected.

f. Performance of Bidder on similar nature of works executed / under execution shall be taken into consideration before selecting the Bidder for opening his price bid.

g. The time schedule for completion is given in the Tender document. Bidder is required to confirm the completion period unconditionally.

h. Department shall not be obliged to furnish any information / clarification to unsuccessful bidder as regard non-acceptance of their Bids.

i. Overall lowest offer , technically and commercial qualified , will be considered for placement of Order.

5. Exclusion of TendersThe following tenders shall be summarily rejected from the procurement process

a. Tenders of suppliers who are already removed from supplier list from having any business dealing.

7

Page 8: Title of the Entity: SDSC SHAR · Web viewPreferably two nos. embedded in windings to monitor winding temperature and trip system upon high winding temperature or one no. only for

b. The tenders that materially depart from the requirements specified in the tender document or which contain false information

8

Page 9: Title of the Entity: SDSC SHAR · Web viewPreferably two nos. embedded in windings to monitor winding temperature and trip system upon high winding temperature or one no. only for

6. Publicity Relating To Tendersa. Advertisements, press release or other specialized publicity documents, which are related to

or reveal the existence of a tender and are intended by the Bidder for public distribution and / or the press, broadcasting, or television, shall be cleared/approved by the Department.

b. The Department may direct the Bidder to withhold such publicity or to require modifications to the publicity material. The Bidder shall comply with such direction.

c. The successful bidder is inhibited from advertising or other means of publicizing the supply of the proposed system to Department.

d. Secrecy / Confidentiality : Supplier / party  shall treat  Specifications , Demand and use of material ,  Terms and conditions of the tender as confidential and not to disclose to third parties without prior written consent of DEPARTMENT (SDSC SHAR / ISRO) except as required under any law for the time being in force or due to statutory requirements.

7. Determination of ResponsivenessThe bid which does not satisfy the pre-qualification criteria as mentioned above (refer point no. 8) shall summarily be rejected and shall not be considered for further evaluation. SDSC SHAR will scrutinize bids to determine whether the bid is substantially responsive to the requirements of the tender documents. For the purpose of this clause, a substantially responsive bid is one which inter-alia conforms to all the terms and conditions of the entire tender document without any deviations and reservations. The decision of department shall be final in this regard.

8. Supplier Evaluation FormatSDSC SHAR seeks response to the following questionnaire for assimilating data which would be used for evaluating the capability of the supplier for executing the referred work. Hence, the supplier is requested to provide only genuine data and any discrepancy found at a later point of time may result in rejection of the supplier from purchase process. Furnishing of data cannot be construed as automatic qualification for participation in the tender. Questionnaire should be signed by a responsible and authorized person of the Company / Agency.

9

Page 10: Title of the Entity: SDSC SHAR · Web viewPreferably two nos. embedded in windings to monitor winding temperature and trip system upon high winding temperature or one no. only for

a. For Indigenous suppliersS.No Description Supplier Response1. Name of the company2. Type of the Company

(Proprietary/ Pvt. Ltd/Public Ltd/ Joint Venture/Consortium)3. If Company is Consortium please provide the signed copy

Consortium Agreement document.4. Registration number & certificate5. Name & Address of the Office of the Chief Executive of the

Company

6. Contact person for this tender with name & address and contact number

7. Locations of the Branches of Company (if any)

8. From which year the Company is in operation9. Current Annual turn-over of the company10. IT returns for the last 3 years11. The Profit & Loss Account details for the last 3 years which

is duly audited and Submitted as part of the Annual Report. 12. In Rs. Lakhs only

Total assets (I)Current assets (ii)

Total liabilities (iii)Current liabilities (iv)

Net Worth (I-iii)Working capital (ii-iv)

Turnover ` in lakhsProfit/Loss in Rest. lakhs

13. The major lines of business:

14. Shop floor area & Handling system availability

Signature of Authorized Person with Seal

10

Page 11: Title of the Entity: SDSC SHAR · Web viewPreferably two nos. embedded in windings to monitor winding temperature and trip system upon high winding temperature or one no. only for

b For foreign suppliersS. No Description Supplier response1. Name of the company2. Type of the Company

(Proprietary/Pvt.Ltd. /Public Ltd. /Joint Venture/Consortium)3. If Company is Consortium please provide the signed copy

Consortium Agreement document.4. Registration number & certificate5. Name & Address of the Chief Executive of the Company

6. Contact person for this tender with name & address and contact number

7. Do you have any Indian Agent (If YES) please provide percentage of Agency Commission?

8. Name & Address of the India Agent details of contact person9. Locations of the Branches of Company (if any)10. From which year the Company is in operation11. Current Annual turn-over of the company12. The Profit & Loss Account details for the last 3 years which is

duly audited and Submitted as part of the Annual Report. Currency ( )

Total assets (i)Current assets (ii)

Total liabilities (iii)Current liabilities (iv)

Net Worth (i-iii)Working capital (ii-iv)

Turnover Net Profit/Loss

13. The major lines of business14. The major customers for whom similar items were supplied

(Enclose copies of the Purchase Orders)

15. Any customer’s feedback on the services which is in writing (Pl. enclose copies)

16. Shop floor area & Handling system availability

Signature of Authorized Person with Seal

11

Page 12: Title of the Entity: SDSC SHAR · Web viewPreferably two nos. embedded in windings to monitor winding temperature and trip system upon high winding temperature or one no. only for

9. Design & supply of equipmenta. The supplier shall provide overall general arrangement of the machine with all major

dimensions. b. The details / designs and GA drawings given in the tender for various systems / equipment’s

are of minimum requirement and are for guidance only. Contractor is free to modify / improve / redress the design if required to meet the guaranteed performance of the systems / equipment’s being supplied. Design and fabrication drawings of the machine and auxiliary systems shall be prepared and sent by the Bidder for scrutiny /review/clearance by Department. The Bidder shall incorporate necessary changes/revisions in the design based on the suggestions made by the Department or its authorized representatives and shall submit the drawings for clearance prior to undertaking fabrication/manufacturing.

c. Scrutiny /review/clearance of the drawings by SDSC, SHAR shall not absolve the responsibility of the Bidder from proper performance of the equipment and associated subsystems and from the guarantee/warranty clauses. However, any modification / improvement shall be carried out after approval by the Department.

d. Supplier shall carry out detailed engineering, manufacture / procure and supply the equipment in accordance with the scope, technical specifications and terms & conditions of contract.

e. Any item which may not have been specifically mentioned herein but are needed to complete the equipment / system shall also be treated as included and the same shall also be supplied and erected at no extra cost, unless otherwise specifically excluded as indicated.

f. Supply of bought out items shall be as mentioned in the technical bid.g. All these goods or material shall be supplied or used shall be new and of first quality. Where

imported or partly imported goods or material are offered or intended to be used, the fact must be specifically stated and brought to the notice of Department.

10. Inspection and testinga. The supplier shall identify various stages of inspection and quality control of the system

including sub systems, components and bought out items etc., and inform the same to SDSC, SHAR in advance. The approved QAP shall be followed during course of selection of materials, Manufacture, Erection & Testing.

b. Department reserves the right to inspect all phases of Supplier’s operations through its representatives and/or third-party inspection agency approved by the Department. Therefore, it is the responsibility of the supplier to provide the necessary support for the inspection agency and get the works inspected at all stages of work as identified in quality assurance plan.

c. The presence or absence of a Department’s representative does not relieve the Supplier of the responsibility for quality control in all phases of the work. In the event that any of the work being done by the Supplier or any Sub-Supplier is found by Department’s representatives to be unsatisfactory or not in accordance with the drawings, procedures, specifications, and standards the Supplier shall, upon verbal notice of such discrepancy or deficiency, take immediate steps to revise the work in a manner to conform to the relevant drawings, procedures and specifications. The Supplier shall carry out required supervision and inspection as per Quality Assurance Plan and furnish all assistance required by the Department in carrying out inspection work during this phase.

d. The authorized inspectors of the department shall have access to the premises of the supplier and its sub-contractors at all reasonable times. All equipment, instruments, tools that are necessary for the inspection shall be provided by the supplier on demand by department’s own inspectors or a third party authorized by department.

12

Page 13: Title of the Entity: SDSC SHAR · Web viewPreferably two nos. embedded in windings to monitor winding temperature and trip system upon high winding temperature or one no. only for

e. Inspection by department’s own inspectors or by third party authorized by department or clearances given by the Department shall not absolve the responsibility of the supplier from proper performance of the machine and from the guarantee/warranty clauses stipulated in the contract.

11. Delivery and storage a. Dispatch Instructions given in the Contract shall be strictly followed. Failure to comply

with the instructions may result in delay in payment apart from imposing any other charges as may be deemed to fit.

b. The Supplier shall be responsible for transporting all the equipment to site, unloading and storage. No equipment shall be delivered without obtaining dispatch clearance from Department. All the equipment shall be properly packed to avoid any damage during transportation / handling / storage.

c. Supplier shall undertake the responsibility of the machine and its components during transportation to Sriharikota and during erection, testing and commissioning of the same at suitable location identified by SDSC, SHAR and until handing over the machine to SDSC, SHAR after its acceptance. SDSC, SHAR will provide sheltered area for storage of the machine and its components. Supplier shall take proper care while storing the equipment and shall provide watch and ward at his own cost.

d. First fill of hydraulic oil, lubricating oil, coolant oil & other consumables as required are to be provided in seal packed at department site.

12. Installation12.1 General

a. Supplier’s staff shall include adequate number of competent erection engineers with proven experience on similar works to supervise the erection works and sufficient skilled, unskilled and semi-skilled labor to ensure completion of work in time.

b. Certain material handling equipment are available with department and the same shall be extended on chargeable basis for carrying out unloading and erection at department’s site. However, supplier shall convey the list of material handling equipment needed for the above purpose. If the required material handling equipment is found unavailable, the supplier shall have to arrange the same by its own.

c. Supplier's erection staff shall arrive at site on date agreed by Department. Prior to proceeding to work, Supplier shall however, first ensure that required/sufficient part of his supply has arrived at site.

d. Special equipment / Material handling equipment other than above mentioned equipment required for erection work shall be arranged by the supplier.

e. Department will make ready the machine foundation, trenches and provision of water supply to a place identified near the building as per the details furnished by the supplier.

f. Erection of equipment may be phased in such a manner so as not to obstruct the work being done by Other Suppliers and / or operating staff that may be present at that time.

g. During erection, Department's engineer will visit site from time to time with or without Supplier’s engineer to establish conformity of the work with specification. Any deviations, deficiencies or evidence of unsatisfactory workmanship shall be corrected as instructed by Department.

a. Supplier shall carry out work in a true professional manner and strictly adhere to the approved drawings. Any damage caused by Supplier during erection to new or existing building shall be made good at no extra cost to Department

13

Page 14: Title of the Entity: SDSC SHAR · Web viewPreferably two nos. embedded in windings to monitor winding temperature and trip system upon high winding temperature or one no. only for

12.2 Setting Out, Leveling and Grouting of Equipment

a. Supplier shall check the civil works where the equipment is to be erected in advance for their correctness / conformity to the approved drawings for erection of equipment with respect to their lines, levels, pockets, openings, cut outs etc. and shall notify Department of any major deviation.

b. Supplier shall mark precisely the center lines and datum reference on civil works where the equipment is to be erected with reference to benchmark given by civil supplier. Any minor adjustment necessary to structure (on which equipment is to be erected) for making them plumb and level shall be carried out by supplier at his cost.

c. All the grout for equipment shall be carried out using non-shrinkable grout. Surfaces receiving grout shall be prepared to receive grout. All block outs for pipes (puddle pipes), sleeves etc. shall be grouted by using cement concrete of the same grade as that of the parent structure. All associated civil works such as cutting of re-bar, chipping or dressing of foundation or widening openings in R.C.C. Work and brick work, drilling holes in concrete work or brick work shall be carried out by supplier as part of the scope of contract.

12.3 Records

a. Supplier shall maintain records pertaining to the quality of erection work in a format approved by Department. Whenever erection work is complete, Supplier shall offer erected equipment for inspection to Department's engineer who along with Supplier's engineer will sign such records on acceptance.

b. The complete construction of machine right from component level till the complete machine assembly performance tested including sub – assembly shall be properly documented with drawing, raw material, Test certificate etc.

c. There shall be time to time submission of information /clearance / approval by the department and all comments shall be duly incorporated.

d. All such drawing will become part of PRODUCTION MASTER FILE which shall also contain as built drawing, Final Erection, Testing & Commissioning report done at site.

e. Three copies of PRODUCTION MASTER FILE shall be supplied.12.4 Equipment Erection

a. Supplier shall carry out the works in accordance with the specific instructions given on the approved drawings, method statements, manufacturer’s drawings / documents or as directed by Department. Equipment shall be erected in neat workmen like manner so that they are level, plumb, and square and properly aligned and oriented. Tolerances shall be as established in manufactures drawings or as stipulated by Department. No equipment shall be grouted or bolted down to the foundation, until its alignment is checked and found acceptable by Department.

b. Supplier shall provide all supervision, labor, tools, machines, cranes, slings, wire rope, D-shackle etc., equipment, scaffolding, rigging material and incidental material such as bolts, wedges, anchors, concrete inserts, grout material etc. required to complete the works. Supplier shall also provide at his own cost of all such consumables like oxygen - acetylene gas welding rods, grinding wheels, temporary supports, shims etc. required to complete work.

c. Supplier shall take utmost care while handling instruments, delicate equipment, panels etc., and protect all such equipment on erection

14

Page 15: Title of the Entity: SDSC SHAR · Web viewPreferably two nos. embedded in windings to monitor winding temperature and trip system upon high winding temperature or one no. only for

13. Drawings and O&M Manualsa. Supplier shall submit three hard copies & one soft copy of all the approved drawings

incorporating any modification / changes made during the execution of CONTRACT. All these drawings shall be marked as 'As Built'.

b. Supplier shall submit three hard & one soft copy of the following documents: i. Operations manual of the machine.

ii. Programs manual.iii. Maintenance manual with drawings, circuit diagrams, interfacing instructions, trouble

shooting and maintenance instructions and spares list with source of supply.iv. Lubricating chart with oil /grease type, quantity, changing interval, brand name

should be indicated clearly.v. Control system Documents on DVD

c. Submission of the drawings and manuals shall be a precondition for releasing of any final payment due to Supplier.

14. TrainingThe supplier shall provide training in the operation, maintenance and trouble shooting of machine and its sub-systems to two departmental personnel free of cost at department’s site.

15. Schedule of Price a. CONTRACT price shall include all costs of “design, preparation of detailed drawings,

manufacture, testing, inspection at manufacturer’s works, packing, forwarding, transportation to site, unloading, installation, testing, carrying out process trials and commissioning of Hammer mill and its sub-systems”. Shop floor testing, packing, forwarding, transport to site, unloading, storage, all risk coverage, erection, installation, training, testing & evaluation and commissioning of equipment including associated civil work and any other cost for proper and complete execution of the CONTRACT.

b. CONTRACT prices shall also include all travelling expenses, living expenses, salaries, overtime, benefit and any other compensation for engineers, supervisors, skilled, semi-skilled workmen, watch and ward staff, laborer and other staff employed by the Supplier, cost of tools and tackles required for erection and other consumable material required, and all taxes, duties, and levies as applicable on the date of submission of bid.

c. Price shall be firm & fixed.d. Supplier shall quote the prices as per price bid format enclosed as Section-E Annexure-2e. The rate quoted shall be on FOR SDSC SHAR, Sriharikota basis. f. All rates of taxes/duties/levies applicable with details of percentage and applicable portion

of the price should be spelt out clearly in the offer.g. The taxes applicable for supply and erection & commissioning shall be indicated

separately in terms of percentage in the price bid. If the offers submitted by the suppliers are silent on taxes, it will be presumed that quoted rates are inclusive of taxes & duties and no claim in this regard will be entertained later.

h. Department is eligible for concessional exemption of Customs Duty for imported items. Necessary exemption certificate will be provided to the suppliers against request. This may be taken into account while quoting for items.

i. Payment for the foreign suppliers:    In case foreign suppliers LC/Sight Draft will be established for supply portion and erection & commissioning portion separately. The agency commission shall be paid in Indian Rupee based on the supplier’s authorization. Any other mode of payment shall be stipulated by the bidder clearly in the statment attached in Section-E Annexure-3 of the proposal document.

15

Page 16: Title of the Entity: SDSC SHAR · Web viewPreferably two nos. embedded in windings to monitor winding temperature and trip system upon high winding temperature or one no. only for

16. DiscountsSupplier shall not indicate any discount separately and quoted price should be after deducting the discount.

17. Payment termsa. In case of indigenous suppliers, all the payments due to Supplier shall be made in Indian

currency through Electronic Clearance System (ECS). b. In case foreign suppliers LC will be established for supply portion and erection &

commissioning portion separately. The agency commission shall be paid in Indian Rupee based on the supplier’s authorization. Any other mode of payment shall be stipulated by the bidder clearly in the deviation statement attached in Section-E Annexure - 3 of the proposal document.

c. In general, our payment terms are 100% payment within 30 days from the date of acceptance. However, if party desires, department may consider the following payment terms.

d. 30% as advance against Bank guarantee and invoice if required.e. 60% on receipt of items and on inspection by CLIP (SDSC Center Level Inspection Party)

at our sitef. 10% within 30 days from the date of commissioning and final acceptance. g. Wherever advance payment is requested, Bank Guarantee from any Nationalized

Bank/Scheduled Bank should be furnished. In case of advance payments, if the supplier is not supplying the material within the delivery schedule, interest will be levied as per the Bank Lending Rate plus 2% penal interest.

h. Interest will be loaded for advance payments/stage payments as per the lending rate of Bank and will be added to the landed cost for comparison purpose. In case of different milestone payments submitted by the parties, a standard and transparent methodology like NPV will be adopted for evaluating the offers.

18. Delivery Schedulea. Hammer mill & its sub-systems design document including QAP shall be supplied to SDSC

SHAR within 8 weeks from the date of receipt of purchase order. Upon clearance from the department, the supplier shall supply the equipment including sub-systems at SDSC SHAR site within 38weeks from the date of clearance of design document. The commissioning, testing and handing over the system in working condition as per the specifications within 10 weeks from the date of receipt of systems at SDSC SHAR.

b. Delivery date is essence for this contract. Supplier shall adhere to the delivery date mentioned in this tender and same shall be confirmed along with the offer. In case Supplier is unable to meet the delivery schedule, the offer is liable for rejection.

c. Intermediate milestones as identified mutually as per design document shall be met with.d. Supplier shall give the delivery schedule as per the format enclosed in Section-E, Annexure-419. Liquidated Damages

In the event of the Supplier failing to complete the work within the delivery period specified in the contract agreement or any extension agreed thereto, the Department shall reserve the right to recover from the Supplier as liquidated damages, a sum of 0.5 percentage per week or part thereof of the undelivered portion of the total contract price of equipment or work. The Total liquidated damages shall not exceed the 10.0 percentage of the total Contract price.

20. Extension of Timea. If the completion of deliveries of equipment, work is delayed due to reason of Force Majeure the

Supplier shall without delay give notice to the Department in writing of their claim for an extension of time. The Department on receipt of such notice may agree to extend the Contract period or

16

Page 17: Title of the Entity: SDSC SHAR · Web viewPreferably two nos. embedded in windings to monitor winding temperature and trip system upon high winding temperature or one no. only for

delivery date as may be reasonable but without prejudice to other terms and conditions of the Contract.

b. Both parties shall keep a record of the circumstances referred to above which are responsible for causing delays in the execution of the services and shall give notice to the other supplier of any such cause as soon as it occurs. An event of Force Majeure, where so ever it occurs,

c. provided it affects either supplier in fulfilling its obligations under this contract, shall justify the affected supplier's claim of Force Majeure. Should one or both the parties be prevented from fulfilling their contractual obligations by a state of Force Majeure lasting continuously for more than a month, the parties shall consult with each other regarding the future execution of the contract.

21. Taxes and Duties 21.1. GSTa. We are eligible for IGST @ 5%, as per Ministry of Finance (Dept. of Revenue)

Notification No.47/2017 dated 14.11.2017. Concession certificate for claiming IGST @ 5% will be furnished along with the Purchase Order.

b. GST @ 5% or AS APPLICABLE will be paid extra. Concession certificate for claiming GST @ 5%, as per Ministry of Finance Dept. of Revenue Notification No. 45/2017- Central Tax(Rate) dated 14.11.2017 and Government of Andhra Pradesh Goods and Services Tax Act, 2017 (Act No.16 of 2017),G.O.MS.No.599 dated 12.12.2017 is attached herewith. Our GST No. is 37AAAGS1366J1Z1

21.2. Customs Dutya. We are entitled to Partial Customs Duty Exemption vide Notification No.50/2017

Customs – Dt. 30.06.2017, Sl. No. 539(A) as amended vide Notification No. 05/2018 dt: 25.01.2018 for imports. Confirm whether CD is applicable and if so whether CD Exemption Certificate is acceptable and the same is required for exemption.

21.3. Income Tax Income tax at the prevailing rate as applicable and if applicable from time to time shall be deducted from the supplier's bills as per Income Tax Act and a certificate issued (TDS Certificate).

22. Risk CoverageThe Supplier shall arrange comprehensive risk coverage at his own cost covering the value of equipment including transportation to the site from manufacturer’s works, storage at site, fabrication, erection, testing and commissioning at site. The period of such coverage shall be up to contractual completion period or any extension granted by Department thereof.

23. Security Deposit A Bank Guarantee for the faithful execution of the contract / PO for 10% of the order value shall be provided immediately within 10 days after receipt of the order towards the performance of the contract. The Bank Guarantee should be from a Nationalised / Scheduled Bank in Rs.200 non-judicial stamp paper valid till the completion of scope of work / supply as per the order plus 60 days. This will not carry any interest and shall be returned to you after successful completion of scope of work / supply against your request. In case of non performance/poor performance the Bank Guarantee shall be forfeited. If you are not submitted the BG within the specified period, this order is liable to be cancelled.

24. Packing and Forwardinga. The bidder will be held responsible for the stores being sufficiently and properly packed for

transport by rail, road, sea or air, to withstand transit hazards and ensure safe arrival at the destination.

17

Page 18: Title of the Entity: SDSC SHAR · Web viewPreferably two nos. embedded in windings to monitor winding temperature and trip system upon high winding temperature or one no. only for

b. The packing and Marking of packages shall be done by and at the expenses of the Contractor.

18

Page 19: Title of the Entity: SDSC SHAR · Web viewPreferably two nos. embedded in windings to monitor winding temperature and trip system upon high winding temperature or one no. only for

25. Warranty The supplier shall provide twelve months warranty for the entire system for a defect liability, after final official handing over at his cost. During this period supplier has to provide and adhere to the following:

a. This period shall include maintenance, replacement of defective / failed parts at free of cost.

b. Supplier has to attend unlimited breakdown calls.c. Department will not provide any transport/accommodation for this purpose.d. Upon oral or written notification of defects in or malfunctioning of the goods during the

warranty period which require corrective action, Supplier shall send the necessary personnel to job site to supervise and assume responsibility for repairs and/or replacement, if necessary, of the defective goods or material at his own cost. If Supplier does not, within seven (7) days after receipt of notification, take steps to correct the breach, Department may do so at the cost and expense of Supplier. Supplier shall reimburse Department all expenses incurred by Department to repair or replace malfunctioning or non-conforming goods.

e. Department has no obligation to discover defects, patent or otherwise, and this shall be sole responsibility of Supplier. Inspection and clearance for shipment by Department’s inspectors or Inspection agency appointed by Department shall not relieve Supplier of any of his obligation and duties under the terms and conditions herein.

f. Where defects in items are remedied under warranty, the period for which the warranty operates shall be extended by such period, as the items were not available to the Department. Where defects items are replaced by new ones, the full warranty period stipulated in the contract shall apply to such replacement items as from the date of their delivery.

g. Supplier shall obtain similar warranty from each of his sub-suppliers. However, the overall responsibility shall lie with the Supplier.

26. Guarantee:a. Hammer mill & its sub-systems shall be guaranteed against any manufacturing defects for

a period of 12 months from the date of commissioning.b. For defects noticed during the guarantee period, replacement rectification should be

arranged free of cost within a reasonable period of such notification.27. Performance Bank Guarantee

A Bank Guarantee for 10% of the order value shall be provided immediately within 10 days after supply or along with supply towards the performance of the system. The Bank Guarantee should be from a Nationalised / Scheduled Bank in Rs.200/- non-judicial stamp paper valid till the successful completion of warranty period plus 60 days. This will not carry any interest and shall be returned to you after successful completion of warranty period against your request.  In case of non performance/poor performance the Bank Guarantee shall be forfeited. 

28. Disclosure and Use of Information by The Suppliera. If the documents supplied by the Department are marked 'restricted use' the Supplier shall

take all necessary steps to ensure that the requirements of the contract or any specification, plan, drawing, pattern, sample or information supplied by, or on behalf of, the Department in connection therewith shall not be disclosed to any person other than a person employed or engaged by the Supplier, whether under sub-contract or otherwise, for the performance of the contract.

b. Supplier shall guarantee that all information and data received during execution of Contract from Department shall be classified as confidential within the meaning of the Official

19

Page 20: Title of the Entity: SDSC SHAR · Web viewPreferably two nos. embedded in windings to monitor winding temperature and trip system upon high winding temperature or one no. only for

Secrets Act and will not be divulged to any third party without prior written permission of Department. All drawings & documents shall be returned after execution of work

20

Page 21: Title of the Entity: SDSC SHAR · Web viewPreferably two nos. embedded in windings to monitor winding temperature and trip system upon high winding temperature or one no. only for

29. ArbitrationIn the event of any dispute/s, difference/s or claim/s arising out of or relating to the interpretation and application of the Contract, such dispute/s or difference/s or claim/s shall be settled amicably by mutual consultations of the good Offices of the respective Parties and recognizing their mutual interests attempt to reach a solution satisfactory to both the parties. If such a resolution is not possible, within 30 days from the date of receipt of written notice of the existence of such dispute/s, then the unresolved dispute/s or difference/s or claim/s shall be referred to the Sole Arbitrator appointed by the Parties by mutual consent in accordance with the rules and procedures of Arbitration and Conciliation Act 1996 as amended from time to time. The arbitration shall be conducted in Bengaluru in the Arbitration and Conciliation Centre –Bengaluru (Domestic and International) as per its rules and regulations. The expenses for the Arbitration shall be shared equally or as may be determined by the Arbitrator. The considered and written decision of the Arbitrator shall be final and binding between the Parties. The applicable language for Arbitration shall be “English” only. Work under the Contract shall be continued by the CONTRACTOR during the pendency of arbitration proceedings, without prejudice to a final adjustment in accordance with the decision of the Arbitrator unless otherwise directed in writing by the DEPARTMENT or unless the matter is such that the works cannot be possibly continued until the decision (whether final or interim) of the Arbitrator is obtained.

30. Purchase / Price preference to MSEs:-Purchase/Price preference will be applicable in addition to product reservation admissible to the Micro and Small Enterprises. Purchase/Price Preference shall be extended to the MSEs under the Public Procurement Policy for MSEs formulated under the Micro, Small and Medium Enterprises Development Act, 2006. The participating MSEs in a tender, quoting price within the band of L-1 + 15% may also be allowed to supply a portion of the requirement by bringing down their price to the L-1 price, in a situation where L-1 price is from someone other than an MSE. Such MSEs may be allowed to supply upto 20% of the total tendered value. In case of more than one such eligible MSE, the supply will be shared equally. Micro & Small Enterprises which have technical capability to deliver the goods & Services as per prescribed technical & quality specifications and may not be able to meet the qualification criterion relating to prior experience-prior turnover may be relaxed as per guidelines issued  by Ministry of MSMEs & as amended from time to time.

31. Applicable Law and JurisdictionThe laws of India shall govern this contract for the time being in force. The Courts of

Andhra Pradesh, India only shall have jurisdiction to be with and decide any legal matters or disputes what so ever arising out of the contract.

32. Force MajeureShould a part or whole work covered under this agreement be delayed due to reasons of Force Majeure which shall include legal lockouts, strikes, riots, civil commotion, fire accident, quarantines, epidemic, acts of God and Government, embargoes, the completion period for work, equipment referred to in this agreement shall be extended by a period not in excess of the duration of such Force Majeure. The occurrence shall be notified by either party within reasonable time.

21

Page 22: Title of the Entity: SDSC SHAR · Web viewPreferably two nos. embedded in windings to monitor winding temperature and trip system upon high winding temperature or one no. only for

33. Site DetailSDSC SHAR, Sriharikota is prohibited place. Hence, no contractor, working personnel will be allowed to stay and they have to be accommodated in Sullurpeta by his own arrangement. The contractor may have to transport working personnel on day to day basis by his own arrangement. Location of the site is worked out to be 23 km from Sullurupeta. The contractor personnel have to undergo security checks by security force i.e. CISF .All the working personnel shall comply with code of conduct during there stay inside the SHAR campus.

34. SafetySupplier shall follow the safety regulations / codes or safety instructions issued by DEPARTMENT and shall take necessary measures at his own cost.

35. Power SupplyElectrical power provided by the department during installation of hammer mill & its sub systems system is NOT chargeable subjected to availability & approval. Reasonable quality of normal power will be made available at one point (415V, 3 phase, 50 Hz). However, onward distribution shall be done by the supplier. All electrical installation by the supplier shall be as per safety regulation & standard and will be subjected to department inspection & approval.

36. Equipment Erectiona. Supplier shall carry out the works in accordance with the specific instructions given on the

approved drawings, method statements, manufacturer’s drawings / documents or as directed by Department. Equipment shall be erected in neat workmen like manner so that they are level, plumb, and square and properly aligned and oriented. Tolerances shall be as established in manufactures drawings or as stipulated by Department. No equipment shall be grouted or bolted down to the foundation, until its alignment is checked and found acceptable by Department.

b. Supplier shall provide all supervision, labor, tools, machines, cranes, slings, wire rope, D-shackle etc., equipment, scaffolding, rigging material and incidental material such as bolts, wedges, anchors, concrete inserts, grout material etc. required to complete the works. Supplier shall also provide at his own cost of all such consumables like oxygen - acetylene gas welding rods, grinding wheels, temporary supports, shims etc. required to complete work.

c. Supplier shall take utmost care while handling instruments, delicate equipment, panels etc., and protect all such equipment on erection.

37. Work RulesGenerally, NO work shall be carried out during night or public holidays unless a written permission is obtained from Department.

38. Site ClearanceUpon completion of work, Supplier shall remove all his equipment and material from the site within one month or time mutually agreed. Supplier at all times shall keep site in clean condition and remove all unwanted material at regular intervals. In case supplier fails to remove all his equipment and material within the mutually agreed time it is deemed that Department will arrange to remove the same at the supplier’s cost besides imposing penalty for failure.

39. Accommodation Very limited accommodation may be provided by Department to senior supervisory staff of the Supplier on chargeable basis subject to availability.

22

Page 23: Title of the Entity: SDSC SHAR · Web viewPreferably two nos. embedded in windings to monitor winding temperature and trip system upon high winding temperature or one no. only for

Supplier shall make his own arrangement for accommodation & canteen facility for all its staff, technicians, labor & workers. Transportation shall be arranged by Supplier at his own expenses for entire staff.

40. Medical FacilitiesNo medical facilities will be provided by Department at site for Supplier's site personnel. Supplier shall make his own arrangement at his own expenses for medical facilities for site personnel.

41. Work ProgrammeThe supplier along with proposal shall give a preliminary programme schedule for executing the contract as per the scope of work. Upon award, supplier shall prepare a detailed programme schedule for review / approval by Department. Supplier as per exigencies of work shall revise and update programme periodically.Monthly progress review meeting will be conducted alternatively at department / supplier site.

42. Sub-Contractsa. Whole of the work shall not be subcontracted. b. The portion of the work for which the supplier is not expert, shall be sub -contracted to

proven / reputed OEM in that field. Such sub- contract if any shall be given with prior approval of the department including choice of subcontractor.

c. The supplier shall be responsible for the proper execution of any sub-contract placed by him in connection with this contract.

d. Unless otherwise authorized by the Department, the conditions of the sub-contracts shall be secured to the Department any rights provided for it under the terms of the main contract.

e. Written permission, if given, shall not relieve Supplier from his obligations under the Contract and he shall take full responsibility for all work done by Sub-Suppliers. Supplier shall be responsible for transmitting pertinent data of all Contract terms and conditions to Sub-Suppliers. Supplier shall furnish to Department copies of all un-priced sub-orders showing promised delivery dates and places.

43. Suspensiona. Department may notify the Supplier to suspend performance of any or all of his obligations

under the Contract. Such notice will specify the reasons for suspension and the effective date of suspension. Supplier there upon shall suspend the performance of such obligations until ordered in writing to resume performance of Contract by Department.

b. If Supplier’s performance or his obligations remain suspended or the rate of progress is reduced, then, the time of completion will be suitably extended and all costs incurred by Supplier as a result of suspension or reduction in rate of progress will be paid to Supplier provided that the suspension or reduction in the rate of progress is not by reasons of Supplier's default or breach of Contract.

44. Cancellation General Rule:The Department shall have the right at any time to cancel a contract either wholly or in part by giving written notice by registered mail. From the time of receipt of the written notice the Supplier shall undertake to observe the instructions of the Department as to the winding up of the contract both on his own part and on the part of his sub-suppliers.Without Fault of Supplier:

23

Page 24: Title of the Entity: SDSC SHAR · Web viewPreferably two nos. embedded in windings to monitor winding temperature and trip system upon high winding temperature or one no. only for

In the case of cancellation of a contract by the Department without any fault of the Supplier, the Supplier shall on receipt of Department's instructions forthwith take the necessary steps to implement them. The period to be allowed to implement them shall be fixed by the Department after conclusion with the Supplier and, in general, shall not exceed three months.Subject to the Supplier confirming, Department shall take over from the Supplier at a fair and reasonable price all finished parts not yet delivered to the Department, all unused and undamaged material, bought-out components and articles in course of manufacture in the possession of the supplier and property obtained by or supplied to the Supplier for the performance of the contract, except such material, bought-out components and articles in course of manufacture as the supplier shall, with the agreement of the Department, elect to retain.

With Fault of Supplier:The Department reserves the right, after full consideration of all relevant circumstances, including the observations of the supplier, to cancel a contract in any of the following circumstances.

a. In the event of the Supplier's failure to meeti. The Technical requirements of the Supply.

ii. The Progress and/or delivery requirements.b. If the Supplier has not observed the provisions of the contract concerning the

disclosure and use of information provided by the Department.c. If the Supplier fails to comply with the provisions of the contract concerning the

equipment, supplies and technical documents made available by the Department.d. If the Supplier transfers his contract without the Department's authorization or

concludes sub-contracts against the Department's explicit directives.e. In the event that Supplier unjustifiably repudiates the Contract or fails to ship or

dispatch all or part of the goods ordered for reasons other than those attributed to the Department’s actions or as provided in the Force Majeure clause, the Department may, by giving an appropriate notice in writing to the Supplier, fix a Date of Essence by which the Supplier shall complete the dispatch in full. If the Supplier fails to do so, the Department, in addition to his right to recover Liquidated Damages in terms of the Contract, shall also have the right to cancel this Contract and make substitute purchases from other sources. If the goods are in a partial state of fabrication, Department may have the fabrication completed by other means, in which event Supplier shall be liable to Department for the additional expenses incurred thereby, but shall not have any claim on savings, if any, in such cases.

In the event of such cancellation, the Department shall unless otherwise specified in the contract, only pays.1. In the case of a fixed-cost contract for the supply of equipment or material. The

contractual value of items delivered and accepted under the contract before receipt of notification of cancellation, or to be accepted under the special conditions of cancellation.

2. In the other cases. a fair and reasonable price in respect of such work as has been carried out prior to the receipt by the Supplier of notification of cancellation.

24

Page 25: Title of the Entity: SDSC SHAR · Web viewPreferably two nos. embedded in windings to monitor winding temperature and trip system upon high winding temperature or one no. only for

SECTION-BTECHNICAL

SPECIFICATIONS:MECHANICAL SYSTEMS

25

Page 26: Title of the Entity: SDSC SHAR · Web viewPreferably two nos. embedded in windings to monitor winding temperature and trip system upon high winding temperature or one no. only for

1. Process descriptionAmmonium perchlorate (AP) is used as oxidizer in propellant. AP is explosive and hygroscopic. AP is received from source in Flexible Intermediate Bulk Container(FIBC) in the multiples of 1 ton. AP received from source is referred as AP coarse (APC). APC undergoes size reduction using hammer mill. Ground AP is referred as AP fine(APF). AP received from AP storage is lifted to feeding room and discharged into a feed hopper of capacity 3000 kg. Hopper consists of a pneumatically operated 300 mm Knife edged gate valve(KGV) or suitable valve. The feed hopper realization is in the scope of department(purchaser). The interface is 300 mm flange of the KGV for further downstream works. The output from KGV will be 2000 kg/hr nominal. Further delivery of the material into the hammer mill shall be designed by the supplier. The supplier is expected to give the design for the feed system.Similarly, the output of hammer mill shall be collected a collection hopper (it is expected that the collection mechanism will be through gravity assisted reverse pulse jet dust collection/pulsaire system with negative suction created by blower). The supplier is expected to give design for ground material conveying and collection system that includes blowers, ducting, pulsaire unit, interfaces to collection hopper. The collection hopper realization is in the scope of department(purchaser). The collection hopper dimensions are ~2.1 x 2.4 x 3.0 m, it is planned to have top opening of Φ300 mm with a flange for interfacing with the dust collection/pulsaire system. The legs of the pulsaire under which this collection hopper is placed shall be properly designed for horizontal travel of the collection hopper positioned on trolley. Approximate height of the trolley is maximum 1 m. Proper design of pulsaire dimensions are also important because the hammer mill is located at an elevation of 8.5 m from finished floor level and may be away from pulsaire location by ~4.5 m. The angle of inclination of the duct from horizontal shall be minimum 10⁰ downwards for gravity assisted flow.Further details are given in the following table a. Feeding systemb. Grinding systemc. Fine collection system 1. Feeding system Description

a. Feed hopper Input material Ammonium Perchlorate Coarse will be loaded into the feed hopper. The capacity of feed hopper is 3000 kg. This hopper will be provided with a knife edge gate valve.(this is in the scope of purchaser)

b.

Dosing screw feeder

This screw feeder will be used to feed material with a constant feed rate to intermediate hopper.

c. Intermediate hopper

Material from dosing screw feeder is fed into intermediate hopper at constant feed rate.

Intermediate hopper consists of a mesh, to prevent the entry of foreign material into grinding system.

An independent bar magnet will be positioned above the mesh to prevent the entry of metal particles into grinding system.

d. Stuffing screw feeder

Material from intermediate hopper will be drawn and fed to hammer mill at a constant feed rate by stuffing

26

Page 27: Title of the Entity: SDSC SHAR · Web viewPreferably two nos. embedded in windings to monitor winding temperature and trip system upon high winding temperature or one no. only for

screw feeder.

2. Grinding system

a. Hammer mill Material fed to hammer mill will be ground by the hammer which will rotate at a desired RPM in order to reduce particle size of material to a desired size referred as AP fine(APF).

3. Collection system

a. Blower APF will be conveyed from hammer mill to the collection point pneumatically.

Suction is provided by blower by proper ducting and interfacing between blower and hammer mill.

b. Dust collection system/pulsaire unit

During pneumatic conveying the material passes through a dust collection system.

Dust collection system consists of filter bag units and pulsing unit.

APF and air will be separated at the surface of filter bags and material will be collected at the bottom of dust collection system into a collection hopper.

In order to dislodge APF stuck to the surface of filter bags, a reverse jet of dried compressed air is injected into the dust collection system using solenoids and sequential timer unit.

Thus, the material will be collected and treated as output of grinding process.

As the material being handled is explosive and hazardous in nature, the process operations are carried out with utmost care and process, safety interlocks. Total process is treated as an unmanned operation. No personnel is allowed into the process building during process operations. Total system will be controlled from control room located at ~100 m away from process area remotely.The following table describes the interlocks required from department point of view and are essential. However, the supplier has to study and design the interlocks required for the system proposed by him and shall ensure that the interlocks suggested by purchaser are also incorporated. This shall form a part of the design document.

Interlock to be fulfilled to take action

Action Point of check

Step-1 Nil Hooter will be given in order to caution the people on start of operation.

-

Step-2 Nil Sequential pulsing unit will be switched ON

Proper functioning of timer unit, pressure with which air will be injected will be checked

Step-3 Pulsing unit to be Blower will be Current, RPM of blower, 27

Page 28: Title of the Entity: SDSC SHAR · Web viewPreferably two nos. embedded in windings to monitor winding temperature and trip system upon high winding temperature or one no. only for

switched ON switched ON Suction in the suction and discharge lines will be monitored. Values shall be within range.

Step-4 Blower to be switched ON and suction should be in the required range

Mill door/housing to be properly closed. Mill door proximity sensor should indicate the status.

Hammer mill will be switched ON

RPM through sensor, current will be monitored. Values shall be within range

Step-5 Hammer mill to be switched ON and all parameters should be within range

Stuffing screw feeder will be switched ON

RPM through sensor, current will be monitored. Values shall be within range

Step-6 Stuffing screw feeder to be switched ON and all parameters should be within range

Dosing screw feeder will be switched ON

RPM through sensor, current will be monitored. Values shall be within range

Switching OFF sequenceThe sequence of switching OFF the systems is exactly the reverse order of switching ON.

Abnormality-ActionS.No. Abnormality Action1 If any of the

monitoring parameters of any of the system are not within range

Total systems will be switched OFF

2 If there is an overflow of material in the intermediate hopper

Total systems will be switched OFF

3 Input material is ground in the hammer mill but APF is not being collected in the collection container

Implies that the conveying duct is choked with material. Hence, the total system will be switched OFF

2. Material detailsAP Characteristics ValuesUN classification of material 1442Appearance White, crystalline powderParticle size distribution AP coarse: 500 to 125 micron (average 320)

AP fine: 105 to sub-micron (average 45)Particle density 1950 kg/cum

28

Page 29: Title of the Entity: SDSC SHAR · Web viewPreferably two nos. embedded in windings to monitor winding temperature and trip system upon high winding temperature or one no. only for

Surface moisture before drying 0.2 %wt/wtSurface moisture after drying 0.01 %wt/wtHardness 3 on mohs scaleChemical nature OxidizerHazard nature Explosive on confinement upon ignition.

sublimes and decomposes on ignition.Abrasive resistance Mildly abrasiveCrystal structure OrthorhombicSolubility Highly soluble in water at any temperature,

220gm/1000ml @250cVacuum stability Highly stableAP Coarse: Input material to Hammer millBulk density 1200 kg/cumMoisture content of APCoarse 0.1%Particle size distribution (micron, % wt.)>500 µ Max. 4%500- 355 µ 22-32%355-300 µ 27-37%300-250 µ 17-27%250-125 µ 10-20%125-45 µ Max.2.0%<45µ Max. 0.5%AP fine: Output material from Hammer millBulk density 600 kg/cumParticle size distribution (micron, % wt.)>105 µ 6-14%105-75 µ 10-26 %<75 µ 62-82%Specific features 1. AP fine is mildly hygroscopic and tends to

caking.2. Dust cloud formation shall be avoided as the

powder (both Coarse and fine) are sensitive to static electricity accumulation and hazards.

3. Angle of reposea. AP coarse :45⁰b. AP fine: >55⁰

3. Scope of itemsThe list of items which are in the scope of supplier is listed below. However, any item which the supplier feels to be essential but not listed below shall be specified by supplier while providing technical offer and shall be supplied. All the systems which necessary to meet the requirement shall be supplied by supplier.

Sl No

Subsystem Components Scope

1. AP Coarse a. Hopper with dosing screw Supplier scope

29

Page 30: Title of the Entity: SDSC SHAR · Web viewPreferably two nos. embedded in windings to monitor winding temperature and trip system upon high winding temperature or one no. only for

Feeding system

b. Dosing Screw feederc. Dosing Screw feeder – motor

(drive system)d. Dosing screw feeder RPM

sensor(Desirable)e. Necessary piping, valves

2.Hammer mill system

a. Stuffing Screw feeder hopperb. Stuffing Screw feeder c. Stuffing Screw feeder motor

(drive system)d. Hammer mille. Hammer mill motor(drive

system)f. Hammer mill rotor RPM sensorg. Screw feeder/stuffing screw

feeder RPM sensorh. Door locking sensori. Collection hopper below mill j. Necessary ducting, valvesk. Static discharge dissipation

bush

Supplier scope

3.

AP Fine Collection system

a. Dust collection system & reverse jet Pulsing system with timer unit, Differential Pressure Indicator cum Transmitter (DPIT) across the filter bags.

b. Centrifugal blower c. Air fail switchd. Necessary ducting, valves

Supplier scope

4. Ducting & pipingAll necessary ducting, piping for material conveying and pneumatic lines

Supplier scope

5. Miscellaneous

The scope of the work is not limited to the above but also include all the requirements for the complete functioning of equipment being supplied to meet all the requirements regardless of whether they are explicitly mentioned or not.

Supplier scope

Spares. The list of spares including such items like hammers, retainer screens etc. as mentioned in the spares list of this document. However, supplier can suggest any spares other than listed. For all the spares, cost shall be separately quoted.

4. DesignThe supplier shall design and shall provide the following details:

A. Process system

a. Design calculations of hammer mill including surface temperature, mechanical design of various parts and assemblies.

b. Design of reverse jet pulsaire system along with suction pressure, blowers,

30

Page 31: Title of the Entity: SDSC SHAR · Web viewPreferably two nos. embedded in windings to monitor winding temperature and trip system upon high winding temperature or one no. only for

volume flow rate, temperature (if not ambient), filter area, no. of filters, pitch, method of assembly and dis-assembly, method of cleaning, compressed air flow rate, pressure, humidity, nozzle dimensions, approaches to various heights and parts of the pulsaire supports, valves etc. to name a few. However, the responsibility of complete description of system and design of each individual component lies with the supplier.

c. Design, sizing, interfacing of ducts, piping.

d. Design of cleaning/ de-dusting mechanisms/ arrangements inside screw feeding system, grinding system, ducting, pulsaire, blowers, filter bags, rotary valve, Collection hopper /bunker below mill etc.

e. Design of Instrumentation systems including sensors and their location, interfacing with feed hopper, grinder, pulsaire systems etc. at one side and at other side interfacing with the PLC/SCADA control system which will be provided by Department as a free issue. All the equipment related to grinding operation is expected to be operated from remote control room and thus all the parameters shall be made to access from the control room.

f. Design of interlocks and suitable mechanisms

g. Design of redundancy mechanisms where ever required.

5. Drawingsa. Each drawing shall be clearly marked with the following details.

i. Name of the Owner: Satish Dhawan Space Centre SHAR, ISROii.Project Title: “Design, Supply, Erection, Testing and Commissioning of Hammer

Mill of capacity 2000 ± 250 kg/hr with their Subsystems” – 2 nos. iii. Purchase Order No: iv. Title of the Drawing clearly identifying the system, equipment or part.v. Drawing, Revision Number and Date.

vi. Name of the Bidder:vii. Drawings duly signed in "checked" and “approved" columns.

viii. Scale to which the drawing is drawn.ix. Cross references to all relevant drawings.x.All notes necessary for understanding and execution of work shown on a drawing

shall be presented on the same drawing.xi. All legends to all notations.

xii. Details of revisions carried outxiii. Bill of materials shall be tabulated, wherever required.xiv. All titles, markings and writings on the drawing shall be in Englishxv. All the dimensions shall be in metric units.

b. If standard catalogues are submitted, the applicable items shall be highlighted therein.

c. The drawings shall indicate all dimensions and details of equipment, materials of construction etc.

d. For all revisions of the drawing, Bidder shall ensure that all revisions are clearly encircled with revision numbers marked on the drawing.

e. Bidder shall also ensure that general details of revisions are indicated for each revision in the revision block of the drawing along with the date and signed by the approving authority.

31

Page 32: Title of the Entity: SDSC SHAR · Web viewPreferably two nos. embedded in windings to monitor winding temperature and trip system upon high winding temperature or one no. only for

6. Quality Assurance Plan (QAP)QAP consists of plan and methodology of acceptance of design, fabrication, transportation, installation, commissioning. The approved document will become the base document for any future reference with respect to fabrication, installation & commissioning and is described as follows:

a. Stage inspectionb. Factory Acceptance Test (FAT)c. Site Acceptance Test (SAT)

Stage inspectionThe clearance for starting each stage by department lies on satisfactory completion of works mentioned as given below:

Stage Milestone Proceeding activity clearance

Documents required

Stage-1 Concept design and general layout

Clearance for detailed design

The supplier shall provide overall general arrangement including P & ID diagram of the equipment & sub systems with all major approximate dimensions

Stage-2 After design of each system/sub-system

Clearance for fabrication/procurement

Design documents of fabricated items, selection criteria and detailed specifications of off-shelf items.

Stage-3 Qualification/Acceptance of vendors, Bill of material

Clearance for procurement

Bill of material with makes.

Stage-4 Acceptance of Material Of Construction(MOC)

Clearance for fabrication by supplier and his vendors

Material test certificates & dimensions.

Stage-5 Acceptance of fabricated works

During progress of fabrication at site

Weld joints RT/DP/UT test certificates

Stage-6 FAT Clearance for packing & dispatch to site

As given below

Stage-7 Installation The scope includes

installation of all the equipment’s, piping and electrical and electronic components in process bay and required rooms.

Installation of all the sensors/transmitters

Clearance for installation

a.Floor space required for offered machine & equipment’s detail layout for review / comments & approval.

b. As built GA drawing of sub-system & sub-assembly & major

32

Page 33: Title of the Entity: SDSC SHAR · Web viewPreferably two nos. embedded in windings to monitor winding temperature and trip system upon high winding temperature or one no. only for

required components.c.Foundation

drawings.d. Electrical &

Instrumentation cables routing with schedule.

e.All electrical panel drawings including auxiliary systems , if any.

f. Schedule/rating of electrical machines / appliance etc.

g. Schedule/rating of Instrumentation & specifications

Stage-8 Commissioning trials, SAT

Overall clearance & acceptance by department.

As given below

Factory Acceptance Test ( FAT) : The supplier shall carry out design verification and fabrication quality control either by internal authorized experts or by a third party. However, Department inspects the factory as the work progresses and gives stage clearances to go ahead with next phase of work based on the inspection carried out by inspectors of the department. The following are essential requisites for FAT.

a. Verification of material test certificates of all the material used for fabrication, pipes etc.

b. Dimensional inspection of process equipment and interfaces as per drawings by suitable methods as suggested by supplier and approved by department.

c. Verification of weld joints RT/DP/UT test certificates.d. Functional testing of hammer mill & its sub-systems. A no-load trial shall be carried

out as per approved QA plan and data shall be logged and presented to department. All data like voltage and current value, bearing temperature, vibration details, noise level etc. shall be logged and presented to department.

e. A load trial shall be carried out with dummy material mutually agreed by department & supplier with maximum feed rate and maximum mill rotor RPM for mutually agreed time to establish mechanical stability and data shall be logged and presented to department. Arranging for the dummy material and its grinding and disposal of the ground material is in the scope of supplier. All data like voltage and current value, bearing temperature, vibration details, noise level, etc. shall be logged and presented to department.

f. Verification of all items as per P.O. including spares.g. Verification of following documents

a. Routine test certificates & Dust ignition/Flame proof certificate of all the electrical components from the competent authority (as approved during drawing/design approval stage).

b. All motor routine test certificates. c. Dynamic balancing certificate of hammer mill shaft and impeller of

centrifugal blower.d. Blower performance curve certificates.

33

Page 34: Title of the Entity: SDSC SHAR · Web viewPreferably two nos. embedded in windings to monitor winding temperature and trip system upon high winding temperature or one no. only for

Installation:

a. After successful completion of FAT, material shall be dispatched to SDSC SHAR, unloaded, stored and installed.

b. The scope includes installation of all the equipment’s, ducting, piping and electrical and electronic components as mentioned in the scope of work.

c. Installation of all the sensors/transmitters required.

34

Page 35: Title of the Entity: SDSC SHAR · Web viewPreferably two nos. embedded in windings to monitor winding temperature and trip system upon high winding temperature or one no. only for

Site Acceptance Test ( SAT) : After successful installation of all systems at site, the site acceptance tests include the following:

a. Physical verification of Hammer mill and its subsystem for any damages and their interfacing. All equipment shall be properly grounded using suitable GI/ Aluminum strips, GI/Copper strips of appropriate size.

b. Verification of all items as per P.O. including spares.c. Functional testing of hammer mill & its sub-systems. A no-load trial shall be carried

out as per approved QA plan and data shall be logged and presented to department. All data like voltage and current value, bearing temperature, vibration details, noise level etc. shall be logged and presented to department.

d. A load trial shall be carried out with dummy material mutually agreed by department & supplier with maximum feed rate and maximum mill rotor RPM for mutually agreed time to establish mechanical stability and data shall be logged and presented to department. Arranging for the dummy material and its grinding and disposal of the ground material is in the scope of department. All data like voltage and current value, bearing temperature, vibration details, noise level, etc. shall be logged and presented to department.

e. Live trials with Ammonium Perchlorate such that the fine tuning of various factors and parameters that influence grinding yields the required PSD of AP fine from given PSD of input material whereas department is responsible for supply of AP Coarse, the supplier has responsibility to fine tune the parameters to achieve the objective. Similarly, the pulsaire parameters also shall be proved and fine-tuned in live trials. All parameters shall be recorded and reported. Any abnormalities shall be reported and rectified. System qualification includes obtaining qualified ground product.

f. The scope of the work is not limited to the above but also include all the requirements for the complete functioning of equipment being supplied to meet all the requirements regardless of whether they are explicitly mentioned or not.

g. The supplier shall be given pre-defined time to complete the action points raised during various reviews such as design review, fabrication drawings, etc. The action points have to be closed within the given time. Otherwise it is considered as delay from supplier side and time will be considered to impose LD.

7. Works Under Department Scopea. Approval for Quality Assurance Planb. Approval for manufacture of machine and its subsystems c. Stage inspections or third-party inspection (generally 3rd party inspection will be

under scope of Supplier) d. Pre-delivery / dispatch inspection and clearance for dispatch.e. Building and cable trenchesf. Supply of PLC & SCADA for remote monitoring and control operationsg. Powering up to the PCCh. CCTV Systemi. Building and cable trenchesj. Compressor, dryer and receiver k. Free electricity and water required for erection at SDSC SHAR.l. Dummy material for full load test conducted at SDSC SHAR

8. Training and Documentation a. Training for department personnel, regarding operation, maintenance and

troubleshooting of system

35

Page 36: Title of the Entity: SDSC SHAR · Web viewPreferably two nos. embedded in windings to monitor winding temperature and trip system upon high winding temperature or one no. only for

b. Supplier shall provide soft copies and hard copies (2 nos.) of the catalogues, and manuals of all the components and systems and as built circuit diagrams. Supplier shall provide 2 no’s of lubrication and maintenance documents, list of spare parts with order number.

9. Changes and Modification to Specifications, Designs, Drawings and Qualitative / Quantitative Requirements.a. Supplier shall obtain approval for the designs and drawings from the Department

before initiating the action for procurement / fabrication.b. Change in make/model for bought item is NOT allowed unless approved by

department. c. The Department reserves the right at any time to modify the Quantitative

Requirement, Specifications, patterns or drawings relating to the work covered by the contract. The Supplier shall inform the Department, within 15 days, of any objection/reservation to the modifications required.

d. Unless the Department directs otherwise, the Supplier shall in either case, submit within a reasonable time limit to be specified by the Department, an estimate of the effect of any such modification in the cost of performance of the contract and/ or on the delivery schedule.

Any amendment to the contract, which may be necessary in this respect, will be established within a reasonable time in the form of an Amendment to Contract to be signed by both parties.

10. Acceptance and Rejection a. On completion of the work or part of the work as specified in the contract, the

representative of the Department referred to, shall check as soon as possible, but in any event within the month of notification of readiness for acceptance that the work performed complies with the contract requirements as regards quantity and quality.

b. In the event of rejection of any of the articles, whereby the Supplier feels himself aggrieved, he may within eight days of the receipt of notification of rejection and before such articles have been removed from the place of inspection, give the Department notice of objection. Such objection shall be considered by a Board of Appeals of the Department. The Department shall, without prejudice to the arbitration clause in the contract, take a decision upon presentation of the Board's findings.

On completion of tests, the members of the Inspection Organization of the Department or Inspection agency appointed by Department shall prepare a report, which must be countersigned by the Supplier

11. Codes and Standardsa. All equipments covered under this specification shall comply with all currently

applicable statutes, regulations, standards and safety codes in the locality where the equipment will be installed.

b. Other national standards established to be equivalent or superior to the codes and standards specified are also acceptable.

c. In the event of any conflict between the codes and standards referred to in the specification and the requirements of this specification, the more stringent of these requirements shall govern.

d. Unless indicated otherwise, all codes and standards referred to in this enquiry specification shall be understood to be the latest version on the date of offer made by the bidder.

12. General Specifications Related To Fabricationa. All welds shall be ground.b. 100% DP test for root and final weld pass shall be carried out.

36

Page 37: Title of the Entity: SDSC SHAR · Web viewPreferably two nos. embedded in windings to monitor winding temperature and trip system upon high winding temperature or one no. only for

c. 100% Ultrasonic test for plates of thickness above 20mm. d. 100% Radiography test for all butt welds for plate thickness 20mm and above. e. The entire fabrication activity shall be performed in a planned / sequential manner to

achieve desired dimensional / geometrical tolerance specified in the drawing or functional requirement mentioned in this document. It is suggested to add sufficient number of fixtures and tools to control the distortion during welding process.

f. Dimensions shown in the drawing are final acceptance dimensions. Allowances for machining and thinning due to fabrication process shall be added to arrive at material sizes. Supplier is wholly responsible for realizing the finished product. Allowances mentioned in the drawing are indicative. Supplier shall study the requirement and provide proper machining allowancFes required based on the fabrication procedure adopted.

g. Dimensional tolerance wherever not specified shall follow the standard open dimension tolerances provided in the drawing. Wherever welded attachments are used to facilitate fabrication, same shall be removed carefully by cutting or chipping and surface of material shall be finished smooth by grinding. As far as possible, hammering shall be avoided.

h. Edge preparation shall be carried out for all joints as mentioned in the drawing or as per standard fabrication procedure.

13. PaintingAll the MS surfaces shall be painted as per following:-

a. Surface Preparation: Cleaning by wire brush or power tools to remove any loose dirt or mill scales from the surface.

b. Emery/buffing shall be carried out to clean the surfaces before painting operation. c. Spray painting/suitable painting technique shall be carried out for primer and paint. d. Primer: One coat of zinc rich primer with red oxide and zinc phosphate pigments.e. Paint: Epoxy/Polyurethene paint of department approved shade.f. Finished paint surface shall be glossy.

37

Page 38: Title of the Entity: SDSC SHAR · Web viewPreferably two nos. embedded in windings to monitor winding temperature and trip system upon high winding temperature or one no. only for

TABLE-1Essential Technical Specifications for Hammer mill and its sub-system for One unit / number

DESCRIPTION Compliance(Yes/NO)

1. Material of construction of all material contact parts shall be preferable SS304/SS304L.

2. Material of construction of non-material contact parts shall be preferably SS.

System Description SpecificationHopper of dosing screw

Quantity 1 NoCapacity Min. 300 kg (10 minutes of supply)Level indicators(Non-contact type)

2 Level indicators(high/low) shall be provided with suitable flange joints.

Mesh To be provided

Dosing screw feeder

Quantity 1 NoFeed rate. 2000 ± 250 kg/hrRPM sensor Suitable RPM sensor shall be provided

Drive system for dosing screw feeder

An FLP induction electric motor with suitable transmission system is to be designed for rotating the screw feeder motor.

The motor RPM should be specified based on design with suitable transmission system(pulley) to achieve required rpm at shaft.

The motor capacity should be selected such that motor shall draw only 80 % of rated current at full load.

Motor & transmission specificationsDescription Essential Specification

Quantity 1 NoCapacity To be specified by supplier. Necessary

sizing calculations to be submitted for review and acceptance.

Operating Voltage

415 V ± 10% , 3 phase with Variable Voltage input from VFD

Operating Frequency

50 Hz ± 5 %

Hazardous zone operation

Dust ignition and Ex Proof( Zone I, Group IIA, Group IIB compatible)

Duty class Continuous with Inverter DutyProtection IP 65 or betterTemperature classification

T4 or better

Insulation Class F and temperature rise limited to Class BBearing Preferably Type: ‘ZZ’ bearingThermistor Preferably two nos. embedded in windings

to monitor winding temperature and trip system upon high winding temperature or one no. only for trip based on the selected motor sizing and as recommended from OEM.

38

Page 39: Title of the Entity: SDSC SHAR · Web viewPreferably two nos. embedded in windings to monitor winding temperature and trip system upon high winding temperature or one no. only for

Remarks Voltage rise time shall be more than 0.1µs, Peak insulation voltage minimum 1400 VSuitable for VFD operation considering factors like voltage rise time, peak insulation voltage and bearing currents caused by VFD. All termination shall be made using proper flameproof glands

Terminal Blocks 1. Preferably on top of the motor.2. Wherever it is on the side of the motor,

a minimum clearance of 600 mm to be maintained to approach for maintenance.

AP Grinding SystemStuffing screw feeder hopper

Quantity 1 No.Mesh Suitable mesh shall be provided

Stuffing screw feeder

Quantity 1 NosFeed rate (kg/Hr) 2000 ± 250 RPM sensor Suitable RPM sensor shall be provided

Drive system for stuffing screw feeder

An FLP induction electric motor with suitable transmission system is to be designed for rotating the screw feeder motor.

The motor RPM should be be specified based on design with suitable transmission system(pulley) to achieve required rpm at shaft.

The motor capacity should be selected such that motor shall draw only 80 % of rated current at full load.

Motor & transmission specificationQuantity 1 NoCapacity To be specified by supplier. Necessary

sizing calculations to be submitted for review and acceptance.

Operating Voltage

415 V ± 10% , 3 phase with Variable Voltage input from VFD

Operating Frequency

50 Hz ± 5 %

Hazardous zone operation

Dust ignition and Ex Proof( Zone I, Group IIA, Group IIB compatible)

Duty class Continuous with Inverter DutyProtection IP 65 or betterTemperature classification

T4 or better

Insulation Class F and temperature rise limited to Class BBearing Preferably Type: ‘ZZ’ bearing.Thermistor Preferably two nos. embedded in windings

to monitor winding temperature and trip system upon high winding temperature or one no. only for trip based on the selected motor sizing and as recommended from OEM.

Remarks Voltage rise time shall be more than 0.1µs, Peak insulation voltage minimum 1400 V

39

Page 40: Title of the Entity: SDSC SHAR · Web viewPreferably two nos. embedded in windings to monitor winding temperature and trip system upon high winding temperature or one no. only for

Suitable for VFD operation considering factors like voltage rise time, peak insulation voltage and bearing currents caused by VFD. All termination shall be made using proper flameproof glands

Terminal Blocks 1. Preferably on top of the motor.2. Wherever it is on the side of the motor,

a minimum clearance of 600 mm to be maintained to approach for maintenance.

Hammer mill

Nominal grinder capacity

2000 ± 250 kg/hr

Model No To be provided in complianceRetaining Screens

Shall be provided

Oil –Plummer block

Shall be supplied for first fill

Liner Multi Deflector typeRotor RPM sensor

Shall be provided

Feed Mechanism Screw feeder typeSafety Mechanism

Provision for necessary safety systems like proximity switch, air fail switch shall be provided

Vibration measurement

Desirable to have vibration measurement. Suitable vibration measurement instrument shall be provided

Base Plate Shall be designed, supplied and commissioned by party along with necessary fasteners

Mill base plate SWL

Dead weight of hammer mill setup + 10% of hammer mill set up.

Drive system for hammer mill motor

An Flame Proof induction electric motor with suitable transmission system is to be designed for rotating the mill rotor.

The motor capacity should be selected such that motor shall draw only 80 % of rated current at full load.

Motor & transmission specificationsQuantity 1NoCapacity To be specified by supplier. Necessary

sizing calculations to be submitted for review and acceptance..

Operating Voltage

415 V ± 10% , 3 phase with Variable Voltage input from VFD

Operating Frequency

10 % to 90% of 50 Hz ± 5 %

Hazardous zone operation

Dust ignition and Ex Proof( Zone I, Group IIA, Group IIB compatible)

Duty Class Continuous with Inverter DutyProtection IP 65 or betterTemperature T4 or better

40

Page 41: Title of the Entity: SDSC SHAR · Web viewPreferably two nos. embedded in windings to monitor winding temperature and trip system upon high winding temperature or one no. only for

ClassificationInsulation Class F and temperature rise limited to Class BBearing Insulated bearing to be used in case of

motor rating more than 55 kWThermistor Two nos. embedded in windings to monitor

winding temperature and trip system upon high winding temperature.

Terminal Blocks 1. Preferably on top of the motor.2. Wherever it is on the side of the motor, a

minimum clearance of 600 mm to be maintained to approach for maintenance.

Motor inverter duty requirements

Voltage rise time shall be more than 0.1µs, Peak insulation voltage minimum 1400 V.Suitable for VFD operation considering factors like voltage rise time, peak insulation voltage and bearing currents caused by VFD.

Dust collection system

Quantity 1 No.Type Reverse jet pulse with timer based system

with filter bag setupAssembly No loose parts like screws, bolts, nuts

which have risk of falling into product are not allowed inside dust collection chamber. Alternative safe fastening technique shall be specified by supplier

Suction source Duct connected to Centrifugal blower inletPulse mechanism Ex-proof solenoid valves operated by a

solid state sequential timer. Access door The size of door shall be suitably designed

to safe, quick and easy access and maintenance of filter bags.To be designed to facilitate removal of the whole set of filter bags as an integral set for cleaning/ replacement. There should provision to change/ replace individual bag. The best possibility may be suggested.

Half Cone angle of hopper

Should not be more than 50OC with vertical

Explosion vents Suitable mechanism to be provided RAL Suitable Rotary Air Lock valve shall be

providedMassagers Suitable mechanism/pneumatic

massager/vibratory hammer for dislodging material from the bag filter body shall be provided

Pressure indicators& Transmitter

U tube manometer shall be provided along with dust collection system to indicate differential pressure between suction and collection using SS tubing. Provision for fixing DPIT should be given which will be realized by purchaser.

41

Page 42: Title of the Entity: SDSC SHAR · Web viewPreferably two nos. embedded in windings to monitor winding temperature and trip system upon high winding temperature or one no. only for

Suction From centrifugal blower using a single duct provided with a damper

Suction filter Shall be providedBlower A Flame Proof induction electric motor with suitable

transmission system is to be designed for rotating the mill rotor.

The motor capacity should be selected such that motor shall draw only 80 % of rated current at full load.

Quantity 1 No’sCapacity To be specified by supplier. Necessary

sizing calculations to be submitted for review and acceptance.

Operating Voltage

415 V ± 10% , 3 phase with Variable Voltage input from VFD

Operating Frequency

10 % to 90% of 50 Hz ± 3 %

Hazardous zone operation

Dust ignition and Ex Proof (Zone I, Group IIA, Group IIB compatible)

Duty Class Continuous with Inverter DutyProtection IP 65 or betterTemperature Classification

T4 or better

Insulation Class F and temperature rise limited to Class BBearing Insulated bearing to be used in case of

motor rating more than 55 kWDrive type Direct driveMounting of motor

SS/RCC pedestal

Hazardous zone operation

Dust ignition and Ex Proof( Zone I, Group IIA, Group IIB compatible)

Blower interconnection

Suction of blowers are to be connected with damper for isolation and proximity sensor for obtaining the feedback. (Proximity sensor in purchaser’s scope)

Terminal Blocks 1. Preferably on top of the motor.2. Wherever it is on the side of the motor,

a minimum clearance of 600 mm to be maintained to approach for maintenance.

Makes All Motors Crompton Greaves/Bharat Bijili/ /Siemens/ABB/SEW or to be specified and approved by department.

Spares Rotor assembled with required sets of hammers

1 set

Hammers 29 nos(30% of 1 set)

TABLE-2

42

Page 43: Title of the Entity: SDSC SHAR · Web viewPreferably two nos. embedded in windings to monitor winding temperature and trip system upon high winding temperature or one no. only for

After allotment of order, during design phase the following information based on design shall be furnished by supplier and approved by department to proceed further.

System Description Specification AcceptanceHopper of dosing screw

Mesh Min. 12 mesh or to be specified

Particle flow rate control valve

To be specified based on design

Clearance between screw and trough

1- 2 mm or to be specified

Inlet To be specified Outlet To be specified RPM sensor Suitable RPM sensor shall

be specified Stuffing screw feeder hopper

Mesh Min. 12 mesh or to be specified

Stuffing screw feeder

Clearance between screw and trough

1- 2 mm or to be specified

Inlet To be specified by supplier Outlet Closed type connected to

hammer mill chamberRPM sensor Suitable RPM sensor shall

be specified Hammer mill Sets of Hammers To be specified

Hammers per set To be specified Hammer to hammer clearance

Positive gap should be ensured and shall be specified

Hammer Type Hammer type with tip hardness to be specified.

Retaining Screens To be specifiedThe suggested screen sizes from purchaser side are herring bone type number 020,027,035 each.

Type of oil –Plummer block

Krytox GPL 106 (M/s Dupont) or suitable oil can be suggested

Liner Multi Deflector typeMOC Housing SS304Base Plate SS304 Base Plate dimension

To be specified based on design

Mill base plate safety factor

To be specified based on design and standards.

Floor loading To be specified based on design

Rotor RPM To be specified by supplier as per design

43

Page 44: Title of the Entity: SDSC SHAR · Web viewPreferably two nos. embedded in windings to monitor winding temperature and trip system upon high winding temperature or one no. only for

Feed Mechanism Screw feeder typeFeed Rate 2000 ± 250 kg/HrSpares One set of recommended

spares for hassle free operation for 2 year

Clearance between liner and hammers

0.65 mm- 0.85 mm or to be specified based on design

Clearance between retaining screen and hammers

2 mm- 3 mm or to be specified based on design

Thickness of components

To be specified based on design

Weight of each components

To be specified based on design

Weight of hammer system

To be specified based on design

Safety Mechanism

Provision for necessary safety systems like proximity switch, air fail switch based on design

Vibration measurement

Suitable type and provision shall be specified by supplier based on design

Dust collection system

Filter Bag material

Polyester needle felted epitrophic antistatic filter bag along SS304 bag retainers and clamps or to be specified based on design

Filter Area To be specified based on design need.

Maximum pressure on filter bags

To be specified based on design

Pulse duration Pulse time, ON/Off requirement to be provided with calculations/ design

Access door The size of door shall be suitably designed to safe, quick and easy access and maintenance of filter bags.To be designed to facilitate removal of the whole set of filter bags as an integral set for cleaning/ replacement. There should provision to change/ replace individual bag. The best possibility may be suggested.

Explosion vents To be specified by supplier

44

Page 45: Title of the Entity: SDSC SHAR · Web viewPreferably two nos. embedded in windings to monitor winding temperature and trip system upon high winding temperature or one no. only for

considering the type of material

Discharge To be specified by supplier as per design.

RAL Suitable RAL shall be specified

Bottom clearance From bottom of Rotary air lock valve to floor shall not be less than 3200 mm

Gap between legs of pulsaire

Min.3 m

Inlet position The inlet to dust collection system shall be connected from outlet of hammer mill, with slope angle not more than 10O with horizontal downwards. The connecting duct from hammer outlet to dust collection system should not have any sharp bends.

Pneumatic massagers

Suitable mechanism/pneumatic massager/vibratory hammer for dislodging material from the bag filter body shall be provided

Floor loading Floor loading shall be specified by supplier

Cleaning, assembly, dis-assembly

Scheme shall be provided

Blowers MOC of blower SS 304, as per designMOC of dampers SS 304, as per designMOC of base frame

SS 304

MOC of impeller SS 304, as per designMOC of ducts and flange

SS 304, duct min. 2 mm thick; flange min. 6 mm thick

Motor capacity To be specified by supplier based on design.

Blower capacity As per designDynamic balance As per standardBlower suction To mate with dust collection

systemBlower discharge To be specified by party,

open into mill room

45

Page 46: Title of the Entity: SDSC SHAR · Web viewPreferably two nos. embedded in windings to monitor winding temperature and trip system upon high winding temperature or one no. only for

SECTION-CTECHNICAL

SPECIFICATIONS:ELECTRICAL SYSTEMS

Scope of work (Electrical system):1. Introduction:

1.1. Supply, installation, testing & commissioning of all the Electrical Motor (Drive) as

46

Page 47: Title of the Entity: SDSC SHAR · Web viewPreferably two nos. embedded in windings to monitor winding temperature and trip system upon high winding temperature or one no. only for

described in the Table No: 1 (Ref. mechanical section) with its associated accessories like junction boxes for Thermistor and Motor terminals are in the scope of Bidder.

1.2. Power panel which is powering all the motors is in the scope of purchaser. Hence, all the details related to the power requirement to complete the overall project need to be shared to purchaser by the bidder before while getting the final approval.

1.3. Since, the power panel is in the scope of purchaser, Approval from the concerned Electrical department from the purchaser’s side is mandatory.

1.4. The Power cables required to power the supplied motors, laying and terminating are in the scope of purchaser.

1.5. All the motor terminal blocks cable entry need to be designed (dia. in particular) and fabricated as per the approved cable size of the purchaser. All the power cables sizing will be shared to bidder based on the production of approved motor data sheet to the purchaser.

1.6. All these Electrical Motors will be used in a very fine dust (Approx. 50 µ) and Hazardous environment, hence suitable ingress protection (ie., IP 65 or better as per IEC standard 60529) and

1.7. All the above said motors are being operated through Variable Voltage Variable Frequency Drive. Hence, selected motor shall be suitable for the same.

1.8. Flame proof protection suitable to Zone-1, Gas Group IIA, IIB & T4 as per the following standards

1.8.1. IS 5572: 2009 1.8.2. IEC 60079-0: 20111.8.3. IEC 60079-1: 2007 (Reaffirmed 2012) 1.8.4. IEC 60079-20: 1996 1.8.5. IEC 61241-4: 2001 (Reaffirmed 2014)1.8.6. IEC 61241-14: 2004 (Reaffirmed 2014) 1.8.7. ATEX / Equivalent European Standard.

1.9. Following documents to be submitted during design review and clearance1.9.1. No. of motors, Power of motor, Frame size, make, duty, no. of starts/hr, type and

No. of poles, Insulation, Amb. temp, applicable IS for construction, bearing, accessories, terminal position from drive end, drawing nos. used for FLP certification, etc.

1.9.2. Torque and speed curves, thermal withstand time curve, efficiency and power factor with respect to loading of the motor, speed and time with respect to current and complete G.A of motor, terminal box / boxes by mentioning the approved drawing reference and nos. etc.

1.9.3. Flame proof electrical equipment test reports along with approved drawings (Either by CIMFR / ERTL (E) or any authorized approving authority) with respect to all the annexure and amendment if available need to be submitted for review and acceptance of all FLP items.

47

Page 48: Title of the Entity: SDSC SHAR · Web viewPreferably two nos. embedded in windings to monitor winding temperature and trip system upon high winding temperature or one no. only for

SECTION-DTECHNICAL

SPECIFICATIONS:INSTRUMENTATION

SYSTEMS

Scope of work (Instrumentation system):1. Introduction:

48

Page 49: Title of the Entity: SDSC SHAR · Web viewPreferably two nos. embedded in windings to monitor winding temperature and trip system upon high winding temperature or one no. only for

1.1. Supply, installation, testing & commissioning of all the field instruments as per the datasheet given in Table No: 1 to 10 with its associated accessories & fittings are in the scope of Bidder.

1.2. The field instruments shall have the following interface to connect with PLC for remote monitoring and operation,

S.No Type of Sensor signal Interface type

1Digital input instruments(Ex: Proximity sensors, Limit switches etc.,)

Potential free contacts/NAMUR switching elements

2Digital output instruments(Ex: Solenoid valves, E/P valves etc.,)

Operating voltage: 24V DC

3Analog Input instruments(Ex: Transmitters)

Profibus/ Foundation field bus. Any other interface type shall have approval from Purchaser.

4Analog output(Ex: Control valve, Thyristor, VVVFD etc.,)

Profibus / Foundation field bus. Any other interface type shall have approval from Purchaser.

1.3. Bidder shall specify the type of interface proposed for all instruments in their offer.1.4. The power supply for all Electrical & Electronic items shall be either 230V AC, 50 Hz

or 24V DC.1.5. All these field instruments will be used in a very fine dust (Approx. 50 µ) and

Hazardous environment, hence suitable ingress protection (ie., IP 65 or better as per IEC standard 60529) and Intrinsically safe/ flame proof protection suitable to Zone-1, Gas Group IIA, IIB & T4 as per ATEX/FM for all instruments shall be provided.

1.6. All the field instruments shall be fixed firmly and necessary pre-caution shall be taken while installation, so that the instrument/ fittings/accessories or any loose components shall not be carried along with the Hazardous powder.

49

Page 50: Title of the Entity: SDSC SHAR · Web viewPreferably two nos. embedded in windings to monitor winding temperature and trip system upon high winding temperature or one no. only for

1.7. All field instruments shall be factory calibrated as per the standard traceable to NIST/NABL and certificates shall be submitted.

1.8. Much care has been taken in arriving the list of equipment and quantities, however if any equipment or components which is not mentioned explicitly but essentially required for the completion of system is in the scope of the Bidder.

1.9. PLC & SCADA will be procured from Siemens/ Schneider/ Rockwell by Purchaser. Bidder shall select the suitable communication interface for their instruments with above PLC system. If any of the item supplied item as part of this contract is not meeting the system requirement or any compatibility/ interface issues with other systems are found at any stage of the project, same shall be replaced with suitable items without any additional cost.

1.10. PLC programming and SCADA development will be done by department. However, the inputs for above programming like sequence of operations, initial interlocks, running interlocks and emergency stop procedure etc., shall be provided by Bidder.

1.11. During the warrantee period, the bidder shall replace the failed/ malfunctioning components without any additional cost.

1.12. List of documents to be submitted (3 sets of soft & 2 set of printed copy); Final BOM with make & model number. Technical catalogues and datasheets of all items. Installation, Operation & Maintenance (IOM) manual. Test certificates. Warranty certificates. Passwords/ Licenses/ Operating keys etc., Any other relevant document not listed above.

2. The following equipment/ services are not in the scope of the contract: 230V AC UPS & 24V DC power supply. PLC, SCADA, MMI, Control consoles, Intrinsically safe isolators & relays. Junction boxes, Panels. Power, Control & Signal Cables. Instrumentation & power earth pits. Fire detection and alarm system (FDAS), firefighting system (FFS), telephones

and wireless sets. CCTV system.

50

Page 51: Title of the Entity: SDSC SHAR · Web viewPreferably two nos. embedded in windings to monitor winding temperature and trip system upon high winding temperature or one no. only for

3. Essential and minimum list of instruments for one number of hammer mill and its sub-systems are given below. For two number of systems the quantity shall be doubled.

S.No Instrument Description Quantity (Nos.)1. RPM measurement

Mill motor Mill rotor Stuffing screw feeder motor Screw feeder rotor (Desirable) Dosing screw feeder motor Dosing feeder rotor (Desirable) Blower Rotary Air Lock valve (RAL) Spare

9 Nos.

2. Temperature transmitter Mill bearing temperature Mill winding temperature Skin temperature of mil housing Screw feeder winding temperature Blower winding temperature Product outlet temperature Spare

7 Nos.

3. Level switch for signaling the AP Material level in feed hopper is full or empty. Desirable.

1(1 set as per design)

4. Pulse air inlet pressure transmitter 15. Differential pressure transmitter to monitor Pressure drop across

automatic filter unit1

6. Air Flow transmitter for monitoring Blower air velocity. 17. Proximity sensor

Mill door open status Mill door close status Mill door locked status Mill door unlocked status Blower suction damper open status Blower suction damper close status Blower delivery damper open status Blower delivery damper close status Spare- 2 Nos.

10 Nos.

8. Low air pressure switch (air fail switch) to confirm blower is running.

1

9. Vibration transmitter for Mill. (Desirable) 110. Timer:

Auto sequencing timer of pulse air unit.Provision to monitor the status of timer like Pulse activation time & sleep time shall be provided.

1

Note: The list of instrumentation items which are required are projected above. However, additions items which the supplier feels essential/required can be projected by supplier with details for department/purchasers approval.

4. Technical specifications for field instruments51

Page 52: Title of the Entity: SDSC SHAR · Web viewPreferably two nos. embedded in windings to monitor winding temperature and trip system upon high winding temperature or one no. only for

Table 1. Specification of RPM sensorDescription Essential Specification

Application

RPM measurement Mill motor Mill rotor Screw feeder motor Screw feeder rotor (Desirable) Blower Rotary Air Lock valve (RAL) Spare

Make Pepperl & Fuchs/ Redlion/ IFM/ Hengstler/ Siemens or equivalent with the approval of Purchaser

Primary element typeNon-contact: Proximity sensor/ Reluctance probe with converter.Contact: Optical encoder

Output Profibus DP/ Profibus PA/ Foundation field busRange As requiredOperating voltage Bus powered/ 24V DCIsolation Required between input & outputAmbient temperature Min. 15ºC to 45 ºCZero & span adjustment RequiredDiagnostics RequiredElectro Magnetic Compatibility (EMC) Required

Calibration/ Test certificate Required

ProtectionIP 65 or better.Intrinsically safe/ Flame proof suitable to use in Zone 1, Gas group IIA, IIB & T4.

Cable EntryTo be specified by bidder. If integrated cable or special connector, then minimum 30 meter cable length shall be supplied with suitable connector.

Quantity 6 Nos. + 1 Spare (Nos.)

Table 2. Specification of RTD Sensors & Temperature transmitterDescription Essential Specification

MakeRosemount / Omega/ Wika/ Honeywell/ Siemens/ Yokogawa/Red lion/ Tempsons or equivalent with the approval of Purchaser.

Type of sensor Pt100Accuracy IEC 751 Class A / DIN 60751Temperature Coefficient: 0.00385 Ohms/ 0CTemperature Range: 0 to 120 0CSheath Sensor shall be housed in ¼” SS 316 sheath.

Thermowell Required (SS) suitable to RTD & mounting location.

Transmitter Required with local indicationTransmitter accuracy 0.1% FSTransmitter output Profibus DP/ Profibus PA/ Foundation field bus.

52

Page 53: Title of the Entity: SDSC SHAR · Web viewPreferably two nos. embedded in windings to monitor winding temperature and trip system upon high winding temperature or one no. only for

Span/ Zero adjustment RequiredAmbient temperature range 10 to 45 0C

Electro Magnetic Compatibility (EMC) Required.

Diagnostics Required.

Cable EntryTo be specified by bidder. If integrated cable or special connector, then minimum 30 meter cable length shall be supplied with suitable connector.

ProtectionIP 65 or better.Intrinsically safe/ Flame Proof suitable to use in Zone 1, GR-IIA, IIB & T4.

Calibration certificate Required.

Application

Mill bearing temperature Mill winding temperature Skin temperature of mil housing Screw feeder winding temperature Blower winding temperature Product outlet temperature Spare

Quantity 6 +1 spare (Nos.)

Table 3. Specification of Level SwitchDescription Essential Specification

Make Rosemount/ Yokogawa/ Honeywell/ Siemens/ Red lion/ P&F/ IFM or equivalent with the approval of Purchaser.

Type Suitable for AP powder

Operating Principle Paddle type level switches for signaling “full” or “empty”.Integral display OptionalMounting location Feed hopper top lidElectro Magnetic Compatibility (EMC) As per EN 61326 or equivalent.

Calibration certificate Required and traceable to NIST/ NABL.Power supply 230V AC, 50Hz (OR) 24V DC (OR) Bus powered

Output signal Potential free NO/NC contacts.Optional: Profibus PA/ Foundation Field bus

ProtectionIP 65 or better.Intrinsically safe/ Flame proof suitable to use in Zone 1, Gas group IIA, IIB & T4.

Process connection To be specified by bidder.

Cable EntryTo be specified by bidder. If integrated cable or special connector, then minimum 30 meter cable length shall be supplied with suitable connector.

Quantity 1 Nos.

Table 4. Specification of Pressure TransmitterDescription Essential Specification

Make Rosemount/ Yokogawa/ Honeywell/ Siemens or equivalent with the approval of Purchaser.

53

Page 54: Title of the Entity: SDSC SHAR · Web viewPreferably two nos. embedded in windings to monitor winding temperature and trip system upon high winding temperature or one no. only for

Operating Principle Capacitance / Piezo-resistive type/ silicone resonant

Integral display LCD display

Mounting location Pulse air inlet pipeline.

Range 0 to 10 bar

Output LinearizedAccuracy 0.1% of FSLong term stability 0.2% full scale over a period of 5 years.

Electro Magnetic Compatibility (EMC) Required

Calibration certificate Required.Power supply Bus poweredOutput signal Profibus DP/ Profibus PA/ Foundation field bus.Span / Zero adjustment Required.Diagnostics Required.

ProtectionIP 65 or better.Intrinsically safe/ Flame proof suitable to use in Zone 1, Gas group IIA, IIB & T4.

Over range protection Required.Application of measurement Pulse air inlet pressure transmitterProcess connection ½” NPT (F) OR to be specified by bidder.

Cable EntryTo be specified by bidder. If integrated cable or special connector, then minimum 30 meter cable length shall be supplied with suitable connector.

2-valve manifold SS and shall be suitable to pressure ratings.Quantity 1 Nos.

Table 5. Specification of Differential Pressure TransmitterDescription Essential Specification

MakeRosemount/ Yokogawa/ Honeywell/ Siemens/ Pepperl & Fuchs/ IFM/ Red lion or equivalent with the approval of Purchaser.

Type Differential pressure type

Operating Principle Capacitance / Piezo-resistive type/ silicone resonant

Integral display LCD displayMounting location To monitor Pressure drop across automatic filter unit.

Output LinearizedAccuracy 0.1% of spanLong term stability 0.2% full scale over a period of 5 years.

Electro Magnetic Compatibility (EMC) Required.

Calibration certificate Required.Power supply Bus powered

54

Page 55: Title of the Entity: SDSC SHAR · Web viewPreferably two nos. embedded in windings to monitor winding temperature and trip system upon high winding temperature or one no. only for

Output signal Profibus DP/ Profibus PA/ Foundation field bus.Transmitter diagnostics Required.Span / Zero adjustment Required

ProtectionIP 65 or better. Intrinsically safe/ Flame proof suitable to use in Zone 1, Gas group IIA, IIB & T4.

Pressure Range To be specified by bidder.Process connection ½” NPT (F) OR to be specified by Bidder.

Cable EntryTo be specified by bidder. If integrated cable or special connector, then minimum 30 meter cable length shall be supplied with suitable connector.

5-valve manifold Required. SSQuantity 1 Nos.

Table 6. Specification of Air flow transmitterDescription Essential Specification

MakeIFM/ Switzer / Honeywell / Sigma / Danfoss/ Omran/ Siemens/ Yokogawa/ Rosemount/ Red lion/ P&F or equivalent with the approval of Purchaser.

Type Direct mounting/ Differential type Sensing element Ultra sonic/ Calorific/ Ventury or as per standardMounting location DuctAccuracy ± 1 % of span

Transmitter output Bus powered field bus interface.Profibus PA/ Foundation Field (FF) bus.

ProtectionIP 65 or better. Intrinsically safe/ Flame proof suitable to use in Zone 1, Gas group IIA, IIB & T4.

Cable EntryTo be specified by bidder. If integrated cable or special connector, then minimum 30 meter cable length shall be supplied with suitable connector.

Calibration Certificate RequiredQuantity (Nos.) 1 Nos.

Table 7. Specification of Proximity sensorDescription Essential Specification

Make P&F/ IFM/ STAHL/ OMRAN or equivalent with the approval of Purchaser.

Type InductiveSwitching element function NAMUR

Operating distance & Quantity 10mm – 25 Nos. (Including spare)5 mm – 25 Nos. (Including spare)

Nominal voltage 8 V DCSwitching frequency 0 to 400 HzReverse polarity & short circuit protection Required.

Diagnostics Required.Indication of switching state Required (LED).

55

Page 56: Title of the Entity: SDSC SHAR · Web viewPreferably two nos. embedded in windings to monitor winding temperature and trip system upon high winding temperature or one no. only for

Mounting type Cylindrical, threaded type with check nuts.

Protection IP 65 or better.Intrinsically safe to Zone 1, Gas group IIA, IIB & T4.

Connection typeMulti pin circular connector and suitable cable with min. 30 meter length shall be supplied with each proximity sensors.

Sensing face PBTHousing material SS

Standards IEC/EN 60947DIN EN 60947 (NAMUR)

Certificate Test certificates are required.

Table 8. Specification of Low Air Pressure switchDescription Essential Specification

MakeIFM/ Switzer / Honeywell / Sigma / Danfoss/ Omran/ Siemens/ Yokogawa/ Rosemount or equivalent with the approval of Purchaser.

Medium AirNo of contacts 2 NO + 2 NC 5 A rated at 24 V DCMounting location In the air delivery ducts

Protection IP 65 or better.Intrinsically safe to Zone 1, Gas group IIA, IIB & T4.

Range: 10- 100 mm WCProcess connection ½ “ NPT or to be specified by the Bidder.

Cable EntryTo be specified by bidder. If integrated cable or special connector, then minimum 30 meter cable length shall be supplied with suitable connector.

Quantity (Nos.) 1 Nos.

Table 9. Vibration transmitterDescription Essential Specification

Make Endevco/ PCB/ Ditron/ Elap/ TE/ Mouser/ Handsford or equivalent with the approval of Purchaser.

Measurement range As required for Mill vibration measurement.Output Profibus/ Foundation Field (FF) busPower supply 24 VDC/ Bus powered.

Protection IP 65 or better.Intrinsically safe to Zone 1, Gas group IIA, IIB & T4.

Connection typeTo be specified by bidder. If integrated cable or special connector, then minimum 30 meter cable length shall be supplied with suitable connector.

Quantity 1 Nos.

Table 10. Timer for actuating the Pulse air unitDescription Essential Specification

56

Page 57: Title of the Entity: SDSC SHAR · Web viewPreferably two nos. embedded in windings to monitor winding temperature and trip system upon high winding temperature or one no. only for

Make Siemens/ Schneider/ OMRAN/ or equivalent with the approval of Purchaser.

Range As required for actuating the Pulse air unit.Output Potential free contactsPower supply 24 VDC.

Protection IP 65 or better.Intrinsically safe to Zone 1, Gas group IIA, IIB & T4.

Connection typeTo be specified by bidder. If integrated cable or special connector, then minimum 30 meter cable length shall be supplied with suitable connector.

Quantity 1 Nos.

57

Page 58: Title of the Entity: SDSC SHAR · Web viewPreferably two nos. embedded in windings to monitor winding temperature and trip system upon high winding temperature or one no. only for

58

Cables

Note: Supply & installation of Field instruments are in Bidder scope.

Interface to connect with PLC shall be clearly provided by bidder in their offer.

Supply & installation of PLC, SCADA, Remote I/O racks, Junction boxes and Cables are in Purchaser scope.

Fig. 1 Typical Instrumentation & Control system Configuration

Purchaser ScopeBidder Scope

SCADA

PLC

RemoteI/O rack

Intermediate Junction box

Solenoid valve

Sensors/ Transmitters

Field Junction

box

Sensors/ Txr

Control valve

Page 59: Title of the Entity: SDSC SHAR · Web viewPreferably two nos. embedded in windings to monitor winding temperature and trip system upon high winding temperature or one no. only for

SECTION-EANNEXURES

59

Page 60: Title of the Entity: SDSC SHAR · Web viewPreferably two nos. embedded in windings to monitor winding temperature and trip system upon high winding temperature or one no. only for

Annexure-1

Minimum Criteria for Bid Qualification

S. No Criteria Vendor Compliance(Yes*/No)

1. Tenderer shall have at least 5 years of experience in the field of design, supply and erection & commissioning of Hammer mill, dust collection and subsystems for grinding of hazardous materials..

2. Should have designed, fabricated, supplied and commissioned at least one Hammer Mill in the past 10 years of capacity 2000 kg/hr and above for hazardous materials.

3. Copies of the completion certificate/performance certificate and contact details from your client organization to whom similar size of the Hammer mill, dust collection and sub systems was supplied shall be furnished, in case of absentia, a declaration of organization giving information of no. of machines delivered for Ammonium Perchlorate powder all over the world and a performance declaration for minimum 2000 kg/hr capacity production of ammonium perchlorate from the offered system by the supplier shall be provided.

4. Bidder shall have an annual turnover of INR 10 crores for Indian suppliers, US $ 1.4 million or equivalent currency for foreign/imported or combined foreign and Indian suppliers on an average during past three years.

Signature of Supplier with Seal

60

Page 61: Title of the Entity: SDSC SHAR · Web viewPreferably two nos. embedded in windings to monitor winding temperature and trip system upon high winding temperature or one no. only for

Annexure -2

Schedule of Prices

SL. No Description Unit Quantity,

nos

Unit cost(in Rs/foreign currency as Applicable.)

Cost (in Rs/foreign currency as applicable.)

1 Design, Supply of Hammer Mill and Its Subsystems

Lump sum 2

2Design, Supply of Dust Collection System and Its Subsystems

Lump sum 2

3 Packing forwarding charges for total system % 2

4 Transportation charges for total system %

5 GST on (1+2+3+4) %

6 Installation, Testing and Commissioning charges

Lump sum 2

7 GST on 6 %Total Cost (Sum of S.No.

1+2+3+4+5+6+7)

8 Cost of Spares Lump sum 2

9 GST on items in S.no. 8 %Total Cost (Sum of S.No. 8+9) of

system

The grand total amount will be considered for evaluation of the offer

Signature of Supplier with Seal

61

Page 62: Title of the Entity: SDSC SHAR · Web viewPreferably two nos. embedded in windings to monitor winding temperature and trip system upon high winding temperature or one no. only for

Annexure-3

Exceptions and Deviations

In line with Proposal Document, supplier may stipulate Exceptions and deviations to the Proposal conditions if considered unavoidable.

SL.NO

Reference in Specification

Dept. Specification

OfferedSpécification DEVIATION

PAGE NO

CLAUSE NO

NOTE   :

(a) Only deviations are to be written in this Annexure-3

(b) Any deviations taken by the Bidder to the stipulations of the Proposal document shall be brought out strictly as per this format and enclosed along with the bid.

(c) Any deviations not brought out as per this Proforma (Annexure-3) and written elsewhere in the Proposal document shall not be recognized and the same is treated as null and void.

(d) Any willful attempt by the Tenderer to camouflage the deviations by giving them in the covering letter or in any other documents that are enclosed may render the Bid itself non-responsive.

Signature of Supplier with Seal

62

Page 63: Title of the Entity: SDSC SHAR · Web viewPreferably two nos. embedded in windings to monitor winding temperature and trip system upon high winding temperature or one no. only for

Annexure – 4Delivery Schedule

S. No Mile Stone Expected date of completion

Compliance

T1 Letter of Intent / Purchase order date T0T2 Submission of Configuration and G.A.

Drawings, T1+ 8 weeks

T3 Date of clearance of Configuration and G.A. Drawings

T2+ 4 weeks

T4 Submission of final drawings T3 + 2 weeksT5 Fabrication & submission for FAT

inspection at party’s siteT4 + 36 weeks

T6 Installation , Code Development, Testing & Commissioning

T5 + 10 weeks

Signature of Supplier with Seal

63

Page 64: Title of the Entity: SDSC SHAR · Web viewPreferably two nos. embedded in windings to monitor winding temperature and trip system upon high winding temperature or one no. only for

Annexure -5Check List

S. No Description Response by Supplier

1. The detailed scope of work and technical specifications are under stood and price was quoted accordingly

Yes / No

2. All the general conditions of the contract as per the section-A are acceptable.

Yes / No

3. In case of some general conditions of the contract as per the section-A are not acceptable, deviation statement is to be enclosed as per Annexure-3

Yes / No

4. The supplier evaluation format as enclosed along the proposal document is filled-in and necessary supporting documents are enclosed.

Yes / No

5. Un-priced copy of schedule of prices, payment schedule is enclosed in the techno-commercial bid.

Yes / No

6. Taxes are quoted in the price bid Yes / No

7. Delivery schedule is acceptable. If not, the deviation is brought-out in the deviation statement (Annexure-3)

Yes / No

8. Terms of payment are acceptable. If not, the deviation is brought-out in the deviation statement (Annexure-3)

Yes / No

9. Compliance to technical tables filled and enclosed Yes/No

64

Page 65: Title of the Entity: SDSC SHAR · Web viewPreferably two nos. embedded in windings to monitor winding temperature and trip system upon high winding temperature or one no. only for

Building ground floor plan: The equipment shall be designed such that it fits in the civil building.

65

Page 66: Title of the Entity: SDSC SHAR · Web viewPreferably two nos. embedded in windings to monitor winding temperature and trip system upon high winding temperature or one no. only for

66

Page 67: Title of the Entity: SDSC SHAR · Web viewPreferably two nos. embedded in windings to monitor winding temperature and trip system upon high winding temperature or one no. only for

67