41
TINSA_TRG_9001_01

TINSA TRG 9001 01 - MOVE

  • Upload
    others

  • View
    7

  • Download
    0

Embed Size (px)

Citation preview

Page 1: TINSA TRG 9001 01 - MOVE

TINSA_TRG_9001_01

Page 2: TINSA TRG 9001 01 - MOVE

TINSA_TRG_9001_01

2

July 2012 Registration in NANDO

per NB 2387 as per

Directive 2008/57 ЕC of

the European

Parliament and of the

Council of 17 June 2008

on the interoperability of

the rail system within the

Community

September 2010 Application to the Railway

Executive Agency to be

registered as a NoBo

September 2013 Designated Body for conformity

assessment of the rail subsystems or

a part thereof with the requirements

of the National Safety Rules and the

National Technical Rules

January 2010 Registration of the company

November 2011 Starting aproval and

registartion in NANDO

May 2015 Full member of NB

RAIL Association

May2015 Inspection body under

BDS EN ISO/IEC

17020:2012

July 2015 Product Certification

Body under BDS EN

ISO/IEC 17065:2012

November 2015 Assessment Body for

Independent Safety

assessment, according

to Commission

Implementing

Regulation (EU) No

402/2013.

Page 3: TINSA TRG 9001 01 - MOVE

TINSA_TRG_9001_01

• ISO 9001:2008 Certificate.

• OHSAS 18001:2007 Certificate.

• BDS EN ISO/IEC 17065:2012 Certificate of Accreditation as Product Certification Body issued by the

Bulgarian Accreditation Service Executive Agency.

• BDS EN ISO/IEC 17020:2012 Certificate of Accreditation as Type A Inspection Body issued by the

Bulgarian Accreditation Service Executive Agency.

• Permit No.1/04.07.2012 for Notified body.

• Permit No.002-1/09.09.2013 for Designated body.

• Certificate of Assessment Body for Independent Safety assessment, according to Commission

Implementing Regulation (EU) No 402/2013.

• NANDO Notification.

3

Page 4: TINSA TRG 9001 01 - MOVE

TINSA_TRG_9001_01

Our European position!

NB 2387

Page 5: TINSA TRG 9001 01 - MOVE

TINSA_TRG_9001_01

5

EO Assessment and verification of the interoperability and issuing of EC

Certificate of Verification of the Trans-European rail system

Infrastructure Subsystem (INF CR)

Safety of Railway Tunnels Aspect (SRT)

Persons with Reduced Mobility Aspect (PRM)

Energy Subsystem (ENE CR)

Control-Command and Signaling On-board and Track-side Subsystem (CCS CR)

Conformity assessment and issuing of Certificate of verification to the Notified

National Rules, in accordance with Article 17, Para.3 of Directive 2008/57/EC

Infrastructure Subsystem (INF CR)

Safety of Railway Tunnels Aspect (SRT)

Persons with Reduced Mobility Aspect (PRM)

Energy Subsystem (ENE CR)

Control-Command and Signaling On-board and Track-side Subsystem (CCS CR)

Locomotives and Self-Propelled Rail Vehicles

Wagons (in process of the application)

BDS EN ISO/IEC 17065:2012

Infrastructure

Energy

CCS

Rolling Stocks

Independent safety and risk assessment under the Regulation 352 and Regulation

402

Railway products’ certification

Page 6: TINSA TRG 9001 01 - MOVE

TINSA_TRG_9001_01

6

Track inspection and measuring of geometrical parameters of the railway track and video surveillance

Accredited Inspection Body, type A

Certificate of Accreditation No. 182 OKA, issued by the Bulgarian Accreditation Service Executive Agency.

Track measuring car “PLASSER & THEURER” ЕМ-120

Page 7: TINSA TRG 9001 01 - MOVE

TINSA_TRG_9001_01

7

Break tests

Electromagnetic compatibility

Train construction

Production Monitoring

Maintenance optimization

Workshops optimization

Independent risk and safety assessment under the Regulation 352 and Regulation 402

Rolling stock

Page 8: TINSA TRG 9001 01 - MOVE

TINSA_TRG_9001_01

8

Human Resource Management

Human resources analysis and audits

Strategic framework for human capital management and development

Strategic planning

Organizational framework

Technical and operational railway trainings

Management trainings

Trainings

Page 9: TINSA TRG 9001 01 - MOVE

TINSA_TRG_9001_01

NB-RAIL – Coordination Group of Notified Bodies for Directive 2008/57/EC on

Railway Interoperability

http://www.nb-rail.eu

9

Page 10: TINSA TRG 9001 01 - MOVE

TINSA_TRG_9001_01

NB-RAIL – Coordination Group of Notified Bodies for Directive 2008/57/EC on Railway Interoperability

- according to Article 44 of IOD, the Commission shall ensure appropriate coordination and cooperation between bodies notified under this Directive through the establishment of a sectoral group of notified bodies. - the European coordination group set up by the Commission according to Article 44 of the Interoperability Directive (EU) 2016/797 to discuss any questions concerning the evaluation’s procedure for IC and Subsystems, including the application of TSIs

http://www.nb-rail.eu

10

Page 11: TINSA TRG 9001 01 - MOVE

TINSA_TRG_9001_01

• Four Subgroups: – ERTMS (six meetings year)

– RST (three meetings year)

– ENE (three meetings year)

– INF (three meetings year)

• One group to coordinate all the documents drafted by the subgroups: Strategy group (three meetings year)

• One decision group: Plenary meeting (three meetings year)

11

Page 12: TINSA TRG 9001 01 - MOVE

TINSA_TRG_9001_01

• ERA is represented in all our NBRail coordination groups:

– Technical groups

– Strategy group

– Plenary meeting

Other representation in Plenary meetings of NBRail:

– Member State representatives

– DG MOVE

– CEN/CENELEC

12

Page 13: TINSA TRG 9001 01 - MOVE

TINSA_TRG_9001_01

• Infrastructure

• Energy

• CCS-OB

• CCS-TS

• Rolling Stocks

• Telematic applications

• Maintenance

• Operation and traffic management

13

Page 14: TINSA TRG 9001 01 - MOVE

TINSA_TRG_9001_01

Independent Safety Assessment in compliance with CENELEC EN 50129, EN 50126 and EN 50128.

14

Page 15: TINSA TRG 9001 01 - MOVE

TINSA_TRG_9001_01

• Testing under static and dynamic load.

• Determining the actual stress and strain state of the design in constructing and operating state and under the influence of test load.

• Conformity assessment of bridges to the calculations in the design for live action testing, and conformity with the requirements of the "Methodology for live action test of railway bridges for normal (1435 mm) tracks" NRIC.

15

Page 16: TINSA TRG 9001 01 - MOVE

TINSA_TRG_9001_01

Control measurements of the railway gauge with laser laboratory Chevrolet.

16

Page 17: TINSA TRG 9001 01 - MOVE

TINSA_TRG_9001_01

Measuring dynamic impact between pantograph and new catenary, according to the requirements of the TSI Energy 2011/274/EC and the standard EN50317: 2002.

17

Page 18: TINSA TRG 9001 01 - MOVE

TINSA_TRG_9001_01

Provide electromagnetic compatibility tests regarding the asessment of electromagnetic impact of traction and non-traction roling stock over the track-side signaling equipment (axle counters and track circuits).

18

Page 19: TINSA TRG 9001 01 - MOVE

TINSA_TRG_9001_01

• Static and dynamic break tests of rolling stock • Static strength and dynamic shock tests of freight wagons • Testing of interoperability constituent of the break system of rolling

stock including stands and installations for quality control of the repair and maintenance

• Testing of the interoperability constituent of wagons- freight and passenger

• Testing of systems and components for fixing goods. • Check rigs and equipment for quality control in the production and

repair of elements of railway wagons. • Train construction inspections

– Checks on the fire systems. – Checks on power systems, lighting, heating and ventilation,

bathrooms, etc.

19

Page 20: TINSA TRG 9001 01 - MOVE

TINSA_TRG_9001_01

• Railway Components Tests – European Vital Computer (EVC) according to the requirements of Subset-026, Subset-076 and Subset-094, Eurobalises and Balise Transmission Module (BTM), according to Subset-036 and Subset-085

• Track/Train Compatibility Validation: provide for early detection of problems in the validation of track/train compatibility based on design data, operational and technical rules, etc.

• Maintenance solutions: provide software and hardware tools for analysing signal quality of balises; services and testing options to upgrade railway infrastructure to newer version standards (baselines).

20

Page 21: TINSA TRG 9001 01 - MOVE

TINSA_TRG_9001_01

ERTMS Railway Laboratory - Sofia Tech Park

Page 22: TINSA TRG 9001 01 - MOVE

TINSA_TRG_9001_01

ERTMS Railway Laboratory - Sofia Tech Park

An example of measurements done and how they are reported: Balise I/O characteristics to measure the overall UPLINK signal level versus

TELEPOWERING FLUX INTENSITY:

-50.00

-40.00

-30.00

-20.00

-10.00

0.00

10.00

20.00

30.00

40.00

50.00

5.00 10.00 15.00 20.00 25.00 30.00 35.00 40.00 45.00

I_lo

op

[d

Bm

A]

Flux [dBnVs]

BALISE I/O CHARACTERISTIC (dB)

UPLINK1

UPLINK2

LOWER LIMIT

UPPER LIMIT

Hysteresis sometime occurs like in the figure at the right alerting over possible excessive capacitive load which might impact on other tests like the BALISE START-UP TIME.

Page 23: TINSA TRG 9001 01 - MOVE

TINSA_TRG_9001_01

ERTMS Railway Laboratory - Sofia Tech Park

Page 24: TINSA TRG 9001 01 - MOVE

TINSA_TRG_9001_01

ERTMS Railway Laboratory - Sofia Tech Park

Page 25: TINSA TRG 9001 01 - MOVE

TINSA_TRG_9001_01

ERTMS Railway Laboratory - Sofia Tech Park

Page 26: TINSA TRG 9001 01 - MOVE

TINSA_TRG_9001_01

ERTMS Railway Laboratory - Sofia Tech Park

• According to Subset-036 all bits of a telegram must be valid. This test is not present in Subset-085, but are verified in the present lab:

- Previous bits - Succeeding bits

validity are checked. • Slow TP slope represent a problem for most suppliers. This test is not present in Subset-085, but are verified in the present lab.

Page 27: TINSA TRG 9001 01 - MOVE

TINSA_TRG_9001_01

ERTMS Railway Laboratory - Sofia Tech Park

Page 28: TINSA TRG 9001 01 - MOVE

TINSA_TRG_9001_01

ERTMS Railway Laboratory - Sofia Tech Park

Page 29: TINSA TRG 9001 01 - MOVE

TINSA_TRG_9001_01

ERTMS Railway Laboratory - Sofia Tech Park

Page 30: TINSA TRG 9001 01 - MOVE

TINSA_TRG_9001_01

ERTMS Railway Laboratory - Sofia Tech Park

The turnout is in the wrong direction. The train will stop. Safety issue : Anomaly on the track. Route supervision with linking.

Page 31: TINSA TRG 9001 01 - MOVE

TINSA_TRG_9001_01

ERTMS Railway Laboratory - Sofia Tech Park

The driver does not brake when reaching turnout. EVC applies automatically Service/Emergency brakes. Safety issue : Good configuration of messages in balises

Page 32: TINSA TRG 9001 01 - MOVE

TINSA_TRG_9001_01

ERTMS Railway Laboratory - Sofia Tech Park

Page 33: TINSA TRG 9001 01 - MOVE

TINSA_TRG_9001_01

ERTMS Railway Laboratory - Sofia Tech Park

Page 34: TINSA TRG 9001 01 - MOVE

TINSA_TRG_9001_01

ERTMS Railway Laboratory - Sofia Tech Park

Page 35: TINSA TRG 9001 01 - MOVE

TINSA_TRG_9001_01

35

PROJECTS’ REFERENCE LIST

Verification and assessment of the interoperability of the railway infrastructure, built during the implementation of the project “Construction of a new combined (road and railway) bridge over Danube river at Vidin – Calafat”.

EC verification and assessment for the site “Rehabilitation of the railway infrastructure along sections of the Plovdiv – Burgas railway line, Lot 1: Rehabilitation of the railway section Mihaylovo – Kaloyanovets, including the main tracks in the stations of Mihaylovo – Kaloyanovets with approximate track length 21 km”.

EC verification and conformity assessment for interoperability for the site “Design and build of signalling systems in the Septemvri – Plovdiv railway section and telecommunications in the Sofia – Plovdiv railway section”. Verification and assessment to be also performed against the National Safety Rules and the National Technical Rules.

Page 36: TINSA TRG 9001 01 - MOVE

TINSA_TRG_9001_01

36

EC verification and conformity assessment for interoperability for the site “Design and build of signalling systems in the Septemvri – Plovdiv railway section and telecommunications in the Sofia – Plovdiv railway section”. Verification and assessment to be also performed against the National Safety Rules and the National Technical Rules.

EC verification and conformity assessment for interoperability for the site “Design and build of signalling systems in the Septemvri – Plovdiv railway section and telecommunications in the Sofia – Plovdiv railway section”. Verification and assessment to be also performed against the National Safety Rules and the National Technical Rules.

EC verification and conformity assessment for interoperability for “Modernization of the railway section Septemvri-Plovdiv – part of the trans-European Rail Network” part Lot 3 Modernization of the Railway Section Stamboliyski - Plovdiv.

Page 37: TINSA TRG 9001 01 - MOVE

TINSA_TRG_9001_01

37

ЕО verification and conformity assessment of railway infrastructure in execution of Project

“Reconstruction and electrification of railway Plovdiv – Svilengrad: rail line from km

231+560 between stations Yabalkovo-Dimitrovgrad to km 297+750; between stations

Svilengrad – Turkish border; and from Svilengrad station to the Greek border, with

approximate total railway length of 74 km, as well as the signaling and telecommunication

systems for the entire rail line Plovdiv-Svilengrad-Turkish/Greek border"". Verification and

assessment to be also performed against the National Safety Rules and National Technical

Rules.

ЕО verification and conformity assessment of the project "Construction of the intermodal

terminal in Sought-Central planning region in Bulgaria- Plovdiv”. Verification and assessment

to be also performed against the National Safety Rules and National Technical Rules.

EC verification and assessment for the site “Rehabilitation of the railway infrastructure along

sections of the Plovdiv – Burgas railway line, Lot 2: Stara Zagora-Zavoj (to km 190+590) and

Zavoj –Zimnitca (from km 192+706 to input switch of Zimnitsa), including main lines in

stations Stara Zagora and Yambol and all stations and stops with approximately length of

120 km“

Page 38: TINSA TRG 9001 01 - MOVE

TINSA_TRG_9001_01

38

ЕC verification and conformity assessment for interoperability for the Project in

Alexandroupoli, Greece

Contract implementation- 2014-2015

Employer: SIDERODROMIKA ERGA S.A., Greece

Contractor: TINSA Ltd.

Assessed subsystems: Energy, Infrastructure Module: SH1

Page 39: TINSA TRG 9001 01 - MOVE

TINSA_TRG_9001_01

39

EC verification tasks in connection with the project «EARTHWORKS

AND STRUCTURES OF THE RAILWAY LINK OF THE PORT OF N. IKONIO

WITH THE RAILWAY NETWORK. SECTION FROM CH.15+850 (ENTRANCE

OF CUT & COVER NATO) UNTIL THE END INCLUDING: THE SECTION

FROM CH.10+100 TO CH.11+100 (ALIGNMENT DEVIATION AT

LANDSLIDE AREA), DAFNI BRIDGE, THE SUPERSTRUCTURE-SIGNALLING-

TELECOMMAND, E/M WORKS OF TUNNELS AND INSTALLATIONS AT

THE PORT» (A.D. 463)

EC verification and conformity assessment of the Thriasio rail freight

terminal in Greece

Employer: AKTOR S.A. Contractors:

RINA Services S.p.A ТINSA Ltd THALES CONSULTANTS

Assessed subsystems: Energy, Infrastructure,CCS Module: SH1

Page 40: TINSA TRG 9001 01 - MOVE

TINSA_TRG_9001_01

40

Page 41: TINSA TRG 9001 01 - MOVE

TINSA_TRG_9001_01

41

THANK YOU!

E-mail: [email protected]

www.tinsabg.com