Time & Effort Reporting – UCB and UCSD Lessons Learned

UCOP: Jorge Ohy

UCB: John Ellis, Wanda Lynn Riley

UCSD: Stephanie Burke, Mark Cooper

August 27, 2008

Page 2: Time & Effort Reporting – UCB and UCSD Lessons Learned UCOP: Jorge Ohy UCB: John Ellis, Wanda Lynn Riley UCSD: Stephanie Burke, Mark Cooper August 27,

Objectives of this Presentation

Discuss increased federal agency focus on compliance with time and effort regulations; and the impact of non-compliance experienced by other institutions

Provide background information concerning results of the NSF audits conducted at UCB and UCSD

Provide overview of lessons learned as a result of electronic time reporting system implementation at UCSD and UCB

Discuss areas of risk and future audit plans

Page 3: Time & Effort Reporting – UCB and UCSD Lessons Learned UCOP: Jorge Ohy UCB: John Ellis, Wanda Lynn Riley UCSD: Stephanie Burke, Mark Cooper August 27,

The Current Environment HHS-OIG issued proposed guidelines for

establishing compliance programs for recipients of Public Health Services grants in November 2005 (http://oig.hhs.gov/fraud/docs/complianceguidance/PHS%20Research%20Awards%20Draft%20CPG.pdf)

The introduction to the proposed guidance highlighted three “risk areas”, including time and effort reporting (other areas include: Properly allocating charges to award projects; and Reporting financial support from other sources.)

Page 4: Time & Effort Reporting – UCB and UCSD Lessons Learned UCOP: Jorge Ohy UCB: John Ellis, Wanda Lynn Riley UCSD: Stephanie Burke, Mark Cooper August 27,

(OMB) Circular A-21 Payroll Distribution System Standards

http://www.whitehouse.gov/omb/circulars/a021/a21_2004.html Section J.10

The effort reporting system must be “incorporated into the official records of the institution”• Cannot exist only on personal calendars or as part of

informal departmental spreadsheets

• Must be formal, but can be based on “subsidiary records”

The effort reporting system must “reasonably reflect the activity for which the employee is compensated by the institution”• Must capture the employee’s “total compensated effort”

Page 5: Time & Effort Reporting – UCB and UCSD Lessons Learned UCOP: Jorge Ohy UCB: John Ellis, Wanda Lynn Riley UCSD: Stephanie Burke, Mark Cooper August 27,

(OMB) Circular A-21 Payroll Distribution System Standards

The payroll distribution system “may reflect categories of activities expressed as a percentage distribution of total activities.”

The system must provide for “after the fact” confirmation of the reasonableness of salary allocations to each sponsored agreements• Salary allocations must be confirmed by the employees

themselves or by “responsible persons with knowledge of the work performed

The system will provide for “independent internal evaluation” to ensure its effectiveness

Page 6: Time & Effort Reporting – UCB and UCSD Lessons Learned UCOP: Jorge Ohy UCB: John Ellis, Wanda Lynn Riley UCSD: Stephanie Burke, Mark Cooper August 27,

Significant Change in Effort

Per the NIH Grants Policy Statement, Part II, Subpart A, General—Administrative Requirejments; Revised December 1,

2003: http://grants2.nih.gov/grants/policy/nihgps_2003/NIHGPS_Part7.htm#_Toc54600127

The sponsor must be notified in writing if the PI or key personnel specifically named in the notice of grant award will withdraw from the project entirely, be absent from the project during any continuous period of three months or more, or reduce time devoted to the project by 25% or more from the level that was approved at the time of award.

Page 7: Time & Effort Reporting – UCB and UCSD Lessons Learned UCOP: Jorge Ohy UCB: John Ellis, Wanda Lynn Riley UCSD: Stephanie Burke, Mark Cooper August 27,

The Impact of Non-Compliance

Date Institution Settlement Reason

February 2003

NorthwesternUniversity

$5.5M Researchers spent less time on NIH

sponsored projects than they reported.

February 2004

Johns HopkinsUniversity

$2.6M Faculty time and effort devoted to NIH

grants was overstated.

June 2004 HarvardUniversity

$2.4M Unrelated salary costs and otherexpenses were charged to federalgrants.

April 2005 University ofAlabama atBirmingham

$3.4M Research effort was overstated; the

Medicare program was billed forresearch that was funded by

anothersponsor.

May 2005 Mayo Clinic $6.5M Research effort associate with other

sponsored projects was charged to

NIH grants.

June 2005 Cornell $4.4M Grant money alleged to supportstandard care for patients.

February 2006

Yale $194K Sub award costs not adequately documented.

Page 8: Time & Effort Reporting – UCB and UCSD Lessons Learned UCOP: Jorge Ohy UCB: John Ellis, Wanda Lynn Riley UCSD: Stephanie Burke, Mark Cooper August 27,

Future Focus of Internal AuditsEffort Reporting Audit Risk - What Causes Non-Compliance?

Failure to distribute and collect effort reporting forms

Lack of understanding of effort reporting regulations by investigators and administrators

Failure to reconcile effort report data with salary charges

Effort reports are signed by individuals with insufficient knowledge of the work performed

Page 9: Time & Effort Reporting – UCB and UCSD Lessons Learned UCOP: Jorge Ohy UCB: John Ellis, Wanda Lynn Riley UCSD: Stephanie Burke, Mark Cooper August 27,

Future Focus of Internal AuditsEffort Reporting Audit Risk - What Causes Non-Compliance?

Failure to include all institutional effort in the effort percentage allocation

Faculty salaries charged 100% to sponsored research

Inaccurate statements of effort on federal projects Failure to account for unfunded effort Failure to document and report significant changes

in effort Misunderstanding of effort report form requirements

Page 10: Time & Effort Reporting – UCB and UCSD Lessons Learned UCOP: Jorge Ohy UCB: John Ellis, Wanda Lynn Riley UCSD: Stephanie Burke, Mark Cooper August 27,

Overview of Recent NSF Audits of Labor Charges at Educational Institutions

NSF Purpose: to evaluate whether the university internal controls were adequate to properly manage, account for, and monitor salary and wage charges to NSF grants in accordance with OMB and NSF grant requirements. Specifically, to determine if salary and wage charges were allowable, allocable, and reasonable in accordance with federal cost principles.

Scope: 30 of 160 institutions receiving over $1M in NSF grants annually

Sample selection: all labor charges for a sample of 30 principal investigators per institution. Results to be extrapolated to all institutions in the sample.

Page 11: Time & Effort Reporting – UCB and UCSD Lessons Learned UCOP: Jorge Ohy UCB: John Ellis, Wanda Lynn Riley UCSD: Stephanie Burke, Mark Cooper August 27,

UCSD NSF Audit Scope

Timeframe: Fiscal Year 2006 NSF Projects Totaling $104M, of which 27% or $28M represented labor charges

Statistical sample: 30 employees with salary and wage costs amounting to $1,194,918

For each salary record selected: PAR reports reviewed for completeness and timeliness, appointment letters or other documents supporting approved salary reviewed; DOPES reviewed; award documents evaluated

Interviews conducted to determine whether:labor charges documented were actually incurredapproximate percentage of effort was reasonably consistent with NSF

labor chargesthe type of work performed was consistent with the award scope of work

Page 12: Time & Effort Reporting – UCB and UCSD Lessons Learned UCOP: Jorge Ohy UCB: John Ellis, Wanda Lynn Riley UCSD: Stephanie Burke, Mark Cooper August 27,

UC Personnel Activity Report (PAR) - What was Required?

The PAR report includes four sections:

PAR Section I = calculated effort• Reviewed by the employee or other responsible official

PAR Section II = actual effort• Adjustments are made as needed to reflect the actual effort spent on each award

PAR Section III = noted corrections made to Section I PAR data Section I• Completed by the employee or other responsible official

PAR Section IV = certification• Validates that PAR information represents a reasonable estimate of the actual effort

expended for wages that were direct charged to each sponsored project and each funding source listed on the PAR for the period reported.

Page 13: Time & Effort Reporting – UCB and UCSD Lessons Learned UCOP: Jorge Ohy UCB: John Ellis, Wanda Lynn Riley UCSD: Stephanie Burke, Mark Cooper August 27,

UCSD NSF Audit Conclusions

UCSD generally has a well established and sound Federal grants management system. Review of 30 sampled employees found that PAR effort certifications generally supported the FY 2006 salary costs of $1.2M directly charged to NSF grants. However, because UCSD has decentralized its grant management functions and responsibilities to Academic Departments, improved internal controls were required to ensure proper oversight and implementation of its PAR labor effort reporting system

Page 14: Time & Effort Reporting – UCB and UCSD Lessons Learned UCOP: Jorge Ohy UCB: John Ellis, Wanda Lynn Riley UCSD: Stephanie Burke, Mark Cooper August 27,

UCSD NSF Audit Conclusions

60 of the 69 PARS representing 64% of total NSF salary charges tested, were certified 5 to 516 days late after the University’s due date or lacked a documented certification date.

2 of the 23 employees submitting PARs had 6 effort certification reports that were either not signed or did not include the proper confirmation of the reported labor effort on NSF projects.

4 employees reported 5 to 20 percent of their labor effort as expended on administrative activities not directly benefiting NSF sponsored projects (proposal preparation)

3 employees improperly charged salaries to sponsored projects exceeding NSF’s faculty salary limitations or UCSD’s incentive award policies.

Page 15: Time & Effort Reporting – UCB and UCSD Lessons Learned UCOP: Jorge Ohy UCB: John Ellis, Wanda Lynn Riley UCSD: Stephanie Burke, Mark Cooper August 27,

UCSD NSF Audit Conclusions

UCSD overcharged $35,050 (3%) of salary charges to NSF awards for activities not directly benefiting the sponsored projects and an additional $16,267 (1%) for salaries exceeding University compensation policies.

UCSD lacked certifications to support $49,595 (4%) of FY06 NSF salary charges reviewed.

Late certification or inadequate documentation to determine approval dates for 64% of NSF salary charges reviewed increases the risk that such certifications are not reliable, particularly given that 11 percent of such labor costs were certified more than six months late or were not dated. The significant nature of these control weaknesses raises concerns about the reasonableness and allowability of the remaining $16.5M of FY06 labor charges to NSF grants, and could affect the reliability of the salary portion of UCSD’s other $629M of Federal awards.

Page 16: Time & Effort Reporting – UCB and UCSD Lessons Learned UCOP: Jorge Ohy UCB: John Ellis, Wanda Lynn Riley UCSD: Stephanie Burke, Mark Cooper August 27,

UCSD NSF Corrective Actions

PAR certification date requirements extended. ECERT to eliminate discrepancies in accuracy and completeness of effort

reports. Sponsored projects to monitor certification timeliness, provide training to

departments, and notify department officials when compliance not maintained.

Accountability procedures to be developed. UCSD to notify campus emphasizing the need for accountability and compliance

UCSD to develop guidance for allowable costs and what is included institutional base salary.

UCSD to apply additional personnel resources and work with campus department to ensure knowledge and compliance with the 2/9th rule.

Page 17: Time & Effort Reporting – UCB and UCSD Lessons Learned UCOP: Jorge Ohy UCB: John Ellis, Wanda Lynn Riley UCSD: Stephanie Burke, Mark Cooper August 27,

UCSD NSF Corrective Actions

UCSD to work with departments to ensure compliance with incentive award allocation procedures.

UCSD Sponsored Projects to develop procedures and guidance for effort reporting and to make these available to the campus

Internal Audit to periodically perform independent, comprehensive reviews of the ECERT system sufficient in scope to meet Federal and NSF requirements on an approximate three to five year cycle.

UCSD to coordinate with NSF program personnel to resolve questioned costs.

Page 18: Time & Effort Reporting – UCB and UCSD Lessons Learned UCOP: Jorge Ohy UCB: John Ellis, Wanda Lynn Riley UCSD: Stephanie Burke, Mark Cooper August 27,

UCB NSF Audit Scope

Timeframe: Fiscal Year 2006 NSF Projects totaling $89M, of which 29% or $26.1 represented labor charges

Statistical sample: 30 employees with salary and wage costs amounting to $850,781

For each salary record selected: PAR reports reviewed for completeness and timeliness, appointment letters or other documents supporting approved salary reviewed; DOPES reviewed; award documents evaluated

Interviews conducted to determine whether:labor charges documented were actually incurredapproximate percentage of effort was reasonably consistent with NSF

labor chargesthe type of work performed was consistent with the award scope of work

Page 19: Time & Effort Reporting – UCB and UCSD Lessons Learned UCOP: Jorge Ohy UCB: John Ellis, Wanda Lynn Riley UCSD: Stephanie Burke, Mark Cooper August 27,

UCB NSF Audit Conclusions

UCB generally has a well established Federal grants management system. Because UCB has decentralized many of its grants management functions to the Academic Departments, UCB needs to improve its internal controls to ensure proper implementation and oversight of its PAR system.

Page 20: Time & Effort Reporting – UCB and UCSD Lessons Learned UCOP: Jorge Ohy UCB: John Ellis, Wanda Lynn Riley UCSD: Stephanie Burke, Mark Cooper August 27,

UCB NSF Audit Conclusions

4 employees did not have appointment letters or employment contracts documenting the base salary rate used to charge NSF, or charged for more than the amount in the appointment letter

31 of 56 PARs reviewed were certified 2 to 412 days late for 20 employees, representing 40% of total salaries tested. An additional 13 reports, representing 21% of salary charges, were either not dated, dated prior to the PAR distribution date, or were missing.

3 employees reported 10 to 20 percent less actual effort worked on NSF grants during interviews than the labor effort certified on their PARs

2 department administrative employees inappropriately certified NSF labor charges for two employees without “suitable means of verification” to validate the reasonableness of actual work performed.

Page 21: Time & Effort Reporting – UCB and UCSD Lessons Learned UCOP: Jorge Ohy UCB: John Ellis, Wanda Lynn Riley UCSD: Stephanie Burke, Mark Cooper August 27,

UCB NSF Audit Conclusions

UCB did not have adequate documentation to validate the reasonableness of 12% ($103,637) of actual salary costs charged.

UCB inappropriately charged $15,543 (2 percent) for activities not directly benefiting the NSF projects.

The significant nature of these control weaknesses raises concerns about the reasonableness and allowability of the remaining $25M of FY06 labor charges to NSF grants and the salary portion of UCB’s other $221M in federal awards.

Page 22: Time & Effort Reporting – UCB and UCSD Lessons Learned UCOP: Jorge Ohy UCB: John Ellis, Wanda Lynn Riley UCSD: Stephanie Burke, Mark Cooper August 27,

UCB NSF Corrective Actions

UCB to remind departments to retain appointment letters. ERS to load salaries directly from PPS, and eliminate discrepancies in

accuracy and completeness of effort reports. Sponsored projects to monitor certification timeliness, provide training to

departments, and notify department officials when compliance not maintained.

UCB to develop guidance for allowable costs and what is included institutional base salary.

UCB to work with department representatives to provide guidelines and document that “suitable means of verification” are used to certify employee effort, when the approver does not have first hand knowledge of the work performed.

Page 23: Time & Effort Reporting – UCB and UCSD Lessons Learned UCOP: Jorge Ohy UCB: John Ellis, Wanda Lynn Riley UCSD: Stephanie Burke, Mark Cooper August 27,

UCB NSF Corrective Actions

Internal Audit to periodically perform independent, comprehensive reviews of the ERS system sufficient in scope to meet Federal and NSF requirements on an approximate three to five year cycle.

UCB personnel with access to ERS will be required to successfully complete mandatory training.

UCB to request coordinate with NSF program personnel to resolve questioned costs.

Page 24: Time & Effort Reporting – UCB and UCSD Lessons Learned UCOP: Jorge Ohy UCB: John Ellis, Wanda Lynn Riley UCSD: Stephanie Burke, Mark Cooper August 27,

UCB NSF Corrective Actions

UCB to revise policy to include review of the PI committed person-months in the NSF’s Current and Pending section as a component of Sponsored Projects administrative review of all aspects of UCB proposals prior to submission to Federal sponsoring agencies. Also in December 2007, UCB revised its software program to start recording PI person-months commitments in extramural proposals.

UCB to prepare an in-depth curriculum to train SPO personnel, and research administrators, and to perform outreach to UCB faculty and academic units.

Page 25: Time & Effort Reporting – UCB and UCSD Lessons Learned UCOP: Jorge Ohy UCB: John Ellis, Wanda Lynn Riley UCSD: Stephanie Burke, Mark Cooper August 27,

UCSD ECERT Implementation Lessons Learned

Pilot Implementation – Opportunity to bring transition to ERS “UCSD ECERT” from PARS with a select group of departments with Business Leaders serving on implementation team

Departmental Ownership – ECERT coordinators identified for each department to design implementation strategy. New roles for some.

Accountability – Department Chairs and Vice Chancellors must be incorporated in the accountability plan.

Reporting - Data access to the campus should be consistent with existing financial reporting tools and processes

Integration of Effort Reporting with existing budget tracking processes Still to Come – Consequences, how do we put teeth into the

accountability requirements

Page 26: Time & Effort Reporting – UCB and UCSD Lessons Learned UCOP: Jorge Ohy UCB: John Ellis, Wanda Lynn Riley UCSD: Stephanie Burke, Mark Cooper August 27,

UCB ERS Implementation Lessons Learned

1) Need active participation & regular on going communications from VC Research to faculty

2) Willingness to change previous decisions made in the early stages of the project

3) Have a communication plan

4) Campus communications written from a departments point of view

Page 27: Time & Effort Reporting – UCB and UCSD Lessons Learned UCOP: Jorge Ohy UCB: John Ellis, Wanda Lynn Riley UCSD: Stephanie Burke, Mark Cooper August 27,

UCB ERS Implementation Lessons Learned

5) Document responses to ad hoc campus questions to facilitate consistent response from central ( & don’t reinvent the wheel each time)

6) Need dedicated project team lead & a full time staff to develop training materials, test system, handle calls, perform follow up, hold training sessions

7) Meet regularly with Campus ERS focus group

8) If possible get support and advice from other UC campuses who have already implemented ERS

9) Need strong IT support assigned to liaise with UCOP IT staff

Page 28: Time & Effort Reporting – UCB and UCSD Lessons Learned UCOP: Jorge Ohy UCB: John Ellis, Wanda Lynn Riley UCSD: Stephanie Burke, Mark Cooper August 27,

UCB ERS Implementation Lessons Learned

10) Recommend implementation with an initial set of pilot departments

11) Need a large pilot group from a cross section of campus research departments

12) Need to develop campus experts outside of central EFA

13) EFA Directors / Controller be flexible & attend faculty department meetings

14) Don’t let the faculty get to you (don’t take the feedback personally!)

Page 29: Time & Effort Reporting – UCB and UCSD Lessons Learned UCOP: Jorge Ohy UCB: John Ellis, Wanda Lynn Riley UCSD: Stephanie Burke, Mark Cooper August 27,

Future External AuditsNIH OIG Work Plan for Fiscal 2007

Securing and Accounting for Controlled Substances Level of Commitment and Effort Reporting University Administrative and Clerical Salaries Cost Transfers Compensation of Graduate Students Involved in NIH

Funded Research NIH Monitoring of Extramural Conflicts of Interest Monitoring of NIH Research

Page 30: Time & Effort Reporting – UCB and UCSD Lessons Learned UCOP: Jorge Ohy UCB: John Ellis, Wanda Lynn Riley UCSD: Stephanie Burke, Mark Cooper August 27,

UCOP Internal Audit Coverage of Time & Effort

A system-wide internal audit of this area is likely, using a common internal audit program across all campuses.