Tier-1 SC4 planning Tier-1 SC4 planning Update on the planning Update on the planning material material GDB meeting GDB meeting CERN 8.11.2005 CERN 8.11.2005 Alberto Aimar Alberto Aimar [email protected] [email protected]

Tier-1 SC4 planning Update on the planning material

Embed Size (px)

DESCRIPTION

Tier-1 SC4 planning Update on the planning material. GDB meeting CERN 8.11.2005 Alberto Aimar [email protected]. Background information. Sites submitted plans at the GDB in Bologna Different format Quite different content. Templates for Planning. - PowerPoint PPT Presentation

Citation preview

Page 1: Tier-1 SC4 planning Update on the planning material

Tier-1 SC4 planningTier-1 SC4 planning Update on the planning Update on the planning

materialmaterial

GDB meetingGDB meeting

CERN 8.11.2005CERN 8.11.2005

Alberto AimarAlberto [email protected]@cern.ch

Page 2: Tier-1 SC4 planning Update on the planning material

A.AimarA.Aimar CERN - LCGCERN - LCG 22

Background informationBackground information

• Sites submitted plans at the GDB in Sites submitted plans at the GDB in Bologna Bologna • Different formatDifferent format• Quite different contentQuite different content

Page 3: Tier-1 SC4 planning Update on the planning material

A.AimarA.Aimar CERN - LCGCERN - LCG 33

Page 4: Tier-1 SC4 planning Update on the planning material

A.AimarA.Aimar CERN - LCGCERN - LCG 44

Templates for PlanningTemplates for Planning

• The MB agreed to change the way projects do The MB agreed to change the way projects do planning and are monitored and reviewedplanning and are monitored and reviewed• Milestone tables for each site/area/projectMilestone tables for each site/area/project• Templates to have the same formatTemplates to have the same format• Review of the plans in order to have consistent Review of the plans in order to have consistent

content, naming, timescalecontent, naming, timescale• Compare with the needs of the usersCompare with the needs of the users

• Converted all plans to the templatesConverted all plans to the templates• Added high-level milestones Added high-level milestones • Capacity, bandwidth, service availabilityCapacity, bandwidth, service availability

Page 5: Tier-1 SC4 planning Update on the planning material

A.AimarA.Aimar CERN - LCGCERN - LCG 55

Page 6: Tier-1 SC4 planning Update on the planning material

A.AimarA.Aimar CERN - LCGCERN - LCG 66

Page 7: Tier-1 SC4 planning Update on the planning material

A.AimarA.Aimar CERN - LCGCERN - LCG 77

Planning for SC4 (and beyond)Planning for SC4 (and beyond)

• Each plan needs to be completed by every siteEach plan needs to be completed by every site• Adding informationAdding information• Verify if they are consistent with the High Level plan Verify if they are consistent with the High Level plan • Check if they meet the needs of the experimentsCheck if they meet the needs of the experiments

• Used at least to discuss on clear and organized Used at least to discuss on clear and organized informationinformation

• Used to plan, monitor and report the statusUsed to plan, monitor and report the status

• The goal is to identify problems (and react) as soon as The goal is to identify problems (and react) as soon as possiblepossible

Page 8: Tier-1 SC4 planning Update on the planning material

A.AimarA.Aimar CERN - LCGCERN - LCG 88

https://uimon.cern.ch/twiki/bin/view/LCG/SitePlansGdbBologna

Page 9: Tier-1 SC4 planning Update on the planning material

A.AimarA.Aimar CERN - LCGCERN - LCG 99

https://uimon.cern.ch/twiki/bin/view/LCG/Planning

Page 10: Tier-1 SC4 planning Update on the planning material

A.AimarA.Aimar CERN - LCGCERN - LCG 1010

ExamplesExamples

• Adding informationAdding information• Clear capacity and performance availability at key dates Clear capacity and performance availability at key dates

SC3: Jan 06, SC4: April 06, Jul 06SC3: Jan 06, SC4: April 06, Jul 06• Clear planning of installations and changes in the Clear planning of installations and changes in the

services providedservices providedSRM 2.1, LFC, FTS, CE, RB, BDII, RGMASRM 2.1, LFC, FTS, CE, RB, BDII, RGMA

• Several steps needed to set-up hardware or a service Several steps needed to set-up hardware or a service (ex: choose, procure, start install, end install, make (ex: choose, procure, start install, end install, make operational)operational)

• Include important infrastructure not only software and Include important infrastructure not only software and computerscomputers

Page 11: Tier-1 SC4 planning Update on the planning material

A.AimarA.Aimar CERN - LCGCERN - LCG 1111

PICPIC

Clear capacity and performance availability at key dates

Page 12: Tier-1 SC4 planning Update on the planning material

A.AimarA.Aimar CERN - LCGCERN - LCG 1212

CC-IN2P3CC-IN2P3

Clear planning of installations and changes in the services provided

SRM 2.1, LFC, FTS, CE, RB, BDII, RGMA

Page 13: Tier-1 SC4 planning Update on the planning material

A.AimarA.Aimar CERN - LCGCERN - LCG 1313

RALRAL

Include important infrastructure not only software and computers

Page 14: Tier-1 SC4 planning Update on the planning material

A.AimarA.Aimar CERN - LCGCERN - LCG 1414

US ATLAS (BNL)US ATLAS (BNL)

Several steps needed to set-up hardware or a service(ex: choose, procure, start install, end install, make operational)

Page 15: Tier-1 SC4 planning Update on the planning material

A.AimarA.Aimar CERN - LCGCERN - LCG 1515

First version of the plansFirst version of the plans

• Plans have to be enriched with more milestones Plans have to be enriched with more milestones and information and information

• Identify the people in chargeIdentify the people in charge

•M.Vetterli (Canada, TRIUMF)M.Vetterli (Canada, TRIUMF)

•F,Hernandez (France, CC-IN2P3)F,Hernandez (France, CC-IN2P3)

•H.Marten (Germany, FZK)H.Marten (Germany, FZK)

•M.Mazzucato (Italy, CNAF)M.Mazzucato (Italy, CNAF)

•K.Bos (Nederlands, Sara-Nikhef)K.Bos (Nederlands, Sara-Nikhef)

•B.Vinter (NDGF)B.Vinter (NDGF)

•G.Merino (Spain, PIC)G.Merino (Spain, PIC)

•T.Cass (Switzerland, CERN)T.Cass (Switzerland, CERN)

•S.Lin (Taipei, ASGC)S.Lin (Taipei, ASGC)

•A.Sansum (UK, RAL)A.Sansum (UK, RAL)

•B.Gibbard (US, BNL)B.Gibbard (US, BNL)

•I.Fisk (US, FNAL)I.Fisk (US, FNAL)

Page 16: Tier-1 SC4 planning Update on the planning material

A.AimarA.Aimar CERN - LCGCERN - LCG 1616

Next StepsNext Steps

• TodayToday: Ask sites to review/add milestones (urgent): Ask sites to review/add milestones (urgent)• Capacity and bandwidth available Capacity and bandwidth available

(Jan 06, Apr 06, Jul 06)(Jan 06, Apr 06, Jul 06)• Services installations and upgrades: SRM 2.1, LFC, FTS, CE, RB, Services installations and upgrades: SRM 2.1, LFC, FTS, CE, RB,

BDII, RGMABDII, RGMA• Operations organization, installation, deploymentOperations organization, installation, deployment• Procurement milestonesProcurement milestones• Details and commentsDetails and comments

• 16 Nov 0516 Nov 05: Send me a new version in one week: Send me a new version in one week• Nov 05Nov 05: I will contact on what is missing/unclear, discuss in order to : I will contact on what is missing/unclear, discuss in order to

complete the plancomplete the plan• Dec 05Dec 05: Review, ask questions, discuss with the users, compare with : Review, ask questions, discuss with the users, compare with

the needs/schedules (capacity, services etc.) of the experimentsthe needs/schedules (capacity, services etc.) of the experiments• Jan 06Jan 06: Used to plan, monitor and report : Used to plan, monitor and report • Summary at the GDB meetingsSummary at the GDB meetings