1 TIA Helio100 technology development project Status and way forward STERG Symposium 15 July 2015

TIA Helio100 technology development project …sterg.sun.ac.za/wp-content/uploads/2015/11/TIA-Helio100...TIA Helio100: 100% SA Heliostat and Tower Phase 1 (April –Dec 2014) –Tech

  • Upload
    others

  • View
    5

  • Download
    0

Embed Size (px)

Citation preview

Page 1: TIA Helio100 technology development project …sterg.sun.ac.za/wp-content/uploads/2015/11/TIA-Helio100...TIA Helio100: 100% SA Heliostat and Tower Phase 1 (April –Dec 2014) –Tech

1

TIA Helio100 technology development project Status and way forward

STERG Symposium 15 July 2015

Page 2: TIA Helio100 technology development project …sterg.sun.ac.za/wp-content/uploads/2015/11/TIA-Helio100...TIA Helio100: 100% SA Heliostat and Tower Phase 1 (April –Dec 2014) –Tech

2

Page 3: TIA Helio100 technology development project …sterg.sun.ac.za/wp-content/uploads/2015/11/TIA-Helio100...TIA Helio100: 100% SA Heliostat and Tower Phase 1 (April –Dec 2014) –Tech

3

Agenda

• Background & STERG

• Helio100 & Helioteam

• Our status today

• Our dreams of tomorrow

Page 4: TIA Helio100 technology development project …sterg.sun.ac.za/wp-content/uploads/2015/11/TIA-Helio100...TIA Helio100: 100% SA Heliostat and Tower Phase 1 (April –Dec 2014) –Tech

4

BACKGROUND

Page 5: TIA Helio100 technology development project …sterg.sun.ac.za/wp-content/uploads/2015/11/TIA-Helio100...TIA Helio100: 100% SA Heliostat and Tower Phase 1 (April –Dec 2014) –Tech

5

TIA Helio100: 100% SA Heliostat and Tower

Phase 1 (April – Dec 2014) – Tech dev – Complete

Phase 2 (Jan – Sept 2015) – Pilot execution – Ramping

Official site visit: 17 October SolarPACES 2015

Page 6: TIA Helio100 technology development project …sterg.sun.ac.za/wp-content/uploads/2015/11/TIA-Helio100...TIA Helio100: 100% SA Heliostat and Tower Phase 1 (April –Dec 2014) –Tech

6

• Primary funders

Page 7: TIA Helio100 technology development project …sterg.sun.ac.za/wp-content/uploads/2015/11/TIA-Helio100...TIA Helio100: 100% SA Heliostat and Tower Phase 1 (April –Dec 2014) –Tech

7

• Primary partners and associations

Page 8: TIA Helio100 technology development project …sterg.sun.ac.za/wp-content/uploads/2015/11/TIA-Helio100...TIA Helio100: 100% SA Heliostat and Tower Phase 1 (April –Dec 2014) –Tech

8

• Staff: 8+ (researchers, administrative, engineering and technical support)• 1,000 m2 solar roof laboratory, staff office, workshop & control room• Receiver test facility & Helio40 – 40 m2 heliostat system• 600 C,1.5 m3 packed bed storage rig & 1,200 C kiln• 25 kWe Eskom McDonnel Douglas Stirling Dish• Solar and weather resource data linked to www.sauran.net

Page 9: TIA Helio100 technology development project …sterg.sun.ac.za/wp-content/uploads/2015/11/TIA-Helio100...TIA Helio100: 100% SA Heliostat and Tower Phase 1 (April –Dec 2014) –Tech

9

9

• ~35 MEng/PhD/Post-docs• Most involved in these 2 key R&D

areas

Page 10: TIA Helio100 technology development project …sterg.sun.ac.za/wp-content/uploads/2015/11/TIA-Helio100...TIA Helio100: 100% SA Heliostat and Tower Phase 1 (April –Dec 2014) –Tech

10

HELIO100 & HELIOTEAM

Page 11: TIA Helio100 technology development project …sterg.sun.ac.za/wp-content/uploads/2015/11/TIA-Helio100...TIA Helio100: 100% SA Heliostat and Tower Phase 1 (April –Dec 2014) –Tech

11

Late 2012 to early 2013…

Page 12: TIA Helio100 technology development project …sterg.sun.ac.za/wp-content/uploads/2015/11/TIA-Helio100...TIA Helio100: 100% SA Heliostat and Tower Phase 1 (April –Dec 2014) –Tech

12

Late 2012 to early 2013…

Page 13: TIA Helio100 technology development project …sterg.sun.ac.za/wp-content/uploads/2015/11/TIA-Helio100...TIA Helio100: 100% SA Heliostat and Tower Phase 1 (April –Dec 2014) –Tech

13

Late 2012 to early 2013…

Page 14: TIA Helio100 technology development project …sterg.sun.ac.za/wp-content/uploads/2015/11/TIA-Helio100...TIA Helio100: 100% SA Heliostat and Tower Phase 1 (April –Dec 2014) –Tech

14

1

10

100

1000

1960 1970 1980 1990 2000 2010 2020

Siz

e m

2(l

og

scale

)

Year (Approximate)

Sources: Larmuth, Landman

We now have

access to

technology to

unshackle us

Inertia?…

Page 15: TIA Helio100 technology development project …sterg.sun.ac.za/wp-content/uploads/2015/11/TIA-Helio100...TIA Helio100: 100% SA Heliostat and Tower Phase 1 (April –Dec 2014) –Tech

15

$-

$50

$100

$150

$200

$250

$300

0 50 100 150 200 250

Co

st P

er U

nit

Are

a ($

/m2

)

Heliostat Size(m2)

Case 1: Category 3 is 10% of DOE $200/m2 Total ($3000)Case 2: Category 3 is 5% of DOE $200/m2 Total ($1500)Case 3: Category 3 is 1% of DOE $200/m2 Total ($300)Case 4: Category 3 is 0.25% of DOE $200/m2 Total ($75)

Sources: Larmuth, Landman, Blackmon

SunSHOT requirement

Example based on key assumptions –

not a generic chart

Page 16: TIA Helio100 technology development project …sterg.sun.ac.za/wp-content/uploads/2015/11/TIA-Helio100...TIA Helio100: 100% SA Heliostat and Tower Phase 1 (April –Dec 2014) –Tech

16

Radical ideas

Evolutionary thinking

Uncompromised

performanceFloppy won’t work…

RMS goal < 3 mrad

Page 17: TIA Helio100 technology development project …sterg.sun.ac.za/wp-content/uploads/2015/11/TIA-Helio100...TIA Helio100: 100% SA Heliostat and Tower Phase 1 (April –Dec 2014) –Tech

17

• Cost reduction is holistic– Local controller 10X to 40X cheaper– No cabling, trenching, wiring– No foundations, minimal ground prep– Factory to installed from 2 people +

• Performance– “Free” optical benefit of small size (2 – 3 m2)– Designed for gas turbine but applicable to all

Page 18: TIA Helio100 technology development project …sterg.sun.ac.za/wp-content/uploads/2015/11/TIA-Helio100...TIA Helio100: 100% SA Heliostat and Tower Phase 1 (April –Dec 2014) –Tech

18

Value Prop & IP

Team• Systems design, integration & component capabilities

• Developing “insource” capabilities to grow the industrialization capabilities fast

• Young team highly motivated + seasoned tech dev leader (from Silicon Valley)

• SA’s biggest RE research group developing the pipeline behind us

Technology • Smart autonomous heliostats: fully wireless or wired or both

• “Plonk down”, modular, scalable: designed from the start with lowest installed cost in mind. Can

serve 1kW to 200 MW. Patented structure

• Lowest cost potential: Designed from the start with <$100/m2 in mind looking at radical cost reduction

in key areas like control systems (40X lower than state of the art) Current design is already below

$150/m2 installed

• Designed for “waterless” CSP: Gas turbine specs from the start

• Tower, field and system control: Not just a heliostat but a full central receiver collector system

including receiver

• Approaching 100% local content + designed to be installed by 2 people

• One of very few “unattached” heliostat technologies worldwide

Business • 10+ bet-able existing business opportunities/models

Partners • EPCs, component suppliers, contractors all lined up

Page 19: TIA Helio100 technology development project …sterg.sun.ac.za/wp-content/uploads/2015/11/TIA-Helio100...TIA Helio100: 100% SA Heliostat and Tower Phase 1 (April –Dec 2014) –Tech

19

THE TEAM

Our primary investment and what this is all about

Holistic belief that a 100% SA design for 100% local content

and employment slingshots us to be world beaters…

Page 20: TIA Helio100 technology development project …sterg.sun.ac.za/wp-content/uploads/2015/11/TIA-Helio100...TIA Helio100: 100% SA Heliostat and Tower Phase 1 (April –Dec 2014) –Tech

South African heliostat

technology development

Optical

measurement

system

Own ultra-low-cost local

controller

Completely wireless

Self-developed wireless

software

PV optimizer and battery

charger

Own facet design

and customizable to

alternative designs

Can reach over

90% local content

Minimal field

preparation needed

Minimal disturbance and

low installation cost

Installable by two

people

Small heliostats low-

cost tracker with wider

application, e.g., CPV,

PV, small and large CSP

Heliostat

designed for

gas turbine

Small heliostats

drive higher

volumes quicker

Heliostat technology & Pod design

Can industrialize

100% drive train

local manufacture

IP, Products & Services: Pod

Page 21: TIA Helio100 technology development project …sterg.sun.ac.za/wp-content/uploads/2015/11/TIA-Helio100...TIA Helio100: 100% SA Heliostat and Tower Phase 1 (April –Dec 2014) –Tech

IP, Products & Services: System

South African heliostat

technology development

Receiver

localization

100% for certain

applications

Small tower

modular

systems

System

design and

integration

services

Page 22: TIA Helio100 technology development project …sterg.sun.ac.za/wp-content/uploads/2015/11/TIA-Helio100...TIA Helio100: 100% SA Heliostat and Tower Phase 1 (April –Dec 2014) –Tech

22

QA System

Page 23: TIA Helio100 technology development project …sterg.sun.ac.za/wp-content/uploads/2015/11/TIA-Helio100...TIA Helio100: 100% SA Heliostat and Tower Phase 1 (April –Dec 2014) –Tech

23

QA System

Page 24: TIA Helio100 technology development project …sterg.sun.ac.za/wp-content/uploads/2015/11/TIA-Helio100...TIA Helio100: 100% SA Heliostat and Tower Phase 1 (April –Dec 2014) –Tech
Page 25: TIA Helio100 technology development project …sterg.sun.ac.za/wp-content/uploads/2015/11/TIA-Helio100...TIA Helio100: 100% SA Heliostat and Tower Phase 1 (April –Dec 2014) –Tech
Page 26: TIA Helio100 technology development project …sterg.sun.ac.za/wp-content/uploads/2015/11/TIA-Helio100...TIA Helio100: 100% SA Heliostat and Tower Phase 1 (April –Dec 2014) –Tech
Page 27: TIA Helio100 technology development project …sterg.sun.ac.za/wp-content/uploads/2015/11/TIA-Helio100...TIA Helio100: 100% SA Heliostat and Tower Phase 1 (April –Dec 2014) –Tech
Page 28: TIA Helio100 technology development project …sterg.sun.ac.za/wp-content/uploads/2015/11/TIA-Helio100...TIA Helio100: 100% SA Heliostat and Tower Phase 1 (April –Dec 2014) –Tech

< 20 min

Page 29: TIA Helio100 technology development project …sterg.sun.ac.za/wp-content/uploads/2015/11/TIA-Helio100...TIA Helio100: 100% SA Heliostat and Tower Phase 1 (April –Dec 2014) –Tech
Page 30: TIA Helio100 technology development project …sterg.sun.ac.za/wp-content/uploads/2015/11/TIA-Helio100...TIA Helio100: 100% SA Heliostat and Tower Phase 1 (April –Dec 2014) –Tech

30

Today

Page 31: TIA Helio100 technology development project …sterg.sun.ac.za/wp-content/uploads/2015/11/TIA-Helio100...TIA Helio100: 100% SA Heliostat and Tower Phase 1 (April –Dec 2014) –Tech

31

Today

Page 32: TIA Helio100 technology development project …sterg.sun.ac.za/wp-content/uploads/2015/11/TIA-Helio100...TIA Helio100: 100% SA Heliostat and Tower Phase 1 (April –Dec 2014) –Tech

32

Today

Page 33: TIA Helio100 technology development project …sterg.sun.ac.za/wp-content/uploads/2015/11/TIA-Helio100...TIA Helio100: 100% SA Heliostat and Tower Phase 1 (April –Dec 2014) –Tech

33

TOMORROW?

Page 34: TIA Helio100 technology development project …sterg.sun.ac.za/wp-content/uploads/2015/11/TIA-Helio100...TIA Helio100: 100% SA Heliostat and Tower Phase 1 (April –Dec 2014) –Tech

34

New CSP company (for and in SA)

New CSP

(Solar)

company

Technology

Services

Consulting

Partners

Projects

Page 35: TIA Helio100 technology development project …sterg.sun.ac.za/wp-content/uploads/2015/11/TIA-Helio100...TIA Helio100: 100% SA Heliostat and Tower Phase 1 (April –Dec 2014) –Tech

35

Products / Technology

Technology

Heliostats

Storage?

Receivers /

Other…

Control

Trackers

Page 36: TIA Helio100 technology development project …sterg.sun.ac.za/wp-content/uploads/2015/11/TIA-Helio100...TIA Helio100: 100% SA Heliostat and Tower Phase 1 (April –Dec 2014) –Tech

36

Services

Energy systems | Optics | QA | Thermal | Cycles | Technoeconomics |

Testing | Monitoring | Optimization | etc.

Page 37: TIA Helio100 technology development project …sterg.sun.ac.za/wp-content/uploads/2015/11/TIA-Helio100...TIA Helio100: 100% SA Heliostat and Tower Phase 1 (April –Dec 2014) –Tech

37

Partnerships

Page 38: TIA Helio100 technology development project …sterg.sun.ac.za/wp-content/uploads/2015/11/TIA-Helio100...TIA Helio100: 100% SA Heliostat and Tower Phase 1 (April –Dec 2014) –Tech

38

Projects

Heat plant (2.4 MW_th) | Power pant (400 kW_e @ 70% solar fraction)

~ 160 x 160 m

Page 39: TIA Helio100 technology development project …sterg.sun.ac.za/wp-content/uploads/2015/11/TIA-Helio100...TIA Helio100: 100% SA Heliostat and Tower Phase 1 (April –Dec 2014) –Tech

39

10 MW baseload power

1400 x 1000 m

Page 40: TIA Helio100 technology development project …sterg.sun.ac.za/wp-content/uploads/2015/11/TIA-Helio100...TIA Helio100: 100% SA Heliostat and Tower Phase 1 (April –Dec 2014) –Tech

40

LCOE Case: Mine at 80% Cf

$103

$271

$319

24Solar (near term) PV + Diesel Diesel

LC

OE

($/M

Wh

)

Page 41: TIA Helio100 technology development project …sterg.sun.ac.za/wp-content/uploads/2015/11/TIA-Helio100...TIA Helio100: 100% SA Heliostat and Tower Phase 1 (April –Dec 2014) –Tech

41

See Helio100 on 17 October

Page 42: TIA Helio100 technology development project …sterg.sun.ac.za/wp-content/uploads/2015/11/TIA-Helio100...TIA Helio100: 100% SA Heliostat and Tower Phase 1 (April –Dec 2014) –Tech

42

In closing

• Helio100 is complete in 2015

• 2016 is our hopeful next step

– We have a great team

– And a very big research group to fall back on!

– We almost have a project! (or 3)

• Our success will be good for IPPs, local industry and the provision of electricity!

Page 43: TIA Helio100 technology development project …sterg.sun.ac.za/wp-content/uploads/2015/11/TIA-Helio100...TIA Helio100: 100% SA Heliostat and Tower Phase 1 (April –Dec 2014) –Tech

43

E: [email protected]: 021 882 8681

W: helio100.sun.ac.za

CONTACT

Paul GauchéE: [email protected]

P: 076 303 4123