www.lipower.org THREE PHASE PADMOUNTED TRANSFORMER TRAINING

THREE PHASE PADMOUNTED TRANSFORMER … · Oil Tank, Windings, ... 5’ From Transformer to Building Wall ... Poured Foundation (slab) – Primary and Secondary Cables Have no

Embed Size (px)

Citation preview

Page 1: THREE PHASE PADMOUNTED TRANSFORMER … · Oil Tank, Windings, ... 5’ From Transformer to Building Wall ... Poured Foundation (slab) – Primary and Secondary Cables Have no

www.lipower.org

THREE PHASE PADMOUNTED TRANSFORMER TRAINING

Page 2: THREE PHASE PADMOUNTED TRANSFORMER … · Oil Tank, Windings, ... 5’ From Transformer to Building Wall ... Poured Foundation (slab) – Primary and Secondary Cables Have no

•What is a Three-Phase Pad Mounted Transformer?

•What are its Applications?

•How is it Installed?

•How is it Wired?

•The Specification Package

•The Specification Letter

•Miscellaneous

What We Will Cover

Page 3: THREE PHASE PADMOUNTED TRANSFORMER … · Oil Tank, Windings, ... 5’ From Transformer to Building Wall ... Poured Foundation (slab) – Primary and Secondary Cables Have no

What is a Three-Phase Pad Mounted Transformer?

Outside

Metal Encased, Tank, Fins, Cabinet – Sits on a Three Piece Vault– Fragile Enclosure, Not for Storage

Inside Contains

Oil Tank, Windings, Terminals

Primary and Secondary Compartments

Grounding Loop

Cables and Terminations

Page 4: THREE PHASE PADMOUNTED TRANSFORMER … · Oil Tank, Windings, ... 5’ From Transformer to Building Wall ... Poured Foundation (slab) – Primary and Secondary Cables Have no

What is a Three-Phase Pad Mounted Transformer?

Steps Down Primary Voltage to Secondary

Primary Side (4kV, 13kV, or both)

Secondary Side (120/208v, 277/480v)

Three Phase Wye Configuration Only

Pad Mounted, or Submersible

Di-Electric Fluid (insulates and cools)

LIPA Sizes Range From:

75KVA to 1000KVA for 120/208

75KVA to 1500KVA for 277/480

Special Order 2500KVA’s

Page 5: THREE PHASE PADMOUNTED TRANSFORMER … · Oil Tank, Windings, ... 5’ From Transformer to Building Wall ... Poured Foundation (slab) – Primary and Secondary Cables Have no

The outside of a Three-Phase Pad Mounted Transformer

Side View of a 150KVA Pad Mounted Transformer

Page 6: THREE PHASE PADMOUNTED TRANSFORMER … · Oil Tank, Windings, ... 5’ From Transformer to Building Wall ... Poured Foundation (slab) – Primary and Secondary Cables Have no

The Outside of a Three-Phase Pad Mounted Transformer

Orientation Away From Building

Clearances

5’ From Transformer to Building Wall

10’ to Vent Openings, Doors, Windows

25’ to Non-Fire-Rated Openings

Auditorium Exits

Truck Accessible (delivery & removal purposes)

NEC Class 1, Division 1, and 2 Locations Shall Require a Minimum 25 ft. Clearance (oil, gas, etc)

Set Vault Level, Grade to Slope Away

Traffic Protection

Page 7: THREE PHASE PADMOUNTED TRANSFORMER … · Oil Tank, Windings, ... 5’ From Transformer to Building Wall ... Poured Foundation (slab) – Primary and Secondary Cables Have no

The Inside of a Three-Phase Pad Mounted Transformer

Page 8: THREE PHASE PADMOUNTED TRANSFORMER … · Oil Tank, Windings, ... 5’ From Transformer to Building Wall ... Poured Foundation (slab) – Primary and Secondary Cables Have no

Inside a Three-Phase Pad Mounted Transformer

Primary Compartment (left side)

Primary Connections (radial, or loop)

Incoming - H1C, H1A, H1B

Outgoing - H2B, H2A, H2C

No Load Tap Changer

A Through E (2.5% increments, middle is zero boost)

Bayonet Fuses, Protect Primary Side of Transformer

Page 9: THREE PHASE PADMOUNTED TRANSFORMER … · Oil Tank, Windings, ... 5’ From Transformer to Building Wall ... Poured Foundation (slab) – Primary and Secondary Cables Have no

Primary Compartment

Load Break Elbows

Sizes: #2, 1/0, 3/0

Lightning Arrestor Elbows (radials, and open points)

Static Drain Wires (#14, and #10 Cu.)

Grounding Loop #2BTN, One HLC

Primary Bushings

Standoff Bushing Slots (open point)

Inside a Three-Phase Pad Mounted Transformer

Page 10: THREE PHASE PADMOUNTED TRANSFORMER … · Oil Tank, Windings, ... 5’ From Transformer to Building Wall ... Poured Foundation (slab) – Primary and Secondary Cables Have no

Primary L/B Elbow

Load Break Elbow, Bushing, Static Drain Wire, and Primary Cable

Detail in Spec. Package

Follow Mfg. Instructions

Pulling Eye

Test Point, & Cap

5’ of Taped Neutral

#2 EPR Insulated May be Hylinked

Sealing Strip, 36” Below Hose Clamp

Inside a Three-Phase Pad Mounted Transformer

Page 11: THREE PHASE PADMOUNTED TRANSFORMER … · Oil Tank, Windings, ... 5’ From Transformer to Building Wall ... Poured Foundation (slab) – Primary and Secondary Cables Have no

Primary Bushing

Supplied by LIPA with L/B, L/A Elbow

Screws in

Must be Kept Clean, Contamination Will Cause Electrical Failure

#14 Static Drain Wire From Eyelet to Grounding Split Bolt

L/B Elbow Should Cover Yellow (now RED) Band

Inside a Three-Phase Pad Mounted Transformer

Page 12: THREE PHASE PADMOUNTED TRANSFORMER … · Oil Tank, Windings, ... 5’ From Transformer to Building Wall ... Poured Foundation (slab) – Primary and Secondary Cables Have no

Secondary Compartment (right side)

Secondary Spades; X0, X1, X2, X3

Nema 2 Hole Lugs (tinned alum. Or Cu.)

Al Lug - Extra Belleville Washer Req

Oxide Inhibitor on Al

Cu to be Tinned, or Alloy plated

750 Cu now Accepted

Buss Supports

Inside a Three-Phase Pad Mounted Transformer

Page 13: THREE PHASE PADMOUNTED TRANSFORMER … · Oil Tank, Windings, ... 5’ From Transformer to Building Wall ... Poured Foundation (slab) – Primary and Secondary Cables Have no

Secondary Compartment

Color Coding

120/208v or 277/480v

Integrated/Isolat ed

8 Sets Max

Grounding Pads, Loop, Split Bolts, Ground Rods

Oil Drain Valve

Inside a Three-Phase Pad Mounted Transformer

Page 14: THREE PHASE PADMOUNTED TRANSFORMER … · Oil Tank, Windings, ... 5’ From Transformer to Building Wall ... Poured Foundation (slab) – Primary and Secondary Cables Have no

Secondary Compartment

•Pressure Relief Valve

•Do Not Pull•Oil Fill Level•Oil Temperature Gauge

•Oil Level Gauge

Inside a Three-Phase Pad Mounted Transformer

Page 15: THREE PHASE PADMOUNTED TRANSFORMER … · Oil Tank, Windings, ... 5’ From Transformer to Building Wall ... Poured Foundation (slab) – Primary and Secondary Cables Have no

Nameplate

Identifies Primary and Secondary Voltage

Indicates Voltage on Different Tap Settings

Shows Internal Coil Configuration

Indicates Transformer Weight

Indicates Transformer Impedance

Inside a Three-Phase Pad Mounted Transformer

Page 16: THREE PHASE PADMOUNTED TRANSFORMER … · Oil Tank, Windings, ... 5’ From Transformer to Building Wall ... Poured Foundation (slab) – Primary and Secondary Cables Have no

Common equipment

Primary Cable

Sizes: 3-2/c#2, 1/0, 3/0

Secondary Cable

Sizes: Minimum #2, Maximum 750

Maintain 5’ min. Slack in Vault

Maintain as Much Physical Separation as Possible

Grounding Pads, Lugs, and Split Bolts

Bare #6 Cu to Ground Rods

Bare Tinned Copper #2 for Ground Loop

Inside a Three-Phase Pad Mounted Transformer

Page 17: THREE PHASE PADMOUNTED TRANSFORMER … · Oil Tank, Windings, ... 5’ From Transformer to Building Wall ... Poured Foundation (slab) – Primary and Secondary Cables Have no

What are its Applications?

Typical for Large Load, Non- Residential Customers; Long Distance From Existing Facilities; and Looped Commercial Industrial Parks

Pad Mounted Transformers are LIPA’s Standard Installation, Non-Standard is Submersible, or Network

Transformer is Delivered, Owned, and Maintained by LIPA for Secondary Metered Service

Page 18: THREE PHASE PADMOUNTED TRANSFORMER … · Oil Tank, Windings, ... 5’ From Transformer to Building Wall ... Poured Foundation (slab) – Primary and Secondary Cables Have no

How is the Three-Phase Pad Mounted Transformer Installed?

Set on a Three Piece Vault, Always Provided by Contractor (see approved vendor list)

Pad Orientation

Primary Side, Secondary Side

Doors to Face Away From Building

10’ Clear in Front of Pad for Switching

Grade Away 1% Slope

Old Way – Poured Foundation (slab) – Primary and Secondary Cables Have no Slack

Boom Truck Delivers Transformer, Lifts it onto Vault

Page 19: THREE PHASE PADMOUNTED TRANSFORMER … · Oil Tank, Windings, ... 5’ From Transformer to Building Wall ... Poured Foundation (slab) – Primary and Secondary Cables Have no
Page 20: THREE PHASE PADMOUNTED TRANSFORMER … · Oil Tank, Windings, ... 5’ From Transformer to Building Wall ... Poured Foundation (slab) – Primary and Secondary Cables Have no
Page 21: THREE PHASE PADMOUNTED TRANSFORMER … · Oil Tank, Windings, ... 5’ From Transformer to Building Wall ... Poured Foundation (slab) – Primary and Secondary Cables Have no

How is the Three-Phase Pad Mounted Transformer Installed?

Boom Truck

Can Deliver All Transformers

Line Truck

Delivers up to 500 kVA

Page 22: THREE PHASE PADMOUNTED TRANSFORMER … · Oil Tank, Windings, ... 5’ From Transformer to Building Wall ... Poured Foundation (slab) – Primary and Secondary Cables Have no

Who Wires the Three-Phase Pad Mounted Transformer?

LIPA Provides

Three Load Break Elbows (rated for 200 ampere)

Three Lightning Arrestor Elbows

With Three NEMA 2-Hole Lugs

One Hot Line Clamp

Bushings Come as a Pair With L/B Elbow and L/A Arrestor Elbow

Page 23: THREE PHASE PADMOUNTED TRANSFORMER … · Oil Tank, Windings, ... 5’ From Transformer to Building Wall ... Poured Foundation (slab) – Primary and Secondary Cables Have no

Radial Installation

Contractor Installs Primary and Secondary Cable

Contractor Wires L/B and L/A Elbows

Contractor Makes Secondary Connections

Contractor Wires All Grounding

Contractor Supplies Secondary Lugs, Static Drain Wires, Ground Rods, Ground Wire, and Grounding Split Bolts

CIPUD Installation

Contractor Supplies and Wires Secondary

LIPA Wires Primary & Grounding

Who Wires the Three-Phase Pad Mounted Transformer?

Page 24: THREE PHASE PADMOUNTED TRANSFORMER … · Oil Tank, Windings, ... 5’ From Transformer to Building Wall ... Poured Foundation (slab) – Primary and Secondary Cables Have no

Specification Package Details

Provides Information Common to All Jobs

Pad Specifications, Vault Details

Primary Side, Secondary Side

Contractor to Discuss Location Before Pad is Set

Knock Outs: 4” PVC Sleeve Flush With Wall, Concreted in Place

Duct Seal or Cap Unused Conduits

Galvanized Conduits Require Bonding

Protection From Traffic

Bollard 3.5” Heavy Steel Wall (minimum)

Concrete Filled

Must be Painted Yellow

Doors Must be Able to Open

Required on All Sides Subject to Vehicular Traffic

Page 25: THREE PHASE PADMOUNTED TRANSFORMER … · Oil Tank, Windings, ... 5’ From Transformer to Building Wall ... Poured Foundation (slab) – Primary and Secondary Cables Have no

Primary Cables

Phases Must be Identified (1, 2, 3 rings), on Both Extremities

15kV Tree-Retardant Cross-Linked Polyethylene for Aluminum (TR-XLPE)

Ethylene Propylene Rubber (EPR) for Copper

Semi-Con 12 Mil

Insulation 220 Mil, Insulation Shield 30 Mil Semi-Con

Jacket 50 Mil Semi-Con

Specification Package Details

Page 26: THREE PHASE PADMOUNTED TRANSFORMER … · Oil Tank, Windings, ... 5’ From Transformer to Building Wall ... Poured Foundation (slab) – Primary and Secondary Cables Have no

Secondary Services

480v - One Service

Exception: Fire Pumps

208v - Multiple Services

Services Must be LabeledCables

480v (must be installed in conduit)

USE-2, XHHW-2, or RHW-2

8 Sets Max

208v

USE-2, THW-2, THWN-2, XHHW-2, or RHW-2*

*With neoprene or hypalon jacket only

Specification Package Details

Page 27: THREE PHASE PADMOUNTED TRANSFORMER … · Oil Tank, Windings, ... 5’ From Transformer to Building Wall ... Poured Foundation (slab) – Primary and Secondary Cables Have no

Three-Phase Specification Letter

Gives Project Specific Details, Such as:

Reiterates Customer Load Letter

Designated Riser Pole, or Point of Termination

Describes Cable Ownership

Provides Costs, if Any

Inrush Information, Motor Starting Limitations

Restates Basic Installation Rules,

Call Before You Dig

Repeats Primary and Secondary Cable Specifications

Page 28: THREE PHASE PADMOUNTED TRANSFORMER … · Oil Tank, Windings, ... 5’ From Transformer to Building Wall ... Poured Foundation (slab) – Primary and Secondary Cables Have no

Miscellaneous

Provide Advance Notification of Projects

Access to an Energized Vault is Forbidden

Industrial Code Rules 753, and 57

These Requirements Conform to the NEC

Contractor to Comply With:

Applicable Codes

Three Phase Transformer Spec. Package

Redbook

Lists Distribution Design Representatives

www.lipower.org

Page 29: THREE PHASE PADMOUNTED TRANSFORMER … · Oil Tank, Windings, ... 5’ From Transformer to Building Wall ... Poured Foundation (slab) – Primary and Secondary Cables Have no

QUESTIONS

?