PD's
QUARTERS CHAPELENTRANCE
GATE
MOTOR
POOL
OUTPOST
FLAG POLE
SECURITY
OUTPOSTSECURITY
PARADE GROUND
GRANDSTAND
PPSC
BUILDING
RANGEFIRING
PCLO
PIAS
BPO
BUILDING
COVERED
BASKETBALL
COURT
PNCO
FUTURE
FUTURE
ON-BASE
HOUSING
FUTURE
ON-BASE
HOUSING
EXPANSION
FUTURE CONCESSIONAIRE
& OTHER FACILITIES
N
S
EW
GATE 2OUTPOSTSECURITY
PARKING
AREAPARKING
AREA
PARKING
AREAPARKING
PARKING
BARRACKS
WATER
RESERVOIR
LOCATION MAPSCALE 1:1000M
E X I S T I N G R O A D
SHEET NO.SUBMITTED BY: APPROVED BY:RECOMMEND APPROVAL:CHECKED BY:PREPARED BY:PROJECT TITLE:
LOCATION: LOCATION:
Republic of the PhilippinesNATIONAL POLICE COMMISSIONPHILIPPINE NATIONAL POLICE
Camp Quintin M Merecido, Davao City
Kidalapong, Malita, Davao Occidental
PROPOSED FIRING RANGE
ENGINEERING SERVICE
REGIONAL PROJECT MANAGEMENT UNIT 11
Director, ES
Police Chief SuperintendentPHILIP LAWRENCE S ABAPO, IIIPOLICE SENIOR INSPECTOR
ANTONIO A TAYLAN, JR
Asst. Chief, RPMU
MARIA DEOVINA G SEVILLANOPolice Chief Inspector
Acting Chief, RPMU
ABELARDO C MATILLANOPolice Senior Superintendent
Chief of Staff, ES
MANUEL G FABROSPolice Senior Superintendent
Deputy Director, ES
DAVAO OCCIDENTAL POLICE PROVINCIAL OFFICE
Acting Chief, ID, ES
HONORIO R AGNILAPolice Superintendent
A-1
THIS SITE
PERSPECTIVE VIEW No. 1SCALE NTS
C:\Users\RUS-CRD\Desktop\JAVA FILES\JV FILES '14\FIRING RANGE\PERSPECTIVE FINAL\CPO\CPO FIRING RANGE ARIAL VIEW REAR.jpg
SHEET NO.SUBMITTED BY: APPROVED BY:RECOMMEND APPROVAL:CHECKED BY:PREPARED BY:PROJECT TITLE:
LOCATION: LOCATION:
Republic of the PhilippinesNATIONAL POLICE COMMISSIONPHILIPPINE NATIONAL POLICE
Camp Quintin M Merecido, Davao City
Kidalapong, Malita, Davao Occidental
PROPOSED FIRING RANGE
ENGINEERING SERVICE
REGIONAL PROJECT MANAGEMENT UNIT 11
Director, ES
Police Chief SuperintendentPHILIP LAWRENCE S ABAPO, IIIPOLICE SENIOR INSPECTOR
ANTONIO A TAYLAN, JR
Asst. Chief, RPMU
MARIA DEOVINA G SEVILLANOPolice Chief Inspector
Acting Chief, RPMU
ABELARDO C MATILLANOPolice Senior Superintendent
Chief of Staff, ES
MANUEL G FABROSPolice Senior Superintendent
Deputy Director, ES
DAVAO OCCIDENTAL POLICE PROVINCIAL OFFICE
Acting Chief, ID, ES
HONORIO R AGNILAPolice Superintendent
A-2
PERSPECTIVE VIEW No. 2SCALE NTS
PERSPECTIVE VIEW No. 3SCALE NTS
ROOFLINE ABOVE
BAY 1 BAY 2 BAY 3 BAY 4 BAY 5
BULLET TRAP
D O W N R A N G E
B A C K S T O PSAND TRAP
P I S T O L F I R I N G R A N G E
BULLET TRAPBULLET TRAP
UPPER ROOF
@ 4.5O M. HIGH
LOWER ROOF
@ 3.5O M. HIGH
M CR F CR
UT
ILIT
Y
ROOFLINE ABOVE
BU
LLE
TIN
BO
AR
D
BAY 1 BAY 2 BAY 3 BAY 4 BAY 5
RECEIVING
OFFICE ARMORY
STORAGERANGE
OFFICERLECTURE
ROOM
SNACK
BAR
BULLET TRAP
D O W N R A N G E
SHOOTERS AREA
BENCHESBENCHES
SHOOTERS LOUNGE AREA
B A C K S T O PSAND TRAP
P I S T O L F I R I N G R A N G E
FLOOR PLAN1SCALE 1:150MTS
1 SEE BACKSTOP DETAIL
ALUM FRAMED CLEAR GLASS ALUM FRAMED CLEAR GLASS
BULLET TRAPBULLET TRAP
B-B
E
2
1
3
4
5
6
7
8
CBA D
B-B
E
2
1
3
4
5
6
7
8
CBA D
ROOF PLAN1SCALE 1:150MTS
A-AA-A
SHEET NO.SUBMITTED BY: APPROVED BY:RECOMMEND APPROVAL:CHECKED BY:PREPARED BY:PROJECT TITLE:
LOCATION: LOCATION:
Republic of the PhilippinesNATIONAL POLICE COMMISSIONPHILIPPINE NATIONAL POLICE
Camp Quintin M Merecido, Davao City
Kidalapong, Malita, Davao Occidental
PROPOSED FIRING RANGE
ENGINEERING SERVICE
REGIONAL PROJECT MANAGEMENT UNIT 11
Director, ES
Police Chief SuperintendentPHILIP LAWRENCE S ABAPO, IIIPOLICE SENIOR INSPECTOR
ANTONIO A TAYLAN, JR
Asst. Chief, RPMU
MARIA DEOVINA G SEVILLANOPolice Chief Inspector
Acting Chief, RPMU
ABELARDO C MATILLANOPolice Senior Superintendent
Chief of Staff, ES
MANUEL G FABROSPolice Senior Superintendent
Deputy Director, ES
DAVAO OCCIDENTAL POLICE PROVINCIAL OFFICE
Acting Chief, ID, ES
HONORIO R AGNILAPolice Superintendent
A-3
ECBA D
SECTION THRU "A-A"1SCALE 1:100MTS
5 6 7 84321
RANGE
OFFICER RECEIVING
SHOOTERS
LOUNGE
AREA OFFICESHOOTERS
AREA
TOP OF LOWER ROOF BEAM
TOP OF UPPER ROOF BEAM
TOP OF LOWER ROOF GIRTTOP OF UPPER ROOF BEAM
TOP OF LOWER ROOF GIRT
TOP OF UPPER ROOF GIRT
SECTION THRU "B-B"1SCALE 1:100MTS
SHOOTERS LOUNGE AREA
TOP OF UPPER ROOF BEAM
TOP OF LOWER ROOF GIRT
TOP OF UPPER ROOF BEAM
SHEET NO.SUBMITTED BY: APPROVED BY:RECOMMEND APPROVAL:CHECKED BY:PREPARED BY:PROJECT TITLE:
LOCATION: LOCATION:
Republic of the PhilippinesNATIONAL POLICE COMMISSIONPHILIPPINE NATIONAL POLICE
Camp Quintin M Merecido, Davao City
Kidalapong, Malita, Davao Occidental
PROPOSED FIRING RANGE
ENGINEERING SERVICE
REGIONAL PROJECT MANAGEMENT UNIT 11
Director, ES
Police Chief SuperintendentPHILIP LAWRENCE S ABAPO, IIIPOLICE SENIOR INSPECTOR
ANTONIO A TAYLAN, JR
Asst. Chief, RPMU
MARIA DEOVINA G SEVILLANOPolice Chief Inspector
Acting Chief, RPMU
ABELARDO C MATILLANOPolice Senior Superintendent
Chief of Staff, ES
MANUEL G FABROSPolice Senior Superintendent
Deputy Director, ES
DAVAO OCCIDENTAL POLICE PROVINCIAL OFFICE
Acting Chief, ID, ES
HONORIO R AGNILAPolice Superintendent
A-5
LEFT SIDE ELEVATION1SCALE 1:100MTS
5 6 7 84
FIREWALL
321 ECBA D
FRONT ELEVATION1SCALE 1:100MTS
5678 4
FIREWALL
RIGHT SIDE ELEVATION1SCALE 1:100MTS
3 2 1 ECBA D
REAR ELEVATION1SCALE 1:100MTS
FIREWALL
TOP OF UPPER ROOF BEAM
TOP OF LOWER ROOF GIRT
TOP OF UPPER ROOF GIRT
TOP OF LOWER ROOF BEAM
TOP OF UPPER ROOF BEAM
TOP OF LOWER ROOF GIRT
TOP OF LOWER ROOF BEAM
TOP OF UPPER ROOF BEAM
TOP OF LOWER ROOF GIRTTOP OF UPPER ROOF BEAM
TOP OF LOWER ROOF GIRT
TOP OF UPPER ROOF GIRT
SHEET NO.SUBMITTED BY: APPROVED BY:RECOMMEND APPROVAL:CHECKED BY:PREPARED BY:PROJECT TITLE:
LOCATION: LOCATION:
Republic of the PhilippinesNATIONAL POLICE COMMISSIONPHILIPPINE NATIONAL POLICE
Camp Quintin M Merecido, Davao City
Kidalapong, Malita, Davao Occidental
PROPOSED FIRING RANGE
ENGINEERING SERVICE
REGIONAL PROJECT MANAGEMENT UNIT 11
Director, ES
Police Chief SuperintendentPHILIP LAWRENCE S ABAPO, IIIPOLICE SENIOR INSPECTOR
ANTONIO A TAYLAN, JR
Asst. Chief, RPMU
MARIA DEOVINA G SEVILLANOPolice Chief Inspector
Acting Chief, RPMU
ABELARDO C MATILLANOPolice Senior Superintendent
Chief of Staff, ES
MANUEL G FABROSPolice Senior Superintendent
Deputy Director, ES
DAVAO OCCIDENTAL POLICE PROVINCIAL OFFICE
Acting Chief, ID, ES
HONORIO R AGNILAPolice Superintendent
A-4
PROFESSIONAL ELECTRICAL ENGINEER
REG NO: PTR NO: TIN:
ISS. AT: ISS. ON: TEL:
NOTE: Sign and Seal of Electrical plans is the sole authority of a PROFESSIONAL ELECTRICAL
ENGINEER
R.A. 7920 Section 31, 32 & 34. Field of Practice and Prohibition in the Practice of Electrical
Engineering and preparation of plans, supervision of installation, application of the Philippine
Electrical Code.
It shall be unlawful for any person not authorized under this Act to prepare plans,
electrical valuations or specifications for any electrical wiring, equipment or system; and no
installation thereof shall be undertaken unless the plans, designs, valuations and specifications
have been prepared by or under the responsible charge of, and signed and sealed by a
professional electrical engineer; and the construction permit for the execution thereof is first
secured; and unless the work is done in accordance with the Philippine Electrical Code and is
executed under the responsible charge or supervision of a PROFESSIONAL ELECTRICAL
ENGINEER or REGISTERED ELECTRICAL ENGINEER or Registered Master Electrician, as the
case may be, and the routinary fiscal and ministerial requirements of the government agency, if
any, exercising jurisdiction over the particular installation have been complied with.
GENERAL NOTES:
ALL ELECTRICAL WORKS HEREIN SHALL BE DONE IN ACCORDANCE WITH THE NATIONAL BUILDING CODE,
PROVISIONS OF THE LATEST APPROVED PHILIPPINE ELECTRICAL CODE, THE LAWS AND ORDINANCES OF
THE LOCAL CODE ENFORCING AUTHORITIES AND REQUIREMENTS OF THE LOCAL ELECTRIC, TELEPHONE
COMPANY AND BUILDING ADMINISTRATION REQUIREMENTS.
ALL WORKS SHALL BE DONE UNDER THE DIRECT SUPERVISION OF LICENSE DULY REGISTERED
ELECTRICAL ENGINEER OR REGISTERED MASTER ELECTRICIAN.
1. CONTRACTOR SHALL SECURE ALL WIRING PERMIT AND ALL FEES REQUIRED FOR THE WORKS AND
FURNISH THE OWNER THE CERTIFICATE OF FINAL ELECTRICAL INSPECTION,
2. CONTRACTOR SHALL CONDUCT EARTH GROUND TEST, WIRE INSULATION AND LOAD TEST UPON
COMPLETION OF WORKS,
3. INCASE OF DISCREPANCY BETWEEN PLANS AND SITE CONDITION, SPECIFICATIONS & REVISIONS
CHANGES, THE CONTRACTOR SHOULD IMMEDIATELY VERIFY & CONSULT TOWITH THE
OFFICER-IN-CHARGE OF THE CONSTRUCTION (OICC) OF THE PNP ENGINEERING SERVICE (PNPES),
4. ALL LOCATION & MOUNTING HEIGHT ARE SUBJECT TO APPROVAL OF THE OICC OF PNPES,
5. CONTRACTOR SHALL BE RESPONSIBLE IN THE PREPARATION OF AS-BUILT PLANS DULY SIGNED
AND SEALED BY PROFESSIONAL ELECTRICAL ENGINEER, AND ELECTRONIC AUTOCAD FILES,
6. FINAL LIGHTING FIXTURES AND WIRING DEVICES SHALL BE APPROVED BY PNPES,
OICCREPRESENTATIVEENGINEER,
7. CONTRACTOR SHALL BE RESPONSIBLE FOR PREPARATION OF SHOP OR CONSTRUCTION DRAWING
REQUIRED BY OICCOWNERARCHITECHENGINEER, THIS INCLUDES DEVICES AND FIXTURES
ELEVATION,
8. CONTRACTOR SHALL VISIT SITE CONDITION AND INCLUDE ALL COST NECESSARY TO COMPLETE
THE SYSTEM AT NO COST TO OWNER, INCLUDING COST OF CORING SERVICE AND EXPENSES FOR
THE RESTORATION OF ANY DAMAGE AFFECTED CIVIL STRUCTUTAL ARCHITECTURAL FINISHES OR
RELOCATION OF EXISTING FACILITIES ON BUILDING,
9. CONTRACTOR SHALL LOCATE ALL SPLICING BOXES TO ACCESSIBLE PLACE OR WITH ACCESS
PANELS,
10. NOMINATED CONTRACTOR TO VERIFY ALL EQUIPMENTS TO BE INSTALLED OR PLACE WITHIN THE
BUILDING SITE, AND MAKE AN ADJUSTMENT WITH THE PNPES OICCENGINEER ARCHITECT
CONSENT,
11. THIS DRAWINGS ARE DIAGRAMATIC LAYOUT ONLY, ANY MATERIALS AND FITTINGS NOT SHOWN ON
THIS PLANS BUT NEEDED TO COMPLETE THE SYSTEM AND OPERATION SHALL BE INCLUDED WITH
THE CONTRACTOR'S SCOPE OF WORKS.
12. ADDITIONAL NOTES:
· USE OF MICA SHALL BE LIMITED TO 150mm MAXIMUM· USE OF FLEXIBLE METALLIC & NON METALLIC CONDUTIT SHALL BE LIMITED TO 1m MAXIMUM· PROVIDE PROPER CONDUIT SUPPORT, G.I. WIRES AS SUPPORT SHALL NOT BE ALLOWED· PROVIDE DOUBLE COAT OF RUST PROTECTIVE PAINT (RED OXIDE PRIMER) ON HANGERS AND
SUPPORTS.
SPECIFICATIONS:1. POWER SUPPLY TO THE BUILDING SHALL BE 230V, SINGLE PHASE,
2-WIRES, 60HZ.
2. ALL MATERIALS TO BE USED SHALL BE NEW AND APPROVED TYPE FOR
PURPOSE & LOCATION.
3. NORMAL AND EMERGENCY CIRCUIT SHALL NOT BE COMBINED IN ONE
RACEWAY OR CONDUIT.
4. RECEPTACLES FOR GENERAL USE SHALL BE DUPLEX 16A, 250VAC,
GROUND TYPE.
5. ALL WIRES SHOULD HAVE A MAXIMUM LOAD OF 80 OF WIRE AMPACITY.
6. LIGHT SWITCHES MINIMUM RATING SHALL BE 16A 230VAC.
7. ALL MATERIALS TO BE USED SHALL BE BRAND NEW AND SHALL HAVE THE
"P.S." MARKS.
8. MOUNTING HEIGHTS SHALL BE AS FOLLOWS:
A. LIGHT SWITCHES - 1.37m above Floor finish
B. CONVENIENCE OUTLET - 0.3m above Floor finish
C. TELEPHONE OUTLET - 0.3m above Floor finish
D. PANEL BOARD - 1.8m ABOVE FLOOR FINISH
9. CONDUIT EMBEDED WITHIN CONCRETE WALL SHALL HAVE A MINIMUM
CEMENT PLASTERED OF 20mm THICK.
10. ALL CONDUIT PIPE ABOVE CEILING SHOULD HAVE INDEPENDENT
HANGER SUPPORTS.
11. ALL LIGHTING FIXTURES SHOULD HAVE INDEPENDENT HANGER
SUPPORTS.
12. ALL BOXES SHALL BE OCCUPIED ONLY OF 50 OF WIRE VOLUME.
13. VOLTAGE DROP SHALL BE LIMITED TO 2.5 FROM SOURCE TO PANEL
BOARD AS P.E.C. REQUIREMENT OR ACCEPTABLE TO THE LABORATORY
EQUIPMENT.
14. CIRCUIT BREAKERS SERVING MOTORS AND LIGHTING SHALL BE
INDUSTRIAL AND COMMERCIAL BOLT-ON TYPE RESPECTIVELY WITH
MINIMUM OF 6kAIC.
15. ALL WIRES AND CABLES SHALL BE BRAND NEW AND APPROVED TYPE.
16. USE SOLDERLESS CONNECTOR, MECHANICAL 1 PRESSURE TYPE COPPER
LUGS FOR CONNECTION OF WIRES LARGER THAN 8mm².
17. USE FILLER COMPOUND, "SCOTCH FILL" OR APPROVED EQUAL AT SHARP
EDGES TO PROVIDE SMOOTH SURFACE BEFORE TAPING WITH
ELECTRICAL TAPE.
LED EMERGENCY LIGHT
9W LED DOWNLIGHT
1-GANG OF 3-SINGLE POLE SWITCHESSabc
DP1 DP1-DISTRIBUTION PANEL 1
LEGEND & SYMBOLS
DUPLEX CONVENIENCE OUTLET WITH GROUND
CIRCUIT HOMERUN, A-ACU CIRCUIT HOMERUN,
L-LIGHTING CIRCUIT HOMERUN, C-CONVENIENCE
OUTLET CIRCUIT HOMERUN
1 x 18 LED TUBE, BOX TYPE
1-GANG OF 2-SINGLE POLE SWITCHESSab
2-WIRE SERVICE ENTRANCE
SWITCH CONDUIT RUN
LIGHTING CIRCUIT CONDUIT RUN
RECEPTACLE OUTLET CIRCUIT CONDUIT RUN
225 AT3PCIRCUIT BREAKER
11 x 18 LED TUBE, WITH WEATHER PROOF CASING
50W LED FLOOD LIGHT
TABLE OF CONTENTS
SHEET
NOSHEET CONTENTS
DRAWING
NO
E1 GENERAL NOTES & SPECIFICATIONS 1
LEGEND & SYMBOLS 2
LOCATION & SITE DEVELOPMENT PLAN 3
ORBIT FAN
CEILING MOUNTED EXHAUST FAN
OUTPOSTSECURITY
OUTPOSTSECURITY
PPSC
BUILDING
RANGEFIRING
COVERED
BASKETBALL
COURT
BARRACKS
FUTURE
ON-BASE
HOUSING
T-350kVA
L2, P7
P6
2 - 30mm² THHN/THWN Cu WireIN 32 mm dia PVC
SERVICE ENTRANCE POLE
4650mm High
SERVICE DROP WIRE
2-14mm² THW CU WIREwith Messenger
SHEET NO.SUBMITTED BY: APPROVED BY:RECOMMEND APPROVAL:CHECKED BY:PREPARED BY:PROJECT TITLE:
LOCATION: LOCATION:
Republic of the PhilippinesNATIONAL POLICE COMMISSIONPHILIPPINE NATIONAL POLICE
Camp Quintin M Merecido, Davao City
Kidalapong, Malita, Davao Occidental
PROPOSED FIRING RANGE
ENGINEERING SERVICE
REGIONAL PROJECT MANAGEMENT UNIT 11
Director, ES
Police Chief SuperintendentPHILIP LAWRENCE S ABAPO, IIIPOLICE SENIOR INSPECTOR
ANTONIO A TAYLAN, JR
Asst. Chief, RPMU
MARIA DEOVINA G SEVILLANOPolice Chief Inspector
Acting Chief, RPMU
ABELARDO C MATILLANOPolice Senior Superintendent
Chief of Staff, ES
MANUEL G FABROSPolice Senior Superintendent
Deputy Director, ES
DAVAO OCCIDENTAL POLICE PROVINCIAL OFFICE
Acting Chief, ID, ES
HONORIO R AGNILAPolice Superintendent
E-1
M CR F CR
UT
ILIT
Y
ROOFLINE ABOVE
BU
LLE
TIN
BO
AR
D
BAY
1
BAY
2
BAY
3
BAY
4
BAY
5
RECEIVING
OFFICE
ARMORY
STORAGE
RANGE
OFFICER
LECTURE
ROOM
SNACK
BAR
BULLET TRAP
D O W N R A N G E
SHOOTERS AREA
BENCHESBENCHES
SHOOTERS LOUNGE AREA
B A C K S T O PSAND TRAP
P I S T O L F I R I N G R A N G E
1 SEE BACKSTOP DETAIL
ALUM FRAMED CLEAR GLASS ALUM FRAMED CLEAR GLASS
BULLET TRAPBULLET TRAP
2
1
3
4
5
6
7
8
CKT
NO.
Panel Board: SCHEDULE OF LOADSOCPD
No. & Size of Wire
and Conduit
DESCRIPTION LO COSPO
GFCITotal Volts kVA Amps
AT, AF, POLE,
kAICWIRE mm²/ PVC mmØ
1 Lighting Outlet 25 25 230 2.50 10.87 15, 50, 2, 6 2-3.5 THHN 20
2 Lighting Outlet 24 24 230 2.40 10.43 15, 50, 2, 6 2-3.5 THHN 20
3 Lighting Outlet 10 10 230 1.00 4.35 15, 50, 2, 6 2-3.5 THHN 20
4 Convenience Outlet 7 0 7 230 1.26 5.48 20, 50, 2, 6 2-3.5 THHN 20
5 Convenience Outlet 10 0 10 230 1.80 7.83 20, 50, 2, 6 2-3.5 THHN 20
6 Convenience Outlet 9 0 9 230 1.62 7.04 20, 50, 2, 6 2-3.5 THHN 20
7 1.5HP WT ACU 1 1 230 2.30 10.00 20, 50, 2, 6 2-5.5 THHN 25
8 1HP WT ACU 1 1 230 1.38 6.00 20, 50, 2, 6 2-5.5 THHN 25
9 SPARE 0 0 230 1.84 8.00 20, 50, 2, 6 25
10 SPARE 0 0 230 1.84 8.00 20, 50, 2, 6 25
Sub-total 59 26 2 87 17.94 78.00
COMPUTATIONS OF LOADS: PANEL BOARD
Iw (Ampacity of Wire)= (Total current, It x Demand factor,df) + 25 of Largest motor
Iw (Wire ampacity) = 78.00 + 2.50 = 80.50 USE: 2 - 30 mm² THHN/THWN in 32 mm Ø RSC PIPEIcb (Main Over Current Protection Device)= Iw + Largest motor
Icb (Main OCPD) = 80.50 + 10.00 = 90.50 10 Branches Panel Board, 100AF with 100 AT Main CB, Bolt-on, Center Main, 2 Pole, 240V, 60Hz
with Grounding Lugs
1
3
2
SijSghSefScdSab
SF3Sab SefScd
Sa Sde
Sa
Sa
Sa
Sa
Sa
Sabc
Sa
SF2Sabc
a a a
a
a a
a
b d
c
c
d
e e
e e
f
a
a b c
b c
a
a
a c
a c
cbb
PROFESSIONAL ELECTRICAL ENGINEER
REG NO: PTR NO: TIN:
ISS. AT: ISS. ON: TEL:
NOTE: Sign and Seal of Electrical plans is the sole authority of a PROFESSIONAL ELECTRICAL
ENGINEER
R.A. 7920 Section 31, 32 & 34. Field of Practice and Prohibition in the Practice of Electrical
Engineering and preparation of plans, supervision of installation, application of the Philippine
Electrical Code.
It shall be unlawful for any person not authorized under this Act to prepare plans,
electrical valuations or specifications for any electrical wiring, equipment or system; and no
installation thereof shall be undertaken unless the plans, designs, valuations and specifications
have been prepared by or under the responsible charge of, and signed and sealed by a
professional electrical engineer; and the construction permit for the execution thereof is first
secured; and unless the work is done in accordance with the Philippine Electrical Code and is
executed under the responsible charge or supervision of a PROFESSIONAL ELECTRICAL
ENGINEER or REGISTERED ELECTRICAL ENGINEER or Registered Master Electrician, as the
case may be, and the routinary fiscal and ministerial requirements of the government agency, if
any, exercising jurisdiction over the particular installation have been complied with.
SF2
Sb
a
a
b
FLOOR PLAN1SCALE 1:100MTS
LIGHTING LAYOUT
TABLE OF CONTENTS
SHEET
NOSHEET CONTENTS
DRAWING
NO
E1 LIGHTING LAYOUT 1
SCHEDULE OF LOAD & COMPUTATIONS 2
SHEET NO.SUBMITTED BY: APPROVED BY:RECOMMEND APPROVAL:CHECKED BY:PREPARED BY:PROJECT TITLE:
LOCATION: LOCATION:
Republic of the PhilippinesNATIONAL POLICE COMMISSIONPHILIPPINE NATIONAL POLICE
Camp Quintin M Merecido, Davao City
Kidalapong, Malita, Davao Occidental
PROPOSED FIRING RANGE
ENGINEERING SERVICE
REGIONAL PROJECT MANAGEMENT UNIT 11
Director, ES
Police Chief SuperintendentPHILIP LAWRENCE S ABAPO, IIIPOLICE SENIOR INSPECTOR
ANTONIO A TAYLAN, JR
Asst. Chief, RPMU
MARIA DEOVINA G SEVILLANOPolice Chief Inspector
Acting Chief, RPMU
ABELARDO C MATILLANOPolice Senior Superintendent
Chief of Staff, ES
MANUEL G FABROSPolice Senior Superintendent
Deputy Director, ES
DAVAO OCCIDENTAL POLICE PROVINCIAL OFFICE
Acting Chief, ID, ES
HONORIO R AGNILAPolice Superintendent
E-2
PROFESSIONAL ELECTRICAL ENGINEER
REG NO: PTR NO: TIN:
ISS. AT: ISS. ON: TEL:
NOTE: Sign and Seal of Electrical plans is the sole authority of a PROFESSIONAL ELECTRICAL
ENGINEER
R.A. 7920 Section 31, 32 & 34. Field of Practice and Prohibition in the Practice of Electrical
Engineering and preparation of plans, supervision of installation, application of the Philippine
Electrical Code.
It shall be unlawful for any person not authorized under this Act to prepare plans,
electrical valuations or specifications for any electrical wiring, equipment or system; and no
installation thereof shall be undertaken unless the plans, designs, valuations and specifications
have been prepared by or under the responsible charge of, and signed and sealed by a
professional electrical engineer; and the construction permit for the execution thereof is first
secured; and unless the work is done in accordance with the Philippine Electrical Code and is
executed under the responsible charge or supervision of a PROFESSIONAL ELECTRICAL
ENGINEER or REGISTERED ELECTRICAL ENGINEER or Registered Master Electrician, as the
case may be, and the routinary fiscal and ministerial requirements of the government agency, if
any, exercising jurisdiction over the particular installation have been complied with.
FLOOR PLAN1SCALE 1:100MTS
SERVICE ENTRANCE
2-WIRE, SINGLE PHASE
kWhr METER
CLASS 1002-30mm² THW Cu Wirein 32mm Ø PVC Pipe
1
3
5
2
4
6
LIGHTING OUTLET
RECEPTACLE OUTLET
LIGHTING OUTLET
RECEPTACLE OUTLET
PANELBOARD
1HP WT ACU
SINGLE LINE DIAGRAM
M
MAIN SERVICE EQUIPMENT
100AT in NEMA 3R Enclosures
(OPTIONAL, FOR MORE THAN 30m ONLY)
2-30mm² THW Cu Wirein 32mm Ø RSC Pipe
SERVICE ENTRANCE POLE
4650mm High
SERVICE ENTRANCE
SINGLE PHASE, 240VAC, 60Hz
2 - 14 mm² THHN/THWN Cu Wirewith Messenger
DRIP LOOP
at least 1500
58" Ø EYEBOLT
GALVANIZED with SPOOL INSULATOR
KWHR METER
USE SOLDERLESS
CONNECTORS
DP100 AT
32 mm Ø RSC with clamps2-30mm² THHN Cu Wire
DETAIL OF SERVICE ENTRANCE
N. G. L.
SERVICE POLE DETAILNOT TO SCALE
TOP
STEEL BARS
STIRRUPS
4 STEEL BARS
BOTHWAYS
NOTE: COORDINATE TO THE
STRUCTURAL ENGINEER FOR
THE SIZE OF STEEL BARS
NGL
2 - 14mm² THHN/THWN Cu Wirewith Messenger SERVICE DROP LINE
2 - 30mm² THHN/THWN Cu Wirein 32 mm dia PVC
100 AT2P
7 8
M CR F CR
UT
ILIT
Y
ROOFLINE ABOVE
BU
LLE
TIN
BO
AR
D
BAY
1
BAY
2
BAY
3
BAY
4
BAY
5
RECEIVING
OFFICE
ARMORY
STORAGE
RANGE
OFFICER
LECTURE
ROOM
SNACK
BAR
BULLET TRAP
D O W N R A N G E
SHOOTERS AREA
BENCHESBENCHES
SHOOTERS LOUNGE AREA
B A C K S T O PSAND TRAP
P I S T O L F I R I N G R A N G E
1 SEE BACKSTOP DETAIL
ALUM FRAMED CLEAR GLASS ALUM FRAMED CLEAR GLASS
BULLET TRAPBULLET TRAP
2
1
3
4
5
6
7
8
7
3
4
5
6
9 10SPARE SPARE
LIGHTING OUTLET
1.5HP WT ACU
RECEPTACLE OUTLET
15 AT2P
15 AT2P
20 AT2P
20 AT2P
20 AT2P
15 AT2P
20 AT2P
20 AT2P
20 AT2P
20 AT2P
POWER LAYOUT
TABLE OF CONTENTS
SHEET
NOSHEET CONTENTS
DRAWING
NO
E3 POWER LAYOUT 1
SINGLE LINE DIAGRAM 2
DETAIL OF SERVICE ENTRANCE 3
SERVICE ENTRANCE POLE
4650mm High
2 - 30mm² THHN/THWN Cu WireIN 32 mm dia PVC
SHEET NO.SUBMITTED BY: APPROVED BY:RECOMMEND APPROVAL:CHECKED BY:PREPARED BY:PROJECT TITLE:
LOCATION: LOCATION:
Republic of the PhilippinesNATIONAL POLICE COMMISSIONPHILIPPINE NATIONAL POLICE
Camp Quintin M Merecido, Davao City
Kidalapong, Malita, Davao Occidental
PROPOSED FIRING RANGE
ENGINEERING SERVICE
REGIONAL PROJECT MANAGEMENT UNIT 11
Director, ES
Police Chief SuperintendentPHILIP LAWRENCE S ABAPO, IIIPOLICE SENIOR INSPECTOR
ANTONIO A TAYLAN, JR
Asst. Chief, RPMU
MARIA DEOVINA G SEVILLANOPolice Chief Inspector
Acting Chief, RPMU
ABELARDO C MATILLANOPolice Senior Superintendent
Chief of Staff, ES
MANUEL G FABROSPolice Senior Superintendent
Deputy Director, ES
DAVAO OCCIDENTAL POLICE PROVINCIAL OFFICE
Acting Chief, ID, ES
HONORIO R AGNILAPolice Superintendent
E-3
ALL PLUMBING WORKS SHALL BE DONE IN ACCORDANCE W THE LATEST PROVISIONS
ALL VERT SOIL & WASTE STACK PIPE SHALL BE EXTEND FULL SIZE ABOVE ROOF LINE
PROVIDE 50MM Ø P-TRAP FOR EVERY 100M M Ø X 100MM Ø FLR DRAIN
PROVIDE CLEANOUT FOR EVERY FIFTEEN METERS ( 15.00 M ) DISTANCE
ALL CHANGES IN PIPE SIZES ON SOIL WASTE LINE SHALL BE MADE W THE REDUCING
OF THE NATIONAL PLUMBING CODE
AS VENTS EXCEPT OTHERWISE SPECIFICALLY INDICATED
FITTINGS OR RECESS REDUCERS
HORIZONTAL LINE
PROVIDE STOP-COCK FOR EVERY FIXTURES
12
0m
m
LIFTING COVER
R.C. COVER W STL
STORM DRAINAGE
PIPE LINE
4-12Ø MM
10 MM O BARSCHB WALL W
BARS BOTHWAYS
10 MM THK
DRAIN LINE
PLASTERED FIN.
LIFTING COVER
R.C. COVER W STL
SECTION
CO CLEAN-OUT
FD FLOOR DRAIN
SHO SHOWER
CV CHECK VALVE
GV GATE VALVE
VSTR VENT STACK THRU ROOF
M WATER METERLAV LAVATORY
WC WATER CLOSET
SV SEPTIC VAULT
URI URINAL
DS DOWNSPOUT
PVC POLYVINYL CHLORIDE
DRAINAGE PIPE LINE
LAV LAVATORY
WC WATER CLOSET
UR URINAL
COLD WATER LINEP L A N
NOTE:
VERIFY SIZE OF SEPTIC TANK TO LOCATION
.40 X .40
6" CHB
MANHOLE
4" CHB
6" CHB
12MM BARSSPACED @ .20M
O.C BW
S E C T I O N
AIR SPACEWATER LEVEL
CHAMBERDIGESTIVE
.40M
WF1
12 LIFT BAR
AIR SPACEWATER LEVEL
CHAMBERLEACHING
CHAMBERLEACHING
21
12MM BARSSPACED @ .20M
O.C BW
4" CHB6" CHB
TO
MA
IN
SE
WE
R L
INE
OU
TL
ET
PIP
E
TO
SE
PT
IC V
AU
LT
INL
ET
PIP
E
TO MAIN SEWER LINEOUTLET PIPE
TO
SEPTIC VAULTINLET PIPE
FAU FAUCET
PLAN
WATER LEVELAIR SPACE
SOIL PIPE LINE
CB CATCH BASIN
VENT PIPE LINE
PPR POLYPROPYLENE RANDOM
NOT TO SCALE
1
P1 NOT TO SCALE
1
P2
SHEET NO.SUBMITTED BY: APPROVED BY:RECOMMEND APPROVAL:CHECKED BY:PREPARED BY:PROJECT TITLE:
LOCATION: LOCATION:
Republic of the PhilippinesNATIONAL POLICE COMMISSIONPHILIPPINE NATIONAL POLICE
Camp Quintin M Merecido, Davao City
Kidalapong, Malita, Davao Occidental
PROPOSED FIRING RANGE
ENGINEERING SERVICE
REGIONAL PROJECT MANAGEMENT UNIT 11
Director, ES
Police Chief SuperintendentPHILIP LAWRENCE S ABAPO, IIIPOLICE SENIOR INSPECTOR
ANTONIO A TAYLAN, JR
Asst. Chief, RPMU
MARIA DEOVINA G SEVILLANOPolice Chief Inspector
Acting Chief, RPMU
ABELARDO C MATILLANOPolice Senior Superintendent
Chief of Staff, ES
MANUEL G FABROSPolice Senior Superintendent
Deputy Director, ES
DAVAO OCCIDENTAL POLICE PROVINCIAL OFFICE
Acting Chief, ID, ES
HONORIO R AGNILAPolice Superintendent
P-1
BULLET TRAP
D O W N R A N G E
B A C K S T O PSAND TRAP
SANITARY LINES LAYOUT1SCALE 1:100MTS
1 SEE BACKSTOP DETAIL
BULLET TRAPBULLET TRAP
E
2
1
3
4
5
6
7
8
CBA D
CO
VTRLAV
LAVFDFD
WCWC
UR
BULLET TRAP
D O W N R A N G E
B A C K S T O PSAND TRAP
WATER LINES LAYOUT1SCALE 1:100MTS
1 SEE BACKSTOP DETAIL
BULLET TRAPBULLET TRAP
E
2
1
3
4
5
6
7
8
CBA D
WM
CV
GV
FAUFAU
LAVLAV
WC WC
UR
SHEET NO.SUBMITTED BY: APPROVED BY:RECOMMEND APPROVAL:CHECKED BY:PREPARED BY:PROJECT TITLE:
LOCATION: LOCATION:
Republic of the PhilippinesNATIONAL POLICE COMMISSIONPHILIPPINE NATIONAL POLICE
Camp Quintin M Merecido, Davao City
Kidalapong, Malita, Davao Occidental
PROPOSED FIRING RANGE
ENGINEERING SERVICE
REGIONAL PROJECT MANAGEMENT UNIT 11
Director, ES
Police Chief SuperintendentPHILIP LAWRENCE S ABAPO, IIIPOLICE SENIOR INSPECTOR
ANTONIO A TAYLAN, JR
Asst. Chief, RPMU
MARIA DEOVINA G SEVILLANOPolice Chief Inspector
Acting Chief, RPMU
ABELARDO C MATILLANOPolice Senior Superintendent
Chief of Staff, ES
MANUEL G FABROSPolice Senior Superintendent
Deputy Director, ES
DAVAO OCCIDENTAL POLICE PROVINCIAL OFFICE
Acting Chief, ID, ES
HONORIO R AGNILAPolice Superintendent
P-2
FO
UN
DA
TIO
N P
LAN
1S
CA
LE1:
100M
TS
E
21 3 4 5 6 7 8
CB
AD
C1F
1C
1F
1
C1F
1C
1F
1
C1F
1C
1F
1
C1F
2C
1F
2
C1F
3
C1F3
C1F
3
P1F3
SC
HE
DU
LE
OF
FO
OT
ING
S
P1F
2P
1F
2
P1F3P1F2P1F
3P
1F
3
P2F
4P
2F
4P
2F
4P
2F
4
P1F3P1F3P1F2 C1F3
C1F3C1F3
WF
1
WF
2
WF
1
WF1
WF1
WF
1
WF1
WF
1W
F1
WF
1
WF1WF1WF1WF1WF1
WF1WF1WF1WF1WF1WF1
WF
1W
F1
WF
1
WF
2W
F2
WF
2
WF
2W
F2
WF
2W
F2
NA
TU
RA
L
GR
AD
E L
INE
10Ø
@ 3
00
600 E
AC
H W
AY
WAL
L W
/ 10Ø
@150 T
HK
. C
HB
(TY
PIC
AL)
3-10
Ø
750 (MIN.)
200
400
150
10Ø
@ 3
00
3-10
Ø
10Ø
@ 3
00E
AC
H W
AY
100 T
HK
. S
LA
BO
N G
RA
DE
W
600 E
AC
H W
AY
(TY
PIC
AL)
WAL
L W
/ 10Ø
@100 T
HK
. C
HB
300
100
100
100
100
300
WF-
2 D
ETA
IL
WF-
1 D
ETA
IL
100
L
FOO
TIN
GS
& C
OLU
MN
S
L
Tariable
CO
LUM
N F
OO
TIN
G1
SC
ALE
NT
S
PLA
N
SEC
TIO
N
WA
LL F
OO
TIN
G D
ET
AIL
S1
SC
ALE
NT
S
CO
LUM
N P
LAN
SHEET NO.SUBMITTED BY: APPROVED BY:RECOMMEND APPROVAL:CHECKED BY:PREPARED BY:PROJECT TITLE:
LOCATION: LOCATION:
Republic of the PhilippinesNATIONAL POLICE COMMISSIONPHILIPPINE NATIONAL POLICE
Camp Quintin M Merecido, Davao City
Kidalapong, Malita, Davao Occidental
PROPOSED FIRING RANGE
ENGINEERING SERVICE
REGIONAL PROJECT MANAGEMENT UNIT 11
Director, ES
Police Chief SuperintendentPHILIP LAWRENCE S ABAPO, IIIPOLICE SENIOR INSPECTOR
ANTONIO A TAYLAN, JR
Asst. Chief, RPMU
MARIA DEOVINA G SEVILLANOPolice Chief Inspector
Acting Chief, RPMU
ABELARDO C MATILLANOPolice Senior Superintendent
Chief of Staff, ES
MANUEL G FABROSPolice Senior Superintendent
Deputy Director, ES
DAVAO OCCIDENTAL POLICE PROVINCIAL OFFICE
Acting Chief, ID, ES
HONORIO R AGNILAPolice Superintendent
S-1
RO
OF
FR
AM
ING
PLA
N1
SC
ALE
1:10
0MT
S
E
21 3 4 5 6 7 8
CB
AD
R A F T E R - 2
R A F T E R - 2
R A F T E R - 2
R A F T E R - 2
R A F T E R - 1
R A F T E R - 1
12MM Ø SAG ROD
12MM Ø SAG ROD
12MM Ø SAG ROD
LINTEL BEAM 1
RO
OF
BE
AM
-1
RO
OF
BE
AM
-1
RO
OF
BE
AM
-1
RO
OF
BE
AM
-1
LINTEL BEAM 2
RO
OF
BE
AM
-2
RO
OF
BE
AM
-2
RO
OF
BE
AM
-2
RO
OF
GIR
T -
1
RO
OF
GIR
T-2
RO
OF
GIR
T-2
R A F T E R-3
R A F T E R-3
R A F T E R-3
R A F T E R-3
R A F T E R-3
R A F T E R-3
12MM Ø SAG ROD
12MM Ø SAG ROD
R A F T E R - 1
LINTEL BEAM 2
LINTEL BEAM 2 LINTEL BEAM 2
RO
OF
GIR
T -
1R
OO
F G
IRT
- 1
LINTEL BEAM 1
SC
HE
DU
LE O
F B
EA
MS
SHEET NO.SUBMITTED BY: APPROVED BY:RECOMMEND APPROVAL:CHECKED BY:PREPARED BY:PROJECT TITLE:
LOCATION: LOCATION:
Republic of the PhilippinesNATIONAL POLICE COMMISSIONPHILIPPINE NATIONAL POLICE
Camp Quintin M Merecido, Davao City
Kidalapong, Malita, Davao Occidental
PROPOSED FIRING RANGE
ENGINEERING SERVICE
REGIONAL PROJECT MANAGEMENT UNIT 11
Director, ES
Police Chief SuperintendentPHILIP LAWRENCE S ABAPO, IIIPOLICE SENIOR INSPECTOR
ANTONIO A TAYLAN, JR
Asst. Chief, RPMU
MARIA DEOVINA G SEVILLANOPolice Chief Inspector
Acting Chief, RPMU
ABELARDO C MATILLANOPolice Senior Superintendent
Chief of Staff, ES
MANUEL G FABROSPolice Senior Superintendent
Deputy Director, ES
DAVAO OCCIDENTAL POLICE PROVINCIAL OFFICE
Acting Chief, ID, ES
HONORIO R AGNILAPolice Superintendent
S-2
6MM X 100MM
W - FLANGE GIRT
G.I. LONG SPAN ROOF SHEETS
2" X 3" C-PURLINS
6MM X 100MM W FLANGE RAFTER
10MM Ø SAG ROD
2" X 6" C-PURLINS
8MM X 150MM W-FLANGE (RAFTER)
G.I. LONG SPAN ROOF SHEETS
G.I. LONG SPAN ROOF SHEETS
2" X 4" C-PURLINS
8MM X 200MM W-FLANGE (RAFTER)
10MM Ø SAG ROD
5 6 7 8
DETAILED SECTION OF ROOF1SCALE 1:30MTS
8MM X 250MM
W-FLANGE
(ROOF GIRT)
L I N T E L B E A M - 2 L I N T E L B E A M - 2
L I N T E L B E A M - 1
5-20MMØ TOP BARS
2-20MMØ BOT BARS
12MMØ STIFFENER BARS
2-20MMØ TOP BARS
5-20MMØ BOT BARS
12MMØ STIFFENER BARS
3-16MMØ TOP BARS
2-16MMØ BOT BARS
12MMØ STIFFENER BARS
2-16MMØ TOP BARS
3-16MMØ BOT BARS
12MMØ STIFFENER BARS
4-16MMØ TOP BARS
2-16MMØ BOT BARS
2-16MMØ TOP BARS
4-16MMØ BOT BARS
3-16MMØ TOP BARS
2-16MMØ BOT BARS
2-16MMØ TOP BARS
3-16MMØ BOT BARS
ROOF BEAM -1
@ SUPPORT @ MIDSPAN
@ SUPPORT @ SUPPORT
@ SUPPORT @ MIDSPAN
@ MIDSPAN @ MIDSPAN
ROOF BEAM -2
ROOF BEAM -3
ROOF BEAM -4
DETAIL OF BEAMS SCALE 1:20MTS
4" Ø SCHEDULE 40G.I. PIPE POST
ROOF BEAM - 2
ROOF BEAM - 1
ROOF BEAM - 1
SHEET NO.SUBMITTED BY: APPROVED BY:RECOMMEND APPROVAL:CHECKED BY:PREPARED BY:PROJECT TITLE:
LOCATION: LOCATION:
Republic of the PhilippinesNATIONAL POLICE COMMISSIONPHILIPPINE NATIONAL POLICE
Camp Quintin M Merecido, Davao City
Kidalapong, Malita, Davao Occidental
PROPOSED FIRING RANGE
ENGINEERING SERVICE
REGIONAL PROJECT MANAGEMENT UNIT 11
Director, ES
Police Chief SuperintendentPHILIP LAWRENCE S ABAPO, IIIPOLICE SENIOR INSPECTOR
ANTONIO A TAYLAN, JR
Asst. Chief, RPMU
MARIA DEOVINA G SEVILLANOPolice Chief Inspector
Acting Chief, RPMU
ABELARDO C MATILLANOPolice Senior Superintendent
Chief of Staff, ES
MANUEL G FABROSPolice Senior Superintendent
Deputy Director, ES
DAVAO OCCIDENTAL POLICE PROVINCIAL OFFICE
Acting Chief, ID, ES
HONORIO R AGNILAPolice Superintendent
S-3